Beruflich Dokumente
Kultur Dokumente
Check List:
Site ID Picture
Far V
BTS Picture
Tow
Waterproofing of Antenn
N/A
8. MW Dish/ODU Pics
ODU/Dish Pictures
8. Aircon Pictures
N/A
N/A
re
re
Picture
Far View of
r Picture
Rectifier Picture
Battery Bank
Rectifier Picture
Battery Bank
enna
N/A
tenna
N/A
N/A
ODU/Dish Pictures
ODU/Dish Pictu
Groundings Pictures
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Board Status
Board Status
VSWR
Alarms Reported
MW Check List:
1.
2.
3.
4.
Board Status
Vlan Status
hot
Board Status
Vlan Status
Freq Status
MW Alarms
MW Alarms ScreenShot
NA
q Status
creenShot
Alarms
creenShot
SNAG List
1. Do Mention Snags with Pictures
Snag#04:
Snag#04: Alarms looped from power side include door and power
Snag#05
Site ID:
Z70003
Date: 16/05/2016
Engineer
Frequency
Vendor's
Recommend.
Frequency
STC
Network Element
NOC
Center
BTS 3900
MNOC
Quarterly
Quarterly
BTS 3900
MNOC
Quarterly
Quarterly
Quarterly
Quarterly
Maintenance Task
BTS 3900
MNOC
Check whether the daily lighting and emergency lighting systems are
operational.
BTS 3900
MNOC
Quarterly
Quarterly
BTS 3900
MNOC
Quarterly
Quarterly
BTS 3900
MNOC
Check whether the cabinet, device case, inside of the device, desktop,
floor, door, and window are clean.
Quarterly
Quarterly
BTS 3900
MNOC
Quarterly
Quarterly
BTS 3900
MNOC
Quarterly
Quarterly
BTS 3900
MNOC
Check whether the PGND cables and grounding bars are connected
properly.
Quarterly
Quarterly
10
BTS 3900
MNOC
Quarterly
Quarterly
11
BTS 3900
MNOC
Quarterly
Quarterly
12
BTS 3900
MNOC
Quarterly
Quarterly
Quarterly
Quarterly
13
BTS 3900
MNOC
Check whether the appearance of the cabinet is impaired and the mark
of the cabinet is legible.
14
BTS 3900
MNOC
Check whether the lock works properly and the door can be opened and
closed freely.
Quarterly
Quarterly
15
BTS 3900
MNOC
Quarterly
Quarterly
16
BTS 3900
MNOC
Quarterly
Quarterly
17
BTS 3900
MNOC
Quarterly
Quarterly
18
BTS 3900
MNOC
Quarterly
Quarterly
19
BTS 3900
MNOC
Quarterly
Quarterly
20
BTS 3900
MNOC
Quarterly
Quarterly
21
BTS 3900
MNOC
Check Labels
Quarterly
Quarterly
22
BTS 3900
MNOC
Quarterly
Quarterly
23
BTS 3900
MNOC
Quarterly
Quarterly
Quarterly
Quarterly
25
BTS 3900
MNOC
26
BTS 3900
MNOC
Quarterly
Quarterly
27
BTS 3900
MNOC
Quarterly
Quarterly
28
BTS 3900
MNOC
Quarterly
Quarterly
29
BTS 3900
MNOC
Quarterly
Quarterly
30
BTS 3900
MNOC
Check MW NE visibility.
Quarterly
Quarterly
31
BTS 3900
MNOC
Quarterly
Quarterly
32
BTS 3900
MNOC
Quarterly
Quarterly
33
BTS 3900
MNOC
Quarterly
Quarterly
34
BTS 3900
MNOC
Quarterly
Quarterly
35
BTS 3900
MNOC
Quarterly
Quarterly
36
BTS 3900
MNOC
MW Tx Power
Quarterly
Quarterly
37
BTS 3900
MNOC
MW Alarms
Quarterly
Quarterly
38
BTS 3900
MNOC
Quarterly
Quarterly
39
BTS 3900
MNOC
Quarterly
Quarterly
40
BTS 3900
MNOC
Quarterly
Quarterly
41
BTS 3900
MNOC
Quarterly
Quarterly
42
BTS 3900
MNOC
Quarterly
Quarterly
43
BTS 3900
MNOC
Quarterly
Quarterly
44
BTS 3900
MNOC
Quarterly
Quarterly
45
BTS 3900
MNOC
Quarterly
Quarterly
46
BTS 3900
MNOC
Quarterly
Quarterly
47
BTS 3900
MNOC
Quarterly
Quarterly
Note:-
Iftikhar Ahmed
Required Result
TT No.
Time
On Site or Remote
Test
(minutes)
Comments
5C to 45C
OnSite
22 C
5% RH to 85% RH
OnSite
54%
make sure it is OK
OnSite
N/A
make
sure its
working
normally. or dry powder fire
The carbon
dioxide
extinguisher
extinguisheris installed in the
equipment room. In addition, the pressure and period of
validity of the extinguisher meet the requirement. No rat, ant,
or insect exists in the equipment room.
All the devices in the equipment room are neat and clean.
OnSite
ok
OnSite
ok
OnSite
10
OK
OnSite
10
OK
OnSite
10
54v
OnSite
10
OnSite
10
N/A
OnSite
OK
OnSite
OK
OnSite
OK
OnSite
OK
OnSite
10
OK
OK or Not OK.
OnSite
10
OK
OnSite
10
OK
OnSite
10
OK
OnSite
10
OK
OnSite
10
OK
OnSite
10
OK
OnSite
10
OK
OnSite
OK
Onsite
20
MW on NEC
Onsite
10
68.4dbm
Onsite
15
MW on NEC
Onsite
10
OK
Onsite
10
OK
MW NE Should be Visible.
Onsite
MW on NEC
Onsite
OK
Onsite
10
OK
Working OK
On site
MW on NEC
Working OK
On site
MW on NEC
Working OK
On site
MW on NEC
Working OK
On site
MW on NEC
Working OK
On site
MW on NEC
Working OK
On site
ok
Working OK
On site
ok
Working OK
On site
not working
Working OK
On site
ok
Working OK
On site
NA
Working OK
On site
ok
Working OK
On site
ok
Working OK
On site
NA
Working OK
On site
OK
Working OK
On site
OK
PMR MASTERSHEET
PMR CYCLE
SR #
May-16
Iftikhar Ahmed
MC
Date
Qwayiyah 16-May-16
Time
4:15
SITE INFORMATION
Site NamLat
Z70003
Long
23.51069N46.06233E Single
GF
Yes
3G
LTE - 180
No
No
STATUS
LTE - 230
No
RBS
RBS TYPE
2G - 900 2G - 180 3G
Complete 3012
None
No
2G
E1 / IP4G - 230 4G - 180
RAN
None
None
E1
3G
ATM /
IP-RAN
No
External
Internal External
Visual
Alarms
Alarms Alarms
Inspecti
Configur
Active Active
on
ation
No
No
Yes
Ok
Number
RBS
of
Roxtec
Filter
Rectifire Staus
Change
Medule
No Need t1
Sealed
ANTENNA
SYSTEM
Jumper
VSWR
Cable/C
check
Feeder
onnecto
through Type
rs/Outd
OMT
oor
Ok
ok
LDF-5
TRANSMISSION
Feeder Antenna
Labellin TX Type TX Type
Length Blockag
g
2G
3G
(Meters) e
75M
No
Ok
E1
No
SSION
TN
Staus
TX Type
Current Desired Far End
TX Type ( ON,OF Link Configuration
LTE
RSL
RSL
Site
F,Disma
ntled)
None
NEC
ON
1+1
68.4
ZRSA972
ELECTROMECHANICAL
Need
Visibilit
Power
Alignme y in
Type
nt
SOM
YES
Total
Rectifier No of
Actual
Rectifier
Type
Rectifier
Load
Load
No
NA
Battery
Backup
Stolen
External
Rest of
Battery
A/C
Tube
Door
Groundi
Alarm
Other
Installat
Working light
Alarm
ng Bar
Define
External
ion Date
Properly Working
Status
in 2G,3G
Alarms
No
No
YES
Yes
2G
NOT WorkiWorking
Fence/S
helter
Damage
d
No
Site Information
Owner,
TT
Shelter Lock
Fence Pad Lock
Shelter
Security
opened
Site
Cleanlin
,
Combin
Combin
Location
for EM Status
Status
ess
Watchm
ation
ation
Team
an etc
Gate
Clean
No
YES
No
No
No
open
DISMANTLED HARDWARE
Unused / Dismantled HW inside
Crane
shelter
Require
Status 2G HW 3G HW MW HW
d
Not Available
No
Indoor
and out
Remark
door
s
busbar
missing,
Tower
groundin
g
missing.
Battery
Stolen