ITEM DESIGNAO UN QUANT. VALOR VALOR TOTAL

CAR PARK
OBRIGADO BARAK

1. PRELIMINARIES 750.00

1. 1. Mobilization contractor's plant and equipment gv 1.00 750.00 750.00

2. ASPHALT PAVEMENT 51,800.00

2. 1. Supply and place asphalt pavement according to


drawings, including ground preparation, compacted sub
base course, compacted base course, hot mix asphalt
and all necessary works. sqm 1,480.00 35.00 51,800.00

2. 2. Supply and apply external paint for asphalt for car parking
markings with white lines, with 100mm width, according to
drawings. lm 305.00

2. 3. Supply and apply external paint for asphalt for crosswalk


markings with white lines, according to drawings.
sqm 5.40

3. GRASS BLOCK PAVEMENT .00

3. 1. Supply and place grass block pavement according to


drawings, including ground excavation, ground
preparation, compacted 200mm sub base course,
compacted 100mm vegetable soil course, place grass
and all necessary works. sqm 606.00

4. DRAINS .00

4. 1. Supply and install PVC pipe for storm water, including


trench excavations, supply and place sand and alert tape,
fill back and compact ground and remove from site
surplus ground, including all necessary works:

4. 1. 1. Diameter 100 lm 66.00


4. 1. 2. Diameter 100 (perforated for car wash) lm 32.00
4. 1. 3. Diameter 150 lm 274.00

4. 2. Supply and place chamber box in block, including


excavation, compact ground, plaster with mortar with
trace 1PC:3SAND, fondled, including all necessary
works, with depth according to pipe inclination of 0.5%,
starting with 400mm and with dimensions:

4. 2. 1. 500x500mm. un 4.00

R PARKING
RIGADO BARAK Page. 1/2
ARQUITECTURA UnitedNationsDevelopmentProgramme
ENGENHARIA
FISCALIZAO

RIBEIRA DE COMORO - DLI - TIMORL-ESTE


CONTACTOS:+670 725 6341 / luiscarvalho.mail@gmail.com

ITEM DESIGNAO UN QUANT. VALOR VALOR TOTAL

4. 3. Supply and place chamber box in block with metallic grill


to drain surface water, including excavation, compact
ground, plaster with mortar with trace 1PC:3SAND,
fondled, including all necessary works, with depth
according to pipe inclination of 0.5%, starting with 400mm
deep and with dimensions:

4. 3. 1. 500x500mm. un 3.00
4. 3. 2. 1500x350mm. un 21.00

5. CAR WASH .00

5. 1. Supply and install sub base with aggregated, with 100mm


thickness (under grass bolck). cum 13.80
5. 2. Supply and install geotextil arround PVC pipe perforated.
sqm 12.00

6. LANDSCAPE WORK .00

6. 1. Supply and place MAHONI (SWIETENIA


MACROPHYLLA) tree with 3m height, including
excavation, vegetable soil ground fill supply and place
and all necessary works. un 5.00

7. CLEANING .00

7. 1. Clean all site from works and remove all derbies from
site. gv 1.00

Note:

Water and electricity are supply by UNDP

TOTAL 52,550.00