YOU ARE AT: Home Validation & Qualification Qualification Installation Qualification(IQ) IQ of 16 station compression Machine
Subscribe
BY PHARMACEUTICAL GUIDANACE ON JULY 14, 2016 INSTALLATION QUALIFICATION(IQ), VALIDATION & QUALIFICATION
TABLE OF CONTENT
Purpose
Scope
Responsibilities
Procedure
Installation Qualification tests
Documents & Drawings Verification
Verification of Technical Specification for In-House & sub-components /
Bought out items FACEBOOK
Utilities Verification
Material of Construction Verification
Critical Instrument calibration verification
Installation Qualification Tests Status
Data Analysis, Summary of IQ & Recommendations
Like Page Share
Amendment Record
Conclusion Be the first of your friends to like this
PURPOSE:
To describe the Installation Qualification procedure to be used during qualification of Single Rotary
Tableting Machine-16 Station, its accessories and to define the specification of the system in order to:
ensure that the equipment meets the specification as Design Qualification.
aid verification of the installation as per equipment general arrangement drawing.
ensure that the system installation meets acceptance criteria
ensure that the equipments will be installed in accordance with current Good manufacturing
Practices.
SCOPE:
This procedure applies to the installation qualification of Single Rotary Tableting Machine-16 Station and
its accessories to be installed.
RESPONSIBILITIES:
It is the responsibility of the Manufacturer to prepare the installation qualification protocol as per
Design Qualification
It is the responsibility of the client to check and approve the installation qualification protocol. FIND US ON GOOGLE PLUS
It is the responsibility of the Manufacturer to perform all the specifications verification checks and
tests with respect to installation qualification and compiling data in co-ordination with client.
PROCEDURE:
The following requirement / practices apply to Single Rotary Tableting Machine-16 Station Installation
Qualification activities:
Verify that systems are installed in accordance with approved engineering drawings and
documents, which shall include the following
General arrangement drawing.
Installation specification
Equipment manuals
Verify that the equipment and instrumentation are clearly described as per vendor, model, capacity,
materials of construction and any critical criteria.
Verify that major components are tagged or labelled with a unique ID number.
INSTALLATION QUALIFICATION TESTS:
The table below lists the tests to be performed as part of the Installation Qualification phase.
1 Installation, Maintenance
and Operation Manual
2 General arrangement
drawing
Verification of Technical Specification for In-House & sub-components / Bought out items
Purpose
To verify that each major component of the Single Rotary Tableting Machine-16 Station are present and
identified.
Test Equipment
None Required
Procedure
Confirm that identification nameplates have been applied to the units and that these indicate
the following (where applicable).
Type
Identification (Tag)
Manufacturer
Model Number
Confirm that the various components of Single Rotary Tableting Machine-16 Station are present
and tagged as per specifications and drawings, in the proper number and configuration.
Note any deviations or discrepancies and recommend follow up action if required.
Acceptance Criteria
All units and parts specified in design qualification and on latest revision of drawings must be present,
documented and tagged.
Major Components Results
1. Equipment Description
Equipment EQ/PR/125
Code
Serial No 251/118
Hopper 21 Liter
capacity
No of Hopper 1 Nos.
Depth of fill 20 mm
2. Electrical / Mechanical
2.2. VFD
Model Powerflex-40
Make Clit
Model No. AM
Sr.No. 1120
Make CPMPL
Qty. 04 Nos.
Make KATLAX
2.7. V-Belt
Size C-85
Qty. 01 Nos.
3. Control Panel
Qty. 02 Nos.
Qty. 02 Nos.
Qty. 01 No.
Model MC-203
Make Rishabh
Range 0-5
Qty. 01 No.
Utilities Verification
Rationale
To verify that all necessary utilities are correctly installed.
Procedure
Confirm that utilities connections are configured as per specification and in compliance with
local codes.
Record the results in the table below. Note any deviations or discrepancies.
Acceptance Criteria
All services and connections must be installed and documented.
Utilities Specification Results
Turret SGI
Hopper SS316
Note: Any changes made in the system must be recorded in this sheet.
CONCLUSION