Sie sind auf Seite 1von 40

INDEX

S.NO CHAPTERS PAGE


NO.

1. ABOUT PLANT 2

2. PLANT OVERVIEWS 5

3. PLANT FAMILIARIZATION 8

4. COAL HANDLING PLANT 8

5. BOILER 9

6. TURBINE 15

7. E.S.P. 20

8. ASH HANDLING PLANT 21

9. CONTROL &
INSTRUMENTATION 22
CIRCLE

(i) SWAS PACKAGES


(ii) ATRS PACKAGES
(iii) FSSS PACKAGES
10.
DETAILS OF PUMPS AT
INTAKE
PUMP HOUSE STAGE I & II 36
11.
CONCLUSION 39
12.
REFERENCES 40

1
ABOUT SSTPS PLANT

INSTALLED CAPACITY 1250 MW (5*250)

LOCATION 27 Km
SOUTH EAST OF
SURATGARH TOWN
NEAR RAIYAWALLI
VILLAGE

TOTAL LAND ACQURED 5020 (BIGHA)

PLANT AREA 3810 (BIGHA)

COLONY AREA 431 (BIGHA)

RAILWAY SITE 425 (BIGHA)

HEIGHT OF BOILER 60 (METERS)

HEIGHT OF CHIMNEY 220 (METERS)

FOUNDATION DEPTH 8.5 (METER)

LENGTH OF INTAKE CANAL 1.6 KM


(Indira Gandhi Canal)

2
HIGHLIGHTS: -

Rajasthan Rajya Vidhyut Utpadan Nigam Ltd (RRVUNL) established under


companies Act- 1956 by Government of Rajasthan on 19.07.2000 is engaged primarily in the
business of GENERATION OF ELECTRICITY.

• With the commissioning of unit #4 of 250 MW at STPS it has become


FIRST SUPER THERMAL POWAR STATION OF RAJASTHAN.

• Unit #1 of STPS was commissioned on coal firing on 4.10.1998 and


commercial operation of the unit was declared from 01.02.1999. The
unit was dedicated to the Nation by Hon’ble chief minister of
rajasthan Mr. Ashok Gehlot on 03.10.1999.

• Hon’ble Chief Minister of Rajas than Mr. Ashok Gehlot laid the
foundation stone for unit # 3 unit #4 of STPS on 03.10.1999.

• 250 MW units #2 of STPS was commissioned on 28.03.2000 and was


put on commercial operation from 16.07.2000. It saved 80 crores due
to early start of generation. The unit was dedicated to the nation of
Hon’ble Leader of opposition, Lok Sabha Smt. Sonia Gandhi on
13.10.2000.

• Hon’ble Union Minister of power Mr. Suresh Prabhu laid the


foundation stone for 250 MW unit #5 under STPS on 12.02.2001.

• 250 MW unit # 3 of STPS was commissioned on oil 29.10.2001 and


was put on commercial from 15.01.2002. The unit was dedicated to
the nation by Hon’ble Dy. Leader of opposition, Lok sabha Sri Shiv
Raj Patil on 17.03.2002

• 250MW unit # of STPS was commissioned on oil 25.03.2002 and has


been put on commercial operation from 31.07.2002. The unit was
dedicated to the nation by Hon’ble leader of opposition, Rajya Sabha
Dr. Manmohan Singh on 10.08.2002.

3
AWARDS: -

Both SSTPS and KTPS have together bagged the meritorious productivity award from
UNION MINISTRY OF POWER for having highest plant load factor.

Year Award by union ministry of power


1999-2000 Gold Medal
2000-2001 Gold Medal
2001-2002 Gold Medal
2002-2003 Gold Medal

4
5
6
7
PLANT FAMILIARIZATION

COAL HANDLING PLANT

Wagon tippler has rated unloading capacity of twelve- box wagon per hour, including
shunting and spotting time of haulage equipment.

A steel hopper has been provided in crusher house to receive coal and distribute it through
manually operated rack and pinion gate to three vibrating screens of 675 –t/hr capacities
each. Coal above 200 mm size passes on granular for crushing and reduction in size. Coal
below 20 mm size passes granular and discharge on to crushed coal conveyor belt.

Following permutation and combination of operation are possible with installed system. To
transfer all crushed coal received from crusher house to live storage pipe. To transfer part of
received crushed to plant and to balance to storage yard.

To deliver the raw coal bunkers part and received crushed coal mixed with balance coal from
the live storage pipe. To transfer to the plant crushed coal at 750 t/hr from the reclaim live
pile and simultaneously stock and s/rad .

The vibrating one as stated above can be obtained by the use of flap gate which are installed
on various chute and two vibrating feeders, installed on tower. The coal carried on various
conveyers shell be main monitored to ensure proper loading and distributing weightless and
vibrating feeders.

8
BOILER

INTRODUCTION:-

M/S BHEL ,hardware ,manufacture the boiler installed in SSTPS .Each of the boiler
are single drum ,tangential fired water tube naturally circulated over hanged ,balance draft,
dry bottom reheat type and is designed for pulverizing coal firing with a maximum
continuous steam output of 375t/h at 138 kg/cm2 pressure 540 degree cent.temp.

The thermal efficiency of each boiler at MCR is 86.8%.Four no. of bowl mills have
been installed for each boiler .oil burner are provided for initially start up and stabilization of
loaw load ESP (one for each boiler ) is arranged to handle flue gases from the resp. boiler s.
The gases from ESP are discharge through 180mt height of chimney .ID fan and a motor are
provided near the chimney to induce the flue gases.

The boiler is provided with a balance draft consisting of two forced draft(F.D.)fans
and two induced draft fan . Flue gases are utilized to heat to secondary air for combustion in
the tubular type air heaters installed in the boiler. Since the boiler furnace is maintained at a
negative pressure so to avoid atm.air entering a furnace a hydraulic pressure is maintend at
the furnace bottom .

The water filled in the stainless steel seal through the hydraulic seal between the
furnace ash hopper and the water wall ring heater. Adequate clearance is also provided for the
downward expansion of the furnace.

Ash is formed by the result of burning of coalinside furnace. A small quantity of ash
is collected in the ESP and magnetic separator hopper. This collected ash is disposed off in a
slurry form in the disposal area.

9
10
SH STEAM OUTLET

CRH IN HRH OUT

DRUM

REAR ROOF

REHEATER REAR
FRONT ROOF

FINAL SUPERHEATER
PLATEN SUPERHEATER

REHEATER FRONT

SCW SH REAR
EX
T SC
W
SH
LTSH
EXTENDED

SCW SH FRONT
WW
DOWN COMERS

Economiser
WATER WALL FRONT

WATER WALL REAR

WATER INLET

Water
Steam Water
Mixture
Steam Cooled
Wall SH
SH Steam
RH Steam
WATER WALL BOTTOM RING HEADER

11
BASIC THEORY AND AUXILARIES

The boiler also termed, as steam generator is a container in which water can be feed
and by the application of heat evaporated continuously in steam .The heat source is obtained
by burning the fuel, which is coal hear in our case .

The walls contained in the boiler drum in the flow through the down corner water
walls and then through risers back to the drum .This closed circuit movement of boiler water
is termed as circulation . The water wall and water in this circuit absorb the heat energy
applied in the furnace & gate heated up.

This give rises to the formation to steam in the water walls. The water mixture of
water and steam continuously and move to the steam drum to its lightness .The mixture of
water and steam contniously displaced the colder water in the drum there by establishing a
natural circulation.

The separation of water particles and stem take place in the steam separator sand the
saturated steam is led into the upper heater for further heating and water particle fall back in
to the drum

SUPER HEATER:-

Super heater is meant to raise the temp. of steam i.e. the saturation temp .by
absorbing heat from flue gases .Limiting value of boiler is 540 degree celcious. Super heater
eliminate the formulation pf condensate during transporting of steam in pipe line and inside
the early stage of turbine, which is harmful to the turbine blade and pipe lines .

Super heater section is composed of four section viz. plates, pendant, rear, horizontals
and steam cooled walls. The plate section is located just above the furnace in front of the
furnace arc. The pladent section is located in the back of screen walls tubes. The rear
horizontal is located in the furnace rear gas pass above the economizer and the steam cooled
wall section comprises of side ,front rear, and roof of the vertical real gas pass.

Desuperheater are provided in between the finiak super heater and preheater to
control the super heated steam temp: feed water is used as a spray to control the temp. Super
heated to steam is lead into the H.P. turbine through main stram stop valve and hydraulically
operated high pressure quick closing stop valve (HPQCSV)governing valve .After doing the
useful work in the HP turbine the steam is returned to reheater through the cold reheat line.

12
REHEATER:-

Reheater are used to raise the temp of steam from which point of the energy had been
exerted in HP turbine with increasing no. of reheating stages. Reheating is continued till temp
of steam reaches to 540d/c. Reheating require additional equipment like as:-

(a) Heating surface.


(b) Boiler turbine connecting pipe and safety equipment like safety valve,
non return valve (NRV) .isolating valve, steam temp, regulating
equipment etc.

A reheater is composed of two section viz. front pendent vertical spaced, rear pendent
vertical spaced. The front pendent vertical section is located between the rear water wall
hanger tube and the super heater plate section.

The rear pendent vertical spaced section is locatd above the furnace arc between the
water cooled system wall tube and heat wall hanger tubes.

ECONOMIZER:-

The function of economizer in a steam generating unit is to absorb heat from the flue
gases and added this as sensible heat to feed water before the water enter the evorpating ckt:
of the boiler .

The coal of economizer are designed for horizontal placement which facilities the
draining of the coal and the favor the arrangement in second path of boiler.

Water flow from bottom to the top so that steam in any form during the heat transfer
can move along with water and prevent the block up steam, which will cause overheating and
failure of economizer.

13
AIRPREHEATER:-

Air preheater is a heat exchanger in which air temp. is raised by transferring heat from
other fluid such as flue gases. Since air heater can be successfully employed to reclaim heat
from flue gas at lower temp. Level so that it is possible so that the heat ejected to chimney
can be reduce to a great extent thus increasing the efficiency of boilers.

14
TURBINE

INTRODUCTION:-

M/S BHEL Hardware has manufactured the steam turbine and their auxiliaries
installed .The turbine are three cylinder, compound 3000 rpm, double flow exhaust type
reheat unit with initial parameter of 13 kg/cm2 and 5 low pressure heart are feed .the high
pressure cylinder comprise of two curt is wheel as a regulation stage .Intermediate pressure
cylinder comprise of twelve stage and each of the double flow section of the LP cylinder
consist of four stage.

OPERATION:-

There are two lime steam line connecting the boiler to the turbine. The super heated
steam enter the HP turbine and strike its blades hence it energy of steam is converted in to
mechanical energy .the steam from HP turbine is reheated in reheater (boiler) and reheated
steam is sent to IP turbine through hot steam line (HRH). Here second stage of energy
conversion is take place .Then steam is sent to L P turbine from where it is ejected by
vacuum ejector and condensed.

Here are two cold reheat and two hot reheat line connecting the reheater and turbine.
In each of two live steam line one electrically operating isolating valve ,one water
separator and one quick closing stop valve are mounted .The direction of revolution of
turbine is clock wise when looking at turbine from front bearing pedestal. For the oil
lubrication of bearing and fore governing .The main oil pump driven shaft is assembled in to
the front bearing pedestal of turbine itself.

15
16
17
18
19
ESP

E.S.P.THEORY:-

The full form of ESP is electro static preceptor .ESP is highly efficient device for extraction
of suspended particle and fly ash from the industrial flue gases .

WORKING PRINCIPLE: -

ESP can handle large volume of gases from which solid particles are to be removed .

Advantage of ESP are :

(a) High ash collection efficiency.

(b) Low resistance path for gas flow.

An ESP can be defined as a device that utilized electric forces to separate suspended particle
from flue gases.

WORKING STEPS:-

ESP consist of two sets of electrode , one in the form of thin wire, called discharge or
emitting electrode in the form of plates. the emitting electrode are placed in the center or mid
way between two plates and are two connected to –ve (negative) polarity of high voltage
DC source of order of 37 kv while collecting electrode are connecting to +ve (positive)
polarity.

The voltage gradient between electrode creates “CORONA DISCHARGE“ i.e. ionizing the
gas molecules .The dust particle present in the flue gases accure negative charge and get
deposit on collecting electrode . The deposited particle are removed by knocking the
electrode by a process a called “ RAPPING” done by “ RAPPING MOTORS “ .

20
ASH HENDLING PLANT

INTRODUCTION:-

The ash handling system provide continuous collection of bottom ash from the furnace
hearth and its intermediate removal by hydro ejectors to a common slurry sump. It also
provide for removal of fly ash to the common slurry sump.

Each boiler is provided with ash precipitator for collecting the fly ash from the flue gases
with high efficiency .to minimize the dust mains and to reduce the water of ID (induced draft
) fan .the fly ash separated from where it is mixed with water to form slurry and disposed off
to pumping area by mean of hydro ash pumps .

Bottom ash from the boiler furnace is passed through slag crusher s and then slurred to the
slurry chamber to the suction of the disposal pumps. These are high pressure and low
pressure pump for this purpose. At at time one pump is working and other then are standby
.From the ash disposal pump house ash slurry is pumped through pipeline to the ash dump
area within about 1.5 km away from the ash disposal pump house .

To separate ash , discharge line are provided one for each unit but only one line is used .The
ash slurry from the two units is taken in one discharge line through electrically operated
valve.

21
CONTROL AND INSTRUMENTION CIRCLE

INTRODUCTION:-

Control and instrumental play a major role in realizing the following objective of any power
plant.

(a) Safety for plant and personnel.


(b) Longer eqipment life

Since a lot of process are involved and distribute are frequent , the correction can be
carried out efficiency and quickly only by the introduction of atomic control system
eliminating any possible human error .

A power system is a combination of many individual eqipment and system and for
better performance of these individual equipments. the equipment are interdependent and
interrelated with each other . Electrical interlock system connect these individual eqipment
and operate s with required sequence. For example boiler is a system comprising milling
plant ,ID fan, FD fans PA fans etc.

These equipment are interlocked in such a way that they are started /shut down in
specific sequence in order to avoid damage to equipment and men .

Also equipment are so interlocked that in case of failure of running equipment to


discharge its function , the reserve one is automatically put into service .

A system of automatic sequence control simplifier the operator duty.

SSTPS have divided three sections in instrumental and control circle: -

1. SWAS package
2. FSSS package
3. ATRS package

22
SWAS (STEAM WATER ANALYSIS SYSTEM)

INTRODUCTION: -

System water analysis is full form of swas. SWAS package is used for analysis of
steam sample coming from boiler .There are nine line coming from boiler.

The equipment is designed and assembled to enable conditioning of sample of boiler


water and steam by reducing the temperature and pressure on to a on line analyzer and a
normal sample may be drawn off as a required to monitor the chemical parameters etc.

There are two type of cooling system: -

(a) Primary cooling system.

(b) Secondary cooling system.

The sample-conditioning panel comprises:

Line Numbers: -

1. Make up drum water.

2. Condensate pumps discharge.

3. LP heater inlet.

4. Feed water booster pump.

5. Feed water economizer inlet.

6. Boiler drum water

7. Boiler saturated steam.

8. Main steam

9. Hot well.

23
SODIMAT

The measurement of sodium in industrial ultra pure waters s essential . The


measurement is based on a direct potentiometric technique, which uses highly sensitive
sodium glass electrode. The difference of potential between the glass electrode and the
reference electrode is directly proportional to the sodium concentration.

Modern high-pressure power plants require feed water of very high purity. Safety in that
sector is of great importance and the sodium measurement plays a specific role compared to
pH, conductivity and silica trace.

Actually sodium cations and anions are always linked. Most cations have a corrosive
influence in water and vapour cooling circuits. Became of this chemical link between sodium
cations and anions, sodium measurement presents particularly important risk of corrosion and
other effects. The SODIMAT uses a sodium sensitive glass electrode to measure sodium in a
sample which has been previously conditioned to a Ph>10.

HYDRASTAT

Low-carbon steel exhibits a significantly improved resistance to corrosion it in


contact with water of high alkalinity (pH 9-10).

High pressure circuits operating with the alkaline reign, therefore employ volatile
alkalizing agents such as ammonia in combination with hydrizne to elevate the feed water Ph
to a level > ph 9.0 .

The addition of hydrazine serve the dual function of an alkalizing agent as well as on
oxygen save energy thus lowering the level of corrosion. The anodic dissolution of iron in
low carbon steels is nominal at pH 9.5 provided the totally demineralized water is available
ammonia concentrations required to reach this high degree of alkalinity would be detrimental
to the copper tubes of the condenser because of dissolution of copper, thus imposing an upper
limit of ph 9-9.3.

24
CONDUCTIVITY MEASUREMENT

The electric conductivity measures the transport of electric change in any field. In
metal conductors the current flows by transport of electrons where as in solution it flows by
transportation such as Na+ and Cl- in which the higher transport of charges is the
conductance of the solution.

Conductivity is the capacity of a solution to conduct current.

In solution conductivity is more complicated than in conductors because several


species ensure the transport of charge for instance in drinking water the conductive species
registered are sodium, calcium, magnesium, ferrous cations, ferrites phosphates and nitrate
iron for slightly concentrated solution. The concentration of H+ protons and hydroxyl OH-
ions can no longer be neglected. Therefore leads to a non-liner variation of conductivity /
concentration.

25
ANALYZERS

Lines Coming From Type of analysis


Line 1 Make up drum water Specific conductivity.

Line 2 Condensate pump Ph , specific conductivity


discharge ,cation conductivity
,dissolved oxygen,sodium.

Line 3 Lp heater/inlet Ph , specific conductivity,


dissolved oxygen.

Line 4 Feed water booster pump Dissolved oxygen.

Line 5 Feed water economizer Ph , specific


inlet conductivity,cation
conductivity,silica,hydrazine.

Line 6 Boiler drum water Ph , specific conductivity,


silica.

Line 7 Boiler saturated steam specific conductivity, cation


conductivity.

Line 8 Main steam specific conductivity, cation


conductivity, silica.

Line 9 Hot well(2 off) specific conductivity.

26
The sample analysis panel comprises the following analyzers:-

No. of Analyzers Analysis

1 Single channel silica


1 Two channel silica
2 Dissolved oxygen
1 Hydrazine
14 Conductivity
4 Ph
1 Sodium

27
ATRS [Automatic Turbine Run Up System]

Introduction

Turbine start up is the most difficult operation. Each start up will be different. Many
parameters and procedures have to be scrupulously adhered to, as an error in human decision
will result in heavier damage to the unit. Therefore modern day machines of higher capacity
or machines ,which are to be started frequently ,are to be provided with automatic run up
synchronizing loading gears.

Under normal condition this gear will accelerate the turbine from barring gear speed
uninterrupted at a rate determined by the initial turbine temp. condition. Under hot start
condition ,this run up period may be of order of 5 to 10 minutes and comprises two zones ,the
first half is relatively slow rate up to 1000rpm ,the second half is a fast rate from 1000 to
3000 rpm ( a range which includes critical speeds ). In the event of abnormal condition this
program of acceleration is temporarily held (except in the regions of critical speed ),or in
more severe conditions, reserved or tripped.

The turbovisory instruments moniter the abnormal condition. The gear if selected for
the function also effects automatic synchronizing . this scheme matches the frequency voltage
and time phase of generator output to that of existing bus bar and close the circuit braker.

Automatic loading gear enables the machine to be loaded automatically at the selected
rate ,through the control of governor speed motor. The supervisory gear also will be in use
during this function. The rate of loading varies widely from 5% per minute during the initial
block loading to 20% M.C.R.. and also condition of the plant when the cold or hot start.

28
All control function related to turbine is realized by microprocessor based
PROCONTROL ATRS System. This is based on user-friendly programming language
p10 .The system is devided in three sub groups :-

1. SGC-OIL

It consist of three types of oil pumps:

1. Auxillary oil pump – 2 AC

2. Emergency oil pump- I AC & I DC

3 Jacking oil pump – 1 AC & 1 DC

Its function is:-


• Estabilishing lubricating oil & jacking oil supply.

• Putting the turbine on barring gear speed.

• Taking of JOP when sufficient speed is achived.

• Taking of AOP when turbine main oil pump has taken over.

WHICH OIL PUMP WORKS AT DIFFERENT SPEEDS OF TURBINE?

SPEED IN RPM OIL PUMP


3000 MAINOIL PUMP
2800 AOP
80 JOP

29
2. SGC-CONDENSOR & EVACUATION

Condensate evacuation pump & vaccum operation.

It comprises of keeping at leat one of the two CEP’s in operation & evacuation the
non- condensate gases from the system, maintaining the desired level of condenser pressure
when turbine is in operation.

3. SGC-TURBINE

It is used for automatic synchronization of machine to the grid. Procontrol requires


serial data exchange confined to the electronic room, process computer and control room.

PROCONTROL has following basic type of electronic modules:-

• Individual Control Modules- These implemented to control, supervise,moniter


protect individual valves ,pumps fans etc. modules equipped with a
microprocessor built in i/o and dedicated control entity to control element. A
serial i/o interface to the local bus to receive process signals required for
interfaces & permissive logic. Hardware inter face is also requires to control
room. Modules are AS45 ,AS46,AS47.

• Programmable Processor – this module used for automation and superimposed


on the individual control modules and allows building control, protection and
alarms. Module is –PR05.

• Input / Output Modules- various modules for input/output capabilities and


connected to local bus. These modules can handle single, double throw
contacts thermocouple, RTd’s milliAmp. signals etc. or to provide milliAmp.
voltage electronic contact output signals.

30
TURBINE PROTECTION

S.NO. SERVICE ALARM TRIP

1 Lube oil pressure very low 2.1


(2 out of 3 Pr. vaccum switch operating) kg/cm2

2 Condenser vaccum very low -0.8 -7


(2 out of 3 vaccum switch operating) kg/cm2
3 HTP exhaust steam temp very high 480 510
(2 out of 3T/C temperature Rises)

4 Axial shift very high +/- 0.5 +/-


(2 out of 3 sensor operated) mm 1.0mm

TURBINE

CONDENSATE EVACUATION PUMP

PERMISSION ON

• SUCTION VALVE OPENS.

31
• HOTWELL LEVEL OK.

• MINIMUM REQUIRED VALVES OPEN OR ANY CEP ON

PERMISSION OFF

• HOTWELL LEVEL VERY LOW

FURNACE SAFEGUARD SUPERVISOR SYSTEM

This system is designed to ensure the execution of a safe, orderly operating


sequence in start up & shut down of fuel firing equipment & to prevent errors of omission &
commission in following such a safe operating procedure. This system takes care that every
increment of fuel input corresponds to the available ignition energy inside the furnace. The
following functions are entrusted to such end automatic burner management system:

1) Furnace purge supervision


2) Igniter control
3) Secondary air damper control
4) Flame scanner intelligence
5) Boiler trip protection

This system includes:

1) All Boiler Protections

(a) All Id Fans Off

Id (included draft) Fans suck the flue gases to the chimney through ESP. so if no
ID fan is on the flue gases can’t be let out of yhe boiler. As the such here we give up a trip
command.
32
(b)Both FD fans off

Fd (Force draft ) fans bring air to the furnace for combustion of coal. If no air is
let in the furnace then complete combustion of coal does not occur.

NOTE:- There is a general principle i.e. fans On are to be greater or equal to FD fans are
ON.

(c) Furnace Pressure

MAX – 150mmwcl
MIN - -175mmwcl

If furnace is generally kept at 10mmwcl. If furnace is high all gases will gush out
from all side. If low furnace will contract.

(d) Drum level

MAX - +250mm
MIN - -250 mm

If drum level is very than steam formed will be more wet and may lead to more
work for dryers. Wet steam may cause corrosion of turbine blades. If very low level than
water is insufficient and may cause melting of boiler tubes.

(e) Unit Flame Failures

If the flame is not available then the boiler trips .

(f) Loss of All fuels

If there is no fuel available then the boiler trips.

(g) Air Flow<30%

Air flow from FD fans & PA fans combined should be more than 30% of
maximum required.

33
(h) Re-Header Protection

Re header is located in the hottest part of the furnace. If the steam from HP
TURBINE i.e. CRH line is not able to go reheater due to HP bypass closed and HPCV (high
pressure control valve) closed ,then reheater can’t get steam and it’s tube may get melted.
Similarly, if IPCV (intermediate pressure control valve) is closed then LP

Bypass is used to divert steam from HRH line (hot reheat line ) to condenser. also
if GCB(grid circuit braker) opens then hp bypasss is opened.

(i) 24/220 V DC Supply

It is necessary for the system working i.e.24 V for the control panel and alarm
system while 220 V for oil firing system.

2) Oil Firing System

We have got their levels/elevation from where oil is fired

AB --> heavy oil & light oil firing


CD -->only heavy oil firing
EF -->only heavy oil firing

Unit is light up using LFO with air. After –ward it is continued using HFO with steam. At
diff. levels we have the ignition system to ignite oil. We are also having flame scanners.
which monitor thr local fireball in the furnace. This system works on 220 V DC ans solenoids
are present.

3) Soot Blower Control System

As the coal burn a large amount of ash is generated which clings to the wall & outer surface
of tubes so we have a number of soot blower to blow the soot as it reduces thermal efficiency
of tubes.

4) Secondary Air Damper Control(SADC)

It is based on tangential firing concept so as to create an imaginary fireball such that oil ,air &
coal mix properly. It controls 6 nos: of fuel(coal) air dampers (A,B,C,D,E,F elevation),3 nos:
of fuel(oil) air dampers(AB,CD,Ef) & 6 nos: of auxillary air dampers(AB,BC,CD,DE,EF,FF
elevation) & 2 nos: of over fire dampers (lower & upper).
34
These dampers help in proper combustion by supplying air using FD fans to the furnace,
which can be controlled using dampers/flaps. These auxillary air dampers maintain a
predetermined set differential pressure between furnacre & wind box.

5)Auxilary Pressure Reducing Desuperheating (APRDS)

There are many places where steam is required like raising temp. of HFO & LFO system etc.
the steam for these is obtained by taking a tapping from main steam. As the main steam is at
pressure 145kg/cm2 & temp 540 C. the steam required is to be at 11 kf/cm2 & temp 340 C .
so we have to both reduced temp & pressure. This is achieved by spraying water ,which helps
to reduce temperature.

FURNACE PURGE

It is required after a boiler trip out ,before relighting the boiler ,to expel all
unburnt fuel particles, vapour etc. from the boiler so that when is introduced during
light up ,possibilities of an explosion are avoided. Till the boiler is purged no fuel mu

DETAIL OF PUMPS AT INTAKE PUMP HOUSE


STAGE I &II

S.NO. EQUIPMENTS NOS. MAKE PUMP PUMP MOTOR


& DISCHARGE HAED DETAIL
MODEL M3/Hr. MAKE KW
1 Intake water 6 WPCIL 1250 16.78 Siemens 90
pumps stage I
2 Intake water 4 Flow 1250 16.69 A.B.B 90
pumps stage II more

LEGENDS OF STPS INTAKE WATER FROM INDIRA GANDHI MAIN


CANAL & RESERVOIR SYSTEM

1. INTAKE FROM INDIRA GANDHI MAINCANAL AT 199 RD

2. I.G.N.P. Bed level -181.21m

3. I.G.N.P Bed Width -30.18m

4. INTAKE CHANNEL:-

35
LENGTH : 1050M
BED WIDTH : 1.9M
TOP WIDTH : 16.24M

5. EMERGENCY RESERVOIRS:-

CAPACITY : 2 x 7.5=15 LACSM3


BOTTOM SIZE : 220M X 305 M
MAX WATER DEPTH : 9.30M

6. DESILTING CHAMBER

A. STAGE I:
CAPACITY : 2 X 1.25=2.5LACSM3
BOTTOM SIZE : 150M X 60 M
MAX WATER DEPTH : 5.60M

B. STAGE II:
CAPACITY : 1 x 2=2LACSM3
BOTTOM SIZE : 150M X 250 M
MAX WATER DEPTH : 5.6M

DETAIL OF PUMPS AT STAGE I

RAW WATER PUMP HOUSE

36
SNO. EQUIPMENT NOS. MAKE & PUMP PUMP MOTOR
MODEL DISCHARGE HEAD DETAIL
M3/Hr (M) MAKE KW
1 Ash water 3 WPCIL 700 30.4 SIEMINS 90
supply pump
stage I
2 Clarifier 3 WPCIL 1600 22 SIEMINS 135
water pumps
stage I
3 Dust 2 WPCIL 300 43.25 SIEMINS 30
suppression
water supply
pump
4 Jockey pumps 2 WPCIL 50 105 SIEMINS
for ff
5 Spray pump 2 WPCIL 410 105 SIEMINS
6 Diesel pump 2 CUMMINS 410 105 SIEMINS
for ff

LEGEND OF RA

WATER PUMP HOUSE STAGE I

S.NO. PARICULARS DATA


1 CAPACITY OF 2 X3.5 LACS M3
RESERVOIR
2 TOP LEVEL 191.16M
3 NORMAL LEVEL 191.16M
4 BOTTOM LEVEL 184M
5 PUMP TRIPPING LEVEL 184M
6 PUMP FLOOR LEVEL 194M
7 OVERFLOW 191.8M

DETAIL OF PUMPS AT STAGE II


37
RAW WATER PUMP HOUSE

SNO. EQUIPMENT NOS. MAKE & PUMP PUMP MOTOR


MODEL DISCHARGE HEAD DETAIL
M3/Hr (M) MAKE KW
1 Ash water supply 3 KBL PUNE 700 30.4 CGL 100
pump stage I BHR -42
2 Clarifier water 3 KBL PUNE 1600 26 CGL 175
pumps stage I BHR -60

LEGEND OF RAW WATER PUMP

HOUSE STAGE II

S.NO. PARICULARS DATA


1 CAPACITY OF 18 LACS M3
RESERVOIR
2 NORMAL LEVEL 191M
3 BOTTOM LEVEL 180M
4 PUMP TRIPPING LEVEL 180.15M
5 PUMP FLOOR LEVEL 192M

38
CONCLUSION

My practical training for 30 days during this summer vacation at SSTPS (Raj.) Was very
successful in all respect. I learn a lot of things which may be milestone in my carrier practical
implementation of theoretical acceptance are indispensable for each and every students this is
an important ingredient in completion of over all knowledge process. The present time need
more perspective and systematic alignment of student along with his knowledge and we will
continue to indulge in such brain storming session to make ourselves abreast with a latest and
trend in technology. In the and we would like to conclude that working own temperature
conversion project not only boosted our confidence but it help us in clearing our doubts
related to MATLAB. We would like to thank to all who directly or indirectly helped us in the
project

39
REFERENCE

1. www.rajenergy.com
2. KTPS, Kota.
3. BRELI THERMAL PALNT, BIHAR.
4. NTPC, HARIDAWAR.
5. BHEL, HARIDAWAR.

40

Das könnte Ihnen auch gefallen