PART 4 Technical Requirements
SECTION 3 Technical Specifeations
‘M-02 Make Up Water System
a DETAILED REQUIREMENT
34 Tank
4.1.1) The tank shall be of all welded construction designed and fabricated in ac-
cordance with API 650 including appendix E, SNI 1726-2012-or AWWA
D100 and shall be supplied complete with pipe-connections and man-
holes.
4.1.2) The plate thickness of the tank shall be designed with minimum 3 mm of
corrosion allowance, Plate material shall be ASTM A283 Grade C.
4.4.(3) Bottom plates shail be of lap-welded construction
Shell plates shall be of butt-welded construction.
WARE Tombak
{COIGTEC Power Plank ( Peake
130 160
oe44.6)
4.1.66)
44.4)
4.4.8)
4.4.09)
4.1.(10)
4.11)
44.12)
4.1.(13)
4.(14)
Revaiond
PART 4 Technical Requitements
SECTION 3 Technical Specifications
M402 Make Up Water System
Roof plates shall be of lap-welded construction, and shall be self-
supporting spherical type.
‘The tank shall be provided with the following:
= Inlet nezzie
= ‘Outlet nozzle
+ Return nozzle
- Overflow nozzle
= Blow off nozzle
- Level transmitter nozzle
- Minimum flow nozzle
. Vacuum relief nozzle
~ Two 2) Spare nozzles
i Sample nozzle
The sufficient number of manholes shall be installed on the roof plate and
shell plate,
‘The spiral stairway to the tank roof shall be installed.
The handrail and platform shall be installed on the roof
‘The grounding wiring shall be installed.
The tank atmospheric vent shall be fitted with an air fiter of replaceable
type to filer out atmospheric dust down fo one (1) micron in size with a
suitable area to maintain an air velocity below 150 m/sec at maximum tank
filling or draining rates.
‘Anchor bolts shall be provided,
‘The floating deck with support shall be provided for airtight sealing of wa-
tern the tank.
The vacuum relief valve shall be installed on the shell
aS ombak GESCIGTCO Power Pant (Peake)