DOCUMENT TITLE :
NOTE:
This document is the Standard Training Program followed by
Future Pipe Industries (FPI) for the training and qualification of
Pipe Fitters, Supervisors and Inspectors in accordance with
Annex D of ISO 14692-4:2002
CONTENTS
A. Scope of Work
B. Manpower/ Crew
C. Training Course
D. Training Register
E. Assessment
F. Test Results & Certificates
G. Training Materials
H. Attachments
A. Scope of Work
The scope of work covers the supply of Training instructor and Technician to
train and familiarize the EPC crew on the procedures and techniques of
performing Adhesive Bonded Joints (TB/TS), GRE/GRV Lamination Joints (LJ)
and Flange Jointing prior to their actual execution at site.
Training will be conducted in five days per session at a given site in Kuwait.
Number of session depends on the number of participants and one session
should not exceed 20 participants maximum four (4) persons per crew.
B. Manpower/ Crew
The contractor shall depute not more than 20 technicians per training session
which will be divided into 5 groups with assigned crew leader in each group. The
crew leader shall be responsible for the technicians and the main point of contact
during the training. Maximum 4 personnel shall constitute one crew.
C. Training Course
Schedule : Day 1
Time : 8:00am to 5:00pm
Attendees : GS Engineering Personnel
materials and consumables shall be identified and presented one by one. The
safety shall be briefly explained at the same time of presentation.
The instructor shall demonstrate and the crew leader shall be required to
perform the same with the assistance of technician.
The tools and consumables required are listed below.
SN Description Remarks
1 Shaver Machine - (TB/TS) applicable sizes To be provided by GS E&C
2 Heating Blankets - applicable size To be provided by GS E&C
3 Wrap around tape (all applicable sizes) To be provided by GS E&C
4 Curve-o-mark To be provided by GS E&C
5 Pi tape To be provided by GS E&C
6 Spirit level To be provided by GS E&C
7 Pipe vice/ Working table To be provided by GS E&C
8 4 Angle grinder To be provided by GS E&C
9 Grinding disc with backing pad To be provided by GS E&C
10 Cutting disc 4 To be provided by GS E&C
11 Drilling machine To be provided by GS E&C
12 Rubber mandrel To be provided by GS E&C
13 Emery cup To be provided by GS E&C
14 Hand gloves To be provided by GS E&C
15 Marker pen To be provided by GS E&C
16 Paint brush 3 To be provided by GS E&C
17 Come along Jacks To be provided by GS E&C
18 Rubber pad 5mm thick To be provided by GS E&C
19 Latching belts To be provided by GS E&C
20 Rubber hammer To be provided by GS E&C
21 Pipe Clamps To be provided by GS E&C
22 Safety glasses To be provided by GS E&C
23 Blind flanges (applicable diameter) To be provided by GS E&C
24 Calibrated torque wrench and sockets To be provided by GS E&C
25 Gaskets, bolts, nuts and washers To be provided by GS E&C
26 Testing manifolds To be provided by GS E&C
27 Pressure pumps & pressure gauge To be provided by GS E&C
28 Cement kit for 1 training session only To be provided by GS E&C
29 Lamination kits - for 1 training session only To be provided by GS E&C
Schedule : Day 1
Time : 8:00am to 5:00pm
Attendees : GS Engineering Personnel
Project Client Doc. Title Doc. No. Page No.
Schedule : Day 1
Time : 8:00am to 5:00pm
Attendees : GS Engineering Personnel
The crew leader and technicians shall be required to perform the actual
jointing spool fabrication. The course outline shall be as follows.
1. Cutting of pipes
2. Calibration using shaver machine
3. Grinding using angle grinder & drill machine
4. Cement mixing and application
5. Joint assembly TB/TS & GRE/GRV Lamination Jointing (LJ)
6. Joint curing using heating blankets
7. Bolt torquing sequence
Depending upon the performance of the crew leader and technicians, FPI
instructor shall at his own discretion extend the duration of this exercise.
5. Hydro testing
The fabricated test spools are to be hydro tested at 1.5 times the pipe class
for 1 hour. Prior to testing, the technician shall be trained in using torque
wrench and flange tightening procedure.
Schedule : Day 5
Attendees : GS Engineering Personnel
D. Training Register
The technician shall be required to register during the course of training in the
attendance sheet.
E. Assessment
The test shall be recorded on the spool fabricated and tested by GS Engineering
Personnel.
G. Training Materials
1. GRE Materials for demo, practice and test spool will be provided by GS E&C.
2. Tools and consumables and testing manifolds including blind flanges, bolts,
nuts and pumps shall be arranged by client.
H. Attachments
1. Training Plan
Training Details:
Adhesive Bonded (TB/TS)
Type of Jointing
Lamination (GRE & GRV)
Adhesive Bonded (TB/TS) & Straight Field Lamination of GRE/GRV Pipes and Fittings of
Training Qualification
diameters from 25mm to 600mm
Training Plan:
No. of training Sessions 2
No. of participants per session 20
Training Duration/Session 5 days
Training Start Date TBA
Batch No. 01 & 02
Proposed test spools:
Adhesive Bonded (TB/TS) Test Spool: 150 mm dia EST20
3.0 meters
3.0 meters
GRV Lamination Test Spool: 300 mm dia VST16
PL/FF PL/FF
3.0 meters
Hydrotest Pressures
Test Spool No. 1 30 barg
Test Spool No. 2 24 barg
Test Spool No. 3 24 barg
A. Tools
B. Consumables
A. Tools
B. Consumables
A. Tools
1. 4 Angle grinder
2. 50m long electrical cables with industrial plug
3. 2 nylon / canvass binders with hook
4. 2 nylon / canvas belt
5. Pipe fitters wrap around
6. Spirit level
7. Measuring tape, 5m
8. 12 right angle
9. Scissors
10. Lamination kit
B. Consumables