Sie sind auf Seite 1von 2

Scheme

Chess
Beanie

25 cm | 42 rows
FALL / WINTER
48 cm | 62 stitches

weareknitters.com Note: the measurements in this pattern are not drawn to scale.

Sewing
Tips & advice
START KNITTING
Before you start knitting, we recommend you to practice the different
techniques and stitches with its tutorial videos, especially if its the first time you knit. You can find the videos in
our website weareknitters.com
If you dont get it at your first try, dont worry, its very common. Watch the video with your needles and yarn in
your hands as many times as you may need.

Cotton care instructions


Because WE ARE KNITTERS wool is 100% wool, we recommend you to wash your garment using cold water and mild
soap. Dry flat. To learn more about WE ARE KNITTERS wool, read the CONCEPT area in our website
weareknitters.com

Stitch sample
It is important to do a sample before start knitting your project. The sample should measure 10cm x 10cm and needs to
be done in Stockinette Stitch. If it comes out to be smaller, you will need to knit more loose, and if it comes out bigger,
you will need to tight more the stitches.
Stitch sample: 13 Stitches = 10cm | 17 Rows = 10cm

The Kit includes:


WAK we
BAG X1 are
knitters
+

8 MM
11 US 100% LITTLE SEWING
0 UK PETITE WOOL WAK TAG NEEDLE weareknitters.com
CHESS CUSTOMIZE!
Row 13: *knit 4 stitches. Transfer the fol- ject. Knit the next stitch. Take up the stitch
lowing stitch onto a help needle in front of that you left without knitting and knit it. Knit Find different styles and knitting levels
the project. Knit the next stitch. Take up the 1 stitch*. Repeat from * to * until there are in our online store. You will also find
stitch that you left without knitting and knit only 2 stitches left and knit them. all the knitting supplies you may need:

BEANIE it. Knit 2 stitches. Transfer the next stitch Once you are done knitting, customize wool and Pima cotton yarn balls, fabric
yourproject with pins, brooches, etc. Have
onto a help needle behind the project. Knit Row 25: *knit 2 stitches. Transfer the fol- yarn and different sized knitting nee-
the next stitch. Take up the stitch you left lowing stitch onto a help needle behind of fun with it! Send us your pics through Insta-
gram using the hashtags #weareknitters &
dles. All at weareknitters.com
without knitting and knit it. Knit 2 stitches*. the project. Knit the next stitch. Take up the
The project is knitted in one piece, knit-
stitch that you left without knitting and knit #chessbeanie !
ting the rows along the length of the whole
Repeat from * to * until there are only 2 it. Knit 6 stitches. Transfer the following

DOUBTS?
beanie.
stitches left and knit them. stitch onto a help needle in front of the pro-
ject. Knit the next stitch. Take up the stitch

START KNITTING
Row 15: *knit 5 stitches. Transfer the fol- that you left without knitting and knit it*. Re-
lowing stitch onto a help needle in front of peat from * to * until there are only 2 stitches You can watch our video tutorials at weare-
the project. Knit the next stitch. Take up the left and knit them. knitters.com.You can also send us an email to
1. Cast on 62 stitches onto one of your stitch that you left without knitting and knit info@weareknitters.com. We will come
wooden needles. it. Transfer the next stitch onto a help nee- Row 27: knit 1 stitch. *Transfer the following back to you asap.
dle behind the project. Knit the next stitch. stitch onto a help needle behind of the pro-
Take up the stitch you left without knitting ject. Knit the next stitch. Take up the stitch

WAK WOOL
2. Knit rows 1 to 6 in Rib Stitch 1x1: Always
knit one stitch and purl one in an alternating and knit it. Knit 3 stitches*. Repeat from * that you left without knitting and knit it. Knit
fashion until you have completed the row. to * until there are only 2 stitches left and 8 stitches. Transfer the following stitch onto
knit them. a help needle in front of the project. Knit the
next stitch. Take up the stitch that you left The WE ARE KNITTERS wool is 100%
3. Knit rows 7 to 42 as follows:
Row 17: *knit 6 stitches. Transfer the fol- without knitting and knit it*. Repeat from * natural. Its softness is due to its origin: the Join the knitters
Row 7: knit one stitch. *Transfer the follow- lowing stitch onto a help needle behind of to * until there are only 2 stitches left and Peruvian Andes. Over there, sheep live in community
ing stitch onto a help needle in front of the the project. Knit the next stitch. Take up the knit them. optimal conditions, allowing the production
project. Knit the next stitch. Take up the stitch that you left without knitting and knit of top quality wool. Because of this, you will
stitch that you left without knitting and knit it. Knit 4 stitches*. Repeat from * to * until Row 29: Transfer the first stitch onto a help end up wearing a luxurious and long-lasting
it. Knit 8 stitches. Transfer the next stitch there are only 2 stitches left and knit them. needle behind of the project. Knit the next garment. If you take care of it, you will prob- Follow us on:
stitch. Take up the stitch that you left with- ably be able to wear it your whole life. Facebook
onto a help needle behind the project. Knit Twitter
the next stitch. Take up the stitch you left Row 19: *knit 5 stitches. Transfer the fol- out knitting and knit it. *Knit 10 stitches.
Pinterest

MORE WAK
without knitting and knit it*. Repeat from * to lowing stitch onto a help needle behind of Transfer the following stitch onto a help Instagram
* until you have completed the row and knit the project. Knit the next stitch. Take up the needle in behind the project. Knit the next Youtube
the last stitch. stitch that you left without knitting and knit stitch. Take up the stitch that you left with- Google +

Even rows: purl all stitches.


it. Transfer the following stitch onto a help
needle in front of the project. Knit the next
stitch. Take up the stitch that you left with-
out knitting and knit it.* Repeat from * to *
until you have completed the row. DESIGNS
Row 9: knit 2 stitches. *Transfer the follow- out knitting and knit it. Knit 3 stitches*. Re- Repeat rows 7 to 30 until you get to row 42.
ing stitch onto a help needle in front of the peat from * to * until there are only 2 stitches

HOW TO
project. Knit the next stitch. Take up the left and knit them.
stitch that you left without knitting and knit
it. Knit 6 stitches. Transfer the next stitch Row 21: *knit 4 stitches. Transfer the fol-
onto a help needle behind the project. Knit
the next stitch. Take up the stitch you left
lowing stitch onto a help needle behind of
the project. Knit the next stitch. Take up the
stitch that you left without knitting and knit
END YOUR
PROJECT
without knitting and knit it. Knit 2 stitches*.
Repeat from * to * until you have completed it. Knit 2 stitches. Transfer the following
the row. stitch onto a help needle in front of the pro-
ject. Knit the next stitch. Take up the stitch
Row 11: knit 3 stitches. *Transfer the fol- that you left without knitting and knit it. Knit 1. Cut a thread long enough to sew the
lowing stitch onto a help needle in front of 2 stitches*. Repeat from * to * until there are sides of your beanie. Thread the little sew-
the project. Knit the next stitch. Take up the only 2 stitches left and knit them. ing needle and place it through all the stitch-
stitch that you left without knitting and knit es. Once you have finished, pull the thread
and close this side of the beanie. Subscribe to our newsletter to
it. Knit 4 stitches. Transfer the next stitch Row 23: *knit 3 stitches. Transfer the fol- SIENNA
onto a help needle behind the project. Knit lowing stitch onto a help needle behind of receive exclusive
the project. Knit the next stitch. Take up the 2. In order to finish, you need to sew the lat-
the next stitch. Take up the stitch you left
eral part of your beanie. Tie a knot at the BEANIE WE ARE KNITTERS news,
without knitting and knit it. Knit 1 stitch*. Re- stitch that you left without knitting and knit
end and hide the remaining thread among promotions, free patterns, knitting
peat from * to * until there are only 2 stitches it. Knit 4 stitches. Transfer the following
stitch onto a help needle in front of the pro- the already knitted stitches. tips and new video tutorials!
left and knit them.

Das könnte Ihnen auch gefallen