Producing ATM Master Plan

and ATM Implementations


in Myanmar
Rapid Traffic Growth Major Traffic Flow
Rate within Yangon FIR

Over flight Traffic Growth Domestic Traffic Growth

Year Traffic Growth Year Traffic Growth


2011 150756 2011 19095
2012 160293 (6.3%) 2012 23848 (24.2%)

2013 171690 (7.1%) 2013 29120 (23%)

2014 183324 (6.8%) 2014 32060 (10.1%)


Enhanced Aviation Infrastructure

Project for Capacity Development


on CNS/ATM Systems

Assistance by JICA

4 years project (Sept14 to Sept18)

5 Objectives (One is to develop CNS/ATM Master Plan)


Targets for the Project

Enhancement of capability to produce CNS/ATM


Development Master Plan

1-1 Current CNS/ATM systems are analyzed

Phased long-term plans for development of CNS/ATM are


1-2
produced

Action plans on the short-term development plan are


1-3
produced
Phased Deliverables

Activities Mar. 2015 Mar. 2016 Mar. 2017 Mar. 2018 Sep. 2018

Current CNS/ATM systems


1-1 Analyzed - - - -
are analyzed

Phased long-term plans for Will be Will be


1-2 development of CNS/ATM started by completed - - -
are produced Apr. 2015 by Oct. 2015
Will check Will check
Will check
Action plans on the short- progress progress
Will be Will be progress
periodically, periodically,
1-3 term development plan are started by completed periodically,
and update and update
produced Oct. 2015 by Mar. 2016 and update
as as
as necessary
necessary necessary
Activities from Apr. 2015 to Mar. 2016

To produce Phased Long-Term Development Plan


Will produce phased long-term development Plan
- 2018: short-term,
- 2019-2023: medium-term,
- 2024-2028: long-term based on the followings and demand
forecast in Yangon FIR:

Analyzed current CNS/ATM system in Myanmar

Studied CNS/ATM plans in advanced countries (Japan, US, EU) and


neighboring countries

Confirmed ICAO GANP, ASBUs, ICAO APAC Seamless ATM Plan and
Roadmap for Transition from AIS to AIM
Activities from Apr. 2015 to Mar. 2016

To produce Short-term Development Plan


Will extract short-term activities from produced
phased long-term development plans and will produce
detailed short-term development plan.

To produce Medium-term Development Plan


Will extract medium-term activities from produced
phased long-term development plans and produce
detailed medium-term development plan.
Contents of Phased Long-term Development Plans

Results of Evaluated
CNS/ATM systems
Phased
Long-team
GANP, ASBUs
Development
Plans
Asia Pacific Seamless
ATM Plan V1.0
Concept of Development of the CNS/ATM master plan

Future ATM
Current CNS/ATM plan
Development Plan Future CNS Phased Long-Term
(Myanmar Air Transport Sector
plan Plan
Report, Air Traffic Management
Modernization Plan, ICAO
proposal, etc. )
Future AIM
Review plan extract

Short and Medium


Monitoring for the Term
Development periodically, Development Plan
and update as necessary

Orange boxes are completed


Enhanced Aviation Infrastructure
Implementations by DCA Myanmar
(ASBU B0-APTA PBN)

working together with Honeywell/Hughes Aerospace, RNAV1


based PBN SID/STAR procedures for VYYY and VYMD already
published in May 2015
between VYYY/VYNT/VYMD , a Uni-directional PBN Parallel route
to introduce in this year
during 2014 to 2018, PBN SID/STAR procedures for 15 domestic
airports are planned to introduce with JICAs Technical Assistant
Project .
under discussion with AEROTHAI for provision of GPS RAIM
Prediction Information
Enroute PBN Implementation
Enhanced Aviation Infrastructure
Implementations by DCA Myanmar
Conducting FUA Workshop on 28-29 July15 in Yangon
by ICAO - RSO

Will conduct Advanced ATFM Workshop on 3-5 August15


by ICAO-RSO

Myanmar is implementing transition from AIS to AIM as per ICAO


timeline:
Phase I (Consolidation) is already finished
During FY 2015-16, budgeting as package 1, to set up
Aeronautical Information Database and produce e-AIP
The rest will be in package 2 during next FY
Enhanced Aviation Infrastructure

Implementations by DCA Myanmar


Installed 2 ADS-B ground stations at Co Co. Island and Sittwe (not
yet operational)
Sign agreement between India and Myanmar for ADS-B Data
sharing by May15
under installation 3 more ADS-B at VYYY/VYMD/VYME
JICA Grant Aid Project to install one ASR at YIA is on-going
process
AIDC to implement with BKK & Kolkata after upgrading current
Eurocat-C system by end of 2015/ early 2016 (Technical Coop
meeting with Aerothai by last week of August)
New ATM Center will establish. Building construction will be
finished by early 2017
New Sectorisation @ VYYY
Note:Sector 3 centered at HGU with 100 NM Radius.
Sector 3 will run border of Thailand and not penetrate Sector 4.

Sector 1
F560
F200
Sector 2
F560
GND

Sector 3
F200
GND

Sector 4
F560
GND