1. Background
1.1. The mission of the United States Patent and Trademark Office (USPTO)
is to administer the laws and regulations related to patents and trademarks
in order to promote industrial and technical progress in the United States and
strengthen the national economy. The USPTO carries out its mission by
examining patent and trademark applications, issuing patents and
registering trademarks, disseminating patent and trademark information to
the public and by encouraging a domestic and international climate in which
intellectual property can flourish.
2. Scope of Work
2.1. The Contractor shall provide technical support for all phases of system
planning and design through deployment to ensure that USPTO Office of the
Chief Information Office (OCIO) IT solutions enable their internal and external
users to meet their mission, goals, and objectives. These efforts include the
full range of infrastructure engineering design, enterprise architecture
standards, prototyping, integration, including, but not limited to, concept
development, planning, requirements definition and analysis, systems design,
1
integration, and deployment.
2.2.1. Infrastructure
2.2.2. Design: The Contractor shall advise and assist the USPTO in the
design of systems that support emerging enterprise architectures for
areas such as IT infrastructure, security, networks, application integration,
application architecture, data architecture and distributed computing.
2.2.3. Engineering
2
design, network engineering, PKI, wireless communications, telephony,
VOIP, voicemail systems, call accounting systems, video
teleconferencing capabilities, secure remote access capabilities,
monitoring, reporting on activities and performance, capacity planning
of network resources, and advising the Infrastructure Engineering
Office (IEO) Director on recommended actions.
3
and resources. The firewall components include capabilities that allow
for the centralized monitoring and management of data traffic coming
in or out of USPTO, permit network-based intrusion prevention, enable
user authentication, and allow secured data exchange. The firewall
infrastructure provides the flexibility to support and secure USPTO
applications/systems as they develop and expand.
2.2.3.8. Network
System/Enterprise Architecture
Network Architecture
Application Architecture
Data Architecture
2.2.5. Integration
4
provide for these changes with the new or revised products on the
contract. All projects shall require expansion and/or alteration of the
infrastructure. Further, rapid delivery of automated systems requires
upgrading USPTOs development infrastructure, software processes,
and methodology.
3.1.2. The Contractor shall develop, update, and maintain the following
Agile artifacts: User Stories and Use Cases, Product Backlog, Sprint
Backlog, Product Burn-down Charts, and Release Burn-down Charts.
5
processes mature.
3.2.1. All USPTO Support Contractors shall follow the USPTO Change
Management, Release Management, and Problem Management processes.
They are integral parts of effective IT Service Management and are part of
the ITIL best practices framework.
3.2.2. ITIL disciplines used at USPTO include processes for Service Desk,
Incident Management, Problem Management, Configuration Management,
Change Management, Release Management, Capacity Management,
Availability Management, Continuity Management, Financial Management,
Service Level Management and Security Management. The Remedy
software product was deployed a USPTO and shall be used by contractors
for, Incident Management, Problem Management and Change
Management.
7.1. The Contractor shall propose the labor mix necessary to complete each
issued task order.
7.2. The USPTO will not provide or pay for training, conferences, or seminars
to be given to contractor personnel in order for them to perform their tasks,
with the exception of USPTO-specific and specialized training not obtainable
outside the USPTO (e.g., patent examination process class). The Contractor
is expected to provide trained, knowledgeable personnel according to the
6
requirement of the Task Order. If it is determined during the performance of
the task order that training, conferences, or seminars not specified in the
task order are required, only the Contracting Officer may approve the
training.