Beruflich Dokumente
Kultur Dokumente
1. The host is to install the ODE board inside the state, the following figure:
2. The following two row of thread according to the direction from the hard shell
position side hole in the following figure:
3. Then the red and black wire from next to the hole into the diagram below:
4. Two row after line and the red and black power supply cord into the diagram
below:
5. Connect the two row line and the red and black is good, the figure below:
6. Will be about two row of thread on PCB edge to prepare viscose, the diagram
below:
7. Gluons, glue the diagram below:
8. PCB board in the shell, the other two small platoon line from two holes through and
good, the figure below:
9. Will be around two big row thread gently push PCB after straightening, then put the
PCB in order to drive in the following, gently push to, the following figure:
10. Hard disk and after PCB advance to stay outside too long line with gluons
fold, the diagram below:
11. Finally all the thread ends connected and will power and drive installed, the
following figure: