Sie sind auf Seite 1von 5

HOW CHIN ENGINEERING

Job Safety Analysis

JOB DESCRIPTION

TYPES OF WORK : Modification of pipeline of air compressor


LOCATION OF WORK: Fire pump house

REQUIRED PERSONAL PROTECTIVE EQUIPMENT

x Safety Helmet Cotton Gloves Work Vest


x Safety Shoes / Boots Welding Gloves Safety Vest
x Safety Glasses x Leather Gloves Safety Harness / Belt
x Face / Welding Shield Leather Apron Face Mask
Goggles Gauntlets Ear Protection
Life Jackets Dust Mask Others (Specify): _________________

OTHER SAFETY EQUIPMENT / REQUIREMENTS

x Fire Extinguisher Tag Out / Lock Out


Gas Detector x Work Permit
x Safety Signs Competency Certificate
x Barricades Respirator
Lifeline x First Aid Equipment

Responsib
N Activity
Potential Hazard Control/ Recovery Measures le/ Action
o ( Job Steps )
By
1. Work permit Unauthorized Authorized lead-operator / in-charge shall ensure obtaining and Lead-
from Client commencement of maintaining valid work permit. operator
to be works may result in The worksite supervisor responsible for this activity has to check
obtained. exposing workers the PPE of his staff to ensure that all required items are available Supervisor
and or potential to and properly used.
HOW CHIN ENGINEERING

harm or danger Inform all workers regarding permit condition before work starts. Safety
Worksite supervisor shall conduct toolbox talks about nature of standby
works and associated potential hazards and their essential
precautionary measure. Fire watch
Safety standby and fire watch required
2 Pre-task The work force does Ensure that the pre task briefing is given out in a language Supervisor
briefing not understand the understood by the work force, have it translated.
toolbox pre task briefing Ask question regarding the briefing to get feedback from the staff, Workers
talks. therefore does not this ensures full comprehension.
understand the Issue required appropriate PPE and replace PPE that has signs of
potential dangers defect.
and control
measures to be
implemented. Some
of the workers could
be lacking PPE or
using defective PPE.
HOW CHIN ENGINEERING

3 Cutting the Fire potential Fill the diesel pipeline with water Safety
pipe Using Water hose and extinguisher should be stand-by on-site standby
the grinder Congestion Avoid extra personnel at work site.
Bodily Injury Fire watch
Tie the pipeline to prevent it from falling or giving retarding force
Electric Shock after cut.
workers
Make sure accessories are rated for the recommended speed to prevent
Supervisor
Fire parts from flying apart.
Make sure the switch is in the OFF position before connecting into a
power supply. Workers
Eye Injury
Change accessories before connecting into a power supply.
Use proper guard with grinding wheel to protect against flying broken
fragments.
Use leather gloves when handling the wire brushes.
Wear protective clothing and wash exposed areas with soap and water.
Hold tool by insulated gripping surfaces
Direct sparks away from self, any person, or flammable material.
Wear proper eye protection Face shield
Wear appropriate hearing protection during use.
Make sure the side handle is tightened.
Always have a secure and firm grip on the side handle.
Make sure the wheel comes to a complete stop before laying the tool
down.
Allow the tool to reach full speed before touching the work surface.
Remove the tool from the work surface before turning it off.

6 Using the Hand injury while Control oil contact with the floor. Supervisor
pipe threader sliding the pipe Clean up spills
through. Workers
Wear eye protection.
Muscle strain
Skin or eye injury
Position pipe without reaching over the threader.
from the cutting oil Dont tighten the clamp while the machine is running.
being delivered to Keep your foot out of the foot safety switch.
the pipe. Keep hand away from the die.
Hand injury from Dont clean the die or the pipe end with your hands.
rotating threads
HOW CHIN ENGINEERING

Injuries due to Dont start the machine until the die is set.
clothing catching on Wear gloves and dont touch the rotating threads.
the threader.
Use a steel brush or similar instrument to clean the threads.
Keep your gloved hands away from the rotating pipe.
Remove foot from the safety switch, flip the switch off, and
ensure the pipe has stopped rotating.
Wear gloves.
Remove foot from the safety switch, flip the switch off, and
ensure the pipe has stopped rotating.
Keep your fingers (gloved) away from the vise jaws .

5 Using Power Electrical shock Ensure to inspect tools, power cords, electrical fittings and wire Supervisor
Tools at hazards condition.
work area Short circuits in Never use bare hand or wet glove to change electrodes. Workers
wiring/ equipment Never stand on wet or grounded surface when changing
tripping electrodes.
Ensure all electric tools equip with functional ELCB plug top.
Use industrial grade connection
6 Using hand- Pinching, back Wear eye protection Supervisor
tools strain, smashing, Wear proper fitting gloves
cutting Clear area of other people
Eye injuries
Photo Ignition / flash Turn of the flash Supervisor
taking
Install and Hand injury Wear proper PPE (leather glove)
remove the Pipes falling when Plan the work, careful when handling the hand tools and
pipes fixing materials

7 Work during Over exposure to Become acclimated to the heat gradually before working in hot Supervisor
extreme heat temperatures for a long time;
weather/ Ensure 100% availability of cold water and always drink plenty of Workers
climate cool water;
conditions. Wear hats and sunglasses to help stay cool;
HOW CHIN ENGINEERING

Take frequent breaks in a cool place, if possible;


Wear loose clothing that allows the skin to breathe, such as cotton;
Protect your skin from the sun. Keep as much of it covered with
clothing as possible. Wearing long-sleeved shirts will help;
Field supervision/ supervisor shall closely monitor the condition of
workers, intervene as the need arises.
8 General Unattended/ Pack-up all the tools and Barricades Before Leaving The Job Supervisor
Items Before abandoned Clear debris From Equipment And job site, Secure All Material
Leaving Job materials or tool Before Exiting The Job Workers
Site / House that can able the Perform two-men carry works where it is needed.
-keeping Employees Exposed Restore Property To Its Original Condition To The Best Of Your
To Falling In Ability
Messy or Unsafe
Work Site-Looks Bad
For Company &
Unsafe For Public
Debris Falling From
wheel-barrow

Prepared By : Reviewed By : Date : 03 August


2016
Contractor / Contractor Representative Lead-operator / In-charge

Das könnte Ihnen auch gefallen