New Port Project Check sheet of Fuel Oil System Delivery &

Construction Development Co. LLC Storage


Boom Construction Co. LLC - JV
NPP/0047: Centralized Customs Inspection Area
Form Ref: FM-CDC47-1158 Rev 0
Location : Storage Area
IR Ref. :
MS Ref. : NPP0047-MEC-MS-00035_3
ITP Ref. : NPP0047-MEC-ITP-00035_3
RA Ref. : NPP0047-MEC-RA-00035_3

Structure : Date : 14/05/2016


COMPLIANCE
S.NO. DESCRIPTION/ TOPIC REMARKS
Yes No N/A
DELIVERY AND STORAGE
1 Materials Approval Submittal (MAS) are approved.
2 Delivered materials are free from defects.
If hand loading is to be carried out, the personnel used proper PPE such as hand gloves.
3 The unloading and loading process are supervised by a supervisor.

The material storage area shall be free from obstruction and materials shall be stored in
4 a manner complying with the manufacturers recommendation.

5 Pipes And Fittings


a. Delivered pipes and tubes with factory-applied end caps.

b.Supported to prevent sagging and bending.

6 Paints
a. Delivered materials with manufacturers labels intact.

b. Delivered materials in manufacturers original, unopened packages and containers


bearing the manufacturers name and label and the following information:
i. Product name or title of material. ii. Product description (generic classification or binder
type). iii. Manufacturers stock number and date of manufacture. iv. Contents by volume,
for pigment and vehicle constituents. v. Thinning instructions. vi. Application instructions.
vii. Colour name and number viii. VOC content

c. Materials is stored in clean, dry, well-ventilated areas, away from heat, sparks, flame,
and direct rays of sunshine; maintain storage areas free from fire hazard.

7 Valves
a. Valves are stored protected from light, heat, dust, dirt, and humidity.
b. Valves are identified & seperated as per their type, size, schedule, sizes.

Note / Remarks:

CDC-Boom JV Other Parties


AGENCY >>> CDC-Boom JV QA/QC PMC
Site Engineer (as required)

NAME

DATE
SIGNATURE
New Port Project Check Sheet for Pipes for Fuel Oil System
Construction Development Co. LLC Fabrication and Painting
Boom Construction Co. LLC - JV
NPP/0047: Centralized Customs Inspection Area
Form Ref: FM-CDC47-1159 Rev 0
Location :
IR Ref. :
MS Ref. : NPP0047-MEC-MS-00035_3
ITP Ref. : NPP0047-MEC-ITP-00035_3
RA Ref. : NPP0047-MEC-RA-00035_3

Structure : Date :
COMPLIANCE
S.NO. DESCRIPTION/ TOPIC REMARKS
Yes No N/A
FABRICATION CHECKS
1 Pipes are cut into the desired length as per the latest approved drawing
2 Visually inspected the pipe for any damages

The surfaces to be welded shall be smooth, uniform, and free from laminations, tears,
3 scale, slag, grease, paint, and other deleterious materials that might adversely affect the
welding.

3 All the open ends plugged after completing the work.


Both end of the pipe to be welded shall be at the right angle of level and the size of the
4
Vbel and root face in accordance with procedure specification
The two prepared ends to be welded pipe to pipe or pipe to fitting shall be aligned as
5 accurately as is practical and ensuring that the spacing between the abutting ends is in
accordance with the procedure specification used
6 Offset between the surface caused by dimensional variation shall be minimized.

PAINTING CHECKS
1 Application of paint has been done as per manufacturer's requirement.
2 Pipes are stored properly after the paint work.
3 Mininum coating thickness provided.
4 Check the finishing paint of pipes. If properly painted as per requirements.

Note / Remarks:

CDC-Boom JV Other Parties


CDC-Boom JV QA/QC PMC
NAME Site Engineer (as required)

DATE
SIGNATURE
New Port Project
Construction Development Co. LLC Check sheet for the Fuel Oil System Installation
Boom Construction Co. LLC - JV
NPP/0047: Centralized Customs Inspection Area
Form Ref: FM-CDC47-1160 Rev 0
Location :
IR Ref. :
MS Ref. : NPP0047-MEC-MS-00035_3
ITP Ref. : NPP0047-MEC-ITP-00035_3
RA Ref. : NPP0047-MEC-RA-00035_3

Structure : Date :
COMPLIANCE
S.NO. DESCRIPTION/ TOPIC REMARKS
Yes No N/A
INSTALLATION CHECKS
1 Material Approval Submittal(s) for the installed material(s) is/are approved.
2 Method Statement, ITP and Risk Assessment are approved.
3 The layout of pipe is as specified in the latest reviewed shop drawing.
4 Pipe support and hangers are installed correctly as per latest shop drawings.
5 Pipes are free of any physical damage or misalignment.
6 Piping are not subjected to external loads by other materials
7 Pipes are not interfering with other services.
All valves & accessories installed as per latest shop drawings & manufacturer's
8
recommendation

Note / Remarks:

CDC-Boom JV Other Parties


CDC-Boom JV QA/QC PMC
NAME Site Engineer (as required)

DATE
SIGNATURE
New Port Project
Construction Development Co. LLC
Testing Check Sheet for Fuel Oil System
Boom Construction Co. LLC - JV
NPP/0047: Centralized Customs Inspection Area
Form Ref: FM-CDC47-1162 Rev 0
Location :
IR Ref. :
MS Ref. : NPP0047-MEC-MS-00035_3
ITP Ref. : NPP0047-MEC-ITP-00035_3
RA Ref. : NPP0047-MEC-RA-00035_3

Structure : Date :
COMPLIANCE
S.NO. DESCRIPTION/ TOPIC REMARKS
Yes No N/A
TESTING CHECKS
1 Method Statement, ITP and Risk Assessment are approved.

2 Verify pipes and fittings are installed as shown on the latest reviewed shop drawings

3 Visual and bubble test inspections for leaks have been completed.

4 The installation is free from stresses or casual breaks

5 Pipes are free of any physical damage or misalignment.

6 Pipes are not interfering with other services.

7 The gauges/ equipments used for pressure testing are calibrated

8 System are pneumatically tested at 1.5 times the working pressure.

9 The test pressure was maintained for 6 hours


10 Pressure test was conducted to ensure that there are no leaks in the piping system

Note / Remarks:

CDC-Boom JV Other Parties


CDC-Boom JV QA/QC PMC
NAME Site Engineer (as required)

DATE
SIGNATURE

Page 1 of 2
Page 1 of 2
New Port Project
Construction Development Co. LLC Flushing Check Sheet for Fuel Oil System
Boom Construction Co. LLC - JV
NPP/0047: Centralized Customs Inspection Area
Form Ref: FM-CDC47-1162 Rev 0
Location :
IR Ref. :
MS Ref. : NPP0047-MEC-MS-00035_3
ITP Ref. : NPP0047-MEC-ITP-00035_3
RA Ref. : NPP0047-MEC-RA-00035_3

Structure : Date :
COMPLIANCE
S.NO. DESCRIPTION/ TOPIC REMARKS
Yes No N/A
FLUSHING CHECKS
Ensure that isolation valves provided in each equipment are close to avoid sand, debris
1 and other foreign particles to enter in every equipment.
2 All lines will be flushed at 4.5 Bar pressure
By maintaining the same pressure, open vent valves at the opposite end of the line to
3
remove the foreign particles from the pipeline
Ensure that aluminum foil paper are kept at the end of the vent line to trace out debris
4
and foreign materials
5 Ensure that there is no trace of debris & foreign materials by repeating the procedure

Note / Remarks:

CDC-Boom JV Other Parties


CDC-Boom JV QA/QC PMC
AGENCY >>> Site Engineer (as required)

NAME

DATE
SIGNATURE

Page 2 of 2
PRESSURE TEST REPORT
Format No : FU-QA-07 Rev-00
Client Location
Site Item
Project Consultant.
Report No: Date:

Working Pressure mbar

Test pressure : bar

Holding time at test pressure: hrs

Bottom Gauge Top Gauge Start Date & Time


Pressure gauge Sl no

Pressure gauge calibration date

Pressure gauge reading: Finish Date &


Time

Test medium: Nitrogen

Test temperature: Ambient

Flushing with Nitrogen: YES

TEST CYCLE
Bottom Gauge Top Gauge
PRESSURISING GAUGE HOLDING TIME GAUGE HOLDING TIME
SEQUENCE READING (bar ) Hrs READING (bar) Hrs

2
REMARKS:

RESULT
ACCEPT REJECT

GASCO GASCO Consultant


Site Incharge Q.A.Engineer Engineer

Signature

Name

Date