Sie sind auf Seite 1von 19

ESE 2017

UPSCENGINEERINGSERVICESEXAMINATION

Preliminary Examination

Paper General Studies and


I Engineering Aptitude

7
Basics of Project Management

Comprehensive Theory with Practice Questions


As per new syllabus of ESE 2017

Publications

www.madeeasypublications.org
Publications

MADE EASY Publications


Corporate Office: 44-A/4, Kalu Sarai (Near Hauz Khas Metro Station), New Delhi-110016
E-mail: infomep@madeeasy.in
Contact: 011-45124660, 08860378007
Visit us at: www.madeeasypublications.org

ESE-2017 : Preliminary Examination


Paper-I : General Studies and Engineering Aptitude

Basics of Project Management


Copyright, by MADE EASY Publications.
All rights are reserved. No part of this publication may be reproduced, stored in or introduced into a retrieval
system, or transmitted in any form or by any means (electronic, mechanical, photo-copying, recording or
otherwise), without the prior written permission of the above mentioned publisher of thisbook.

1st Edition : 2016

MADE EASY PUBLICATIONS has taken due care in collecting the data and providing the solutions, before publishing this book.
Inspite of this, if any inaccuracy or printing error occurs then MADE EASY PUBLICATIONS owes no responsibility. MADE EASY
PUBLICATIONS will be grateful if you could point out any such error. Your suggestions will be appreciated.

All rights reserved by MADE EASY PUBLICATIONS. No part of this book may be reproduced or utilized in any form without the
written permission from the publisher.
Preface
The compilation of this book Basics of Project
Management was motivated by the desire to provide a
concise book which can benefit students to understand
the concepts of Project Management topics.

This textbook Basics of Project Management provides


all the requirements of the students, i.e. comprehensive
coverage of theory, fundamental concepts and objective
type questions articulated in a lucid language. The
concise presentation will help the readers grasp the theory of this subject with clarity and apply
them with ease to solve objective questions quickly. This book not only covers the syllabus of ESE
but also addresses the need of many other competitive examinations. Topics like Basic Concepts
and Project Life Cycle, Initiation Process : Project Formulation and Appraisal, Project Organisation,
Planning Process : Project Planning and Scheduling, Execution Process: Project Monitoring and
Control, Closing Process: Project Evaluation and Termination, Tender and Contract are given full
emphasis, keeping in mind of our research on their importance in competitive examinations.

We have put in our sincere efforts to present detailed theory and MCQs without compromising the
accuracy of answers. For the interest of the readers, some notes, do you know and interesting facts
are given in the comprehensive manner. At the end of each chapter, sets of practice question are
given with their keys, that will allow the readers to evaluate their understanding of the topics and
sharper their question solving skills.

Our team has made their best efforts to remove all possible errors of any kind. Nonetheless, we would
highly appreciate and acknowledge if you find and share with us any printing and conceptual errors.

It is impossible to thank all the individuals who helped us, but we would like to sincerely thank all
the authors, editors and reviewers for putting in their efforts to publish this book.

With Best Wishes

B. Singh
CMD, MADE EASY
General Studies and Contents
Engineering Aptitude

Basics of Project Management


Chapter 1 Chapter 3
Basic Concepts and Project Life Cycle..... 1 Project Organisation.............................. 49
1.1 What is Project?.................................................................. 1 3.1 Introduction.......................................................................49
1.1.1 Characteristics and Features of a Project.... 1 3.1.1 Attributes/ Qualities of a Good Project
1.1.2 Classification of Projects (Taxonomy of Manager................................................................49
Projects).................................................................. 2 3.1.2 Role of the Project Manager..........................50
1.2 What is Management?..................................................... 3 3.2 Type of Project Organisations.....................................51
1.3 What is Project Management?...................................... 3 3.2.1 Functional Organisation/Traditional/
1.3.1 Characteristics of Project Management...... 3 Classical Organisation......................................51
1.3.2 Different Types of Management.................... 4 3.2.2 Product Organisation.......................................52
1.4 Project Life Cycle................................................................ 4 3.2.3 Matrix Organisation..........................................53
1.4.1 Project Life Cycle (4 Phases)............................. 4 3.2.4 The Strong, Weak or Balanced Matrix........55
1.4.2 Level of Effort (Intensity of Activities).......... 6 3.3 Project Organisation Structure...................................56
1.4.3 Level of Influence Vs. Cost of Changes Objective Brain Teasers................................................57
(Front-End Importance)..................................... 7
1.4.4 Product Life Cycle (10 Phases)........................ 7 Chapter 4
1.5 Project Management Process........................................ 9 Planning Process :
Objective Brain Teasers................................................11 Project Planning and Scheduling.......... 59
4.1 Planning..............................................................................59
Chapter 2 4.2 Scheduling ........................................................................59
Initiation Process : 4.3 Implementation and Control.......................................59
Project Formulation and Appraisal....... 14 4.4 Work Break Down Structure.........................................59
2.1 Project Formulation and Development...................14 4.5 Techniques Used for scheduling................................61
2.1.1 Pre-Investment Phase......................................14 4.5.1 Bar Charts.............................................................61
2.2 Project Appraisals............................................................16 4.5.2 Mile-Stone Charts..............................................61
2.2.1 Technical Analysis/Technical Appraisal.....16 4.5.3 Line of Balance (LOB) Techniques................62
2.2.2 Market and Demand Analysis.......................17 4.5.4 Network Method of Scheduling...................62
2.2.3 Financial Analysis/Financial Feasibility......23 4.6 Network Diagram.............................................................62
2.2.4 Economic Analysis (Economic Feasibility).... 29 4.6.1 Elements of a Network....................................63
2.2.5 Social Cost Benefit Analysis (SCBA).............29 4.6.2 Rules of a Network............................................66
2.5 Formulation of Detailed Project Reports (DPR)....34 4.7 Network Scheduling Techniques...............................67
2.6 Project Risk Analysis........................................................36 4.7.1 Programme Evaluation and Review
Objective Brain Teasers................................................43 Technique (PERT)...............................................67
4.7.2 Critical Path Method (CPM)............................70 6.1.2 Evaluation Methods....................................... 110
4.7.3 Comparison between PERT and CPM .......73 6.2 Networking Updating of Network Diagram........ 112
4.7.4 CPM Systems.......................................................73 Objective Brain Teasers............................................. 113
Objective Brain Teasers................................................78

Chapter 7
Chapter 5 Tender and Contract............................. 114
Execution Process: 7.1 Project Contract............................................................. 114
Project Monitoring and Control............ 89 7.1.1 Type of Contracts............................................ 114
5.1 Project Control System...................................................89 7.2 Project Tender................................................................ 115
5.1.1 Tools Used for Project Control......................89
7.3 Project Cost Estimate................................................... 118
5.1.2 Earned Value Analysis (EVA)...........................90
7.3.1 Objectives of Cost Estimate........................ 118
5.1.3 Critical Ratio........................................................92
7.3.2 Methods of Cost Estimate........................... 118
5.1.4 Line of Balance (LOB).......................................92
7.3.3 Project Cost Components............................ 119
5.1.5 Graphical Evaluation and Review Technique
7.3.4 Cost Funnel....................................................... 119
(GERT)....................................................................93
7.4 Types of Cost Estimates.............................................. 120
5.1.6 Network Simulation..........................................95
7.4.1 Conceptual Cost Estimate........................... 120
5.1.7 Outsourcing Method........................................96
7.4.2 Semidetailed Cost Estimate........................ 121
5.1.8 Review Meetings...............................................96
7.4.3 Detailed Cost Estimate................................. 121
5.2 Tips for Efficient Implementation of Projects........96
7.5 Project Sickness............................................................. 122
5.3 Project Information System..........................................97
7.6 MiscellaneousTopics................................................... 124
5.4 Resource Allocation........................................................97
7.6.1 What is Cost Overrun?.................................. 124
5.4.1 Resource Leveling.............................................98
7.6.2 What is Credit Rating?................................... 124
5.4.2 Resource Smoothening................................ 100
5.5 Project Cost Control..................................................... 101 7.6.3 What is Capital Cost?..................................... 125

5.5.1 Time-Cost Trade-off....................................... 101 7.6.4 What is Operating and Maintenance Cost?....125

5.5.2 Cost Model Analysis....................................... 101 7.6.5 What is Enterprise Resource Planning (ERP)?......126

Objective Brain Teasers............................................. 107 7.6.6 What is ABC Analysis?................................... 127


7.6.7 What is Economic Ordering Quantity (EOQ)?........

Chapter 6 (Wilson Harris Model for Inventory Control)..127

Closing Process: 7.6.8 What is Technical Consultancy

Project Evaluation and Termination... 110 Organisations (TCOs)?................................... 131

6.1 Project Evaluation......................................................... 110 7.7 Value Analysis and Value Engineering................... 131

6.1.1 Project Evaluation Objectives.................... 110 Objective Brain Teasers............................................. 135

nnnn

(v)

Das könnte Ihnen auch gefallen