1 Part A: Survey Work

Topographic Survey with a grid area of 15MX15M, includes


all features such as structures (bridges, culverts etc.)
utilities, existing roads, electric and telephone installations
(both O/H as well as underground), huts, buildings, fencing
2 and trees, oil, water and gas lines etc. using Total Station
and develop a drawing in AUTO CAD format using the
layering system and Geo referencing including supply of
detailed drawings in appropriate scale in A-2 size complete
in all respect.
3 For preparation of plans of Open Areas 10Hect.
Topographic Survey by taking longitudinal sections at
every 10m interval, cross sections at every 5m interval on
either side of centerline of Road including supply of
4 detailed drawings in appropriate scale & size in soft copy &
Hard copy complete all respect as per direction of Engineer
and detailed alignment plans with covering all features in a
width
5 Upto 10 mtrs. 90Km
6 From 10 mtrs. Upto 20 mtrs. 20Km
7 From 20 mtrs. Upto 30 mtrs 15Km
Survey of all properties, preparation of GIS based
No. of
8 consumer mapping and database, plotting assets on GIS 25000
property
map etc
Survey for identify the Existing Underground utilities: Field
survey using Geo-radar system & Total Station for GIS
mapping, collecting of data and plotting the details on
digital map of Existing Underground utilities for a width of
15 m including supply of detailed drawings of lanes in
appropriate scale & A-2 size in soft copy & Hard copy
complete all respect.
9 130Kms
(a) Water mains: Alignment using appropriate techniques
and it's attributes depth of laying, diameter and material
and location of pipe/ appurtenances/ meters.
(b) Location of manholes and alignment of sewers.
(c) Road levels at every intersections or 50 meters
whichever is less.
(d) Present condition of available services.
10 To Analyze the soil conditions by drilling bore holes at 150Mtr
different locations to represent soil strata to conduct
Standard penetration test (SPT) for determining SBC in
hole as per IS-2131 including collection of disturbed and
undisturbed soil samples at every 3.0 m or at change of
strata analyzing the soil or grain size, atterberg limits, bulk
& dry densities, shear parameters and specific gravity. In
case of rock, collection of core, calculation or RQD (Rock
Quality Designation) and core recovery and
comprehensive strength of rock. Geo-tech investigation to
be done at different locations complete in all respect as
per specifications.
In all type of soils

Plate load test for determining SBC at a specified depth


and draw load settlement curve as per Indian standard
11 5Each
complete in all respect as per
specifications.
Preparation of SIP suitable for approval by the Employer
12 1Lot
and its updation