Sie sind auf Seite 1von 1
‘The next step is to check coordination for permanent “faults by comparing fuse maximum clearing: time curves swththe recloser °C” curve. Figure 18A8 shows that com: lle coordination is achieved with any of the three links (G07, 40T and 507) that passed the minimurmelt check, ‘since none of the three fuse maximum clearing cuNes intersect with the the recloser "C” curve. Any of these fuses will melt and clear forthe given faul-current range without resulting in a recioser trip operation on the time olay curve. Fuse selections can now be made, One approach would be to select fuse sizes for each tap based on the load Pr 20 Me nseconos, g Beaee Hi “sets 8 888088 ure 18.43. Figt For aplicetion efagrammed in Figure 1643: comparison of recloser curves wi Tink m a ‘CURRENT IN AMPERE: ment For evtrerapa whore th peak load current was Soest 1 30 and 40 amperes. However, this approach wae oe a meee tn socal rnate tagm oes es se operation and outages. essary fas WEIN CYOLES (2-HERT2 BASIS) 1 1 los HH EEE imum clearing curves.

Das könnte Ihnen auch gefallen