‘The next step is to check coordination for permanent
“faults by comparing fuse maximum clearing: time curves
swththe recloser °C” curve. Figure 18A8 shows that com:
lle coordination is achieved with any of the three links
(G07, 40T and 507) that passed the minimurmelt check,
‘since none of the three fuse maximum clearing cuNes
intersect with the the recloser "C” curve. Any of these
fuses will melt and clear forthe given faul-current range
without resulting in a recioser trip operation on the time
olay curve.
Fuse selections can now be made, One approach would
be to select fuse sizes for each tap based on the load
Pr
20
Me nseconos,
g Beaee
Hi
“sets 8 888088
ure 18.43.
Figt
For aplicetion efagrammed in Figure 1643: comparison of recloser curves wi Tink m
a
‘CURRENT IN AMPERE:
ment For evtrerapa whore th peak load current was
Soest 1 30 and 40 amperes. However, this approach
wae oe
a meee tn
socal rnate tagm oes
es se operation and outages.
essary fas
WEIN CYOLES (2-HERT2 BASIS)
1 1 los
HH EEE
imum clearing curves.
Distribution Impact Study Robinsons Land Corporation 500 KW On-Grid Three Phase Photovoltaic Power Plant Located in Robinsons Cybergate Bacolod, Araneta St. Brgy. Singcang, Bacolod City