Hazard Classifications
Embankment Dam Schematic
Overtopping Failure
Overtopping
Begins
Dam Overtopping Photo 1
Dam Overtopping Photo 2
Overtopping Breach
of Earth Dam
Initial Breach
Final Breach
Overtopping Breach Stages
for Earth Dam
Overtopping Begins
Overtopping Breach Stages
for Earth Dam
Horizontal Erosion
Continues
Overtopping Breach Stages
for Earth Dam
Vertical Erosion
Begins
Overtopping Breach Stages
for Earth Dam
Vertical Erosion
Ends
Piping Failure for Earth Dam
Piping Failure at Loveton Dam
(1989)
Loveton Dam Failure (1989)
Loveton Failure Viewed
from Downstream
Medford Quarry Wash Pond
Piping Failure
Piping Failure
Anti-seep
collars do
not prevent
seepage
failures!
Annap. Mall Piping Failure
Sinkhole in Dam Crest
Typical Problems schematic
Pipe Installation in Dam
Dam Embankment
Pipe in
Flowable Fill vertical
trench
Filter Diaphragm
FILTER DIAPHRAGM
Foundation Failure
Slope Failure
Saturated
Slope Failure
Structural Failure
Types of Dam Failures
Other
6%
Foundation Overtopping
23% 38%
Piping
33%
300
250 56 59
20000 Square Miles
53
34
200 44 10000 Square Miles
51 57
41 45
5000 Square Miles
40
150 49
53
44 49 1000 Square Miles
37
10 Square Miles
40
50 35 39 39 35
27 26 32 27 25
0
6 12 24 48 72
Duration [hrs]
Source: NWS, HMR 51, 1983 (?)
Increased Flood Risks
Before Downstream Development
Sunny Day
Dam Break Models
H, Breach Height
1
Z = 0 to 1
Breach Bottom Elevation
Bottom Width, b
Breach Photo
Breach Shape
Suggested Breach
Parameters for Earth Dams
Average Breach Side Breach Failure
Source Breach Width Slope (1V:ZH) Time (hrs)
(ft)
NWS (1988) 1H to 5H Z = 0 to 1 0.1 to 2.0
= 0 . 59 ( V s 0 . 47
)H 0 . 91
INPUT VARIABLES:
Qo = 0 cfs
As = 5.00 ac
H = 20.0 ft
OUTPUT VARIABLES:
SELECTED TIME MAXIMUM
BREACH OF BREACH
WIDTHS FAILURE COMPUTED FLOW
Br, [ft] Tf, [hrs] C VALUE Qb,[cfs]
b = 9.5Ko(VsH)^0.25
T f = 0.59(Vs^.47)/(H^.91)
where,
b = average breach width (ft),
Tf = time of failure (hrs),
Ko = 0.7 for piping and 1.0 for overtopping failure
Vs = storage volume (ac-ft), and
H = height (ft) of water over breach bottom
H = 20.0 ft b = 35.4 ft
Vs = 40.0 ac-ft Tf = 0.22 hrs
Ko = 0.7
Qb= 3.2H5/2
H As Tf QNWS QNRCS
[ft] [ac] [hrs] C [cfs] [cfs]
Easy to Use
Uses NWS Simple Dam Break Equation
for Breach Flow
Uses Dynamic Routing of Flood Wave
Input Downstream Cross Sections
Will Not Route through Downstream
Structures
Dam Break Models
NWS Full Dam Break Model (DAMBRK)
3.00
2.00
1.50
Judgement Zone
1.00
0.50
Low Danger Zone
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0
Velocity [fps]
6.00
4.00
Judgement Zone
3.00
2.00
4.50
4.00
3.50
Flood Depth [ft]
3.00
2.50
High Danger Zone
2.00
0.50
Low Danger Zone
0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00
Velocity [fps]
15
16
20
12
10 5
Nagel Mill Dam before Floyd
Nagel Mill Dam after Floyd
Nagel Mill Dam after Floyd
Nagel Mill Dam after Repair
Nagels Breach Statistics
Piping Failure
Breach Width = 60 ft = 4H
Side Slope Z = 0.4
Time of Failure <20 min
Foreman Branch Dam before Floyd
Foreman Branch Dam after Floyd
Foreman Branch Dam after Floyd
Foreman Branch Dam after Repair
Foreman Dam Breach
Statistics
Overtopping Failure
Breach Width = 85 ft = 8H
Side Slope Z = 0.5
Time of Failure <30 min
Frazer Mill Dam before Floyd
Frazer Mill Dam after Floyd
Frazer Mill Dam after Floyd
Frazer Dam Breach Statistics
Overtopping Failure
Breach Width = 120 ft = 6H
Side Slope Z = 0.6
Time of Failure Unknown
Jones Lake Dam before Floyd
Jones Lake Dam before Floyd
Jones Lake Dam after Floyd
Jones Lake Dam Breach
Statistics
Piping Failure
Breach Width = 103 ft = 6H
Side Slope Z = 0.6
Failure Time Unknown
Sassafras Dam before Floyd
Sassafras Dam after Floyd
Sassafras Dam During Floyd
Sassafras Dam after Repair
Sassafras Dam During Repair
Sassafras Dam Breach
Statistics
Overtopping Failure
Breach Width = 47 ft = 4H
Side Slope Z = 0.2
Failure Time = 15 Min
Stubbs Dam after Floyd
Stubbs Dam after Floyd
Stubbs Dam after Repair
Stubbs Dam Breach Statistics
Piping Failure
Breach Width = 30 ft = 2.5H
Side Slope Z = 0.2
Failure Time Unknown
Tuckahoe Dam after Floyd
Tuckahoe Breach below Spillway
St Pauls Emergency Spillway during Floyd
Boundary Dam Near Seattle Washington
Emergency Action Plan
Introduction
O P E R A T IN G P R O C E D U R E
1) Purpose. The purpose of the Emergency Action I. The da m w ill be in sp e cte d perio d ica lly each year for
Plan (EAP) is to safeguard lives and secondarily to ma inten ance and distress signa ls.
II. The da m obse rv er will in sp ect the da m wh en the
reduce property damage in the event that (your dam) Na tio n al W eather Serv ice issues a Flo o d W a rn in g for
would fail. To carry out this mission, the EAP contains: the area and co m p lete the follo w in g task s.
1) procedures to monitor (your dam) periodically and
1. The da m obse rv er will note & reco rd water
during flood warnings issued by the National Weather
leve ls in reservo ir and the rate at wh ich the po o l
Service; 2) notify (County) Emergency Operation is risin g.
Center of a potential dam failure; and 3) warn and 2. If the da m sh ow s sign s of interna l pip in g (m udd y
evacuate the isolated residences at risk. These see pa ge exitin g the do w nstrea m em b an k m en t),
ero sio n, slo pe failures, blo ck ed sp illw ays, or
procedures are to supplement and be used in oth er om in o us distre ss signs, the da m obse rv er
conjunction with (your County's Emergency Operation wil call the Co u nty Em e rgen cy O peratio n Cen ter
Plan). to se nd out po lice to ro ad b lo ck do wn strea m
ro ad s and warn any iso la ted resid e nc es in the
dan ger reac h. The dam ob server may co ntact the
2) Flood Description. Failure of the dam could cause M d D am Safety Div isio n or his design ated
significant damage to (all roads and isolated en gine er to pro v ide assistan ce.
3. If the po o l le ve l rises too with in one foot (or
residences downstreamof your dam within the danger oth er le ve ls accep te d by M DE) of the da m cre st,
reach) located miles downstream of (your dam). the dam ob se rv er will con tact the Co unty
Em er gency Op e ra tio ns Cen ter to d ispa tch po lice
to ro ad b lo ck do wn strea m ro ad s and warn any
iso late d resid en ce s in the dan ger reac h.
Emergency Action Plan
DAM NAME
PR E V E N TATIV E AC TIO N S
Signatures of Persons Involve d in Eme rgency Action Plan
If time allows, contact your engineer (_________________) and the
Maryland Dam Safety Division for ad vice on pre ventative actions. Listed
D am Owner By ______________________ Date
below are potential emergency actions whic h may pre vent or delay the
___________
failure of the dam. They should be considered based on site-specific
conditions, as well as the risk of failure and risk to employees.
Typed Name:
Title:
Phone: (day) Possible Actions To Be Taken In The Event Of:
(night)
Im minent Overto pping by Flood W aters:
C ounty Department of By ______________________ Date
___________ 1) Open drain or flood gates to maximum capacity.
E mergency Operations 2) Place sand bags along the dam crest to increase freeboard.
Typed Name: 3) Place riprap or sandbags in da maged areas of dam.
Title: 4) Pro vide erosion protection on downstream slope by placing
Phone: (day) riprap or other appropriate materials.
(night) 5) Di vert flood waters around dam if possible (such as emergency
spillway)
L ocal or State Police By ______________________ Date
___________ Erosion of Dam by Seepage Th rough the E mbank ment, Fou ndation, or
B arracks "?" Abut ments:
Typed Name:
Title 1) Plug the seepage with appropriate material such as (riprap, hay
Phone: (day) bales, bentonite, sandbags, soil, or plastic sheeting if the leak is
(night) on upstream face of dam).
2) Lower the reser voir le vel until the flow decreases to a non-
M D Department of the Environment By ______________________ Date erosive velocity or stops leaking.
___________ 3) Place a sand and gra vel filter over the seepage exit area to
D am Safety Division minimize loss of embank ment soils.
Typed Name: Brad Iarossi 4) Continue lowering the reser voir le vel until the seepage stops or
Title: Chie f is controlled. Refill reser voir to nor mal le vels only after seepage
Phone: 410-631-3538 is repaired.
Owners Engineer By ______________________ Date Slide or Slope Failu re on Up stream or Dow nstream Slope of
___________ E mb ank ment:
1) Lower the reser voir water le vel at a rate, and to an ele vation that
is considered safe. Contact y our engineer or the Dam Safety
Emergency Action Plan
SU P P L IE S A N D R E S O U R C E S
L is t o f C o n tra c to rs
- C o n tra c to r na m e
- C o n ta c t p e rs o n .
- A d d re s s .
- P ho n e nu m b e r.
- E q u ip m e n t & re p a ir s u p p lie s av a ila b le .
- A rriv a l tim e to d a m
1. C o n tra c to r:
C o n ta c t p e rs o n : P ho n e No :
A d d re s s :
S e rv ic e s c o n tra c te d fo r:
2. C o n tra c to r:
C o n ta c t p e rs o n : P ho n e No :
A d d re s s :
Emergency Action Plan
DANGER REACH MAP
EVACUATION ROUTES
RESERVOIR
DAM
EVACUATION ROUTES
MDE Dam Break Web Site
ftp://ftp.mde.state.md.us/outgoing/Dam_Safety/
Hazard Guidelines
Microsoft Word
Documents Model Emergency Action Plans
NWS Dam Break Equation
Microsoft Excel USBR Hazard Graphs
Spreadsheets Hydrology Spreadsheets
Hydraulic Spreadsheets
HEC-1 Program
Executable NWS Simple Dam Break
Programs Program
Sample Data for HEC-1 & NWS
Simple Dam Break
Any Questions?