Sie sind auf Seite 1von 156

Site Acquisition Information

Nepal Telecom
WiMAX SITE SURVEY REPORT
20 % sites Expansion Project

Site Acquisition Information

Site ID: Date:

SITE Name:

Region: City: Candidate:

District: Zone LOT : 2nd

Municipality VDC Name: Ward N

Coordinates: Latitude: Longitude:

3m Wall 3m 6m 9m Rooftop 12m


Rooftop
Site Type: mounted Poles
12m Rooftop
18m Pole Rooftop
20m 4Pole Pole
30m 4 Rooftop
50m 4Tower
Legs
Greenfield
Monopole Monopole Legs Tower Legs Tower Tower
Other (describe)

Antenna type
Omni
Sector Tilt Azimuth
1st Sector
2nd Sector
3rd Sector

Equipment room type: Room Shelter Equipment Room Location

Ownership Type: Governmenta Privat Commer Other


l e cial s

Site Contact Person Details: Site Owner Contact Details:

Name Name
Position Position
Mobile Phone Mobile Phone
Phone/Fax Phone/Fax
Site Access Very
Normal
Hard Difficult To be Other (describe):
Site Access Gravel or difficult
standin establishe
Transport to site: g not stabilized Not possible
d
Truck 4WD by vehicle
Access to site Available Everyda Week Satur Sun Appointment Oth
y days day day needed er:
Any restriction of time to access:

On
Location of Key: Off-
Site
Site
Directions to get to Site:

Special access details:

Site Acquisition Information Nepal Telecom 10M Lines GSM/UMTS Roll out Page1of156
Nepal Telecom
WiMAX SITE SURVEY REPORT
20 % sites Expansion Project
Site ID: Candidate:

Site Name:

GOOGLE MAP Show nearest neighbor BS and minimum 2 km raduis coverage of candidate site in circle
Coordinates Latitude: Longitude:

Comments and coverage targets

Google Map Nepal Telecom 10M Lines GSM/UMTS Roll out Page2of156
Nepal Telecom
WiMAX SITE SURVEY REPO

Exisitng BTS, Antenna & Feeders

1.Existing Equipment Information:


Existing Equipment Manufacturer Configuration

Comments:

2.Existing Antenna&Feeder Information:N/A


2.1 Dual Band (900MHz+1800MHz)
Cell 1 (9M/18M) Cell 2 (9M/18
Antenna Type
Antenna Height (m)
Antenna Bearing / Azimuth
Comments:

2.2 Single Band (900MHz)


Cell 1 Cell 2
Antenna Type
Antenna Bearing / Azimuth
Antenna Height (m)
Comments:
2.3 Single Band (1800MHz) N/A
Cell 1 Cell 2
Antenna Type
Antenna Bearing / Azimuth
Antenna Height (m)
Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page3of156
Nepal Telecom
WiMAX SITE SURVEY REPO

Comments:

Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page4of156
Nepal Telecom
WiMAX SITE SURVEY REPO

2.4 Single Band (2100MHz) N/A


Cell 1 Cell 2
Antenna Type
Antenna Bearing / Azimuth
Antenna Height (m)
Comments:

2.5 Single Band (CDMA)


Cell 1 Cell 2
Antenna Type
Antenna Bearing / Azimuth
Antenna Height (m)
N/A

Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page5of156
al Telecom
E SURVEY REPORT

na & Feeders

Type & Model

Cell 2 (9M/18M) Cell 3 (9M/18M) Other Comments

Cell 2 Cell 3 Other Comments

Cell 2 Cell 3 Other Comments

Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page6of156
al Telecom
E SURVEY REPORT

Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page7of156
al Telecom
E SURVEY REPORT

Cell 2 Cell 3 Other Comments

Cell 2 Cell 3 Other Comments

Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page8of156
Nepal
WiMAX SITE

SITE ID:
Site Name:

Coordinates Latitude:

1.AC Power Information:

ACDB Type Phase: 1 Phase

Amount of available Breaker slots (Empty Breaker


Slots)
Amount and Size of Used breakers
YES NO
Available space on existing cable ladder

2.Power Plant System(SMPS) Information:


DCPDB Type ( Model)
Amount of available Breaker slots (Empty Breaker
Slots)
Amount and Size of Used breakers

Existing Cable run way to New Equipment


YES NO

NO
Existing Cable run way to AC Power YES

NO
Provide new ladder for cable runway YES

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page9of156
Comments:
Nepal
WiMAX SITE

SITE ID:
Site Name:

Comments:

Check List Availability

YES
Power System Model/Make
YES
Power Plant ultimate capacity and Present capacity
DC load current YES

YES
Input Phases of the Power system

YES
RF Module rating

RF Module Installed YES

RF Module working YES

YES
Check space to connect other load in Power Plant
NA
Service life of the Power system

NA
Check any Faults

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page10of156
Nepal
WiMAX SITE

SITE ID:
Site Name:

3. Battery Bank Information


Check List Availability
Battery Cable Size YES

Battery Model/Make YES

Check all cells are ok or any leakages NO

Number of Battery cells 24

Battery set Capacity / bank 400 AH

Total battery capacity 1x400AH

Service life of the Battery Bank NA

New battery bank proposed location YES

Check Battery Bank1 total voltage at 0mn before Switching off the Main Powe
______52.8___V

Switch off the Ac power and check Battery Bank1 total voltage after 15 minute
____50.4______V

Switch off the Ac power and check Battery Bank1 total voltage after 30 minute
____50.4______V

Cell 1 Cell 2 Cell 3

Value
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page11of156
Nepal
WiMAX SITE

SITE ID:
Site Name:

Cell 13 Cell 14 Cell 15

Check Battery cells voltage at 0mn Value


before Switching of the Main Power
Cell 25 Cell 26 Cell 27
Value
Cell 37 Cell 38 Cell 39
Value
Cell 1 Cell 2 Cell 3
Value
Cell 13 Cell 14 Cell 15
Switch of the Main Power and Value
check Battery cells voltage after
15 minutes Cell 25 Cell 26 Cell 27
Value
Cell 37 Cell 38 Cell 39
Value
Cell 1 Cell 2 Cell 3
Value
Cell 13 Cell 14 Cell 15
Switch of the Main Power and Value
check Battery cells voltage after
30 minutes Cell 25 Cell 26 Cell 27
Value
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page12of156
Nepal
WiMAX SITE
Switch of the Main Power and
check Battery cells voltage after SITE ID:
30 minutes
Site Name:

Cell 37 Cell 38 Cell 39


Value

Comments:

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page13of156
Nepal
WiMAX SITE

SITE ID:
Site Name:

4. Diesel Generator Information: N/A


Check List Availability
DG Capacity/Type/Brand N/A

Automatic Control panel of the DG N/A

In/Out phases of the DG N/A

How to start the DG in Old System N/A

Comments:

5. Solar Information: N/A


Check List Availability

Solar panels obstructed by if any N/A

PV panel Capacity N/A


No of panels and no of panels in Series N/A
No of Junction Boxes N/A
No of Solar Controllers / Capacity N/A
No of Load Controllers / Load capacity N/A
Junction Box Voltage N/A
Solar Control Voltage N/A

Solar earthing availability & Value N/A


Check space to connect other load in Solar
N/A
controller
Comments:

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page14of156
Nepal
WiMAX SITE

SITE ID:
Site Name:

6.Cooling Unit Information


AC I
Company Name Capacity
AUX 7000W

Free cooling / E
Company Name Capacity
N/A N/A

Comments:

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page15of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!

NA Candidate:

e: Longitude:

Existing Power Info

ase 3 Phase Mains MCCB Capability-Meter box/LT panel(A/KVA):

Amount and Size of Unused breakers

Amount and Size of Spare breakers

Length of New DC power cable to Equipment

Total length of cable runway


O

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page16of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!

NA Candidate:

Description Remarks

ZXDU68 / ZTE

ultimate:550A,current:200A

32A

Three phase

50A

4 NOS

4 nos

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page17of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!

NA Candidate:

Description Remarks
35 SQ.MM

GFM-400/ SHOTO

NO ANY LEAKAGE

FOR ONE BATTRY BANK

400Ah

400Ah

NOT PROVIDED BY NT

ain Power: Check Battery Bank2 total voltage at 0mn before Switching off the Main
Power: ___N/A_______V

5 minutes: Switch off the Ac power and check Battery Bank2 total voltage after 15
minutes: __N/A_______V

0 minutes: Switch off the Ac power and check Battery Bank2 total voltage after 30
minutes: ____N/A______V

Cell 4 Cell 5 Cell 6 Cell 7 Cell 8 Cell 9 Cell 10 Cell 11

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page18of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!

NA Candidate:

Cell 16 Cell 17 Cell 18 Cell 19 Cell 20 Cell 21 Cell 22 Cell 23

Cell 28 Cell 29 Cell 30 Cell 31 Cell 32 Cell 33 Cell 34 Cell 35

Cell 40 Cell 41 Cell 42 Cell 43 Cell 44 Cell 45 Cell 46 Cell 47

Cell 4 Cell 5 Cell 6 Cell 7 Cell 8 Cell 9 Cell 10 Cell 11

Cell 16 Cell 17 Cell 18 Cell 19 Cell 20 Cell 21 Cell 22 Cell 23

Cell 28 Cell 29 Cell 30 Cell 31 Cell 32 Cell 33 Cell 34 Cell 35

Cell 40 Cell 41 Cell 42 Cell 43 Cell 44 Cell 45 Cell 46 Cell 47

Cell 4 Cell 5 Cell 6 Cell 7 Cell 8 Cell 9 Cell 10 Cell 11

Cell 16 Cell 17 Cell 18 Cell 19 Cell 20 Cell 21 Cell 22 Cell 23

Cell 28 Cell 29 Cell 30 Cell 31 Cell 32 Cell 33 Cell 34 Cell 35

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page19of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!

NA Candidate:

Cell 40 Cell 41 Cell 42 Cell 43 Cell 44 Cell 45 Cell 46 Cell 47

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page20of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!

NA Candidate:

Description Remarks
N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A

Description Remarks

N/A provide length and height of ob

N/A
N/A
N/A
N/A
N/A
N/A
N/A

N/A
N/A
N/A

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page21of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!

NA Candidate:

AC Information
Quantity AC Phase Status
1 NA NOT WORKING

oling / Exhaust fan Information


Quantity Status
N/A N/A

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page22of156
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page23of156
Remarks

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page24of156
Remarks

e at 0mn before Switching off the Main

ck Battery Bank2 total voltage after 15

ck Battery Bank2 total voltage after 30

Cell 12

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page25of156
Cell 24

Cell 36

Cell 48

Cell 12

Cell 24

Cell 36

Cell 48

Cell 12

Cell 24

Cell 36

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page26of156
Cell 48

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page27of156
Remarks
N/A

N/A

N/A

N/A

Remarks

provide length and height of obstacle

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page28of156
Status
NOT WORKING

Status
N/A

Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page29of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPORT


#REF!

SITE ID: #REF! NA

Site Name: #REF!

Coordinates Latitude: #REF! Longitude:


Altitude: #REF! Distance from Nom
Existing Grounding System

Earthing system

Availabled Existing YES NO Earth Value:


Grounding

Availabled Existing Earth


pits (pictures are YES NO Amount of Existing Earth pit
mandatory)

Space available on indoor YES NO Space available on outdoor earthing bus


earthing bus

Available ports on indoor


6 Available ports on Outdoor earthing bus
earthing bus

Existing Earthing
2.72
resistance value (Tower)

Existing Earthing
resistance value 2.72
(Equipment)

Lightning arrester available


AVILABLE
or, not

Lightning arrester available


YES
and connected

Lightning arrester available


NO
but not connected

Existing Lightning and Earthing protection System


Nepal Telecom 10M Lines GSM/UMTS Roll out Page30of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPORT


#REF!

SITE ID: #REF! NA

Site Name: #REF!


Existing Earthing
resistance value 2.72
( Lightning arrestor )

Length of cable from Indoor Earthing bar to Grounding system

Length of cable from Outdoor Earthing bar to Grounding system

Length of cable from Equipment to Indoor Earthing bar

Length of cable from Rectifier (DC Power) toIindoor Earthing bar

Length of cable from Indoor Cable runway to Indoor Earthing bar

Length of cable from arrester to outdoor Earthing bar

Length of cable from outdoor Cable runway to outdoor Earthing bar

Comments:

TGB Tower Grounding Bar YES NO If yes amount of free ports 8


Available

EGB available Outdoor YES NO If yes amount of free ports

IGB available Indoor YES NO If yes amount of free ports 6

Photo Taking YES NO If yes amount of free ports

Existing Lightning and Earthing protection System


Nepal Telecom 10M Lines GSM/UMTS Roll out Page31of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPORT


#REF!

SITE ID: #REF! NA

Site Name: #REF!


2. Lightning Protection System for New Equipment:
YES
Lightning Protection Existence of a lightning protection ?

To refit ? NO To create ? NO
Choosen Solution detail:

YES
Earthing system Existence of a lightning protection ?

To refit ? NO
To create ? NO
Choosen Solution detail:

Existing Lightning and Earthing protection System


Nepal Telecom 10M Lines GSM/UMTS Roll out Page32of156
GSM/UMTS Roll out expansion

TE SURVEY REPORT
#REF!

Candidate: #REF!

#REF!
Distance from Nominal point : #REF!

Earth Value: 2.72

Amount of Existing Earth pits 2

YES NO

Existing Lightning and Earthing protection System


Nepal Telecom 10M Lines GSM/UMTS Roll out Page33of156
GSM/UMTS Roll out expansion

TE SURVEY REPORT
#REF!

Candidate: #REF!

20M

NA

8m

8m

7m

25M (From LA to earthing system)

NA

s amount of free ports 8 If Not Available, Required .. PCS

s amount of free ports If Not Available, Required .. PCS

s amount of free ports 6 If Not Available, Required .. PCS

s amount of free ports If Not Available, Required .. PCS

Existing Lightning and Earthing protection System


Nepal Telecom 10M Lines GSM/UMTS Roll out Page34of156
GSM/UMTS Roll out expansion

TE SURVEY REPORT
#REF!

Candidate: #REF!

YES NO

To create ? NO

YES NO

To create ? NO

Existing Lightning and Earthing protection System


Nepal Telecom 10M Lines GSM/UMTS Roll out Page35of156
Nepal Telecom 10M GS
TECHNICAL SIT

SITE ID: #REF! NA

Site Name: #REF!

Coordinates Latitude: #REF! Longitude

Altitude: #REF! Distance

Existing Transmission

Existing Microwave Antenna Information

High/Low
No. Near End Model Manufacturer Frequency
end

PASOLINK 14~40-
1 NAR147 N/A LOW
NEO 15~35 GHZ
2 N/A N/A N/A N/A N/A
3 N/A N/A N/A N/A N/A
4 N/A N/A N/A N/A N/A
6 N/A N/A N/A N/A N/A

Transmission Information:
Existing Transmission (add additional data, take notes). If other than note what
and optical (o) ports.Please fill the data for Each Links Individually.
YE
Microwave
S
NO

NEC IDU serial number 23537


Model/Make:MDP-34MB-27C/NEC
Hop Distance (km): 5.51KM
Protection:1+0 Frequency (Tx)(
IF Cable Length _____25M_______m E1 Ports(n) Con
PDH
(Take Photos
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page36of156
Front/Back of each
Nepal Telecom 10M GS
TECHNICAL SIT

SITE ID: #REF! NA

Site Name: #REF!


PDH
Port Details Total Used
(Take Photos
Front/Back of each E1 Ports (n) 6 PAIR 1 PAIR
unit)
Fe Ports (n) (Optical) N/A N/A
Fe Ports (n) (Electrical) N/A N/A
GE Ports (n) (Optical) N/A N/A
GE Ports (n) (Electrical) N/A N/A
BW Capacity (Mbps) 12MB 2MB
Model/Make:
Hop Distance(km):
Protection: Frequency (Tx)(
Waveguide Length ______m IF Cable Length _____
Port Details Total Used
STM-1 Ports (Optical)
SPDH (Take
Photos Front/Back STM-1 Ports (Electrical)
of each unit)
E1 Ports (n)
Fe Ports (n) (Optical)
Fe Ports (n) (Electrical)
GE Ports (n) (Optical)
GE Ports (n) (Electrical)
BW Capacity(Mbps)

Model/Make:
Hop Distance(km):
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page37of156
Nepal Telecom 10M GS
TECHNICAL SIT

SITE ID: #REF! NA

Site Name: #REF!

Protection: Frequency (Tx)(


Waveguide Length ______m IF Cable Length _____
Port Details Total Used
STM-1 Ports (Optical)
SDH (Take Photos
Front/Back of each STM-1 Ports (Electrical)
unit)
E1 Ports (n)
Fe Ports (n) (Optical)
Fe Ports (n) (Electrical)
GE Ports (n) (Optical)
GE Ports (n) (Electrical)
BW Capacity(Mbps)

NO

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page38of156
Nepal Telecom 10M GS
TECHNICAL SIT

SITE ID: #REF! NA

Site Name: #REF!

Optical: YES NO Total number of fiber cores:

Model/Make: Type of Equipment:

Wavelength:_______m

DDF Port Availability YES NO ODF Availability

Type of Connectors(Details) :

Port Details Total Used

STM-1 Ports (Optical)

STM-1 Ports (Electrical)

E1 Ports (n)
TDM/IP
(Take Photos Fe Ports (n) (Optical)
Front/Back of each
unit) Fe Ports (n) (Electrical)

GE Ports (n) (Optical)

GE Ports (n) (Electrical)

Equipment Capacity(Mbps)

STM-1

L2/L3 Switch YES NO Make/Model:

Port Details Total Used

Fe Ports (n) (Optical)


L2/L3 Switch(Take
Fe Ports (n) (Electrical)
Photos)
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page39of156
Nepal Telecom 10M GS
TECHNICAL SIT

SITE ID: #REF! NA

L2/L3 Switch(Take Site Name: #REF!


Photos)
GE Ports (n) (Optical)

GE Ports (n) (Electrical)

Copper YES NO Total number of pairs:

Model/Make(900MHz BTS): Upgradation to M

XDSL MODEM CO/Remote: Upgradation to O


(Take Photos of Front/Back of
each unit)

Model/Make(1800 MHz): Upgradation to M

CO/Remote: Upgradation to O

Satellite YES NO Make/Model:

Type of Connectors(Details) :

TDM Port Details Total Used


(Take Photos Front/Back of
each unit) E1 Ports(n)

BW Capacity (Mbps)

E1 Impedance for all 75 120

Proposed New Transmission

Available space for new Equipment (indoor unit)(Take Photos)

Available space for new Equipment (outdoor unit)(Take Photos)

New Boom Required for MW Antenna


Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page40of156
Nepal Telecom 10M GS
TECHNICAL SIT

SITE ID: #REF! NA

Site Name: #REF!

Available space for Cable (on ladder)

Proposed new ladder for cable runway


Comments:

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page41of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

A
Candidate: #REF!

gitude: #REF!

ance from Nominal point : #REF!

sion Information

Polarization Antenna Antenna Tower


Azimuth Far End
(V/H) Diameter (m) Height (AGL) Height (A

BIRUA
N/A 0.3M 13M 119 20M
GUTHI
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A

what the other item is in detail. Make additional rows if required to show electrical (e)

Model:34MB-27C
Frequency Band Information: 8 GHZ 15 GHZ OTHERS (SPECIFY)

Power consumption: 1A

(Tx)(MHZ):14.400-15.3500 MHZ
) Connectors : BNC SIEMENS OTHERS (SPECIFY)

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page42of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

A
Candidate: #REF!

unused Remarks(For Faulty Ports, High BER & Others if any)


5 PAIR
N/A
N/A
N/A
N/A
10MB
Frequency Band Information:
OTHERS (SPECIFY)
6 GHZ

(Tx)(MHZ): Power consumption:

______m E1 Ports(n) Connectors : BNC SIEMENS OTHERS (SPECIFY)

unused Remarks(For Faulty Ports, High BER & Others if any)

Frequency Band Information:


OTHERS (SPECIFY)
6 GHZ

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page43of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

A
Candidate: #REF!

(Tx)(MHZ): Power consumption:

______m E1 Ports(n) Connectors : BNC SIEMENS OTHERS (SPECIFY)

unused Remarks(For Faulty Ports, High BER & Others if any)

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page44of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

A
Candidate: #REF!

es: Lit: Dark:

SDH PDH OF MODEM DIRECT FIBER CONNECTION OTHERS (SPECIF

Power consumption:

YES NO OTB Availability YES NO

unused Remarks(For Faulty Ports, High BER & Others if any)

OF MODEM

Power consumption:

unused Remarks(For Faulty Ports, High BER & Others if any)

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page45of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

A
Candidate: #REF!

CAT 5 OTHERS (SPECIFY)

Notes (Distance to the other end in


n to MW:Remote MW link(LOS): Km):

Notes (Distance to the other end in


n to Optical:Remote Optical Node: Km) :

Notes (Distance to the other end in


n to MW:Remote MW link(LOS) Km) :

Notes (Distance to the other end in


n to Optical:Remote Optical Node Km) :

Band: C K

unused Remarks(For Faulty Ports, High BER & Others if any)

OF MODEM

Power consumption:

YES NO

YES NO

YES NO

Existing TRNInformation NO Nepal Telecom 10M Lines GSM/UMTS Roll out Page46of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

A
Candidate: #REF!

YES

YES NO

YES NO

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page47of156
Tower
Height (AGL)

20M
N/A
N/A
N/A
N/A

nal rows if required to show electrical (e)

OTHERS (SPECIFY)

OTHERS (SPECIFY)

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page48of156
ty Ports, High BER & Others if any)

OTHERS (SPECIFY)

OTHERS (SPECIFY)

ty Ports, High BER & Others if any)

OTHERS (SPECIFY)

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page49of156
OTHERS (SPECIFY)

ty Ports, High BER & Others if any)

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page50of156
Dark:

OTHERS (SPECIFY)

ulty Ports, High BER & Others if any)

ty Ports, High BER & Others if any)

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page51of156
Notes (Distance to the other end in
Km):

Notes (Distance to the other end in


Km) :

Notes (Distance to the other end in


Km) :

Notes (Distance to the other end in


Km) :

ty Ports, High BER & Others if any)

Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page52of156
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page53of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: #REF! NA

Site###

Coordinates Latitude: #REF!


Altitude: #REF! Distance from Nominal point :

Existing Civil Works Information

1.Civil work information:


No. of equipment rooms :ONE
Location of Equipment room :G+2
Type of Equipment room ( Brick/ Shelter / Mud wall / Wooden structure) :BRICK
Type of roof ( Concrete / GI sheet / Stone slab / Wooden Structure / Grass) :CONCRETE
Cracks are observed (take
Roof condition Good Poor
pictures)
Defects Description / comments if any (pictures of evidence are mandatory):NO DEFECT

Thickness of walls 250MM Thickness of Floor 100MM


Need any strengthening for room for new equipments (Especially battery banks)
Check whether existing walls are constructed on the existing beams
Is there any beams below the Existing floor of Equipment room
Check whether existing floor can take load for the new proposed Battery banks
Existing Building and Room condition Good Very Good

Space available for new equipment (indoor) without removing equipment

Concrete

Type of existing foundation of Equipment Room


Steel Base Frame

Is the room Window sealed


Does room need cleaning
Does room has enough space for new equipment without existing equipment removal
Are there any free holes on existing cable entry plate
Provide amount of free holes on existing cable entry plate: __3_
Rusty (take
Good Cold Gavanized
pictures)
Indoor Cable Tray general
condition No Galvanization Twisted Bended
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: #REF! NA

Site###
Enough space has been found on Indoor Cable Tray for the additional required YES
cables (CPRI, DC, IF, Waveguide cables )
Defects Description / comments if any (pictures of evidence are mandatory)

Rusty (take
Good Cold Gavanized
pictures)
Outdoor Cable Tray general
condition No Galvanization Twisted Bended

Enough space has been found on Indoor Cable Tray for the additional required YES
cables (CPRI, DC, IF, Waveguide cables )

Defects Description / comments if any (pictures of evidence are mandatory)

Indoor / Outdoor cable runs are secured using cable clamps or pipes or trunks
YES
or cabletrays:

Indoor / Outdoor cable runs are secured using GI pipes (secured on support)
YES
when accessible from Public

Indoor / Outdoor cable runs are protected from anyone stepping on using pipes YES

Comments:
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: #REF! NA

Site###

Existing Antenna Supporting Structure Foundation conditi


Rooftop
Load Distibution Beams are used to support the existing Antenna Supporting Structure
Type of Load Distibution Beams Concrete Beams
Cracks observed on concrete Beams (take
Status of concrete Beams (Take pictures) Good
pictures)

Defects Description / comments if any


Rusty (take
Good Cold Gavanized
pictures)
Status of I or H Beams (Take pictures)
No Galvanization Other defects (descr

Defects Description / comments if any


Defects (describe be
Waterproofing Good
pictures)
Defects Description / comments if any + Pictures of evidences:NO DEFECT

Ground Based Tower N/A


Cracks observed on concrete Beams (take
Status of concrete Pedestals (Take pictures) Good
pictures)

Is there any stagnant water YES NO

Defects Description / comments if any + Picture of evidence

Poor condition of existing struct


Structural Evaluation sheet chimney)
No
Structural Suitability
Problem
Poor condition of existing structure (mast, chimne
Roof modification needed Poor condition of existing wooden structure
Fragile structure/surface Poor condition of roof covering(e.g. tiles)
(specify)
Decription of other defects

Structural measurements YES NO NO NEED Impossible


done for rooftop
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: #REF! NA

Site###

Modification of existing YES NO


structure needed (describe)
Describe Size of the Column,Reinforcement details,Column C/c distances(Mention exposed steel detailed above terrace

Describe Walls and Slab condition GOOD


Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: #REF! NA

Site###
Existing Antenna Supporting Structure condition
Tower / Pole Bracings are complete and no structural component is missing YES

Tower / Pole bolts, nuts and washers are complete and no part is missing YES
Rusty (take
Tower / Pole general Good
pictures)
Cold Gavanized
condition (if any defect take
No Galvanization Twisted Other defects (descr
picture)

Draining holes (pipe leg members, pipe lattice parts) are not blocked. YES

ladder with safety


Tower / Pole climbing facilities Steps bolts
cage
ladder without safet
Rusty (take
Good Cold Gavanized
Tower / Pole climbing pictures)
facilities general condition No Galvanization
Step Bolts / Rungs Obstruction to climb
missing way
Defects Description / comments if any (pictures are mandatory): e.g. The access to the top of the pole
tray + picture of evidence
Rusty (take
Good Cold Gavanized
pictures)
Cable Ladder on structure
No Galvanization Twisted Bended

Enough space has been found on cable ladder for the additional required cables
YES
(CPRI, DC, IF, Waveguide cables )
Defects Description / comments if any (pictures of evidence are mandatory):NO DEFECT

RF Antenna Mountings type Booms

Good Hot Dip Galvanized Cold Gavanized


RF Antenna Mountings general condition Othe defects (descr
No Galvanization

Defects Description / comments if any (pictures of evidence are mandatory)

Space Available for new required RF antennas mountings (without removing YES
existing ones)
Booms
Amount and of new required RF antennas mountings N/A
Amount:
MW Antenna Mountings type Booms

Good Hot Dip Galvanized Cold Gavanized


MW Antenna Mountings general condition
No Galvanization Othe defects (descr

Defects Description / comments if any (pictures of evidence are mandatory)


Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: #REF! NA

Site###
Space Available for new required MW antennas mountings (without removing YES
existing ones)
Booms
Amount and of new required MW antennas mountings
Amout:
Space Available for new required MW antennas mountings (without removing
YES
existing ones)
Space Available for all new required RRUs mountings (without removing existing YES
ones)
Presence of Aircraft Obstruction Light on Structure YES

If Yes, is the Aircraft Obstruction light operated at -48 volt DC YES

YES
If Yes, does Aircraft warning Lamps (AWL) have a photo sensor (use dark plastic
bag to test)

If No, is Aircraft Obstruction Light required YES


GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!

Candidate: #REF!

Longitude: #REF!
Distance from Nominal point : #REF!

en structure) :BRICK
ructure / Grass) :CONCRETE
Cracks are observed (take
Other defects (describe below)
pictures)
are mandatory):NO DEFECT

Thickness of Floor 100MM


ecially battery banks) YES NO

g beams YES NO

oom YES NO

osed Battery banks YES NO

Very Good Medium Poor

ng equipment YES NO

Concrete

Steel Base Frame

YES NO

YES NO

xisting equipment removal YES NO

YES NO

__3_
Cold Gavanized Hot Dip Galvanized

Othe defects
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!

Candidate: #REF!

NO

are mandatory)

Cold Gavanized Hot Dip Galvanized

Othe defects

NO

are mandatory)

NO

NO

NO
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!

Candidate: #REF!

ting Structure Foundation condition

tenna Supporting Structure YES NO

I or H Beams
Cracks observed on concrete Beams (take Other defects (describe
pictures) below)

Cold Gavanized Hot Dip Galvanized

Other defects (describe below)

Defects (describe below and take


pictures)
ces:NO DEFECT

Cracks observed on concrete Beams (take Other defects (describe


pictures) below)

Poor condition of existing structure (mast,


chimney)
Other defects (describe
Poor condition of existing structure (mast, chimney)
below)
Poor condition of existing wooden structure
Poor condition of roof covering(e.g. tiles)
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!

Candidate: #REF!

ces(Mention exposed steel detailed above terrace):


GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!

Candidate: #REF!

NO (if NO take pictures)

NO (if NO take pictures)

Cold Gavanized
Hot Dip Galvanized
Other defects (describe below)

NO

ladder without safety cage No Climbing Facilities

Cold Gavanized
Hot Dip

Obstruction to climbing Galvanized
Othe defects
way
ory): e.g. The access to the top of the pole is obstructed by existing cable

Cold Gavanized Hot Dip Galvanized

Othe defects

NO

are mandatory):NO DEFECT

Ring+ Booms

Cold Gavanized Rusty (take pictures)

Othe defects (describe below and take picture

are mandatory)

NO

Ring+ Booms

Amount
Other

Cold Gavanized Rusty (take pictures)

Othe defects (describe below and take picture

are mandatory)
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!

Candidate: #REF!

NO

NO

NO

NO

NO

NO

NO
Nepal Telecom 10M GSM/U
TECHNICAL SITE S
New BTS, Anten
#REF

SITE ID: #REF! NA

Site Name: #REF!

Coordinates Latitude: #REF!

Altitude: #REF!

1. New Equipment Information:


New Equipment Manufacturer Type & Model C
GSM 900
DCS 1800
WCDMA 2100
Comments:

2. NEW Antenna & Feeder Information: GSM900


Cell 1
Antenna Type
Antenna Bearing / Azimuth
Antenna Downtilt (Mech)
Antenna Downtilt (Elec)
Antenna Height
Antenna Pole/Boom needed
Antenna support structures needed
CPRI Cable Length
Feeder Type
Jumper Length
New vertical cable tray required YES NO

New BTS,Antenna FeederInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page66of156
YES NO
New horizontal cable tray required
Comment:

3. NEW Antenna & Feeder Information: DCS 1800


Cell 1
Antenna Type
Antenna Bearing / Azimuth
Antenna Downtilt (Mech)
Antenna Downtilt (Elec)
Antenna Height
CPRI Cable Length
Feeder Type
Jumper Length
YES NO
New vertical cable tray required
YES NO
New horizontal cable tray required
Comment:

4. NEW Antenna & Feeder Information: UMTS 2100


Cell 1
Antenna Type
Antenna Bearing / Azimuth
Antenna Downtilt (Mech)
Antenna Downtilt (Elec)
Antenna Height
CPRI Cable Length
Feeder Type
Jumper Length
New vertical cable tray required YES NO

YES NO
New horizontal cable tray required
Comment:

New BTS,Antenna FeederInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page67of156
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
Antenna & Feeders
#REF!
NA
Candidate: #REF!

REF! Longitude: #REF!

REF! Distance from Nominal point : #REF!

Configuration Rated Load Current

Cell 2 Cell 3 Comments

NO

New BTS,Antenna FeederInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page68of156
NO

Cell 2 Cell 3 Comments

NO

NO

Cell 2 Cell 3 Other Comments

NO

NO

New BTS,Antenna FeederInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page69of156
Nepal Telecom 10M GSM/UMTS Roll out expan
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: ###


Site Name: ###

Coordinates Latitude: #REF! Longitude:


Altitude: #REF! Distance from N

Notes: Nominal marked here with


Diagram of Obstacles
Obstacle

NORTH

WEST

Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page70of156
SOUTH

Type of obstacle

Photos are taken from:

Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page71of156
Obstacles Photos
Obstacle 1

Obstacle 2

Obstacle 3

Obstacle 4

Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page72of156
Obstacle 5

Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page73of156
SM/UMTS Roll out expansion
TE SURVEY REPORT
#REF!

Candidate: ###

Longitude: #REF!
Distance from Nominal point : #REF!

EAST

Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page74of156
Azimuth Dist (m) Width () Height (m)

Distance(
Azimuth Height(m)
m)

Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page75of156
acles Photos

Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page76of156
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page77of156
Nepal Telecom 10M GSM/UMTS Roll ou
TECHNICAL SITE SURVEY REP
#REF!

SITE ID: #REF! NA

Site Name: #REF!

Coordinates Latitude: #REF!

Altitude: #REF!

Site sharing / Co-location Sites Inform

1. Existing Typology 2.
Existing Antenna supporting structures on Roof top:(Pole 6m, Lattice Groundig Sys
Tower) Available

Number all the existing Antennas support clock wise starting from the Distance from
north using OP1,OP2 Show the location poles on the skettch map (Main Ground
with respective their numbers Bar to Equipm
Antenna
supporting OP1 OP2 OP3 OP4 OP6 OP7
Structures TGB(Towe
grounding B
Lattice Tower

Guyed Mast
MCB Availab
(Outdooor
Pole

Existing Equipment (to be shown on sketch map)


Indoor Outdoor
Photo takin
Existing RF Antennas
Number all the existing Antennas clock wise starting from the North
using ES1,ES2.

Co-LocationInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page78of156


Nepal Telecom 10M GSM/UMTS Roll ou
TECHNICAL SITE SURVEY REP
#REF!

SITE ID: #REF! NA

Site Name: #REF!

Show the location poles on the Sketch map with respective their
numbers
ES1 ES2 ES3 ES4 ES5 ES6 ES7
900

1800
2100
1800/2100

900/1800/2100

CDMA

WIMAX

Co-LocationInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page79of156


Nepal Telecom 10M GSM/UMTS Roll ou
TECHNICAL SITE SURVEY REP
#REF!

SITE ID: #REF! NA

Site Name: #REF!

3. CONTACTS

Coordination required with (Write name and


phone number):

Operators already present on site,

Company / Department / Project

Contact details of responsible coordinator

Existing and planned (as far as known during TSS) RF/TV/Radio


Equipment:

Operator / Project

Type of equipment

Services (2G, 3G, LTE, WiMAX, CDMA,..)

Frequency Bands

Antenna heights, azimuths

Existing and planned (as far as known during TSS) MW equipment

Co-LocationInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page80of156


Nepal Telecom 10M GSM/UMTS Roll ou
TECHNICAL SITE SURVEY REP
#REF!

SITE ID: #REF! NA

Site Name: #REF!

MWAntenna Size

MW Upper / lower Band

MW Antenna height, azimuths

Floor plan with existing and planned equipment

Comments:

Co-LocationInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page81of156


M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

Candidate: #REF!

Longitude: #REF!

Distance from Nominal point : #REF!

-location Sites Information

2. Grounding System For Existing Site

Groundig System Yes No


Earth
Available Value

Distance from MCB


(Main Grounding
Bar to Equipment

Yes

TGB(Tower If not Available


grounding Bar) required. PCS
No

Yes

MCB Available If not Available required...


No
(Outdooor) PCS

No
Yes

Yes Remarks
Photo taking
No

Co-LocationInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page82of156


M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

Candidate: #REF!

Co-LocationInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page83of156


M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

Candidate: #REF!

Co-LocationInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page84of156


M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!

Candidate: #REF!

Co-LocationInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page85of156


Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPORT


#REF!
SITE ID: ### Candidate: #REF!

Site Name: ###

Coordinates Latitude: #REF! Longitude: #REF!

Altitude: ### Distance from Nominal point : #REF!


Note: Tower, Equipment & Earth Pit location to be marked on photo.

Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page86of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Coordinates Latitude: #REF!

Altitude: #REF!

Photo Checklist
Description Photos Tak
Access Road YES

Existing Equipment YES

Existing DDF YES

Existing Transmission Equipment: YES

Existing AC Power System: YES

Existing AC Power System: YES

YES
Existing battery System YES

Existing Grounding bar YES

Existing Feeder Window Hole YES

Existing Site Gate YES

Existing Cable Ladder: YES

Existing RF Antenna YES

Panoramic Surroundings Overview YES

Sector photo YES

Proposed NEW Equipment space YES

Proposed New Antenna & RRU YES

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page87of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Proposed DDF YES

Proposed AC Power System: YES

Proposed Rectifier (DC Power) System: YES

Proposed Transmission Equipment YES

Proposed Cable Ladder YES

Proposed Grounding bar YES

Handwritten Sketch from nearest Landmark YES

Antenna bottom part YES

Tower foundation YES

Grounding Resistance photo YES

New antenna information YES

Defect 1 (describe) YES

Defect 2 (describe) YES

Defect 3 (describe) YES

Defect 4 (describe) YES

Defect 5 (describe) YES

Defect 6 (describe) YES

Defect 7 (describe) YES

Defect 8 (describe) YES

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page88of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Access To Site

Existing Equipment

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page89of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page90of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Existing DDF

Existing Transmission

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page91of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page92of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Existing ACDB

Existing DCDB(Rectifier)

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page93of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page94of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Existing Battery System

Existing Grounding

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page95of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page96of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Existing Feeder Hole

Existing Site Gate

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page97of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page98of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Existing Cable Ladder

Existing Antenna

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page99of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page100of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Proposed New Equipment

Proposed New Antenna

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page101of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page102of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Defect 1 (description is mandatory)

Defect 2 (description is mandatory)

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page103of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Defect 3 (description is mandatory)


General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page104of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Defect 4 (description is mandatory)

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page105of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page106of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Defect 5 (description is mandatory)

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page107of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Defect 6 (description is mandatory)

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page108of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

Defect 7 (description is mandatory)

Defect 8 (description is mandatory)

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page109of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPOR


SITE ID: #REF!

Site Name: #REF!


#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page110of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

Longitude: #REF!

Distance from Nominal point : #REF!

Checklist
Photos Taken Remarks
NO

NO

NO

NO

NO

NO

NO
NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page111of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

NO

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page112of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page113of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page114of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page115of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page116of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page117of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page118of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page119of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page120of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page121of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page122of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page123of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page124of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page125of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page126of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page127of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page128of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page129of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page130of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page131of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page132of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page133of156
SM/UMTS Roll out expansion

E SURVEY REPORT
Candidate: #REF!

#REF!

General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page134of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:

Site Name: ###

#REF!

Coordinates Latitude: #REF! Longitude: #REF

Altitude: #REF! Distance from Nominal point :

Panaromic Photos(from 13m)


0 Degree

30 Degree

60 Degree
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page135of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:

Site Name: ###

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page136of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:

Site Name: ###

#REF!

90 Degree

120 Degree

150 Degree

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page137of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:

Site Name: ###

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page138of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:

Site Name: ###

#REF!

180Degree

210 Degree

240Degree

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page139of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:

Site Name: ###

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page140of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:

Site Name: ###

#REF!

270 Degree

300 Degree

330 Degree

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page141of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:

Site Name: ###

#REF!

Pnrm Photos-4

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page142of156
M/UMTS Roll out expansion
E SURVEY REPORT

#REF!

#REF!

#REF!

Photos(from 13m)

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page143of156
M/UMTS Roll out expansion
E SURVEY REPORT

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page144of156
M/UMTS Roll out expansion
E SURVEY REPORT

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page145of156
M/UMTS Roll out expansion
E SURVEY REPORT

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page146of156
M/UMTS Roll out expansion
E SURVEY REPORT

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page147of156
M/UMTS Roll out expansion
E SURVEY REPORT

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page148of156
M/UMTS Roll out expansion
E SURVEY REPORT

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page149of156
M/UMTS Roll out expansion
E SURVEY REPORT

#REF!

Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page150of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: #REF! Candidate: #

Site Name: #REF!

Coordinates Latitude: #REF! Longitude: #REF!

Altitude: ### Distance from Nominal point : #REF!

1. Materials Required BSS


Material Description Quantity Remarks
1
Trunk cable length/Size (from DDF to BBU) 10M
1
Length from existing transmission to DDF 15M
NA
Optical Patch Cable length and connector type
1
BBU PGND cable length/Size (from BBU to grounding bar) 12M
1
DCDU power cable length/Size (from PP to DCDU) 9M
1
DCDU PGND cable length/Size (from DCDU to grounding bar) 15M
15m
CPRI cable Length(from the BBU to RRU)
15m
RRU power cable length (from DCDU to RRU)
7m
RRU PGND cable length (from RRU to Grounding bar/hole)
7m
RRU PGND cable length (from RRU to Grounding bar/hole)
as per
Clamps for CPRI, Power Cable and IF Cable(MW). required
Comments:

Materials Requiredfor BSS Nepal Telecom 10M Lines GSM/UMTS Roll out Page151of156
Nepal Telecom 10M GSM/UMTS Roll out expansion

TECHNICAL SITE SURVEY REPORT


#REF!

SITE ID: #REF!

Site Name: #REF!

SCOPE of WORK
1 Cabble ladder will be provided by Huawei as per requirement.(Indoo

2
3
4
5
CME
6
7
8
9
10
1 DC power cable of suitable length between the BTS equipment and

2 DC power cable between the DC power distribution cabinet and the

3 DC power cable between the DC power distribution cabinet and DC

4 Power cable between the DC power equipment (Rectifier) and the b

5 AC power cable between the Rectifier and the AC distribution plate


Power
6 DCPDB, ACPDB, Battery, power-plant, DDF will be supplied by Huaw

7 power cables for RRU from DCPDB will be provided by Huawei.

8 16 sq. mm cable (4 core) with lugs will be provided by Huawei if req

9 DDF will be supplied by Huawei if required.

10
1
2
3
4
Scope of work Nepal Telecom 10M Lines GSM/UMTS Roll out Page152of156
5
Transmission
6
7
8
9
10
1 Protective grounding cable between the BTS equipment and the gro

2 Protective grounding cable between the DC power equipment, batte

3 Protective grounding cable between the DDF box, Equipment cabin

4 Protective grounding cable between the feeder and the grounding p

5 Protective grounding cable between RRUs, ODUs and grounding pl


Earthing
6 Lightning arrestor kit along with 50 sq. mm cable upto the earth-pit

7 Connectors on the side of the grounding plate (indoor) will be prov

8 Connectors on the side of the grounding plate (outdoor) will be pro

9 Earthing will be measured and in case it is below 5 ohms then it wil

10 3 grounding bus-bars is required. In case any of them are missing,

1
2
3
4
Any other 5
additional work 6
7
8
9
10

Scope of work Nepal Telecom 10M Lines GSM/UMTS Roll out Page153of156
SM/UMTS Roll out expansion

E SURVEY REPORT
#REF!

Candidate: #REF!

E of WORK
wei as per requirement.(Indoor and outdoor)

ween the BTS equipment and the DC power distribution cabinet with connector

r distribution cabinet and the DC power equipment (Rectifier) with connector (

r distribution cabinet and DC transmission equipment (Microwave) with connecto

uipment (Rectifier) and the battery.(50 sq.mm)


and the AC distribution plate with connector on the side of DC power equipmen

DDF will be supplied by Huawei if required as per site condition.

be provided by Huawei if required as per site condition.

ired.

Scope of work Nepal Telecom 10M Lines GSM/UMTS Roll out Page154of156
e BTS equipment and the grounding plate (indoor) will be provided by Huawei.

e DC power equipment, battery banks and the grounding plate (indoor) will be

e DDF box, Equipment cabinets and the grounding plate (indoor) will be provi

e feeder and the grounding plate (outdoor) will be provided by Huawei. (16 sq.
RUs, ODUs and grounding plate (outdoor) will be provided by Huawei. (16 sq.

mm cable upto the earth-pit will be provided by Huawei if required as per site

ng plate (indoor) will be provided by Huawei if required.

ng plate (outdoor) will be provided by Huawei if required.

it is below 5 ohms then it will be maintained by Huawei.


ase any of them are missing, it will be provided by Huawei.

Scope of work Nepal Telecom 10M Lines GSM/UMTS Roll out Page155of156
TSSR
TECHNICAL SITE SURVEY REPORT
#REF!

SITE ID: #REF! Candidate: #REF!

Site Name: #REF!

Note Put comments if site requires non-standard solutions or in case if additional materials will be needed

Item Notes
1 Existing tower is 5.30m and is at G+3
2 Building height is 8.50m and is G+3
3 Equipment room has dimension 3350X3800mm and is at G+2
4 Antenna height of GSM 12.50M