WiMAX SITE SURVEY REPORT
20 % sites Expansion Project
SITE Name:
Antenna type
Omni
Sector Tilt Azimuth
1st Sector
2nd Sector
3rd Sector
Name Name
Position Position
Mobile Phone Mobile Phone
Phone/Fax Phone/Fax
Site Access Very
Normal
Hard Difficult To be Other (describe):
Site Access Gravel or difficult
standin establishe
Transport to site: g not stabilized Not possible
d
Truck 4WD by vehicle
Access to site Available Everyda Week Satur Sun Appointment Oth
y days day day needed er:
Any restriction of time to access:
On
Location of Key: Off-
Site
Site
Directions to get to Site:
Site Acquisition Information Nepal Telecom 10M Lines GSM/UMTS Roll out Page1of156
Nepal Telecom
WiMAX SITE SURVEY REPORT
20 % sites Expansion Project
Site ID: Candidate:
Site Name:
GOOGLE MAP Show nearest neighbor BS and minimum 2 km raduis coverage of candidate site in circle
Coordinates Latitude: Longitude:
Google Map Nepal Telecom 10M Lines GSM/UMTS Roll out Page2of156
Nepal Telecom
WiMAX SITE SURVEY REPO
Comments:
Comments:
Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page4of156
Nepal Telecom
WiMAX SITE SURVEY REPO
Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page5of156
al Telecom
E SURVEY REPORT
na & Feeders
Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page6of156
al Telecom
E SURVEY REPORT
Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page7of156
al Telecom
E SURVEY REPORT
Exisitng BTS, Antenna Feeders Nepal Telecom 10M Lines GSM/UMTS Roll out Page8of156
Nepal
WiMAX SITE
SITE ID:
Site Name:
Coordinates Latitude:
NO
Existing Cable run way to AC Power YES
NO
Provide new ladder for cable runway YES
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page9of156
Comments:
Nepal
WiMAX SITE
SITE ID:
Site Name:
Comments:
YES
Power System Model/Make
YES
Power Plant ultimate capacity and Present capacity
DC load current YES
YES
Input Phases of the Power system
YES
RF Module rating
YES
Check space to connect other load in Power Plant
NA
Service life of the Power system
NA
Check any Faults
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page10of156
Nepal
WiMAX SITE
SITE ID:
Site Name:
Check Battery Bank1 total voltage at 0mn before Switching off the Main Powe
______52.8___V
Switch off the Ac power and check Battery Bank1 total voltage after 15 minute
____50.4______V
Switch off the Ac power and check Battery Bank1 total voltage after 30 minute
____50.4______V
Value
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page11of156
Nepal
WiMAX SITE
SITE ID:
Site Name:
Comments:
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page13of156
Nepal
WiMAX SITE
SITE ID:
Site Name:
Comments:
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page14of156
Nepal
WiMAX SITE
SITE ID:
Site Name:
Free cooling / E
Company Name Capacity
N/A N/A
Comments:
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page15of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!
NA Candidate:
e: Longitude:
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page16of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!
NA Candidate:
Description Remarks
ZXDU68 / ZTE
ultimate:550A,current:200A
32A
Three phase
50A
4 NOS
4 nos
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page17of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!
NA Candidate:
Description Remarks
35 SQ.MM
GFM-400/ SHOTO
NO ANY LEAKAGE
400Ah
400Ah
NOT PROVIDED BY NT
ain Power: Check Battery Bank2 total voltage at 0mn before Switching off the Main
Power: ___N/A_______V
5 minutes: Switch off the Ac power and check Battery Bank2 total voltage after 15
minutes: __N/A_______V
0 minutes: Switch off the Ac power and check Battery Bank2 total voltage after 30
minutes: ____N/A______V
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page18of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!
NA Candidate:
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page19of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!
NA Candidate:
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page20of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!
NA Candidate:
Description Remarks
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A
Description Remarks
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page21of156
Nepal Telecom
X SITE SURVEY REPORT
#REF!
NA Candidate:
AC Information
Quantity AC Phase Status
1 NA NOT WORKING
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page22of156
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page23of156
Remarks
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page24of156
Remarks
Cell 12
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page25of156
Cell 24
Cell 36
Cell 48
Cell 12
Cell 24
Cell 36
Cell 48
Cell 12
Cell 24
Cell 36
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page26of156
Cell 48
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page27of156
Remarks
N/A
N/A
N/A
N/A
Remarks
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page28of156
Status
NOT WORKING
Status
N/A
Existing PowerInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page29of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
Earthing system
Existing Earthing
2.72
resistance value (Tower)
Existing Earthing
resistance value 2.72
(Equipment)
Comments:
To refit ? NO To create ? NO
Choosen Solution detail:
YES
Earthing system Existence of a lightning protection ?
To refit ? NO
To create ? NO
Choosen Solution detail:
TE SURVEY REPORT
#REF!
Candidate: #REF!
#REF!
Distance from Nominal point : #REF!
YES NO
TE SURVEY REPORT
#REF!
Candidate: #REF!
20M
NA
8m
8m
7m
NA
TE SURVEY REPORT
#REF!
Candidate: #REF!
YES NO
To create ? NO
YES NO
To create ? NO
Existing Transmission
High/Low
No. Near End Model Manufacturer Frequency
end
PASOLINK 14~40-
1 NAR147 N/A LOW
NEO 15~35 GHZ
2 N/A N/A N/A N/A N/A
3 N/A N/A N/A N/A N/A
4 N/A N/A N/A N/A N/A
6 N/A N/A N/A N/A N/A
Transmission Information:
Existing Transmission (add additional data, take notes). If other than note what
and optical (o) ports.Please fill the data for Each Links Individually.
YE
Microwave
S
NO
Model/Make:
Hop Distance(km):
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page37of156
Nepal Telecom 10M GS
TECHNICAL SIT
NO
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page38of156
Nepal Telecom 10M GS
TECHNICAL SIT
Wavelength:_______m
Type of Connectors(Details) :
E1 Ports (n)
TDM/IP
(Take Photos Fe Ports (n) (Optical)
Front/Back of each
unit) Fe Ports (n) (Electrical)
Equipment Capacity(Mbps)
STM-1
CO/Remote: Upgradation to O
Type of Connectors(Details) :
BW Capacity (Mbps)
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page41of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!
A
Candidate: #REF!
gitude: #REF!
sion Information
BIRUA
N/A 0.3M 13M 119 20M
GUTHI
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
what the other item is in detail. Make additional rows if required to show electrical (e)
Model:34MB-27C
Frequency Band Information: 8 GHZ 15 GHZ OTHERS (SPECIFY)
Power consumption: 1A
(Tx)(MHZ):14.400-15.3500 MHZ
) Connectors : BNC SIEMENS OTHERS (SPECIFY)
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page42of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!
A
Candidate: #REF!
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page43of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!
A
Candidate: #REF!
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page44of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!
A
Candidate: #REF!
Power consumption:
OF MODEM
Power consumption:
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page45of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!
A
Candidate: #REF!
Band: C K
OF MODEM
Power consumption:
YES NO
YES NO
YES NO
Existing TRNInformation NO Nepal Telecom 10M Lines GSM/UMTS Roll out Page46of156
0M GSM/UMTS Roll out expansion
L SITE SURVEY REPORT
#REF!
A
Candidate: #REF!
YES
YES NO
YES NO
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page47of156
Tower
Height (AGL)
20M
N/A
N/A
N/A
N/A
OTHERS (SPECIFY)
OTHERS (SPECIFY)
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page48of156
ty Ports, High BER & Others if any)
OTHERS (SPECIFY)
OTHERS (SPECIFY)
OTHERS (SPECIFY)
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page49of156
OTHERS (SPECIFY)
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page50of156
Dark:
OTHERS (SPECIFY)
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page51of156
Notes (Distance to the other end in
Km):
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page52of156
Existing TRNInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page53of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!
Site###
Concrete
Site###
Enough space has been found on Indoor Cable Tray for the additional required YES
cables (CPRI, DC, IF, Waveguide cables )
Defects Description / comments if any (pictures of evidence are mandatory)
Rusty (take
Good Cold Gavanized
pictures)
Outdoor Cable Tray general
condition No Galvanization Twisted Bended
Enough space has been found on Indoor Cable Tray for the additional required YES
cables (CPRI, DC, IF, Waveguide cables )
Indoor / Outdoor cable runs are secured using cable clamps or pipes or trunks
YES
or cabletrays:
Indoor / Outdoor cable runs are secured using GI pipes (secured on support)
YES
when accessible from Public
Indoor / Outdoor cable runs are protected from anyone stepping on using pipes YES
Comments:
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!
Site###
Site###
Site###
Existing Antenna Supporting Structure condition
Tower / Pole Bracings are complete and no structural component is missing YES
Tower / Pole bolts, nuts and washers are complete and no part is missing YES
Rusty (take
Tower / Pole general Good
pictures)
Cold Gavanized
condition (if any defect take
No Galvanization Twisted Other defects (descr
picture)
Draining holes (pipe leg members, pipe lattice parts) are not blocked. YES
Enough space has been found on cable ladder for the additional required cables
YES
(CPRI, DC, IF, Waveguide cables )
Defects Description / comments if any (pictures of evidence are mandatory):NO DEFECT
Space Available for new required RF antennas mountings (without removing YES
existing ones)
Booms
Amount and of new required RF antennas mountings N/A
Amount:
MW Antenna Mountings type Booms
Site###
Space Available for new required MW antennas mountings (without removing YES
existing ones)
Booms
Amount and of new required MW antennas mountings
Amout:
Space Available for new required MW antennas mountings (without removing
YES
existing ones)
Space Available for all new required RRUs mountings (without removing existing YES
ones)
Presence of Aircraft Obstruction Light on Structure YES
YES
If Yes, does Aircraft warning Lamps (AWL) have a photo sensor (use dark plastic
bag to test)
Candidate: #REF!
Longitude: #REF!
Distance from Nominal point : #REF!
en structure) :BRICK
ructure / Grass) :CONCRETE
Cracks are observed (take
Other defects (describe below)
pictures)
are mandatory):NO DEFECT
g beams YES NO
oom YES NO
ng equipment YES NO
Concrete
YES NO
YES NO
YES NO
__3_
Cold Gavanized Hot Dip Galvanized
Othe defects
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!
Candidate: #REF!
NO
are mandatory)
Othe defects
NO
are mandatory)
NO
NO
NO
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!
Candidate: #REF!
I or H Beams
Cracks observed on concrete Beams (take Other defects (describe
pictures) below)
Candidate: #REF!
Candidate: #REF!
Cold Gavanized
Hot Dip Galvanized
Other defects (describe below)
NO
Cold Gavanized
Hot Dip
Obstruction to climbing Galvanized
Othe defects
way
ory): e.g. The access to the top of the pole is obstructed by existing cable
Othe defects
NO
Ring+ Booms
are mandatory)
NO
Ring+ Booms
Amount
Other
are mandatory)
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
#REF!
Candidate: #REF!
NO
NO
NO
NO
NO
NO
NO
Nepal Telecom 10M GSM/U
TECHNICAL SITE S
New BTS, Anten
#REF
Altitude: #REF!
New BTS,Antenna FeederInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page66of156
YES NO
New horizontal cable tray required
Comment:
YES NO
New horizontal cable tray required
Comment:
New BTS,Antenna FeederInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page67of156
GSM/UMTS Roll out expansion
SITE SURVEY REPORT
Antenna & Feeders
#REF!
NA
Candidate: #REF!
NO
New BTS,Antenna FeederInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page68of156
NO
NO
NO
NO
NO
New BTS,Antenna FeederInformation Nepal Telecom 10M Lines GSM/UMTS Roll out Page69of156
Nepal Telecom 10M GSM/UMTS Roll out expan
TECHNICAL SITE SURVEY REPORT
#REF!
NORTH
WEST
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page70of156
SOUTH
Type of obstacle
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page71of156
Obstacles Photos
Obstacle 1
Obstacle 2
Obstacle 3
Obstacle 4
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page72of156
Obstacle 5
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page73of156
SM/UMTS Roll out expansion
TE SURVEY REPORT
#REF!
Candidate: ###
Longitude: #REF!
Distance from Nominal point : #REF!
EAST
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page74of156
Azimuth Dist (m) Width () Height (m)
Distance(
Azimuth Height(m)
m)
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page75of156
acles Photos
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page76of156
Obstacles Diagram Nepal Telecom 10M Lines GSM/UMTS Roll out Page77of156
Nepal Telecom 10M GSM/UMTS Roll ou
TECHNICAL SITE SURVEY REP
#REF!
Altitude: #REF!
1. Existing Typology 2.
Existing Antenna supporting structures on Roof top:(Pole 6m, Lattice Groundig Sys
Tower) Available
Number all the existing Antennas support clock wise starting from the Distance from
north using OP1,OP2 Show the location poles on the skettch map (Main Ground
with respective their numbers Bar to Equipm
Antenna
supporting OP1 OP2 OP3 OP4 OP6 OP7
Structures TGB(Towe
grounding B
Lattice Tower
Guyed Mast
MCB Availab
(Outdooor
Pole
Show the location poles on the Sketch map with respective their
numbers
ES1 ES2 ES3 ES4 ES5 ES6 ES7
900
1800
2100
1800/2100
900/1800/2100
CDMA
WIMAX
3. CONTACTS
Operator / Project
Type of equipment
Frequency Bands
MWAntenna Size
Comments:
Candidate: #REF!
Longitude: #REF!
Yes
Yes
No
Yes
Yes Remarks
Photo taking
No
Candidate: #REF!
Candidate: #REF!
Candidate: #REF!
Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page86of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
Altitude: #REF!
Photo Checklist
Description Photos Tak
Access Road YES
YES
Existing battery System YES
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page87of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page88of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
Access To Site
Existing Equipment
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page89of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page90of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
Existing DDF
Existing Transmission
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page91of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page92of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
Existing ACDB
Existing DCDB(Rectifier)
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page93of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page94of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
Existing Grounding
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page95of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page96of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page97of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page98of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
Existing Antenna
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page99of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page100of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page101of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page102of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page103of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page105of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page106of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page107of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page108of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page109of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page110of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
Longitude: #REF!
Checklist
Photos Taken Remarks
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page111of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page112of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page113of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page114of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page115of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page116of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page117of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page118of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page119of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page120of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page121of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page122of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page123of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page124of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page125of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page126of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page127of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page128of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page129of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page130of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page131of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page132of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page133of156
SM/UMTS Roll out expansion
E SURVEY REPORT
Candidate: #REF!
#REF!
General Site Photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page134of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:
#REF!
30 Degree
60 Degree
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page135of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page136of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:
#REF!
90 Degree
120 Degree
150 Degree
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page137of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page138of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:
#REF!
180Degree
210 Degree
240Degree
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page139of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page140of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:
#REF!
270 Degree
300 Degree
330 Degree
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page141of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
SITE ID: #REF! Candidate:
#REF!
Pnrm Photos-4
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page142of156
M/UMTS Roll out expansion
E SURVEY REPORT
#REF!
#REF!
#REF!
Photos(from 13m)
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page143of156
M/UMTS Roll out expansion
E SURVEY REPORT
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page144of156
M/UMTS Roll out expansion
E SURVEY REPORT
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page145of156
M/UMTS Roll out expansion
E SURVEY REPORT
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page146of156
M/UMTS Roll out expansion
E SURVEY REPORT
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page147of156
M/UMTS Roll out expansion
E SURVEY REPORT
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page148of156
M/UMTS Roll out expansion
E SURVEY REPORT
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page149of156
M/UMTS Roll out expansion
E SURVEY REPORT
#REF!
Panaromic photos Nepal Telecom 10M Lines GSM/UMTS Roll out Page150of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
TECHNICAL SITE SURVEY REPORT
#REF!
Materials Requiredfor BSS Nepal Telecom 10M Lines GSM/UMTS Roll out Page151of156
Nepal Telecom 10M GSM/UMTS Roll out expansion
SCOPE of WORK
1 Cabble ladder will be provided by Huawei as per requirement.(Indoo
2
3
4
5
CME
6
7
8
9
10
1 DC power cable of suitable length between the BTS equipment and
10
1
2
3
4
Scope of work Nepal Telecom 10M Lines GSM/UMTS Roll out Page152of156
5
Transmission
6
7
8
9
10
1 Protective grounding cable between the BTS equipment and the gro
1
2
3
4
Any other 5
additional work 6
7
8
9
10
Scope of work Nepal Telecom 10M Lines GSM/UMTS Roll out Page153of156
SM/UMTS Roll out expansion
E SURVEY REPORT
#REF!
Candidate: #REF!
E of WORK
wei as per requirement.(Indoor and outdoor)
ween the BTS equipment and the DC power distribution cabinet with connector
ired.
Scope of work Nepal Telecom 10M Lines GSM/UMTS Roll out Page154of156
e BTS equipment and the grounding plate (indoor) will be provided by Huawei.
e DC power equipment, battery banks and the grounding plate (indoor) will be
e DDF box, Equipment cabinets and the grounding plate (indoor) will be provi
e feeder and the grounding plate (outdoor) will be provided by Huawei. (16 sq.
RUs, ODUs and grounding plate (outdoor) will be provided by Huawei. (16 sq.
mm cable upto the earth-pit will be provided by Huawei if required as per site
Scope of work Nepal Telecom 10M Lines GSM/UMTS Roll out Page155of156
TSSR
TECHNICAL SITE SURVEY REPORT
#REF!
Note Put comments if site requires non-standard solutions or in case if additional materials will be needed
Item Notes
1 Existing tower is 5.30m and is at G+3
2 Building height is 8.50m and is G+3
3 Equipment room has dimension 3350X3800mm and is at G+2