1. Purpose
This method statement is designed to assist engineers, supervisors and
technicians for the installation of rubber seal lock joint (RSL J)
This Method Statement must be used and referenced in the pre-work Tool Box
talk briefing.
Any changes to the MS must be noted and addressed in the pre-work meeting.
All personnel must be familiar with this document prior to commencing any work.
Any risks identified as part of this MS must have adequate control methods
identified prior to commencement of work.
This Method Statement must be explained to all personnel involved in the activity
process, prior to commencing work.
2. Scope
This method statement addresses the circumstances that may be
encountered during installation.
This Method Statement is prepared specifically for this activity and aims to
provide information and awareness to the responsible personnel involved.
3. Responsibilities
Site Engineer: Site Engineer is responsible for executing the job and manpower
control according to plan schedule to work and client/customer standard.
DATE 01/17/2017
METHOD STATEMENT FOR
4. PROCEDURES
DATE 01/17/2017
METHOD STATEMENT FOR
4.2 Installation
4.2.1 Preparation of joining surfaces
Remove the end protection from the male pipe end. Loosen and
remove dirt and debris from the grooves using compressed air, a
clean, dry rag or by brushing it of by soft-bristled paint brush.
Clean the grooves and sealing surfaces of the female end or coupling.
Sand off any projections or rough edges on the entry ramps which
compress the O-ring during insertion.
Brush or rub a layer of lubricant into the O-ring groove of the male
end and all inside the surfaces of the female end or coupling. Apply
lubricant only when you are ready to complete the joint. Keep
lubricated surfaces clean and free of sand and dirt, as contamination is
likely to interfere with joining and sealing. Proper lubrication of the O-
ring and joint surfaces is important to avoid cutting the O-ring or
rolling it out of place during assembly.
Important: Apply lubricant only when you are ready to
complete the joint!
4.2.2 O-Ring placement
Lubricate entire surface of the O-ring and slip it into the first groove
on the male end. Distribute the O-ring evenly in the groove by slipping
a screwdriver under it, sliding the tool around the joint.
Important: Do not gouge or abrade the O-ring! A sound O-ring
is the key to a watertight joint.
DATE 01/17/2017
METHOD STATEMENT FOR
Insert the male end until the scribed line is about 6mm from the
leading edge of the female end or coupling. To reduce spillage you
may elect to use rubber pads under the band clamps.
Straightness of entry adds significantly to the ease of assembly. Sight
along the pipe and carefully observe concentricity and uniformity of
entry.
Place lubricated locking keys into the insertion holes, and slowly close
the joint until the keys slip into the key ways.
Check straightness of the entry again by sighting along the pipe and by
aligning the scribe mark on the male end with the edge of the female
end or coupling.
Use a hammer or mallet to drive the locking keys through the
insertion holes and into the keyways until the leading end can be seen
in the insertion hole and approximately 75 to 100 mm remain
projecting.
Important: Drive the key only until you can see its leading end
through the insertion hole. If the key is driven too far, heat may
elongate it and cause it to stick, making later removal
impossible. Fill key holes with caulking compound to prevent
intrusion of sand and dirt wich ay make later key removal
difficult.
After driving the keys deflect the joint to fit the hanger supports or
trench bottom. With the pipe fully supported in its final position,
release the lifting straps: for buried pipe in sag curves, it may be
necessary to leave the lead lifting strap in position to align the next
joint during assembly.
To avoid excessive movement and bending at turns and branches
during the hydrostatic test, pull straight sections of joined pipe
forward as assembly in progresses, using a ratchet winch or other
means to remove play in the joints.
Additional coat may be applied for areas where the paint applied
appear to be thin, with hint of substrate still visible. Touch-points
shall be painted when the materials shall be removed from the area.
DOC. REF. NO. MS-001-17
PETROL& GAS CONSTRUCTION CO.
Rev. 0
DATE 01/17/2017
METHOD STATEMENT FOR
5. Documentation
All personnel involved shall use necessary PPE as required and Site supervisor
shall ensure regular inspection of workers PPE.
It is mandatory for all to undergo / attend the specific HSE trainings that focuses
on actual condition of the activity to be executed.
The workers shall be made aware of safety requirements related to this activity
through daily, weekly and monthly toolbox and safety talks. The JSA shall be
used to the site supervisor as the basis of conducting his daily Tool Box Talks.
All equipment, plant, machineries and tools that shall be utilized in the job shall
be kept in good working condition.
Access and good housekeeping should be maintained in all erection areas.
Working area shall be barricaded with Warning Tape.
Safety watch shall be present from start up to the completion of the
installation/erection work, to prevent unauthorized entry onto the work area
and provide immediate response assistance in case of emergency.
DOC. REF. NO. MS-001-17