FUNCTION TRANSMIT LOADS TO GROUND
a) SAFELY
b) within ACCEPTABLE DEFORMATION LIMITS
FOUNDATION
ENGINEER
CHOICE OF
FOUNDATION SYSTEM
4
FUNCTION TRANSMIT LOADS TO GROUND
a) SAFELY
b) within ACCEPTABLE DEFORMATION LIMITS
Ultimate resistance
Limiting
settlement
Damage is caused
by distortion
5
Understanding & designing for soil-structure
interaction requires:
Reliance on observation &
measurement
Deep understanding of
(ground & structural)
materials
Development & use of
appropriate models
(conceptual, analytical or
physical)
Reference to precedent
knowledge
after Burland (2006)
6
footing
Shallow
(D < B) &/or ground
raft
improvement
combined
Deep piled-raft
(D > c. 3B)
vibro-concrete
piles columns
7
less than about 5 m to approx. 30 m to about 70 m
Possibly on footings/
raft in basement >5 m
8
less than about 30 m to approx. 50 m More than 50 m
10
may be mass concrete or need reinforcement for
punching &/or bending; combined to take out
11 eccentric loads
when footing size becomes large..,
12
Consider raft foundation
simple slab (at surface or in basement),
13
Combined piled raft foundation,
www.wechselwirkung.eu
14
are used where competent foundation soils (or
rock) are not close to the ground surface, or when
loads are very high &/or expected movement of
surface foundation is not acceptable.
many different types and systems offered, and
these vary from market-to-market as well.
but principles of piled foundations are the same.
15
Classification by function
compression lateral
raking
friction
end-bearing
tension
0.3%B to 3%B
shaft resistance, Rs
DISPLACEMENT
base resistance, Rb
21
Low displacement
cce4004.blogspot.pt
Materials:
Steel
(open tube or H-pile)
Concrete sections
(open-ended hollow)
Installation:
Driving
Jacking
Oscillation/ vibration
22
Replacement
Crowd
Torque
1. Auger Considerations:
Excavation stability (casing, fluid)
Durability
Obstructions in ground
Arisings (contamination, disposal)
Monitoring of installation (QC)
2. Ground
Shaft defects (process control,
detection)
Effect of soil disturbance
23
Replacement
Materials:
Concrete
Steel reinforcement and
possibly permanent steel
casing
Installation:
Rotary
Rotary percussion
Continuous Flight Auger
Barrettes (grab/ mill)
24
Deep foundations often to
BY-PASS weak/deformable Basic categories:
ground. Substitution
As an alternative the ground
Consolidation
could be either REPLACED
or IMPROVED. Densification
Choice of best method (or Grouting
combination of methods) is
Mixing
project specific.
Essentially, aiming to Reinforcement
achieve necessary strength Thermal
& stiffness with least cost
(time & monetary).
25
Applicability by soil type:
2.0 0.06 0.002 mm
GRAVEL SAND SILT CLAY
VIBRO-COMPACTION ELECTRO-OSMOSIS
VIBRO-REPLACEMENT/ STONE COLUMNS/ CONCRETE COLUMNS
BLASTING THERMAL
DYNAMIC DEEP COMPACTION
REINFORCEMENT/ INCLUSIONS
PRE-CONSOLIDATION/ SURCHARGING
PERMEATION GROUTING
PARTICULATE
CHEMICAL
COMPACTION GROUTING
JET GROUTING
CEMENT STABILIZATION LIME/CEMENT STABILIZATION
26 LIME
Many very different
techniques for improving Considerations:
ground. Quality control
Development is practice Improvement
lead, science is added performance
later.
Durability
As precedent experience
grows, techniques become
more widely accepted
27
Consolidation
Soft clayey soils have poor
strength & settlement
characteristics.
BUT strengthen & stiffen with
time under sustained load.
Methods used to increase pre-
consolidation pressure incl.
Surcharging/ preloading (often with
vertical drains)
Vacuum (suction preload)
Dewatering to lower GWL
Heating/electric current
www.deltaressystems.com
28
Consolidation tsurch
t90,fill time
by increasing fill
settlement,
height, time to
achieve target-% of fill
final fill settlement
fill+
is faster.
hsurcharge surch
surcharge or fill
settlement rate can hfill
be accelerated by
drainage, to reduce
flow path length
(T 1/H2)
29
Densification/ compaction
Loose granular soils also have
poor characteristics & are
susceptible to liquefaction.
Impulse/ vibrations force
particles closer together.
Methods incl.
High energy compaction (< 5m)
Dynamic compaction
Vibro-compaction
Vibro-replacement (stone columns,
vibro -concrete columns)
30
Densification/ compaction
Vibro-compaction
Water jets & rig crowd assist
insertion
Vertical vibrations cause particle
rearrangement and densification
Topping-up
www.agra.com
www.abelhomes.co.uk
31 Insertion Compaction
Densification/ compaction
Vibro-replacement
Extension of vibro-compaction
Granular material (sand drains,
stone columns) or concrete
(vibro-concrete columns) can
be made
Final diameter depends on soil
characteristics.
32
Summary:
The Structure:
Carries loads to foundation
Sensitivity to movement
The Foundation:
Distributes load safely
Installation may modify ground
The Ground:
Strength to carry load
Will move in response to load change
33