Case History

Intelligent Well System Completion


Improved Selective Zone Production
Saved installation time and reduced operating costs

In an ultradeepwater Gulf of Mexico project in excess of


8,000 ft (2438 m) with a potential for strong loop currents, Nipple

an operator needed to monitor and remotely control the


Benefits
individual zones in the high-rate gas wells to reduce high- Chemical injection
S aved 1416 hours of rigtime mandrel
intervention operating costs and associated risk.
during installation
P rovided monitoring and control The operator chose Baker Hughes two-zone InForce
of individual zones from surface
intelligent well system with 4-in. HCM-Plus (shrouded Splice sub

Produced each zone selectively and non-shrouded) hydraulic sliding sleeves, splice sub,
97/8-in. x 4-in. Premier packer with six feed-through ports
Background and challenges and debris barrier, and the Neptune safety valve.
onitor and remotely control
M
individual zones in high-rate
The completion team used this equipment to construct
gas wells
93-ft (28.3-m) completion assemblies using compensating Premier packer
with feed-through
igh intervention operating
H slings. The completion assembly produced each zone
costs and associated risk
selectively and the operator was able to monitor and control
Baker Hughes solution and results individual zones from the surface.
Applied InForce intelligent well
system, HCM-Plus sliding sleeve,
Premier packer, and Neptune
safety valve
Gauge mandrel

ssembly produced each zone


A
selectively with monitoring and
control from surface using
intelligent well system completion
HCM-Plus
sliding sleeve

Shrouded HCM
sliding sleeve

Quick connect

www.bakerhughes.com
Disclaimer of Liability: This information is provided for general information purposes only and is believed to be accurate as of the date hereof; however, Baker Hughes Incorporated and its affiliates do
not make any warranties or representations of any kind regarding the information and disclaim all express and implied warranties or representations to the fullest extent permissible by law, including
those of merchantability, fitness for a particular purpose or use, title, non-infringement, accuracy, correctness or completeness of the information provided herein. All information is furnished as is
and without any license to distribute. The user agrees to assume all liabilities related to the use of or reliance on such information. BAKER HUGHES INCORPORATED AND ITS AFFILIATES SHALL NOT BE
LIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES FROM ANY CAUSE WHATSOEVER INCLUDING BUT NOT LIMITED TO ITS NEGLIGENCE.

2011 Baker Hughes Incorporated. All rights reserved. 27932

Das könnte Ihnen auch gefallen