General Note:
All civil, mechanical, electrical and other miscellaneous
work items mentioned here-in-after for all project
facilities and units shall include supply, delivery
installation, adjustment, testing commissioning, as built
drawings and all required materials, equipment and
workmanship to execute the items of construction in
accordance with the specifications, drawings, and
engineer instructions, complete in place and ready for
handing over. Measurements and payment shall be
described in the relevant documents. Prices must
include shop drawings for all works that should be
submitted by the contractor and to be approved by the
engineer before starting works.
Mobilization
This item should include site office for the use of the
Engineer's and Employer's staffs with the necessary
facilities, furniture, computers, printers, photocopier, fax
machine, as described in the specifications, equipment,
supplies, maintenance of traffic, temporary works, etc,
which are required for the completion of the works as
1.01 per the specifications and safety plan. Price of this item L.S 1 0
shall include inspection of the site, identifying connection
points with existing network and connecting the new
network with the existing manholes, pipes, and existing
network. This item includes also all obligations, and
liabilities conferred
on the contractor by the bidding documents, and all tests
required for the completion of the work.
Total of Mobilization: 0
1 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
2 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
3 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
Ditto but for 10" (250mm) diameter uPVC pipes SN8 and
of minimum wall thickness (7.3mm) with trench
1.02.5 L.M 2346 0
excavation width 0.85m and trench excavation depth not
exceeding 2.0 m
Ditto but for 8" (200mm) diameter uPVC pipes SN8 and
of minimum wall thickness (5.9mm) with trench
1.02.11 L.M 9806 0
excavation width 0.8m and trench excavation depth not
exceeding 2.0 m.
4 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
5 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
Notes:
All pipes must be internally coated with aluminous
cement mortar and externally coated with metallic zinc
spray 200g/m2 covered by epoxy pore sealant. All
valves to be installed shall be ductile iron fully coated
inside and outside with epoxy and all valves shall be
suitable for sewage use, all according to specification,
drawings and as directed by the Engineer.
All pipes, fittings and valves required should be suitable
for sewage use and in accordance with the followings:
*EN 598 - 2007 or ISO 7186 ( Pipes, Fittings &
Accessories)
*EN 598 - 2007 or ISO 4179 ( Cement mortar Alum
lining)
*EN 681-1 or ISO 4633 ( Gaskets - Materials
specifications)
6 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
7 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
8 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
9 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities
Concrete Encasement
Allow for each and every expense for pipe encasement
with concrete B250 for any diameter where the cover
1.06.1 M3 45 0
above the crown of the pipe is less than 60 cm including
all necessary works, complete, all according to tender
documents, drawings and as directed by the Engineer
Asphalt Reinstatement
Reinstatement of paved roads for the trench works
above trenches of uPVC & DI pipes and around precast
manholes. The asphalt works should be reinstated to
1.06.2 their original thickness and conditions, considering that L.M 10000 0
the minimum thickness of asphalt layer shall be 5cm
after compaction, price to include prime coat at the rate
of 1kg/m2, all to be according to tender documents and
directions of Engineer.
Thrust Blocks
Allow for each and every expense to supply and install
1.06.3 B200 plain concrete for thrust blocks, over pipes where M3 15 0
ever required as per drawings and as directed by
Engineer.
Concrete Reinstatement
Allow for each and every expense for 10 cm thickness
1.06.4 for reinforced concrete B250 including 8mm steel mesh M3 50 0
reinforcement and all necessary works, complete and all
according to directions of Engineer.
10 /10