Sie sind auf Seite 1von 10

ATLAS 63105 Promote Peace Building December 2010

Project: Barta'a Sewage Collection System


District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$

General Note:
All civil, mechanical, electrical and other miscellaneous
work items mentioned here-in-after for all project
facilities and units shall include supply, delivery
installation, adjustment, testing commissioning, as built
drawings and all required materials, equipment and
workmanship to execute the items of construction in
accordance with the specifications, drawings, and
engineer instructions, complete in place and ready for
handing over. Measurements and payment shall be
described in the relevant documents. Prices must
include shop drawings for all works that should be
submitted by the contractor and to be approved by the
engineer before starting works.

Mobilization
This item should include site office for the use of the
Engineer's and Employer's staffs with the necessary
facilities, furniture, computers, printers, photocopier, fax
machine, as described in the specifications, equipment,
supplies, maintenance of traffic, temporary works, etc,
which are required for the completion of the works as
1.01 per the specifications and safety plan. Price of this item L.S 1 0
shall include inspection of the site, identifying connection
points with existing network and connecting the new
network with the existing manholes, pipes, and existing
network. This item includes also all obligations, and
liabilities conferred
on the contractor by the bidding documents, and all tests
required for the completion of the work.

Total of Mobilization: 0

1 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$
Supplying & Installation of uPVC Pipes for Sewage
1.02
Drainage System

Note: All plastic pipes are uPVC pipes even though


in some drawings they are printed PVC.
Allow for each and every expense to supply & install 12"
(300mm) diameter uPVC sewage pipes SN8 and of
minimum wall thickness of (9.2mm) "marked with quality
approved tag" and as per PWA specifications including
all necessary fittings, rubber rings, adhesive material,
any other accessories...etc, price includes but not limited
to the followings:

Trench excavation in soil or rock for pipes, removing


surplus excavation material from the site, providing soft
backfilling, laying of pipes, proper jointing, underground
supporting and hanging the existing utilities which will
face the contractor during excavation and the backfilling
with base course, leveling, compaction in layers, cutting
1.02.1 asphalt. if any, reinstatement, cleaning, testing ...etc and L.M 724 0
all other necessary works to be jointed complete, all
above should be according to the drawings,
specification, standards and under the supervision and
direction of the Engineer. For 12" (300mm) uPVC pipes
SN8 for trench excavation width 0.9m and excavation
depth not exceeding 2 m

Notes: Rate shall include but not limited to the


followings:

1 - Excavation shall cover clearing, grubbing of top soil ,


trimming bottoms and sides of trench to the depths and
widths shown on drawings, removal and disposal of all
excess material to locations acceptable to the Engineer,
Client representatives and related authorities

2 - Soft Backfilling shall cover supplying and backfilling


(surrounding the pipe) by using sea sand. This sea sand
bedding material shall be placed 150 mm below the
invert level up to 200 mm over the crown of the pipe and
for the full width of the trench. The work shall be
completed according to the drawings, specifications and
up to the satisfaction of and as directed by the Engineer.

3 - Supply and installation of proper warning tape


marked "Sewer Pipe"

2 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$

4 - Final Backfilling and Reinstatement shall cover


backfilling and reinstating of the excavated trench by
supplying proper material depending on the type of the
trench as shown on the drawings for different types of
trenches. Rate must include supply of materials and
backfilling in layers not exceeding 250 mm measured
before compaction, watered and compacted to 95% of
field density ( the maximum dry density) according to
modified AASHTO density test T-180 and AASHTO test
T-191 or equivalent. (as shown in the drawings).
Compaction tests and grain size analysis must be
carried out according to PWA specifications by the
contractor and at his own expense also rate includes
supply and installation of the reinstatement materials
depending on the original existing surface depending on
situation. All works should be completed according to the
contract drawings, specifications and Engineer's
approval

5 - Laying of pipes shall cover proper jointing, cleaning,


testing, inspection by mirror, hydrostatic testing, all shall
be performed according to PWA specifications,
standards and directions of Engineer.

6 - The contractor has to submit shop drawing for all


works to be approved by the Engineer before starting
any activity.

7 - The contractor has to fix and repair any damage to


underground utilities that may be caused during work
implementation

8 - If the bottom of any excavation is taken out beyond


the limits indicated or prescribed, the resulting void shall
be backfilled and thoroughly compacted in layers of
150mm, with the following:
Selected screened gravel or sand fill if the excavation
was for a pipeline, or
Class B-150 concrete if the excavation was for a
structure or a manhole.

9 - Length of installed pipes will be measured between


the internal two wall faces of the two adjacent manholes.

3 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$
Ditto for 12" (300mm) uPVC pipes but at depth between
1.02.2 L.M 79 0
2.01m and 2.50m

Ditto for 12" (300mm) uPVC pipes but at depth between


1.02.3 L.M 55 0
2.51m and 3.00m

Ditto for 12" (300mm) uPVC pipes but at depth between


1.02.4 L.M 25 0
3.01m and 3.50m

Ditto but for 10" (250mm) diameter uPVC pipes SN8 and
of minimum wall thickness (7.3mm) with trench
1.02.5 L.M 2346 0
excavation width 0.85m and trench excavation depth not
exceeding 2.0 m

Ditto for 10" (250mm) uPVC pipes but at depth between


1.02.6 L.M 200 0
2.01m and 2.50m

Ditto for 10" (250mm) uPVC pipes but at depth between


1.02.7 L.M 187 0
2.51m and 3.00m

Ditto for 10" (250mm) uPVC pipes but at depth between


1.02.8 L.M 83 0
3.01m and 3.50m

Ditto for 10" (250mm) uPVC pipes but at depth between


1.02.9 L.M 40 0
3.51m and 4.00m

Ditto for 10" (250mm) uPVC pipes but at depth between


1.02.10 L.M 64 0
4.01m and 4.50m

Ditto but for 8" (200mm) diameter uPVC pipes SN8 and
of minimum wall thickness (5.9mm) with trench
1.02.11 L.M 9806 0
excavation width 0.8m and trench excavation depth not
exceeding 2.0 m.

Ditto for 8" (200mm) uPVC pipes but at depth between


1.02.12 L.M 800 0
2.01m and 2.50m

Ditto for 8" (200mm) uPVC pipes but at depth between


1.02.13 L.M 350 0
2.51m and 3.00m

Ditto for 8" (200mm) uPVC pipes but at depth between


1.02.14 L.M 20 0
3.01m and 3.50m

Total of Supplying & Installation of uPVC Pipes for


0
Sewage Drainage System:

4 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$
Supplying & Installation of Sewage Precast
1.03
Manholes

Supply and install of 100cm precast concrete circular


sewage manhole with depth not exceeding 1.5m. The
manhole should have internal epoxy coating, benching,
iron steps rubber coated and should be of sulfate
resistance cement or of bituminous external protection.
1.03.1 No. 366 0
The price is to include necessary excavations,
backfilling, and protection as described in the
specifications, drawings and as directed by the
Engineer. Supply and installation of ferrous and of heavy
duty cast iron cover is also included in the price.

1.03.2 Ditto but for manholes of 1.51m to 2.00m depth No. 40 0

1.03.3 Ditto but for manholes of 2.01m to 2.50m depth No. 30 0

1.03.4 Ditto but for manholes of 2.51m to 3.00m depth No. 25 0


Ditto as described in item 1.03.1 but for 120cm precast
1.03.5 circular concrete sewage manholes with depth between No. 10 0
3.01m to 3.50m

1.03.6 Ditto but for manholes of 3.51m to 4.00m depth No. 5 0

1.03.7 Ditto but for manholes of 4.01m to 4.50m depth No. 2 0

Total of Supplying & Installation of Sewage Precast


0
Manholes:

5 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$

1.04 Supply & Installation of Ductile Iron Force Main

Notes:
All pipes must be internally coated with aluminous
cement mortar and externally coated with metallic zinc
spray 200g/m2 covered by epoxy pore sealant. All
valves to be installed shall be ductile iron fully coated
inside and outside with epoxy and all valves shall be
suitable for sewage use, all according to specification,
drawings and as directed by the Engineer.
All pipes, fittings and valves required should be suitable
for sewage use and in accordance with the followings:
*EN 598 - 2007 or ISO 7186 ( Pipes, Fittings &
Accessories)
*EN 598 - 2007 or ISO 4179 ( Cement mortar Alum
lining)
*EN 681-1 or ISO 4633 ( Gaskets - Materials
specifications)

Force Main Pipe (Pressurized Pipeline)


Supply, installation and testing 100 mm diameter Ductile
Iron Socket Spigot force main pipe (pressure pipeline)
internally coated with aluminous cement mortar and
externally coated with metallic zinc spray200g/m2
covered with epoxy pore sealant. Price includes, trench
excavation in soil or rock for Ductile Iron pipes,
earthworks, removing surplus excavation material from
the site, laying of pipes, underground supporting and
hanging the existing utilities which will face the
contractor during excavation and the sand bedding
1.04.1 L.M 1100 0
15cm below the pipe and 20 cm above the crown of the
pipe and for the full width of the trench, warning tape,
backfilling leveled and compacted also cutting asphalt if
any and repairing internal lining and external coating.
Rate to include all required fittings such as elbows etc,
all required accessories such as elastomers etc, proper
protection over joints, thrust blocks if required,
restoration of surface and reinstatement to original
conditions, testing and cleaning. All according to the
drawings, specification, standards, and direction of the
Engineer.

6 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$

Sewage Air Release Valve with Concrete Chamber


Supply and install air release valve which shall be
specially fit of sewage use. The air release valve must
be a kinetic and automatic valve to release air (gases)
and to admit air into to sewage system cast iron body,
conical shape, steel valve body with oven-baked epoxy
coating, drainage outlet, threaded type, price includes
but not limited to 2" threaded gate valve, coupling and all
other necessary fittings and accessories designed for] 6
bar working pressure. Price also shall include chambers
1.04.2 No. 2 0
complete including but not limited to the following:
excavation in all types of soil, reinforced concrete valve
chamber (precast if achievable), chamber cover and
rungs, backfilling, compaction and reinstatement. The
rate must also include supply and installation of all
required pieces of pipes, concrete supports. All
according to specifications, drawings, catalogues,
manufacturer instructions and directions of Engineer. PN
] 6, DN50 mm Sewage Air Release Valve on 100 mm
Ductile Iron pipe.

Total of Supply & Installation of Ductile Iron Force


0
Main:

7 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$
Sewage Pump Units
Supply, and install electric submersible sewage pump
with grinde caprari type or equivalent of 30 cubic meters
/ hour discharge capacity and 40 meters total head,
complete with the drive motor assembly, 100mm outlet.
Price shall include all civil, electrical and mechanical
1.05
works and materials and all other necessary parts and
fittings needed for proper installation and operation of
the pump in its place, all as indicated in the
specifications and drawings, catalogues and
manufacturer instructions. Price shall include but not
limited to the followings:

Earth works for the inlet, sump and outlet assemblies


including but not limited to excavation in all materials,
backfill & compaction, disposal of surplus excavated
material to approved locations, blinding concrete,
reinforced concrete for floor, walls, and roof of pump
sump, valve chamber...etc of B250 on blind concrete
B150, vent pipes, stainless steel ladders, steel covers,
sand trap, bar screen, emergency 8" uPVC pipe to the
nearest wadi, 4" check valve, 4" gate valve, 2" air
release valve with isolation cock, water level indicator,
4"steel outlet discharge pipe, tees, flanges, elbows,
reducers, dressers, puddle flanges, concrete supports,
pressure gauges, electrical cables and accessories,
power supply cable, connecting to the power supply...
etc, external and internal protections, testing, operation
& commissioning and any other requirements deemed
necessary for the proper performance and completion of
the works under this contract as per contract
specifications, drawings, catalogues, manufacture
instructions and engineer directions.

Electric submersible sewage pump with grinder of 30


m3/hour discharge capacity and 40 m total head and of
efficiencies not less than 70% complete with all required
1.05.1 parts as recommended by manufacturer installed in L.S 1 0
sump of 3m x 3m size and 4m depth with inlet and outlet
assemblies to the sump including all necessary civil,
electrical and mechanical works. (Provisional Item)

Electric submersible sewage pump with grinder of 30


m3/hour discharge capacity and 20 m total he ad and of
efficiencies not less than 70% complete with all required
1.05.2 parts as recommended by manufacturer installed in L.S 1 0
sump of 2.5m x 2.5m size and 2.5m depth with inlet and
outlet assemblies to the sump including all necessary
civil, electrical and mechanical works. (Provisional Item)

8 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$
Total of Sewage Pump Units: 0

9 /10
ATLAS 63105 Promote Peace Building December 2010
Project: Barta'a Sewage Collection System
District: West Bank/ Jenin
Bill of Quantities

Unit Price Total Price


Item No. Description of Works Unit Qty.
US$ US$
1.06 Miscellaneous Works

Concrete Encasement
Allow for each and every expense for pipe encasement
with concrete B250 for any diameter where the cover
1.06.1 M3 45 0
above the crown of the pipe is less than 60 cm including
all necessary works, complete, all according to tender
documents, drawings and as directed by the Engineer

Asphalt Reinstatement
Reinstatement of paved roads for the trench works
above trenches of uPVC & DI pipes and around precast
manholes. The asphalt works should be reinstated to
1.06.2 their original thickness and conditions, considering that L.M 10000 0
the minimum thickness of asphalt layer shall be 5cm
after compaction, price to include prime coat at the rate
of 1kg/m2, all to be according to tender documents and
directions of Engineer.

Thrust Blocks
Allow for each and every expense to supply and install
1.06.3 B200 plain concrete for thrust blocks, over pipes where M3 15 0
ever required as per drawings and as directed by
Engineer.

Concrete Reinstatement
Allow for each and every expense for 10 cm thickness
1.06.4 for reinforced concrete B250 including 8mm steel mesh M3 50 0
reinforcement and all necessary works, complete and all
according to directions of Engineer.

Total of Miscellaneous Works: 0

10 /10