Sie sind auf Seite 1von 2

9902966099

9951602952 sudhakar
veggies
kukatpally 1000 * 200 rs = 2 lakhs daily
expenses - labor 10 / motorcycle, lorries
lorries - 500 km = 8000 rs - 5 tonnes * 15 = 75000 + 10k = 85k
profit = 5 t * 30 = 150k
door delivery = 10 * 400 = 4k - manual - 10k
150k - 85k - 10k = 55k
website maintenance = 4-5 lakhs
VEHICLES = 10 = 2.5 lakhs
godown advance =
pay = cash / cc / paypal

Develop in depth knowledge in SAP technical (ABAP RICEFW) & functional side (Sal
es and distribution, MM) ? Use knowledge & learning interest for the growth of
the organization & clients by aligning my goals with the goals of the organizati
on.
Professional Experience Summary:
? 2 years of experience in Information Technology spread across various phases o
f Software Development Lifecycle like Design, Build and Test. ? Working as Assso
ciate consultant in Suchi software solutions Pvt Ltd (Hyderabad) from June 2014-
till date. ? Have worked extensively with SAP R/3 ABAP (ECC 6.0)as Developer& De
signer in the following areas: ABAP: - Reports (Simple ALV / Interactive ALV / M
odule Pool programming) - Enhancements (BAdI / User Exits / Implicit enhancement
s / Customer Exit) - Forms (Scripts, Smart forms) ? Have worked extensively in O
bject Oriented ABAP and have good debugging skills in the following: - Normal cu
stom program debugging using Classic / New debugger - Debugging Remote Function
Calls - Debugging Pop up dialogs ? Have good knowledge in HTML5. ? Have worked a
s Technical Designer for objects in various RICEF areas like Reports, Enhancemen
ts, Conversions and Forms ? Fast learner, curious about new technologies.
Page 2
Roles & Responsibilities:
Role Responsibility
Developer
1. Deliver the Object with high standards by following good coding practice and
performance optimization. 2. Ensure object quality with Code Inspector, Extended
Syntax check, Performance Analysis and SQL trace. 3. Thoroughly test the object
with all the test cases listed out in the Component test plan. 4. Transport rel
ease.
Designer
1. Attend Functional Design transition call. 2. Prepare Technical Design documen
t. 3. Prepare Component Test document which includes test cases from functional
design and technical test conditions. 4. Assist and provide guidance to the Deve
loper. Overall responsibility of the object rests with the Designer.
Support
Provide support for the new requirements / modifications / defects arising out o
f the object after functional acceptance till hyper care phase of the project re
lease.
Technical Analyst
Provide production support for fixing bugs and Design change within SLA.
Project 1 GE April 2016 to till date
Client Overview: General Electric Co. is a technology and financial services com
pany that develops and manufactures products for the generation, transmission, d
istribution, control and utilization of electricity. Its products and services i
nclude aircraft engines, power generation, water processing, security technology
, medical imaging, business and consumer financing, media content and industrial
products.
Roles : Developer Areas of work : EhpUpgarde And Performance Optimization
Tasks Performed:
? Coordinating work among Team. ? Applied optimization techniques to improve per
formance of object. ? Developed tracking solution program. ? Preforming SPAU a
nd SPDD, Implementing SAP Notes.
Project 2 Nestl Dec 2015 to Mar 2016
Client Overview: NESTL is the world's leading Nutrition, Health and Wellness Comp
any. The Company was founded in 1866 by Henri Nestl in Vevey, Switzerland. The fl
agship brand Nestl
Page 3
Roles : Developer Areas of work : HANA Migration
Tasks Performed:
? Coordinating work among Team. ? Applied optimization techniques to improve per
formance of object. ? Responsible for whole deliverables and support.
Project 3 Exxon Mobil Nov 2015
Client Overview: ExxonMobil, the largest publicly traded international oil and G
as Company, uses technology and innovation to help meet the world s growing energy
needs. We hold an industry-leading inventory of resources and are one of the wo
rld s largest integrated refiners, marketers of petroleum products and chemical ma
nufacturers.
Roles : Developer Areas of work : SAP- HANA Migration (POC)
Tasks Performed:
? Coordinating work among Team. ? Applied optimization techniques to improve per
formance of object.
Project 4 Exxon Mobil Sep 2015 to Oct 2015
Client Overview: ExxonMobil, the largest publicly traded international oil and G
as Company, uses technology and innovation to help meet the world s growing energy
needs. We hold an industry-leading inventory of resources and are one of the wo
rld s largest integrated refiners, marketers of petroleum products and chemical ma
nufacturers.
Roles : Developer Areas of work : Upgrade Non-Unicode system to ECC 6.0 Ehp7
Tasks Performed:
? Coordinating work among Team. ? Preforming SPAU and SPDD, Implementing SAP Not
es. ? Running UCcheck, sci, slin and fixing all the issues in order to make prog
ram run as usually. ? After upgrade support.

Das könnte Ihnen auch gefallen