Answer:
Please refer to Scope of Work, section 3.2, which states that the Contractor shall be responsible to revalidate the geotechnical
report recommendations under report number 2015/104, Rev.1 provided by the Company.
Answer:
Request for extension of bid submission date is not entertained as the project scope is a straight forward. The current bidding
period is more than adequate for a project of this nature.
Answer:
Please refer to Scope of Work, section 3.3.3 Lighting System. LSTK Contractor shall be responsible to provide all supports for
lighting, cable trays/conduits and all other welded parts with tanks.
Answer:
Please refer to Scope of Work, section 3.3.4 Grounding & Lighting Protection System Grounding lugs "bosses" shall be provided
by LSTK Contractor as per applicable standards.
https://ecnx.aramco.com/ecnx/ecn/web/qa/bqa/new_bqa.jsp 8/11/2016
Page 2 of 6
Answer:
Please refer to Scope of Work, section 3.3.4 Grounding & Lighting Protection System. Lightning rod clip supports shall be
provided by LSTK Contractor.
Answer:
Please refer to Scope of Work, section 3.3.4 Grounding & Lighting Protection System. Lightning protection system shall be
designed by CMEI Contractor, LSTK contractor shall evaluate the design & provide recommendations about the best lightning
rod location. Welding to any clip supports is the responsibility of LSTK contractor.
Answer:
LSTK Contractor shall be responsible to coordinate with CMEI Contractor, and will ensure it design comply with all the tank
associated HCIS requirement. (Reference to Schedule B paragraph 3.8 for interface coordination)
Answer:
The pipe size shown on the PIDs is preliminary, Scope break is shown on the PID between LSTK Contractor and CMEI
Contractor. LSTK Contractor is responsible to finalize the Foam water requirements for each tank including pipe sizing and
foam pourer?s selection. In addition, hydraulically size the Foam Ring and Foam piping up to the base of the tank. LSTK
Contractor to communicate final pipe sizing to base of the tank where the interface with the CMEI occurs.
Answer:
Manual call point, sounder & strobe are excluded from LSTK Contractor. However, Junction box related to Linear Heat Detector
System is included in LSTK Contractor scope.
https://ecnx.aramco.com/ecnx/ecn/web/qa/bqa/new_bqa.jsp 8/11/2016
Page 3 of 6
Answer:
HCIS approval on the fire protection system for tanks is LSTK Contractor responsibility. The Company will only be responsible
in liaising with HCIS for approval.
Answer:
Vendor shall specify the venting requirements per API 2000 and applicable Saudi Aramco material system specifications.
Answer:
Tank capacity, Liquid levels, and operating and design conditions, pumping in and out rates, fluid physical properties are final.
For vent calculations the tank vendor shall comply with the standard requirements of pump in and pump out rate. PFD are
being provided for reference. Provided tank dimensions are minimum (reference Tank Data Sheet Note) please Refer to
attahments
Attachments:
VA247849-001.pdf
VA247842-001.pdf
VA247840-001.pdf
VA247841-001.pdf
VA247839-001.pdf
VA247898-001.pdf
VA247899-001.pdf
VA247900-001.pdf
VA247901-001.pdf
VA247902-001.pdf
VA247903-001.pdf
VA247904-001.pdf
VA247905-001.pdf
VA247906-001.pdf
VA247907-001.pdf
VA247908-001.pdf
VA247909-001.pdf
VA247910-001.pdf
VA247911-001.pdf
VA247912-001.pdf
VA247913-001.pdf
VA247929-001.pdf
VA247836-001.pdf
VA247837-001.pdf
Answer:
Reference P&ID are being provided. please refer to the attachments
Attachments:
VA247898-001.pdf
VA247899-001.pdf
VA247900-001.pdf
VA247901-001.pdf
VA247902-001.pdf
VA247903-001.pdf
VA247904-001.pdf
VA247905-001.pdf
VA247906-001.pdf
VA247907-001.pdf
VA247908-001.pdf
VA247909-001.pdf
VA247910-001.pdf
VA247911-001.pdf
VA247912-001.pdf
https://ecnx.aramco.com/ecnx/ecn/web/qa/bqa/new_bqa.jsp 8/11/2016
Page 4 of 6
VA247913-001.pdf
VA247929-001.pdf
VA247836-001.pdf
VA247837-001.pdf
VA247839-001.pdf
VA247840-001.pdf
VA247841-001.pdf
VA247842-001.pdf
VA247849-001.pdf
Answer:
Bidder scope of supply is reflected through Data sheet, however any component which is essential for these tanks to comply
with SA/international standards shall be contractor scope.
Answer:
Clean out connection is required for all Tanks as mentioned in Tank Datasheets under Index D
Answer:
Over Pressure/Vacuum Bleeder Vents are required for the floating roof tanks. Venting requirement provided in datasheet are
minimum requirement and vendor shall provide adequate vents as per the pump in pump out rate provided in data sheet
Answer:
Bidder shall detail the venting requirements as per API 2000 and applicable Saudi Aramco material system specifications.
Accordingly Bidder to consider Open Vent, Over Pressure/Vacuum Bleeder Vent or Pressure/Vacuum Relief Valve. This is
already mentioned in submitted Tank datasheets under Index D
https://ecnx.aramco.com/ecnx/ecn/web/qa/bqa/new_bqa.jsp 8/11/2016
Page 5 of 6
Answer:
Bidder understanding is not correct. Elevation and Orientation will be provided (by CMEI Contractor) at later stage and
accordingly needed drawings, steel structure, access platform, access ladder shall be considered in estimate.
Answer:
Please refer document# GEN-E0107, section 2.5.
Answer:
Please refer Project Scope of work Doc NO GEN-E0107 for detail scope.
Answer:
Reinforcement % shown in the proposal drawings is indicative and for that reason number of bars are not mentioned on
drawings. It is LSTK contractor's responsibility to design ring wall foundation as per vendor load data and geotechnical
recommendation and arrive at design including % of reinforcement; this shall be in compliance with Saudi Aramco standards
requirement.
Answer:
Please refer geotechnical report number 2015/104, Rev.1, point (xii) on page 63.
Answer:
Immediate settlement reported in geotechnical report number 2015/104, Rev.1 is corresponds to settlement during hydro test.