Archer is a global oilfield service company with more than
40 years experience, 7,000 employees, and operations in
more than 100 locations worldwide. From drilling
services, production optimization, well integrity and
intervention, to decommissioning, Archer is focused on
safely delivering the highest quality services and products
to the drilling and well service markets. We are Archer.

Introduction to Archer 2
Well Integrity Cflex Cementing Sleeve
Unique ISO 14310/14998 V0 certified seal
Allow operator to plan the cement job without risk of compromising
Well Integrity
High burst, collapse, torque and tensile ratings
Full bore ID and slim OD
Multiple opening and closing part of qualification
Unlimited number can be installed in liner or casing string and
operated selectively
Can operate with high differential pressure without damaging seal
Suits all type of premium casing threads

The Cflex MKII-F with Cement Base


The MKII-F is a Cflex SS with a built-in fundament.
The seal provided by the fundament prevents the cement to flow
downwards in a well. It prevents contamination of the cement. The
fundament can hold differential pressures, and is an integrated part of
the valve
The fundament is mechanically activated when the sleeve of the valve is
opened; the whole cementing process is done in one run
Cflex V0 gas tight stage Cflex V0 MKII-F
The MKII-F maintain a large flow by area for low ECD impact
cementing system w/ Cement Base

Private and Confidential 3


archerwell.com

Case study: Cflex

Cflex provides reliable


annulus integrity when primary
cementing falls short in the Region: Gulf of Mexico, United States
Well type: Oil & Gas

Gulf of Mexico Case benefits


Avoided the high cost and risk of
tertiary remediation
Challenge Compliance with regulatory requirements
A major international operator anticipated significant Secure well integrity
operational difficulties in cementing the annulus of a
horizontal well that intersected a low fracture gradient Key capabilities
Unique ISO 4310 V0 certified seal
formation. In order to comply with regulatory requirements,
Improved annulus integrity and zonal isolation
500ft of cement was required above the uppermost Security and confidence in gas tight sealing
production zone at 10,091ft measured depth (MD), capability and mechanical integrity
crossing the liner lap of the 9 5/8in and 13 5/8in casing Easy installation and single-trip operation of
at 9,825ft MD. Modeling and offset data indicated that multiple Cflex devices
Precise and conclusive operation for open,
traditional primary cementing methods would be unable
close and lock; no risk of accidental lock
to ensure well integrity, leading the operator to explore a Improved operational efficiency
contingency solution. and effectiveness
Versatility and flexibility for
multiple applications
Slim design minimizes ECD effects
Solution Large flow area ports maximize possible
The operator selected Archers Cflex multistage cementing flow rate
technology as a contingency in the event that primary
cementing failed to provide sufficient cement coverage.
The Cflex was run integral with the 9 5/8in casing string to
9,391ft MD, 700ft above the upper-most production zone.
As anticipated, the primary cement job provided insufficient
zonal coverage. Cflex was then operated to displace 100bbl
of cement down to the upper-most production zone,
isolating the 13 5/8in casing shoe at 9,825ft MD.
Case study: Cflex
Results Typical applications
Cement bond logging clearly demonstrated that 600ft of Controlled, secure and selective access to
casing annulus
effective pressure barrier cement was in place above the Multistage cementing
production zone, crossing the 13 5/in and 9 5/8in liner lap. Annulus cleanout
The Cflex was then locked closed to create a permanent V0 Fracturing
rated gas tight seal.

The successful contingency operation allowed the operator


to meet its regulatory requirements and move forward with
completion operations without further delay, ultimately
mitigating the costly, high risk tertiary remediation of
perforating and squeezing cement.

958in Longstring

Cement squeeze from Cflex


to 13 58 Shoe = 600ft

Cement squeeze from Cflex


to top of zone = 700ft
9,391ft

Objective
accomplished

9,825ft 13 58 in Shoe

Upper
10,091ft zone of int.

Expected
primary
cement job

Cflex.

Cflex multifunction operating tool controls Cflex


selectively and precisely.

Cflex dart catcher.

We are a global oilfield service company that specializes in well delivery and well
performance because we believe that specialists do the job best. More than 40 years
experience drives our difference in a constant search for new ways to deliver better wells.
We listen to our customers and use our expertise to help them produce more oil and gas.
We are craftsmen. We take great pride in our work and always deliver on our promises.
We are Archer, the well company.

Archer 2012 / CS-CX-4-1


Well Integrity LOCK Suspension Plug
Applications ISO 14310 V0 certified gas-tight seal
Temporary well suspension Ball valve ISO 28781 qualified to 10,000 psi
Emergency well control Millable and 100% retrieval record from over 1,900 run
Pressure or leak-off testing No weight needed below LOCK to set
Up to 660 kips Hanging capacity
Manufactured and tested in accordance with ISO
14310 Shallow, deep and horizontal set
Multiple release and set with no swabbing effect
Testable above and below
Straight through bore
Element tested for up to 10,000 psi

Short to Long Tem Suspension


Plugs retrieved after 4 years in well
Private and Confidential 4
archerwell.com

Case study: Major Natural Gas Project

Archer was awarded the Well Suspension Plugs


contract for a 10 well, 3 year campaign in August
2011, for a major international operator, operating
in one of the largest natural gas projects in the Region: Australia
Customer: Major Operator
world and single largest resource development Field: Offshore Australia
Well type: Gas / Developement
in Australias history.
Case benefits
The following points are some of the LOCK
features that the operator benefited during
Challenge the campaign:
The gas field was situated in environmentally challenging  Proven gas tight and V0 ISO 14310
area, which includes the Barrow Island, a Class A Nature  Excellent track record in deep water
Reserve since the year 1910. Drilling was conducted in environment
approximately 1350m of water using a 5th Generation  Rapid and easy deploymentno weight
required below plug for setting purposes,
ultra-deepwater drill ship. The well program consisted of which saves costly rig time on ultra
batch drilling, followed by batch completions. In view of deepwater drill ships.
the above conditions, well integrity during the period of  3 straight through bore allows high
temporary suspension was a very critical element. The circulation rate during fluid displacement
well suspension program required setting of a proven gas and well cleaning.
100% retrievability to date
tight plug in the 13-5/8 casing section and another to be Extended period of suspension does not
set in a deep (3500m 4000m), highly deviated (up to 70 affect retrievability efficiencyup to 434 days
degrees) 9-5/8 casing section. to date
Sealing element fully retracts even after
Solution long suspension period and enable efficient
retrieval. All plugs were retrieved with sealing
The LOCK Series of well suspension plugs provided the
element in good conditionthere was no
assurance of an absolute seal, is independently certified drag during pulling out of hole.
as gas tight, and qualified as V0 under ISO 14310. With
over 1,300 deployments, mostly in the harsh North Sea
environment, the LOCK series plugs also come with an
unrivalled 100% retrievability track record. The 13-5/8
TIMELOCK was utilized as the upper barrier and is the only
suspension plug in this size to come with V0 ISO 14310
qualification. The 9-5/8 TIMELOCK was deployed as the
operators lower barrier of choice as its installation is not
hampered by high well deviation and allows
for rapid deployment.
Case study: Major Natural Gas Project

Result
Case benefits continued
All installed plugs were successfully pressure tested from above  Multi functioning ball valve allows monitoring
and below, enabling in-flow tests to be conducted per the of well pressure without unsetting the plug
operators stringent requirements. Additionally, the 9-5/8 plug was and enables well control when required.
able to be set as deep as possible because no tail pipe is required. Most wells experienced pressure spike when
opening the ball valve. Although all pressure
spikes were later proven to be thermal
Some of the plugs have since been retrieved, including two plugs expansion and not
that were left in the well for over 14 months, and another two plugs a well control situation, the ball valve was
for just under 12 months. During the retrieval process, the operator an invaluable tool during the pressure
was able to monitor and deal with well pressure prior to un-setting monitoring exercise.
the plug by functioning the ball valve.  The operator now keeps the 13-5/8 and
9-5/8 TIMELOCKS on the drill ship as
contingency packers. These plugs come
with magnetic drift that allow clean up of
plug setting area in the event time is of the
essence.

Typical applications
 Planned temporary well suspension that
requires the highest gas tight qualification
V0 ISO 14310
 Storm and contingency suspension that
requires high hang off weight capability
without sacrificing gas tight assurance
Leak detectionmulti set in one trip and not
limited by depth or well deviation
In-flow testing while maintaining full well
control capability

Archer is a global oilfield service company with more than 40 years experience, over
8,000 employees, and operations in more than 100 locations worldwide. From drilling
services, production optimization, well integrity and intervention, to decommissioning,
Archer is focused on safely delivering the highest quality services and products to the
drilling and well service markets. We are Archer.
Well Efficiency and Reliability Tornar BOP Cleaning

Archer Tornar BOP cleaning tool reduce NPT Significantly

Archer Tornar Sub creates a high velocity vortex of drilling fluid inside BOP
As the high velocity and rotating fluids passes, it creates a suction inside the cavity that pull any
debris in to the rotating column of fluids
The turbulent flow prevent debris from falling into the well
Extreme Archer magnet design to overcome the magnetic field of Riser and BOP
Able to maintain high flow rate and high Velocity without risk damage

Private and Confidential 5


archerwell.com

Case study: Tornar BOP Cleaner

Effective cleaning of
Subsea 18.75 BOP stack
Challenge Region: North Sea
During drilling operations swarf and magnetic debris Customer: COSL
Field: Troll
accumulate in BOP cavities as fluids are circulated and Rig: COSL Promotor
returned to surface. Operating BOP in such environment Well type: Oil & Gas
can cause damage to the seals, which in turn can lead to
expensive repair operation or in worst case malfunctioning Case benefits
BOP in well control situation. Reduced BOP downtime and maintenance
Extended BOP operating performance
Reduced safety and environmental
However, cleaning debris from BOP cavities by traditional operating risks
methods has proven to be especially challenging as the
associated technologies have not been optimized for the Key capabilities
task. The magnets are too weak, or too small, or both, and Effective well cleaning
Configuration to suit any BOP requirements
the jet subs tend to push debris in to the cavities rather Drillpipe connection
than washing it out. One piece mandrel
Non-rotating stabilizer and magnet
Suspicion of swarf in the 18.75 subsea BOP stack on COSL Most powerfull magnets in the industry
Innovator semi-submersible drilling rig prompted the Proprietary Tornar flow port technology
drilling contractor to carry out BOP stack cleaning prior to
BOP performance test. Owing to the increased demands of
operating in a deep water environment it was imperative
for COSL to find an effective and efficient solution to
safeguard operations without elevating operating costs.
Case study: Tornar BOP Cleaner
Solution Additional information
COSL selected Archers 17.45 inch Tornar BOP cleaner, a
1st run
solution that has been specifically designed and developed Washed at 4800 lpm - 38 bar
to remove debris from 18.75 inch subsea BOP stack safely, Clean and remove swarf from magnets,
rapidly and reliably. Tornar technology combines proprietary 70 kg recovered.
Tornar flow ports with a powerful industrial magnet to
2nd run
ensure the maximum extraction of harmful debris from the Washed at 6000 lpm - 56 bar
well. The Tornar flow ports positioned within the large body Clean and remove swarf from magnets,
stabilizer create a high-rate drilling fluid cyclone even at low 25 Kg recovered.
pump rates. A proprietary riser cleaner is also available to
3rd run
maximise debris recovery for subsea applications. Washed at 6000 lpm - 57 bar
Clean and remove swarf from magnets,
The differential pressure caused by the cyclone generates 16 kg recovered.
a powerful suction effect, which extracts any accumulated 4th run
debris from the BOP and retains it in the drilling fluid just Washed at 4500 lpm - 32 bar
like a vacuum cleaner. The powerful 17.45 inch industrial Clean and remove swarf from magnets,
magnets incorporated within the cleaning string improve the 5 kg recovered.
overall efficiency of the system by ensuring the effective and
complete retrieval of metallic debris from the BOP and its
surrounding area.

Results
The Tornar BOP cleaner proved to be a highly effective
solution for the task at hand, with a considerable amount of
swarf was recovered from the BOP stack (as shown in figures
1, 2 and 3) and subsequently the BOP test was completed
successfully and safely.
Figure 1. Swarf recovered by the string magnet during
Had the BOP test had been conducted without recovering first run.
such large volumes of debris from the well, it may have been
unsuccessful at best, and at worst may have resulted in
permanent damage to the BOP.

Based on the results from the operation COSL have adopted


Tornar technology as the primary BOP cleaning solution in
order to minimize BOP downtime and maximise
operational safety.
Figure 2. Close up of string magnet showing volume of
swarf recovered during first run.

Figure 3. Swarf recovered by circulation magnet during


first run.

We are a global oilfield service company that specializes in drilling services and well
services because we believe that specialists do the job best. Our experience drives our
difference in a constant search for new ways to deliver better wells. We listen to our
customers to provide straighforward solutions to help them produce more oil and gas.
We are craftsmen, who take pride in our work and always do what we promise.
We are Archer.

Archer 2013 / CS-TORNAR-2-1-09112013


Well Efficiency and Reliability Well Bore Cleaning
Tornar Wellbore Clean Up Tools Family
TornarTM was Developed and built on latest design criteria with special attention to efficient cleaning and reliability
Non Rotating high flow area tools deployed on one piece mandrel

There are 3 key element for efficient Mechanical Wellbore Cleaning


High Rotation speed is important to create turbulent flow and transport debris in to the flow regime in the vertical
section of a well.
Fluid Velocity is important to transport debris out of the well. Maintaining a constant fluid velocity in the different
sections is important to avoid debris settlings when there is a change in liner or casing size.
Fluid Rheology is equally important to create a viscous coupling with the drillpipe and suspend debris in the flow
regime.

TornarTM Family
TornarTM String Magnet (Non-Rotation)
TornarTM Casing Scraper (Non-Rotation)
TornarTM Casing Brush (Non-Rotation)
TornarTM WellFilter
TornarTM Balanced Circulation Valve
TornarTM Circulation Magnet
TornarTMCCirculation Sub
Landing Sub F/7" PBR

Private and Confidential


Well Integrity w/ PWT Testing - Zonal Isolation - P&A
Application
RIH, perforate CSG and drop guns

Create a clean rock to rock contact in casing and liner


annulus through perforations and placing a cement
barrier plug

Confirm creeping shale integrity as barrier

Replace costly fishing and milling operation

Wash annulus and place Cement through perfs Rock to Rock cement plug

Private and Confidential 7


archerwell.com

Case study: Perforate & Wash tool

Reducing cost and improving


effectiveness of P&A
on Statfjord. Region: North Sea
Customer: Statoil
Field: Statfjord
Well type: Oil and gas

Challenge Case benefits


Statoil was seeking an efficient and reliable method to plug The Perforate & Wash tool (PWT) eliminated
the need to mill casing and provide more
and abandon its well (P&A), whilst minimizing the use of rig security when drilling out cement.
time, and ensuring and effective, long-lasting seal. Provided a clean and open annular space in
which to place cement.
Traditional P&A methods are often time consuming Customer was able to set a balanced cement
and costlythe need for milling and debris handling; plug and squeezed cement into washed
perforations.
perforating, and then preparation of the seal zone to
receive cement; the deployment of a rock-to-rock cement Key capabilities
seal; and the subsequent verification of the seal using Field proven
logging techniques, can all add complexity and risk. Also, High circulation rates
squeezing cement into perforations without washing and Adjustable distance between swab cups
Dual swab cup design
purging the perforated zone can reduce the chance of Flow by-pass system
success.
Case study: Perforate & Wash Tool
Solution
Archers Perforate & Wash Tool (PWT) is designed to
perforate selected casing or liner sections; wash and clean
the perforated zone completely; then enable permanent
rock-to rock cement pluggingall during a single trip.

By eliminating the need for milling and debris handling,


and preparing the seal zone to receive cement, the PWT
delivers a step change in P&A efficiency and effectiveness.
13 3/8 Casing
In this case, the PWT was deployed after the initial
perforations had been performed. The perforating program TOC
targeted two intervals at 22402303 m and 21082170 m
Cement plug 2
respectively, and was configured to deliver 12 shots per
foot with a hole size of 0.48 inches. After perforation, the
PWT was deployed to the top of the shallowest perforation
interval and the washing sequence commenced as the
PWT was deployed further into the well. During washing,
a flow rate of up to 2200 liters per minute with 4045 bar
circulation pressure was achieved. By visually examining
Logged section TOC
the fluid returns over the shakers and monitoring the
pressure points throughout the perforated intervals, it was Cement plug 1
possible to observe that debris was being successfully
removed from the perforated zones. A spacer was pumped
into the perforated zone before pulling out of hole. Then,
after blowing out the solid ball seat, an open ended stinger 9 5/8 Casing
was deployed, enabling a balanced cement plug to be
set and cement to be squeezed into the pre-washed
perforations. A cement evaluation log was deployed
following the PWT operation, in order to verify the quality of
the cement seal.

Results
The Perforate & Wash Tool has eliminated the need to mill
casing, and has provided a clean and open annular space
in which to place cement, creating a secure and permanent
seal of the well. High-circulation rates enabled improved 13 3/8 Casing
efficiency and more effective removal of debris from the
perforated zone. Eliminating the need for milling and debris
TOC
handling, and preparing the seal zone to receive cement,
has reduced overall complexity, risk and cost, whilst at the
Cement plug 2
same time improving the integrity of the end result, as
validated by a subsequent cement evaluation log.

This PWT job has been a great success for Statoil and has
provided a robust blueprint for future operations.

TOC

Cement plug 1

9 5/8 Casing

We are a global oilfield service company that specialises in drilling services and well
services because we believe that specialists do the job best. Our experience drives our
difference in our constant search for new ways to deliver better wells. We listen to our
customers to provide straightforward solutions to help them produce more oil and
gas. We are craftsmen, who take pride in our work and d  o what we promise.
We are Archer, the well company.
archerwell.com

Case study: Perf & Wash Tool (PWT)

Pressure test formation behind


13 3/8 casing through perforated
9 5/8 casing and cement. Region: North Sea
Customer: Statoil
Field: Statfjord
Well type: A-36A
Challenge Reference: T  hanong Hongdul and
Main challenge was to locate the 6 ea perforated interval of Jrgen Bugge-Mahrt
only 1 feet between 2078,2 m to 2160 m and pressure test
them to 40 Bar. Key capabilities
Effective rock-to-rock cement barrier
Significant time and cost savings
Efficient one-trip system
Eliminates need for section milling and swarf
handling
No surge or swab effect

Typical applications
Permanent abandonment
Screen washing
Case study: Perf & Wash Tool (PWT)

Solution
To resolve the issue we RIH to below 2160 m and pressure
up to 31 Bar and slowly POOH to we saw a pressure drop to
27 Bar. This confirmed that we had placed the perforated
interval between our swab cups in the PWT. Next step
was to pressure test the formation behind 13 3/8 casing
and also test communication between the perforated
interval.40 Bar was applied after 70 litre pumped. A leak
into the formation was observed with no return to surface.
60 litres was bleed back confirming that the formation had
taken 10 litres.

Results
The conclusion was that there was communication
between perforations and formation behind 13 3/8 casing
but not between perforated intervals. After each interval
had been tested with same result a dart was dropped to
disconnect the tool and place a cement plug on top of tool
and past the perforated interval.

Archer is a global oilfield service company with more than 40 years experience, over
8,000 employees, and operations in more than 100 locations worldwide. From drilling
services, production optimization, well integrity and intervention, to decommissioning,
Archer is focused on safely delivering the highest quality services and products to the
drilling and well service markets. We are Archer.
Archer 2014 / CSPWTNORTHSEASTATOIL07102014
Safety & Efficiency Remote Controlled Cement Heads

Controlled release of setting balls and/or drillpipe darts without the need to stop circulation,
rotation or break connections

Controlled entirely from the rig floor using rig air, the RCCH has the flexibility to operate
safely and effectively with all systems
Casing cementing, expandable screen deployment, perforating & squeezing, and
cement injection operations are completed without the need for man-riding above drill
floor

10k psi working pressure, 1,500 klbs load, 50k ft/lbs TQ and 4 ID

Private and Confidential 8


Well Integrity - Greenlight Pressure Test System
The system consists of 3 elements; Software, Modem and Transducer
Non- EX EX Zone 0

USB

Transducer
Modem Box with
EX Barrier

HP Flowline

Easy and understandable, w/ Built in Filter that removes pressure fluctuation issues
Removes any doubt if a pressure test met acceptance criteria or not
The system will automatically give a green light when the acceptance criteria is fulfilled
Outputs a PDF file with graph and all test information, including sensor ID, calibration date etc.
Saves all tests in a library for later review
Cannot be altered with during or after the test
Well barrier testing, Assembly testing to 20,000 psi