Beruflich Dokumente
Kultur Dokumente
Familiar with BS, ASTM, AWS, ASMI, ISO, NACE, QCS2010 / 2014 and other International
Standards and Specifications.
Having experience in protective coatings in Oil & Gas Pipelines external & internal coatings,
Galvanizing, Neoprene, Foam, Thermal spray coatings and Concrete weight coating
Impeachment and Compression coatings.
Enable to prepare the project audits schedule in line with the project execution plans and
operating model requirements and subsequently organize / execute quality audits and ensure
non-conformities (NCR / PAR / CAR/SOR) are closed in a timely manner.
Page No: 1
Experience:
2011 Bam Clough Joint Venture, Port Moresby, Papua New Guinea
(PNG LNG Plant & Marine Jetty Project)
Deputy QC Manager
Project Procedures & ITPs Review and implementation.
Follow up with Project Quality Plan Requirements.
Page No: 2
Coordinate with External Laboratory and Inspection companies.
Attending Client & Contractors meeting
Attending daily internal meeting and implementing the instructions.
Visiting site regularly to check quality of works, procedures, drawings and specifications implementation
and Guide concerned personnel for any rectification works.
Over view of Welding & NDT Inspectors Testing activities.
Daily QC Activity Planning & Implementation.
Coordination with Client & Sub Contractors.
Internal Audits with all departments and Sub Contractors as per BCJV Policy.
Project Documentation Review and Monitoring.
Page No: 3
Deputy Q.A. / Q.C. Manager
Follow up with QC Managers Instructions.
Organize External Laboratory Testing.
Pipe Tracking System Review & Control.
Training Concrete Q.C. & Traceability Personnel.
Coordinate with the Clients & Contractor.
Discussing & Clearing NCR & CAR with Client Representative.
Weekly & Monthly Report Preparation
Project Documentation Preparation.
Witness Raw Materials Tests.
2002 - 2003 Rosson Pipe Coatings / Bohai Oil Pipeline Co., Tanngu, Tianjin, China
(CNOOC Bohai Oil Company - Project)
Q. A. / Q. C. Consultant
Concrete Weight Coating Inspection & Control.
Negative Buoyancy & Density Calculation Control.
Laboratory Testing Supervision.
Pipe Tracking System Review & Training.
Training Concrete & Lab. Q.C. Inspectors.
Insulation for steam tracing Piping and Equipment.
Insulation for APH and Hot air ducts.
Cold insulations for air conditioning ducts, chemical pipelines.
Insulation for fuel oil, wax and sulphur tanks & connected piping.
Insulation for Electrical Tracing Lines.
Wrapping & Coating work.
Spray insulation for Turbine & valves.
Insulation for jacketing & Painting for Pipelines.
Fire proofing for steel structural, equipment skirts and saddles.
Page No: 4
1995 - 1996 Bredero Price (M.E.) Ltd. Sharjah, U.A.E.
(Hyundai - Enron, K.O.C., McDermott, Overseas Ast Projects)
Q. C. / Traceability Inspector
Coal Tar Enamel & Concrete Weight Coating Inspection.
Negative Buoyancy & Density Calculation Control.
Laboratory Testing for Anti Corrosion & CWC Samples.
Pipe Tracking System - Data Base Control.
Data Book Preparation.
Q. C. / Traceability Inspector
Load in & Load out Supervision.
Pipe Tracking System - Data Base Control.
Negative Buoyancy & Density Calculation Control.
Data Book Preparation.
Personal Details:
Present Address:
CECC AFRC Project, Al Khor Qatar, Mobile: +974 55368257
Permanent Address:
292, Mankind House, East Street,, Ayangudi 608306,Kattu Mannar Kudi Taluk, Cuddalore Dist.,
Tamil Nadu, India. Mobile: +91 9786 948 903 / 88703 03012, E-mail: iniyavan.haji@gmail.com
Page No: 5