DEFECT

Side light sectors incorrect

Insulation monitor for battery charger disconnected

Master and CO hours of work does not reflect actual working hrs

Deck fire line stbd side not pointed in contrast with it's surroundings

Exhaust pipe of lifeboat not insulated, releasr handle not painred with colour contrasted to
surrounding

Insulation matting provided only infront of switch board and not behind side

Auxilary engine fuel oil leak alram tank drain valve kept in open position

steering gear room gyro repeater with large deviation


Master does not aware where overriding authority is mentioed in SMS and not able to explain
the intent of this provision

Ship stability and stress calculations for different stages of the voyage are being carried out
Emergency exercises with the shore-based emergency response team have not been carried
out as required by the SMS - Contingency plans for potential emergency situations are not
available
Two fire hydrants in the engine room with frozen valves and outlet caps. A hammer was needed
to free the outlet caps and a large tool was needed to free the valve wheel.Two hose stations in
the engine room without spanner wrenches.

PSCO observed that the vessel was unable to provide proof of the annual security exercise.
The fire control plan does not show an additional general, engine, and chemical material
storage room located within the sewage room.
Passage plan failed to use appropriate large scale charts.No evidence to indicate manual testing
of auto pilot as per STCW

Navigating officers fixing vessels position in coastal waters at 60 minute intervals for previous
voyage. SMS procedure requires fixing intervals of not more than 15 minutes in coastal
waters.Significant number of instances where bridge officers have fixed the vessels position
infrequently and using only one means of navigation (GPS). During Jomard transit GPS positions
hourly whilst vessel is 1.3' from navigation hazard. Chart A388 vessel is 2.2 from Nav. Hazard
and GPS positions 1h 32m apart.
Lifeboats (P/S) fitted with FPDs. FPD shackles Fwd. & Aft on lifeboat (P) and Aft FPD shackle on
lifeboat (S) seized
No evidence that the cargo operation has been monitored, no records of observed draft made
for the various stages of loading
A number of alarms for engine room alarm monitoring system disabled through manual repose.
Starboard accommodation ladder inner sheave seized, not free to rotate.
Hanging electric cabling in Deck 8 fan room, Port and Stbd

Sewage treatment plant not being operated in accordance with manufacturers instruction or in
accordance with vessels ISPP certificate. Records indicate that plant being stopped and sewage
directed overboard at Sea.
Key for BNWAS left in unit and evidence of key being controlled during voyage could not be
presented.
RPM indicator at local maneuvering station defective.

Galley fire door found lashed open; two numbers galley doors unable to close by self-closing
arrangement.
DEFECT REMARKS

Sector checked and found in order

Working Satisfactory

corrected

Marked with signal red band

Insulated

Both side mats are provided

Kept normally closed

Working Satisfactory

Satisfactory

Loadicator print out of different stage of voyage is maintained as proof of stability calculation.

Available

All are in good condition, spare spanners provided for all hydrants

Available

Chemical locker is not shown in fire plan

Using appropriate scale of charts and have record of testing auto pilot.

Complying with SMS reqirement of position fixing method and intervals.

Checked shackles in FPD, In good condition and free.

Morning and evening drafts entered in deck log book and loading / discharging sequence is checke
monitoring cargo operations.
All alarms are working satis
All sheaves are greased and free to rotate
NA

Onboard plant continuously in use

Key in master's custody

Working Satisfactory

Working satisfactory