++ + IN CANAL
MFL 535.290
4.
535.290
535.040
2
2 4.
FLOW CONDITION AT SECTION 5-5
NUMBER OF VENTS 1
NUMBER OF VENTS 1
0.40
534.915 SS = 0.000
0.40
0.000
534.940 SS = 0.000
0.40
0.000 <------ Difference in TELs
M F L 535.290
0.250
B L 535.040
0.400
534.940
534.390
1.500
535.338 SS = 0.000
535.336 SS = 0.000
MFL 535.390
6.
535.390
535.190
6.
FLOW CONDITION AT SECTION 6-6 (ie @ DROP)
NUMBER OF VENTS 1
NUMBER OF VENTS 1
EE
D D
C C
B B
A
534.700 SS = 1.5
534.689 SS = 0.000
B.W= 0.50
0.000
534.704 SS = 0.000
B.W= 0.50
0.000 <------ Difference in TELs
M F L 535.390
0.200
B L 535.190
0.500
534.704
534.190
535.453 SS = 0.000
535.459 SS = 0.000
A
Design of operation platform :
Fixation of platform level
Sill level = 535.040 m
Height of barrel = 0.380 m
Height of shutter = 0.60 m
Thickness of slab = 0.15 m
Thickness of bed block = 0.30 m
Required platform level = 537.430 m
Ground Level/TBL = 537.428/537.430
Hence platform level is at = 537.430 m
= 50.22 Kgs -m
= 5022 Kgs -cm
MR = 13.879*bd2
Effective depth required
d= 5022
13.88x100
= 1.9 cm
Available effective depth
= 12 cm > 1.9
Hence ok
Area of Steel required = M / t j d
Area of Steel required = 0.32 cm2
Minimum area of steel required0.12% of cross setional area
= 0.12x15 x100/100 = 1.8 cm2
Assuming 10 mm dia bars
Spacing = 0.785 x100/1.8 = 43.633 cm
Provide 10mm f Bars @ 150 mm c/c
Area provided = 5.24 cm2 > 0.32
Distribution reinforcment :
= 0.12% of cross setional area
= 1.8 cm2
Spacing of 10 mm dia bars
spacing = 0.785 x100/1.8 = 43.633 cm
Provide 10mm f Bars @ 150 mm c/c
Area provided = 5.24 cm2 > 1.8
10 cms
0.6m
Ordinary fill
H = 2.05
GL 537.430
h' = 535.53
2.05 150 Top of pipe
40 535.380
100 100
300
Loose fill D
Sill level 535.04
150
Selected Compacted d/4 534.85
fill 380 `
Continuous Concrete Cradle
580 If Unreinforced
TBL/GL = 537.430
G.L./TBL = 537.430
Sill level of pipe = 535.040
Top level of pipe = 535.380
From Fig:
H = TBL - Top of pipe
= 2.050
h' = GL - Top of pipe
= 2.05
H/B = 3.534
Negative Projection ratio = P' = h'/B 3.534 Say 4 IS: 783 - 1985
Wu = CuBU
B = 580 m
Cu = 0.22 From Fig. 5, Pg.No.15 of IS:783 - 1985
Cu a coefficient used in calculation of the load on a pipe due to a Unifomly distributed
superimposed load of U KN/m2
Superimposed load U = 1.2 x 21.0 = 25.2 KN/m
As per Clause 710.6.9 of IRC - 78 - 2000
Wu = CuBU
= 3.30 KN/m
f fill material
niformly distributed load
fomly distributed
-
D/S HEAD WALL & D/S WING WALL AT JUNCTION OF HEADWALL
2:01
W6
1.2
2.52 537.430
W3
W4
Pv W1
3.05
Ph
W2
8.9145 A
534.385
0.6
533.785 W5 B
10.17 0.300
0.300 0.45 2.40
3.450
TOTAL
Base Width = b 2.850
Lever arm(a) = M/V = 1.860
Eccentricity e = a-(b/2) 0.435
Eccentricity Limit = b/6 0.475
Stress on masonary
Direct stress= = (V/b) 9.032
Bending stress=V/b*(6e/b) 8.277
STRESSES ON CONCRETE
max.stress 17.309
Min. stress 0.755
TOTAL MOMENTS
STRESSES ON SOIL
Maximum Stress= 16.36
Minimum Stress= 3.05
ONCRETE(t/m2)
17.310
0.760
2.850
SOIL(t/m2)
16.360
3.050
3.450
1.35
1.20
EARTH
SIDE
3.045
0.600
Lever Moment
Arm(M) (T-M)
2.625 8.633
1.600 14.031
0.800 6.139
1.800 6.124
- -
1.239 12.960
TOTAL 47.886
M = 47.886
Lever Moment
Arm(M) (T-M)
2.925 9.619
1.900 16.662
1.100 8.441
0.1500 0.288
1.725 8.570
2.100 7.144
- -
1.456 20.248
TOTAL 70.972
M = 70.972
-
DESIGN OF U/S HEAD WALL
2.52 537.430
W3
W4
Pv W1
2.47
Ph
W2
7.6965 A
534.965
0.6
534.365 W5 B
8.96 0.300
0.300 1.20 1.10
2.900
TOTAL
Base Width = b 2.300
Lever arm(a) = M/V = 1.507
Eccentricity e = a-(b/2) 0.357
Eccentricity Limit = b/6 0.383
Stress on masonary
Direct stress= = (V/b) 7.636
Bending stress=V/b*(6e/b) 7.107
STRESSES ON CONCRETE
max.stress 14.742
Min. stress 0.529
TOTAL MOMENTS
STRESSES ON SOIL
Maximum Stress= 13.98
Minimum Stress= 2.76
13.980
2.760
2.900
0.7
1.20
EARTH
SIDE
2.465
0.600
Lever Moment
Arm(M) (T-M)
1.700 12.069
0.733 2.386
0.367 1.044
0.467 0.377
- -
1.700 2.834
1.024 7.752
TOTAL 26.462
M = 26.462
Lever Moment
Arm(M) (T-M)
2.000 14.198
1.033 3.362
0.667 1.898
0.1500 0.233
1.450 6.055
0.767 0.789
- -
2.000 3.334
1.246 13.171
TOTAL 43.040
M = 43.040
Reaction Over Pail Wall Due to operation Platform
Load transmitted by screw rod = wt of shutter + Friction exerted by Water thrust to the
sides of gate groove
= 153 + 27
= 180 kgs
* 0.6
kgs
DESIGN OF OFFTAKE SLUICE OFD-1(L/S) DIST KM 3.150 OFRMC OF TAPASPAL
Area = (b+n*d)*d
Area = 0.610 sq.mt.
Perimeter = b+ ( 1 + n2 ) *2*d
Perimeter = 2.481 mts.
R = A/P
R = 0.246 mts.
R 2/3
= 0.393
V = ( 1 / n ) * ( R2/3 ) * ( 1 / S )1/2
V = 0.335 mts/sec
Vo = 0.53(d)0.52
= 0.53*0.35^0.52
= 0.3070
Discharge = VxA
Q = 0.204 cumecs =
I. Fixation of Sill Level of Offtake Sluice :
Case ( II ) Considering 1/2 th supply in the Main canal (since the OT falls in the Tail reach of ca
FSD of Main canal = 0.49 m
Area = (b+n*d)*d
Area = 0.394 sq.mt.
Perimeter = b+ ( 1 + n2 ) *2*d
Perimeter = 2.199 mts.
R = A/P
R = 0.179 mts.
R2/3 = 0.318
V = ( 1 / n ) * ( R2/3 ) * ( 1 / S )1/2
V = 0.271 mts/sec
Discharge = VxA
Q = 0.107 cumecs <
However adopt NP3 class pipe of diametre 0.30 m for vent way
Thickness of pipe as per table 3 IS 458-2003 0.040 m
Cross sectional area of pipe = 0.071 sq.m
Velocity in the pipe = 0.195/0.071 = 2.746
7.50
m
136.467 TBL
136.017
0.300
135.636
0.15
0.6 0.6
135.022 1.080
0.87
533.000
CISTERN CALCULATIONS :
y1
y1
d1 = q
c(2gy1)
=
0.7477 x
= 0.650
2.146
d1 = 0.303 m
v = q
d1
= 0.650
0.303
v = 2.145 m/sec
Fr1 = v
gd1
=
Sqrt
Fr1 = 1.24
d2 = d1
2
= 0.303
2
= 0.152
d2 = 0.403
Since d2 is more than the Full supply depth in the canal , the floor has to be depresse
However, Provide
III.
E D C B
2.3 0.300 m
1.22
7.50
m
E D C B
Q =
Scourdepth in Distributary (R)= 1.35 (q2 / f ) 1/3 Where q =
= 0.316 m
Maximum Scour Depth = 1.50 R = 0.474 m
FSL of Distributary - 1 = 136.017
Maximum Scour Level = 136.017-0.474= 135.543
W3 W1
W4
W2
1 w1 0.45X0.932X2.40
2 w2 0.50X0.4X0.932X2.40
3 w3 0.50X0.4X0.932X2.100
4 pv 0.04X2.100X0.932X0.932
Total vertical Load =
5 pH 0.158X2.100X0.932X0.932
1 w1 0.45X0.932X2.40
2 w2 0.50X0.4X0.932X2.40
3 w3 0.50X0.4X0.932X2.10
4 w4 0.3X0.932X2.100
5 w5 1.45X0.6X2.400
6 pv 0.04X2.100X1.532X1.532
Total vertical Load =
7 pH 0.158X2.100X1.532X1.532
W3 W1
W4
W2
1 w1 0.45X401.213X2.40
2 w2 0.50X0.65X401.213X2.40
3 w3 0.50X0.65X401.213X2.100
4 pv 0.04X2.100X401.213X401.213
Total vertical Load =
5 pH 0.158X2.100X401.213X401.213
Lever Arm=-6401018.945/14541.721=
Eccentricity (e) = 1.1/2--440.183=
b/6 = 1.1/6= 0.18333333
Hence OK
Stresses in Concrete = P/b(1 6e/b)
14541.721/1.1(1(6X440.733/1.1))
=
Pmax and Pmin = 31793466 t/m2
Lever Arm=-6429081.837/14837.406=
Eccentricity (e) = 1.7/2--433.302=
b/6 = 1.7/6= 0.283
Hence OK
Stresses in SOIL = P/b(1 6e/b)
14837.406/1.7(1(6X434.152/1.7))
=
Pmax and Pmin = 13382478 t/m2
Stresses should be with in the SBC of soil
IST KM 3.150 OFRMC OF TAPASPALLY TANK
408
1.5 / 1.5
CANAL SECTION
0.350
1.22
0.195 cumecs
0.195/0.2782= 70.09 %
(since the OT falls in the Tail reach of canal i.e., less than 80% of Q)
GN OF CHANNEL SECTION
0.230
1.37
0.13911 cumecs
m Channel section
135.822
136.017
-0.195
SILL Level of Offtaking canal = 135.662
TBL/GL 136.582
FSL 136.082
0.49
Sill 135.662 s
0.070
CBL 135.592
1.080
0.45
= 0.300 m
Q
nL
0.195
1 x 0.300
0.650 cusecs/m
0.650
Sqrt 19.62 x 0.420
2.145
9.81 x 0.303
((( 1 + 8 Fr12) - 1)
3.66 - 1
x 2.66
m > 0.38 m FSD
5 (d2 -d1)
0.403 - 0.303
0.499 m
2.000 m Hence OK
or say 533.000
0.195 B = 1.22
Q/B = 0.16 m2 / sec
f = 2.00
or say 533.000
2 - 533)+0.45+397.978+2(135.662-135.022)+7.5+2(0.60-0.3)+0.48+2.3+ = 12.270 m
head in 'm'
m
1.5 m
1.5 = 137.162
136.467
136.017
0.932
135.535
134.935
Moment in
Load in "T" LA in "m" Remarks
T.m
1.007 0.225 0.227
0.447 0.583 0.261
0.391 0.717 0.28
0.073 0.3728 0.027
1.92 0.795
0.288 0.3728 -0.107
Total Moment = 0.688
0.359
0.85/2-0.359= 0.066
> 0.066
X0.0660000000000001/0.85))
and 1.205 t/m2
Moment in
Load in "T" LA in "m" Remarks
T.m
1.007 0.525 0.529
0.447 0.883 0.395
0.391 1.017 0.398
0.587 1.3 0.763
2.088 0.725 1.514
0.197 0.6128 0.121
4.72 3.720
0.779 0.6128 -0.477
Total Moment = 3.243
0.688
1.45/2-0.688= 0.037
> 0.037
401.213
135.587
134.987
Moment in
Load in "T" LA in "m" Remarks
T.m
433.31 0.225 97.495
312.946 0.667 208.631
273.828 0.883 241.79
13521.637 160.4852 2170022.62
14541.72 2170570.53
53410.467 160.4852 -8571589.5
Total Moment = -6401018.9
-440.183
1.1/2--440.183= 440.733
> 440.733
Moment in
Load in "T" LA in "m" T.m Remarks
433.31 0.525 227.488
312.946 0.967 302.514
273.828 1.183 323.939
252.764 1.55 391.784
2.448 0.85 2.081
13562.11 160.7252 2179772.84
14837.41 ###
53570.333 160.7252 -8610102.5
Total Moment = ###
-433.302
1.7/2--433.302= 434.152
> 434.152
10 clause 206.1)