Sie sind auf Seite 1von 1

Key Plan

A
BL
QI
Notes

65mm PREACTION VALVE FOR


PREACTION SYSTEM IN LEVEL 3

E
80mm TEST & DRAIN PIPE RISER T/A
FOR LV & FHR SYSTEM IN LEVEL 3
TO BE ENCLOSED

3-WAY MANIFOLD

65mm SPRINKLER PIPE RISER T/A


FOR SPRINKLER SYSTEM IN LEVEL 3

STAIR # 1
25mm PIPE FOR SPRINKLER PIPE
FE2,FE3 AIR RELEASE VALVE IN LEVEL 3 H/L

D A ISSUED FOR TENDER ARN BM* AH* 08.03.15

25mm PIPE FOR SPRINKLER PIPE No Revision


Job Project
Drawn Manager Director Date
FROM LEVEL 1

Note: * indicates signatures on original issue of drawing or last revision of drawing


Conditions of Use. This document may only be used by GHD's client (and any other
person who GHD has agreed can use this document) for the purpose for which it was
prepared and must not be used by any other person or for any other purpose.

Master Developper / Owner

Abu Dhabi Airports Company PJSC


C Planning & Development
PO Box 94449, Abu Dhabi, U.A.E
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300

Lead Consultant

GHD GLOBAL PTY LTD


B 3rd Floor, Guardian Tower, Danet Community
PO Box 45921 Abu Dhabi United Arab Emirates
T 971 2 6968700 F 971 2 4472915
E abumail@ghd.com W www.ghd.com

Specialist Consultant

Fire Life Safety, Planning


and Regulatory Specialist

A Specialist Consultant

Third Party
1 2 3 4 5 6
Operational Advisor

Client
ADAC
Project
MIDFIELD TERMINAL FIRE
STATION
Title

FIRE PROTECTION SERVICES -


FIRE PROTECTION SERVICES - LEVEL 2 PLAN - PART 1 LEVEL 2 PLAN - PART 1
SCALE 1 : 100
Scale 1 : 100 DO NOT SCALE
Drawn A. NOCEJA Designer P. MOHD.
Drafting Design
Check Check
Approved
(Project Director)
Date
This Drawing must not be used for Construction unless signed as Approved
Original Size
Drawing No:
A1
DETAIL DESIGN 76-10526- F126 Rev: A
Plot Date: 7/03/2015 11:14:29 PM Cad File No: C:\Users\fvillete\Documents\76-10526_Midfield Fire Station MEP-Central_fvillete.rvt