Key Plan

U1 U2 U3 U4 U5 U6 U7

A
BL
QI
Notes
5000 5000 6625 5935 2940 3000

K UC

6000
6000
4
S113

J UB

7000
6000
I UA
2

6000
S112

6000 RBU BM* AH* 08.03.15


A ISSUED FOR TENDER

No Revision
Job Project
Drawn Manager Director Date
G
Note: * indicates signatures on original issue of drawing or last revision of drawing
6000

Conditions of Use. This document may only be used by GHD's client (and any other
3 person who GHD has agreed can use this document) for the purpose for which it was
prepared and must not be used by any other person or for any other purpose.
S113

F
Master Developper / Owner
7500

Abu Dhabi Airports Company PJSC


Planning & Development
PO Box 94449, Abu Dhabi, U.A.E
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300
C4 C11 C1 E

7000
UP
Lead Consultant

C2 C3 C3 C11
D

GHD GLOBAL PTY LTD

7000
3rd Floor, Guardian Tower, Danet Community
PO Box 45921 Abu Dhabi United Arab Emirates
T 971 2 6968700 F 971 2 4472915
E abumail@ghd.com W www.ghd.com
C7 C3 C8 C8 C
150 Specialist Consultant
SSL -0.100

7000
Fire Life Safety, Planning
C2 C3 C3
C3
C3
C2 B and Regulatory Specialist
SSL +0.300
200
1

7000
S111
Specialist Consultant

C1
C4 C1 C5
A
Third Party
8100 7900 8000 8000 8000 7500 6000 6000 6000 6000 6000 Operational Advisor

1 2 3 4 5 6 7 8 9 10 11 12
Client
ADAC
Project
MIDFIELD TERMINAL FIRE
STATION
GROUND FRAMING PLAN KEY PLAN Title
SCALE 1 : 200
GROUND FLOOR FRAMING
KEY PLAN
Scale 1 : 200 DO NOT SCALE
Drawn R. BUDUAN Designer R. EDNALINO
Drafting Design
Check Check
Approved
(Project Director)
Date
0 2000 4000 6000 8000 10000mm This Drawing must not be used for Construction unless signed as Approved
Original Size
SCALE 1: 200 AT ORIGINAL SIZE Drawing No:
A1
DETAIL DESIGN 76-10526- S110 Rev: A
Plot Date: 5/03/2015 10:39:45 PM Cad File No: C:\Users\rbuduan\Documents\76-10526_Midfield Fire Station-Central_rbuduan.rvt