Beruflich Dokumente
Kultur Dokumente
2. Please provide us evidences how your specialist judged that there was no
problem with cables and drainage pumps.
The evidences hereby mean like records of terminal numbers which cables
were connected, insulation test results, and so on.
In this regard, for our study, we would like to have the terminal box drawings
of 7.5kW and 22kW motors of drainage pumps which are not available with
us.