Beruflich Dokumente
Kultur Dokumente
AISC 201-06
Approved by the
AISC BOARD OF DIRECTORS
Prepared under the direction of the
AISC CERTIFICATION COMMITTEE
December 4, 2006
Copyright 2006
by
The information presented in this Standard has been prepared by the Certification Committee of the American Institute of
Steel Construction, Inc. (AISC) in a consensus manner in accordance with recognized industry standards, codes, and practices.
The Standard has been prepared within the scope and for the purposes stated in the body of this document and for no other
purpose.
The Standard has been developed by a balanced committee of participants in the industry who have particular experience
and expertise in the topics addressed in the Standard. Every effort has been made to solicit comments and participation from a
broad cross section of the construction industry. Participation by any federal or state agency representative(s) in this process is
not to be interpreted as government endorsement of this Standard.
AISC accepts responsibility for only those interpretations of this Standard that are issued in writing and in accordance with
governing AISC procedures and policies. Issuances of informal interpretations are not necessarily the official interpretation of
AISC or its Certification Committee. This Standard is subject to revision at any time by the AISC Certification Committee.
Neither AISC nor its program auditors approve, rate, or endorse any item, construction technique, proprietary device, or activ-
ity referenced in this Standard. Nor do they take any position with respect to the validity of any patent rights asserted in connec-
tion with any items referenced in this Standard, nor suggest infringement of any patent, nor undertake to insure or indemnify
anyone utilizing this Standard against liability for infringement of any applicable Letters Patent.
AISC disclaims for itself, its committee members and its program auditors any liability for any injury to persons or to prop-
erty or other damages of any nature whatsoever, whether special, indirect, consequential or compensatory, directly or indirectly
resulting from the publication, use of, or reliance upon this Standard or application of the activities or devices referenced
herein.
Caution must be exercised when relying upon other specifications or codes developed by other bodies and incorporated by
reference herein. Such material may be modified or amended from time to time by such other bodies subsequent to the printing
of this Standard. AISC bears no responsibility for such material other than to refer to it as being applicable to this Standard and
to incorporate it by reference at the time of the initial publication of this Standard.
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
v
ADVISORY
Daniel J. Kaufman Quality Management Company, LLC
Brian W. Miller American Institute of Steel Construction, Inc.
Patricia A. Thomashefsky Quality Management Company, LLC
Michael A. West Computerized Structural Design, S.C.
STAFF
Roger E. Ferch American Institute of Steel Construction, Inc.
David B. Ratterman, Esq. Stites & Harbison, PLLC
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
vi
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
vii
TABLE OF CONTENTS
1. Purpose ...............................................................................................................................................................................1
2. Scope ..................................................................................................................................................................................1
3. References...........................................................................................................................................................................1
4. Definitions...........................................................................................................................................................................1
5. Management Responsibility .............................................................................................................................................4
5.1 Policy for Quality and Quality Goals .......................................................................................................................4
5.2 Direction and Leadership .........................................................................................................................................4
5.3 Management Representative .....................................................................................................................................5
5.4 Resources ..................................................................................................................................................................5
5.5 Internal Communication ...........................................................................................................................................6
5.6 Documentation Requirements ..................................................................................................................................6
6. Contract and Project Specification Review and Communication ................................................................................6
7. Detailing..............................................................................................................................................................................7
7.1 Detailing Procedures.................................................................................................................................................7
7.2 Detailing Function Resources...................................................................................................................................8
8. Document and Data Control ............................................................................................................................................9
8.1 Review and Approval................................................................................................................................................9
8.2 Customer Requirements ...........................................................................................................................................9
8.3 Revision Control .......................................................................................................................................................9
8.4 Access .......................................................................................................................................................................9
8.5 Obsolescence and Transmittal ..................................................................................................................................9
9. Control of Quality Records ..............................................................................................................................................9
9.1 Retention of Quality Records .................................................................................................................................10
9.2 Availability of Quality Records ..............................................................................................................................10
10. Purchasing ........................................................................................................................................................................10
10.1 Purchasing Data ......................................................................................................................................................10
10.2 Selection of Subcontractors and Suppliers .............................................................................................................10
10.3 Verification of Purchased Product, Materials, and Services ..................................................................................11
10.4 Customer Verification of Fabricated Product .........................................................................................................11
10.5 Control of Customer-Supplied Material .................................................................................................................11
11. Material Identification ....................................................................................................................................................11
12. Fabrication Process Control ...........................................................................................................................................11
12.1 Welding ...................................................................................................................................................................11
12.2 Bolt Installation ......................................................................................................................................................11
12.3 Material Preparation for Application of Coatings ..................................................................................................12
12.4 Coating Application ................................................................................................................................................12
12.5 Equipment Maintenance .........................................................................................................................................12
13. Inspection and Testing ....................................................................................................................................................12
13.1 Assignment of QC Inspections and Monitoring.....................................................................................................12
13.2 Inspection Procedure ..............................................................................................................................................12
14. Calibration of Inspection, Measuring, and Test Equipment .......................................................................................13
15. Control of Nonconformances..........................................................................................................................................13
15.1 Nonconforming Process .........................................................................................................................................13
15.2 Nonconforming Product .........................................................................................................................................13
16. Corrective Action .............................................................................................................................................................14
17. Handling, Storage and Delivery of Product and Materials.........................................................................................14
18. Training ............................................................................................................................................................................14
19. Internal Audit ...................................................................................................................................................................14
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
viii
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
1
An electronic PDF version of this reference may be downloaded free from www.aisc.org/freepubs.
1
2
This custom compilation created by ASTM for AISC contains the normally applicable and routinely used ASTM Standards for
fabricated steel. Alternatively, these Standards are available in other publications offered by ASTM and at www.astm.org.
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
2
Detailing. The function that produces Shop Drawings, Fabricator. The entity that is responsible for fabricating
digital Manufacturing Models, and Erection Drawings from the Structural Steel. NOTE: The Fabricator referenced in
Contract Documents. this document is the entity being certified.
Documented Procedure (Quality Management System pro- Key Position/Function. Executive Management and posi-
cedure). A procedure that is established, documented, tions in the Fabricators Quality Management System that
implemented, and maintained. The documentation provides manage:
information about how to perform an activity or process Detailing
consistently. Documentation can include written instruc- Purchasing
tions, drawings, diagrams, charts, specifications, and refer- Quality Assurance
ences or excerpts of appropriate technical standards and Quality Control
codes. Documentation shall contain: Fabrication process
Project management functions
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
3
Additionally, a Key Position/Function is any position cited PQR. Procedure Qualification Record as defined by ANSI/
in this document as requiring qualification. AWS A3.0.
Manufacturing Model. Digital sub-model of the Logical P.E. Professional Engineer.
Product Model as defined in Appendix A of the AISC Code
Quality Assurance (QA). That part of quality management
of Standard Practice for Steel Buildings and Bridges. The
focused on providing confidence that quality require-
Manufacturing Model includes data represented in detailing
ments will be fulfilled. For the purposes of this program,
for fabrication.
Quality Assurance is the planned system of Documented
MTR. Mill Test Report as defined in Section 14 of ASTM Procedures and organizational requirements developed and
A6. implemented for the purpose of measuring and assuring
compliance with customer requirements and providing con-
Nonconformance. Attributes of materials, consumables,
fidence that quality goals are achieved. Quality Assurance
fabricated product (in-process or final), and processes that
encompasses such areas as compliance with project specifi-
do not meet contract, regulatory, or Fabricator defined
cation technical requirements, compliance with referenced
requirements.
standards and achievement of customer service objectives.
NDT (NDE). Nondestructive Testing (Nondestructive Specific functions included in Quality Assurance are:
Examination).
Determination of quality criteria
Objective Evidence. Data supporting the existence or Establishment of a plan to monitor quality including
verification of something. Records, statements of fact, or assignment of Quality Control (inspection)
other information which are relevant to the audit criteria Determination of acceptance criteria
and verifiable. In this context, it is evidence that the Qual- Determination of QC personnel qualifications
ity Management System is functioning properly. Objective Oversight (periodic monitoring) of QC activities
Evidence can be obtained through: Summarizing and reporting quality conformance mea-
sures to management
Observation of the performance of a task or physical
products Quality Control (QC). QC is the inspection of work. Con-
Measurements formity evaluation and judgment accompanied as appropri-
Tests ate by measuring, testing, or gauging.
Review of a record, document, or Procedure
Quality Manual. A document stating the quality policy
The result of an interview with one or more employees
and describing the Quality Management System of the
about their duties or performance of a task
Fabricators organization.
Owner. The entity that is identified as such in the Contract
Quality Management System. A system to establish policy,
Documents.
objectives, plans, and resources to direct and control an
Owners Designated Representative for Construction. The organization with regard to quality.
Owner or the entity that is responsible to the Owner for
Quality Record. A specific type of quality document that
the overall construction of the project, including its plan-
provides Objective Evidence of activities performed or
ning, quality, and completion. This is usually the general
results achieved.
contractor, the construction manager, or similar authority
at the job site. RCSC. Research Council on Structural Connections.
Owners Designated Representative for Design . The RFI. A written request for information or clarification gen-
Owner or the entity that is responsible to the Owner for the erated during the construction phase of the project.
overall structural design of the project, including the Struc-
Structural Engineer of Record. The licensed professional
tural Steel frame. This is usually the Structural Engineer of
who is responsible for sealing the Contract Documents,
Record.
which indicate that he or she has performed or supervised
Procedure. See Documented Procedure. the analysis, design, and document preparation for the
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
4
structure and has knowledge of the load-carrying structural System to meet the specific requirements of this Standard,
system. industry and government regulations, and contract require-
ments.
S.E. Structural Engineer.
5.1 Policy for Quality and Quality Goals
Shipping Piece. Individual member for field erection carry-
ing a specific identification mark. Executive Management shall adopt, document, and
maintain a policy for quality. The policy shall define:
Shop Drawings . Drawings of the individual Structural
Steel Shipping Pieces that are to be produced in the fabrica- A commitment to quality that includes a commitment
tion shop. to meet contract requirements.
Quality Management System objectives that provide
Specifications. The portion of the Contract Documents
a framework for establishing and reviewing quality
that consists of the written requirements for materials, stan-
goals of the Fabricators organization.
dards, and workmanship.
Management shall ensure that the policy for quality
Specifier. The entity defining the requirements for fabri-
is understood, implemented, and maintained at appro-
cated Structural Steel.
priate levels of the Fabricators organization.
SSPC. SSPC: The Society for Protective Coatings, which Executive Management shall direct the development
was formerly known as the Steel Structures Painting Coun- of systems necessary and establish measurable quality
cil. goals to achieve the objectives of the Fabricators policy
for quality. Executive Management will document and
Standard. The Certification Standard for Steel Building
demonstrate that:
Structures.
There is a minimum of one specific measurable qual-
Steel Detailer. The entity that produces the Shop and Erec-
ity goal related to Structural Steel Fabrication
tion Drawings.
Specific measurements related to goals are being
Structural Steel. Elements of the structural frame as given recorded
in Section 2.1 of the AISC Code of Standard Practice for Current goal achievement levels are known relative to
Steel Buildings and Bridges. a previous measurement or baseline
Subcontractor. A firm that performs a portion of the Fabri- As quality goals are achieved, new goals shall be set
cators contract work such as fabrication, detailing, coating that demonstrate commitment to continuous improve-
application, inspection, or consulting services. ment. New goals can be a new level of achievement of
a previous goal, or a new goal that has not been previ-
Supplier. A firm that supplies materials (including but not
ously examined.
limited to: mill materials, process supplies, welding con-
sumables, coatings, and process machinery) and completed 5.2 Direction and Leadership
purchased product (including but not limited to: fasteners,
Executive Management and the Executive Management
decking, joists, and proprietary buy-out items) needed to
Team shall review the Fabricators Quality Management
fulfill the Fabricators contract requirements.
System at planned intervals, but not less than annually.
Training. See Documented Training. Records from management reviews shall be main-
tained. Management review requirements will be
WPS. Welding Procedure Specification as defined by ANSI/
defined by the Fabricator and include a specific method
AWS A3.0.
to obtain, appropriately assess and analyze, and then
report the following:
5. Management Responsibility
Results of internal, external, and AISC audits
Management shall define and adopt a commitment to
Opportunities for improvement of product quality
quality and shall direct and lead the Fabricator to assure
Need for changes to the Quality Management
continuous progress toward achieving the objectives of the
System
commitment. The Fabricators Executive Management is
responsible to develop and maintain a Quality Management
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
5
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
6
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
7
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
8
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
9
Graduate Engineer with experience related and necessary external organizations, Subcontractors,
to Structural Steel fabrication. or Suppliers.
Licensed P.E. or S.E., with experience
8.3 Revision Control
related to Structural Steel fabrication.
The revision shall be clearly identifiable on all docu-
7.2.3 Subcontract Services
ments and data controlled by the Procedure and there
In lieu of employed staff personnel, Subcontractors shall be a method for monitoring and identifying the lat-
may be used for the following functions: Detailing, est revision. The Fabricator shall establish a method to
connection consultation, Checking of Shop and Erec- ensure identification of changes to the Quality Manual
tion Drawings, training of Detailers and Checkers. or referenced Procedures from previous revisions. Doc-
However, the Fabricator retains the responsibility for uments shall remain legible and easily identifiable.
compliance with the requirements of this Standard.
8.4 Access
The Fabricator shall define and document the
qualification and selection process for choosing Sub- Relevant and current Procedures and policies pertinent
contractors as required in Section 10.2. to an area of operation or management shall be available
and readily accessible to all personnel responsible for
8. Document and Data Control performing work affecting the product quality.
The Fabricator shall develop a Documented Procedure to 8.5 Obsolescence and Transmittal
control documents and data affecting quality including:
The Procedure shall describe methods to prevent inad-
The Quality Manual vertent use of controlled documents that are obsolete in
Contract Documents the fabrication or erection process.
Shop and Erection Drawings A method shall be established and maintained show-
Detailing standards ing the latest revisions and location of:
All Documented Procedures
The Quality Manual and other Quality Management
8.1 Review and Approval System documents
Contract Documents including Design Drawings
Documents affecting quality shall be reviewed and
Shop and Erection Drawings
approved by authorized management. Revisions to the
Quality Manual and other Quality Management System A transmittal system will be established to record
documents shall be reviewed for adequacy and approved the distribution of drawings, documents, and specifica-
by the same function and authority level that authorized tions to Customers, Subcontractors, and Suppliers. The
the original document. The Procedure for document and records shall indicate the status of approval and release
data control shall describe the frequency and require- to fabrication or erection.
ments established by management for review and updat-
ing and establish a method to identify changes. 9. Control of Quality Records
8.2 Customer Requirements The Fabricator shall develop a Documented Procedure for
Quality Records that provides for:
The Fabricator shall develop a Documented Procedure
to receive and document Customer requirements and Identification
Fabricator originated changes as they occur throughout Collection
the fabricating and detailing process. Customer require- Storage
ments may be received in original Contract Documents, Maintenance
or subsequent telecommunications, letters, transmittals Retention
related to product requirements. Disposition
The Procedure shall require records (e.g., logs, files,
All Quality Records shall be legible and shall be stored
or master lists) that show receipt of change data, incor-
and retained in such a way that they are retrievable from
poration, issue, and distribution of approved and revised
facilities that provide a suitable environment to prevent
Shop Drawings and Erection Drawings to all necessary
departments and personnel at the Fabricators facility
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
10
damage, deterioration, or loss. Quality Records typically Purchasing documents for materials furnished to
include, but are not limited to: ASTM specifications shall include the information
required in the Order Information section of the
Inspection records
ASTM Standard.
NDT reports
Drawing logs 10.2 Selection of Subcontractors and Suppliers
MTRs
The Fabricator shall evaluate and select Subcontrac-
C of Cs
tors and Suppliers on the basis of their ability to
Design changes
meet subcontract requirements, the Fabricators Quality
RFIs
Management System, the requirements of this Stan-
Mill and consumable purchase orders
dard, project requirements, and any specific inspection
Records or summaries of Nonconformance reports
requirements.
Corrective Action Requests
A Documented Procedure shall be developed that
Training records
describes how the Fabricator conducts initial and ongo-
Subcontractor and Supplier evaluations
ing evaluation of all Subcontractors and Suppliers.
Internal and external Quality Management System
Management shall determine:
audits
Evaluation criteria
9.1 Retention of Quality Records
Reevaluation interval
Retention times shall be established and recorded for Personnel involved in the evaluation process
records retained for any purpose. The retention periods
The Fabricator will evaluate Subcontractors and Sup-
will be at least long enough to permit evaluation of the
pliers via an audit or documented acceptable past expe-
records during the course of project construction.
rience. As a minimum, quality of the finished products
9.2 Availability of Quality Records and timely, proper delivery of services or products shall
be part of the evaluation Procedure.
Specific Quality Records required by contract or regula-
tion, shall be made available for review and evaluation 10.2.1 Fabrication Subcontractors
by the Fabricator for the required time period.
The Structural Steel Fabricator selected as a Subcon-
tractor shall have the required AISC Certification on
10. Purchasing
projects requiring AISC Certification.
The Fabricator shall develop a Documented Procedure to A written waiver shall be obtained from the
ensure that Subcontractors and Suppliers provide materials, Owners Representatives for Design and Construc-
products, and services conforming to project requirements. tion for any subcontracted Fabricator that is not
Responsibility for quality of the subcontracted products an AISC Certified Fabricator on projects requiring
and services remains with the Certified Fabricator. Purchas- AISC Certification.
ing documents, Subcontractor and Supplier qualification
10.2.2 Detailing Subcontractors
records, and records of the periodic evaluation of Subcon-
tractors and Suppliers shall be maintained. The Fabricators Procedure defines the methods
used for initial and ongoing evaluation of Detailing
10.1 Purchasing Data
Subcontractors and may include direct or third party
The Fabricator shall clearly describe subcontracted review of one or more of the following:
work and the purchased products, materials, and ser-
Drawing products and other work to assess abil-
vices ordered in written purchasing documents. This
ity to perform the specific type of work the Fab-
shall include but not be limited to:
ricator is subcontracting.
The type of service, material, class, grade, and other Implementation and effectiveness of procedures
unique identification. to track RFIs.
The applicable specifications, drawings, process Employment experience records for individual
requirements, and inspection instructions and any Detailers and Checkers.
witness points. For ongoing evaluation, Detailing error fre-
Delivery instructions and date. quency and severity from Fabricator records.
Required C of Cs, MTRs, and NDT reports.
The Fabricators Procedure shall define Detailing
Subcontractor evaluation criteria that include how
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
11
the following information is identified on or incorpo- quality requirements. Customer-supplied material shall
rated into drawings: be protected to prevent use in other than its intended
purpose. Any such product that is lost, damaged, or
Material requirements and special conditions
is otherwise unsuitable for use shall be recorded and
Coating requirements
reported to the Customer.
Contract Document special conditions
Inspection requirements
11. Material Identification
Conformance to the Fabricators Detailing
standard The Fabricator shall develop a Documented Procedure for
Drawing check complete identification of material. The Procedure shall provide for
Identification of Checkers identification of Structural Steel material as stated in the
AISC Code of Standard Practice for Steel Buildings and
When the Fabricator awards Detailing Subcon-
Bridges and in Contract Documents.
tracts in advance of evaluation, the Fabricators
MTRs, manufacturers test reports, and C of Cs for base
Procedure shall include methods to assess the pre-
materials, bolts, welding consumables, and coatings pro-
evaluation level of risk to meeting:
vide minimum material identification. In the absence of
Subcontract requirements special contract requirements, these records shall constitute
The Fabricators Quality Management System sufficient evidence that product satisfies material order
The requirements of this Standard requirements. Records that provide a basis for material
Project requirements identification shall be filed and retained as defined in the
Specific inspection requirements Fabricators Procedure required by Element 9.
The Fabricators Procedure shall require a full ini-
12. Fabrication Process Control
tial evaluation of award in advance of evaluation
Detailing Subcontractors during the performance The Fabricator shall develop Documented Procedures for
of the subcontracted work. Ongoing evaluation as process control necessary to produce a consistent accept-
required in the Procedure shall be conducted if the able level of quality of the furnished product in accordance
Detailing Subcontractor is to be considered as a with the applicable codes or specifications. Fabrication pro-
source for future work. cesses include: thermal and mechanical cutting, fitting and
assembly, welding, drilling, bolting, milling, and coating.
10.3 Verification of Purchased Product, Materials,
The Fabricator will include additional special Procedures
and Services
that cover fabrication processes done at the facility (e.g.,
The Fabricators Procedure for purchasing shall define cambering).
the extent of control necessary to conform to the project Regardless if these processes are routinely performed
requirements. This may be dependent upon the type of at the facility, effective implementation of the following
product, the impact of subcontracted product on the Documented Procedures are required as a minimum:
quality of the final product or the records available for
12.1 Welding
the demonstrated capability and performance of previ-
ous projects. Test reports, C of Cs, or other evidence of The Fabricators welding Procedure shall include:
Quality Control shall be kept on file as defined in the
WPSs
Fabricators Procedure required by Element 9.
Preheat requirements
10.4 Customer Verification of Fabricated Product PQRs
Welder, welding operator, and tack welder Qualifica-
The Customer or the Customers representative shall be
tions and Qualification Test Records
allowed the right to verify the conformance of the final
Welder, welding operator, and tack welder perfor-
product to the project requirements at the Fabricators
mance recordsto provide Objective Evidence that
premises.
the period of effectiveness has not been exceeded
10.5 Control of Customer-Supplied Material for welder, welding operator, and tack welder quali-
fications
If materials are supplied by the Customer; the Fabri-
cator shall verify, store, and maintain materials in an
12.2 Bolt Installation
appropriate fashion. Verification shall include confirma-
tion that the material is what is required and meets the The Fabricators bolting Procedure shall include pre-
installation verification, installation, and inspection of
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
12
fastener assemblies for snug-tightened, pretensioned, Production personnel shall be assigned to QC inspec-
and slip-critical joint types. The Procedure shall meet tion duties under the following conditions:
the requirements of the RCSC Specification for Struc-
They shall be trained both in knowledge and practice
tural Joints Using ASTM A325 or A490 Bolts.
in proper inspection methods and acceptance criteria
12.3 Material Preparation for Application of specified for the material they are inspecting.
Coatings They are aware of their responsibilities and are given
time to perform their inspection responsibilities.
12.4 Coating Application
They do not inspect their own work.
12.5 Equipment Maintenance Their inspections are monitored by qualified QC
personnel.
The Fabricator shall develop a Documented Procedure
defining an equipment maintenance program to produce 13.2 Inspection Procedure
the required quality. The Procedure shall define preven-
The Fabricators Procedure shall include provisions for
tative maintenance for, at minimum, equipment critical
the following:
to product quality and delivery requirements.
13.2.1 Material Receipt Inspection
13. Inspection and Testing
Materials received shall be compared to the purchase
The Fabricator shall develop a Documented Procedure for order requirements. The receiver shall identify the
inspection and testing activities to verify that the product material, grade, and quantity and look for visible
quality meets the project requirements. shipping damages. The receiver shall inspect shapes
The inspection and testing Procedure shall define receipt, and plates for obvious deviations from the require-
in-process, and final inspection of all product furnished to ments of purchase order specifications.
a project.
13.2.2 In-Process Inspection
Product determined during inspection and testing to be
nonconforming shall be addressed by the Fabricators Non- The Fabricator shall conduct in-process inspection.
conformance Procedure required in Element 15. In-process inspection plans and practices will pro-
For each type of inspection less than 100 percent, the vide a level of compliance assurance for specified
Procedure shall describe the methods for establishing process requirements and inspection acceptance cri-
sampling plans and for adjusting the level and frequency teria that are not verifiable at final inspection or that
of inspection to assure expected contract quality. The can hinder assembly. In-process inspection is appro-
Fabricators methods will adjust the level and frequency of priate for: welds that will be hidden or out of reach
inspection at any time the required level of quality is not during the final inspection, visual examination of fit-
met. The level or frequency of an inspection sampling plan up tolerances that will not be visible after welding,
shall not be zero where a Nonconformance has been identi- areas requiring coatings that will not be accessible
fied and Corrective Action has not been fully implemented during final inspection.
and verified as effective. Materials shall be inspected for specification and
grade, workmanship, and tolerances using appropri-
13.1 Assignment of QC Inspections and Monitoring
ate codes, standards, or a documented plan before
The inspection Procedure shall define inspection and Fabrication begins. Compliance with documented
testing and the required records to meet the project bolting Procedures and welding Procedures (WPSs,
requirements and shall assign QC inspection and QC preheat and welding personnel qualifications) shall
monitoring duties. be monitored.
Qualification requirements for QC inspectors shall Under the conditions described in Section 13.1,
be defined and documented as required in Section production personnel shall be capable of inspecting
5.4.1. QC inspectors shall be assigned on the basis of the product or subassembly before sending it to the
qualification, evidenced by experience, training, and next process.
education. Qualification Standards and Certifications
13.2.3 Final Inspection
granted by recognized industry organizations related
to Structural Steel Fabrication can be used as a basis The Fabricator shall conduct final inspection. QC
for qualification. QC inspectors shall be periodically inspectors qualified and responsible for final inspec-
monitored by QA (either by repeating the QC duties or tion shall perform the final inspection of Structural
by witnessing their work). Steel products after the fitting, welding, and coating
operations, but prior to delivery.
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
13
Qualification requirements for personnel perform- Handling, preservation, and storage of inspection,
ing final inspection shall be defined and documented measuring, and test equipment to maintain accuracy
as required in Section 5.4.1. Competency of staff and fitness for use
employed and subcontracted individuals performing Calibration frequency for each piece of equipment
final inspection shall be verifiable and evidenced by based upon: service use, requirements of this Standard,
experience, training, and education. manufacturers recommendations, project require-
ments, specification requirements
13.2.4 Inspection Records
Identification of standards or certified equipment hav-
The inspection Procedure shall indicate what records ing a known valid relationship to internationally or
and marks are used to document inspections. In nationally recognized standards used to calibrate each
process inspections shall be verifiable until the final listed piece of equipment. Where such standards do
inspection of the piece. not exist, the basis used for calibration shall be docu-
Final inspections shall be documented. The Qual- mented
ity Records produced shall be filed and retained as The calibration procedure for each piece of equipment
defined in the Fabricators Procedure required by calibrated at the Fabricators facility
Element 9. Inspection records shall clearly show the The calibration accuracy acceptance criteria for each
products and product aspects that were inspected and piece of equipment
who performed the inspection. The action to be taken when equipment does not meet
the calibration accuracy acceptance criteria
14. Calibration of Inspection, Measuring, and Calibration Quality Record maintenance as defined in
Test Equipment the Fabricators Procedure required by Element 9
Method of preventing inadvertent use of equipment
The Fabricator shall develop a Documented Procedure
that is not calibrated where calibrated equipment is
to control, calibrate, and maintain inspection, measuring,
required
and test equipment used to demonstrate the compliance of
products and processes to the specified requirements. Tools
15. Control of Nonconformances
with devices for measuring properties of fabricated pieces
or process variables are included in this requirement when The Fabricator shall develop a Documented Procedure to
they are used to demonstrate the compliance of products identify and control Nonconformances. These Nonconfor-
and processes to the specified requirements. mances may be identified by the Fabricators inspection
The Procedure shall define equipment calibration fre- program, process monitoring, and during internal and
quency. However, the volt/amp meters used to verify com- external audits, which are then addressed by the Corrective
pliance with WPS parameters (may be welding machine Action Procedure required by Element 16 and reviewed
volt and amp meters or auxiliary volt/amp meters) shall be during the management review (Section 5.2).
calibrated whenever the accuracy of the meter is in question
15.1 Nonconforming Process
and at a minimum every twelve months.
Inspection, measuring and test equipment shall be used Nonconformances related to the performance of the
in a manner consistent with the required measurement. The Quality Management System shall be documented to
precision capability of the equipment used shall support the detail level described by this Procedure.
reliable determination of compliance with acceptance cri-
15.2 Nonconforming Product
teria. When specifically required, technical data pertaining
to the measurement equipment shall be made available for Nonconforming product shall be documented to ensure
verification that the measuring equipment is performing that final product not conforming to specified require-
properly. ments is prevented from reaching the Customer. This
For inspection, measuring, and test equipment used to Procedure shall provide for identification, documenta-
demonstrate the compliance of products and processes to tion, evaluation, segregation (when practical), treatment
the specified requirements, the Procedure shall include: of nonconforming product, and for notification of the
relevant functions concerned.
An equipment list that provides a means for unique
Nonconforming product shall be clearly marked as
identification of each piece of equipment
soon as practical after it is discovered. Records shall be
Service use for each piece of equipment including the
kept of the pieces affected, the nature of the Noncon-
required precision for the types of inspections, mea-
formance, the treatment selection, authorization, and
surements or tests made
reinspection results if applicable.
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.
14
The responsibility for review, authority, and required define the functional positions authorized to issue a
qualifications for the personnel selecting treatment of CAR and initiate the Corrective Action process.
nonconforming product shall be defined by the Proce- 2. Assign responsibility and establish a timeframe for
dure. If the treatment is rework or repair, the result will the response to a CAR.
be inspected per drawing, specification, project require- 3. Investigate and document the scope of the Nonconfor-
ments, and the Fabricators inspection Procedure. The mance, root causes, Corrective Measures taken, and
treatment of nonconforming product may be: list the actions to be taken to prevent recurrence.
4. Communicate the Corrective Action Request and
Reworked
resolution to the Management Team and appropriate
Repaired
members of the organization.
Use as is (after more detailed analysis or acceptance
5. Follow up the Corrective Action taken with periodic
by the Fabricators engineering or management)
monitoring to assure the Corrective Action is imple-
Customer-approved nonconforming product
mented and is effective.
Scrapped
Approval from the Owners Designated Represen- 17. Handling, Storage and Delivery of Product
tatives for Design and Construction may be required and Materials
by contract for treatment of Nonconformances. These
Material shall be stored, loaded, and shipped to avoid dam-
approvals shall be in writing for treatments resulting in
age and deterioration. Material shall be marked with its
use as is, repaired, or reworked.
identification and shall be listed on a manifest or shipping
documents.
16. Corrective Action
Delivery instructions and any shipping agreements (e.g.,
The Fabricator shall develop a Documented Procedure for sequencing that complies with erection needs) between the
Corrective Action. Any Corrective Action taken shall be to Fabricator, the Customer, the Fabricators Subcontractors,
the degree appropriate to the magnitude of problems and or the Fabricators Suppliers shall be included in written
commensurate with the risks to product quality. purchasing documents as required in Section 10.1 of this
The Corrective Action Procedure shall include periodic Standard. Shipments by Subcontractors and Suppliers shall
review of records or summaries of Nonconformances and of be coordinated and monitored for compliance with shipping
internal and external quality audit reports for determination and delivery instructions as required in Section 10.3 of this
and initiation of Corrective Actions. Corrective Action may Standard.
be applied when:
18. Training
There is a Nonconformance that is repetitive in nature.
This can be identified by periodically reviewing Inspection personnel performing final inspection of the
Nonconformance reports or summaries for negative product and personnel responsible for functions that affect
trends. quality shall receive initial and periodic Documented Train-
Process Nonconformances are found during the inter- ing. Personnel receiving initial and periodic Training shall
nal and external quality audits indicating that the include: project managers, detailers, inspectors, welding
Quality Management System may not be implemented personnel, fitters, and painters.
and functioning as stated in the Quality Manual. Personnel providing Training shall have training or
Nonconformance with the Quality Management Sys- experience in the subject they are teaching. Training course
tem is found during the day-to-day execution of the outlines include the subject and the key points. Evaluation
system. of student comprehension of course material is desirable.
Nonconformance is unacceptable due to cost or
severity. 19. Internal Audit
A customer complaint has been received.
The Fabricator shall perform an internal audit of each Ele-
The Corrective Action Procedure shall address these ment of the Quality Management System at least once a
steps: year to evaluate their compliance and the effectiveness of
implementation.
1. Document a Corrective Action Request (CAR) that
The Management Representative or a qualified indi-
includes the Nonconformance to be addressed by
vidual, independent of the function being audited, shall
the Corrective Action and the requirement that has
perform the audit and provide a written record of the audit
not been met. The Corrective Action Procedure shall
result from each Element.
AISC Certification Program for Structural Steel FabricatorsStandard for Steel Building Structures2006
American Institute of Steel Construction, Inc.