This checklist provides instructions for concreting a structure. It includes 12 items to check before pouring concrete, such as ensuring proper surface preparation, formwork, openings, provision of vibrators, condition of mixing/vibrating equipment, access platforms, reinforcement as per drawings, embedded parts, concrete cover, plumbness, levels, and pour schedule. The quality assurance engineer signs off after inspection and any remarks are noted.
This checklist provides instructions for concreting a structure. It includes 12 items to check before pouring concrete, such as ensuring proper surface preparation, formwork, openings, provision of vibrators, condition of mixing/vibrating equipment, access platforms, reinforcement as per drawings, embedded parts, concrete cover, plumbness, levels, and pour schedule. The quality assurance engineer signs off after inspection and any remarks are noted.
This checklist provides instructions for concreting a structure. It includes 12 items to check before pouring concrete, such as ensuring proper surface preparation, formwork, openings, provision of vibrators, condition of mixing/vibrating equipment, access platforms, reinforcement as per drawings, embedded parts, concrete cover, plumbness, levels, and pour schedule. The quality assurance engineer signs off after inspection and any remarks are noted.