Sie sind auf Seite 1von 176

NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : iv OF iv


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

TABLE OF CONTENTS

Section # Contents Page #

1.0 SCOPE ................................................................................................................ 1


2.0 APPLICABLE CODES AND STANDARDS.................................................... 11
3.0 GENERAL FUNCTION AND DESCRIPTION ................................................ 14
4.0 REQUIREMENTS ............................................................................................ 16
5.0 INSTRUMENTATION AND CONTROL REQUIREMENTS .......................... 25
6.0 ELECTRICAL REQUIREMENTS.................................................................... 31
7.0 INSPECTION AND TESTING REQUIREMENTS .......................................... 33
8.0 PERFORMANCE TESTING AND GUARANTEE ........................................... 34
9.0 SPARE PARTS ................................................................................................. 36
10.0 SPECIAL CLEANING, PROTECTION AND PAINTING ............................... 37
11.0 PACKING AND SHIPMENT ........................................................................... 38
12.0 TRAINING FOR NPCIL O&M PERSONNEL ................................................. 40
13.0 SERVICING REQUIREMENTS....................................................................... 40
14.0 DATA / DOCUMENTS TO BE SUBMITTED ................................................. 40
15.0 QUALITY ASSURANCE PLAN ...................................................................... 43
16.0 LIST OF ABBREVIATIONS ............................................................................ 43
17.0 REFERENCES AND ATTACHMENTS ........................................................... 44

ANNEXURE - 1 : VENTILATION AND AIR-CONDITIONING SYSTEM


SUMMARY OF PLANT BUILDING COVERED IN
ELECTRICAL AREA PACKAGE - (19 Pages)

ANNEXURE - 2 : VENTILATION AND AIR-CONDITIONING SYSTEM


SUMMARY OF PLANT BUILDING COVERED IN MIAN
PLANT PACKAGE - (57 Pages)

ANNEXURE - 3 : VENTILATION AND AIR-CONDITIONING SYSTEM


SUMMARY OF PLANT BUILDING COVERED IN
AUXIARY AREA PACKAGE - (22 Pages)

ANNEXURE - 4 : VENDORS SCOPE OF WORK ELECTRICAL (2 Pages)

ANNEXURE - 5 : INSTRUMENT INDEX FORMAT (TYPICAL) (1 Page)

ANNEXURE 6 : BASIC SCHEME OF VENTILATION & AIR-


CONDITIONING SYSTEM WITHIN BUILDING

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 1 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

1.0 SCOPE

This specification is intended to cover the design, materials, constructional features,


manufacture, in process inspection and testing at manufacturers works, assembly,
packing, delivery to site, installation, commissioning, carrying out field performance tests
of Ventilation and Air-conditioning systems of NPCIL design scope of plant buildings
complete with all controls, accessories and auxiliaries as specified herein for KKNPP-
3&4.

1.1 SCOPE OF SUPPLY AND SERVICES

Bidders scope of supply and services shall include but not be limited to the following:-

1.1.1 Design, manufacturing, testing at manufacturer facility, painting, packing, supply, erection
at site, testing and guarantee of ventilation equipment such as

Air handling unit (AHU)


Centrifugal, axial fans,
Package air conditioners
Filter assembly
Roof extractors
Split air conditioner
Silencers / Muffler.
Deflector

1.1.2 Design, manufacturing, testing at manufacturer facility, painting, packing, supply, erection
at site, testing and guarantee of ventilation system components such as

Electrically operated Volume control dampers


Electrically operated Fire dampers
Manually operated damper
Flow check damper
Flow regulation damper
Supply & exhaust diffuser, grills
Louvers for fresh air intake & exhaust

1.1.3 Design, manufacturing, supply, fabrication, welding, inspection, erection at site, testing
and guarantee of ventilation system ducting of following material

GSS ducting
Carbon steel ducting
Stainless steel ducting
Supports
OW/01 September, 2012
NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 2 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Equipment base frame with foundation


Painting of CS duct and all supports as per colour coding
Duct insulations

1.1.4 Design, manufacturing, testing at manufacturer facility, painting, packing, supply, erection
at site, testing and guarantee of Electrical and Instrumentation items as specified in this
specification, referred specification and elsewhere in the tender document. For vendor's
scope of work electrical part please refer Annexure 4 attached with this specification.

1.1.5 Scope of services shall also include :

i. Design, Engineering and selection of equipment.


ii. Manufacturing, fabrication and assembly at shop.
iii. Procurement of raw materials and bought out items. All bought out items shall be
purchased from Owner / EIL approved vendors.
iv. Inspection and Testing at works shall be as per vendors approved QAP. Vendor shall
have to submit approved QAP and test certificates.
v. Surface preparation, protective coating and painting as per project specification of
field and shop painting.
vi. Insulation works.
vii. Packing and transportation of material upto purchaser's job site. Storing, handling of
material at site.
viii. Erection, hookup, inspection, testing, commissioning and performance guarantee
testing at site.
ix. Preparation and submission of drawings and documents including detailed erection
drawings and as built drawings as specified under vendor data requirement.
x. Statutory approvals, seismic/safety qualifications, if any.

1.2 SYSTEM DESCRIPTION :

a. Central Chilled Water Type Air-conditioning System with Chilled Water AHUs.
(Each system consisting of but not limited to the following)

Sl. No. Description


1. Horizontal double skin Air-handling Units comprising of fan section with
backward curved centrifugal fans, fan motor and belt drive package, filter section
with pre-filter upstream AHU Fan, pressure switch and pilot light on panel to
indicate dirty condition of filters, coil section with chilled water cooling coil (min
4 rows deep), vibration isolation pads etc.

2. Interconnecting piping, piping within vendors battery limit, fittings, valves and
accessories for the following services as per project piping material specifications:

- Insulated chilled water piping with valves (3-way modulating valve &
proportionating thermostat, Orifice type flow meters including weld neck
OW/01 September, 2012
NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 3 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Sl. No. Description


flanges, orifice plate, flow transmitter at AHU outlet, bypass rotameter at
AHU water supply line for each AHUs, butterfly valve, gate/globe valve,
check valve, pressure and temperature gauges etc) and fittings.

- Insulated condensate piping of carbon steel (IS-1239, black, heavy


schedule) with fittings to collect condensate from AHU and discharge the
condensate up to floor drain inside the AHU Room. Condensate line shall
have water seal arrangement.

3. Air-distribution system comprising of following:

- Fresh air arrangement with intake louvers, bird screen with fresh air fan and
drive motor, volume control dampers, ducting for interconnections, fire
damper for fresh air and fire resistance flexible connection between ducting
and fresh air fan inlet etc.

- Insulated supply air ducting as per Technical Specification of Ducting Systems


(HVAC) (I301.KK34.0.0.OW.TS.WD008 ) comprising of supply air ducting
and duct insulation, supply air diffusers/grills, volume control dampers for
ducts, split flow dampers, fire resistant flexible connection between AHU
and ducting, frames for diffusers / grills, fire dampers in supply air ducts,
air flow switch in main supply air ducts, inspection windows for access to
damper operation and heater maintenance and duct supporting arrangement
with anchor fasteners.

- Return/Exhaust air ducting system as required as per Ventilation and Air-


conditioning Scheme in compliance to Technical Specification of Ducting
Systems (HVAC) (I301.KK34.0.0.OW.TS.WD008) comprising of air
ducting and duct insulation (for return air system), return air diffusers/grills,
fire resistant flexible connection between AHU/Exhaust fans and ducting,
frames for diffusers / grills, fire dampers in return/exhaust air paths (as
applicable), return air grilles / diffusers for covering all return air slits along
with anodised aluminium angle frame required and duct supporting
arrangement with anchor fasteners. HEPA filters and aerosol filters shall be
envisaged as applicable as per Ventilation and Air-conditioning schemes
for buildings.

4. Painting of site structure work (including touch up painting of main equipment at


site) as per project painting specification.

5. Foundation nuts and bolts, virgin neoprene vibration isolation pads for AHUs,
fans, etc.

6. Civil works like grouting of equipment, including supply of grouting material,


OW/01 September, 2012
NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 4 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Sl. No. Description


supply and fixing of steel supports for duct/cable/pipe/tubing etc, breaking and
making good of openings in wall and temporary scaffolding related to erection,
testing and commissioning.

7. Structural steel works as required for equipment support, base frame of equipment
and pipe supports etc.

8. Controls, Instruments and safety devices required for smooth and unattended
operation of equipment/plants.

9. Electrical panels and electrical works as per electrical specification.

10. Self standing/ wall mounted audio-visual annunciation panel for all the
faults/conditions specified in this Specification.

11. A set of special tools and tackles as per clause SPARE PARTS of this
specification.

12. Spare parts for commissioning and start up (Price of these spares shall be included
in the lump sum price of the equipment)

13. Recommended spares for five years of normal operation including those required
for Electrical/instrumentation as specified in their specifications. (spares for 5
years of normal operation to be quoted separately and list of spares with itemised
prices and quantity to be furnished with the bid)

14. Mandatory spares as per clause SPARE PARTS of this specification.

b. Package Air-conditioning System (Air-cooled type)


(Each system consisting of but not limited to the following)

Sl. No. Description


1. Air-cooled type package units each comprising of scroll/reciprocating
compressor(s) with motor, drive package with guard, air-cooled condenser with
condenser fans, interconnected insulated refrigerant piping complete with
necessary fittings, DX evaporator coil, control and line accessories, microprocessor
based panel, first charge of refrigerant and oil.

2. Booster fan, if required, in supply air duct meet total static pressure requirement of
50 mm WC. Booster fan shall be cabinet type inline fans. Booster fan unit shall be
connected to the ducting with fire resistant flexible connection.

3. Interconnecting piping, piping within vendors battery limit, fittings, valves and

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 5 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Sl. No. Description


accessories for the following services as per attached EIL piping material
specifications:
- Insulated condensate piping of carbon steel (IS-1239, black, heavy
schedule) with fittings to collect condensate from Package Unit and
discharge the condensate up to floor drain inside the Package Unit Room.
Condensate line shall have water seal arrangement.

4. Air-distribution system comprising of following:

- Fresh air arrangement with intake louvers, bird screen with fresh air fan and
drive motor, volume control dampers, ducting for interconnections, fire
damper for fresh air and fire resistance flexible connection between ducting
and fresh air fan inlet etc.

- Insulated supply air ducting as per Technical Specification of Ducting


Systems (HVAC) (I301.KK34.0.0.OW.TS.WD008) comprising of supply
air ducting and duct insulation, supply air diffusers/grills, volume control
dampers for ducts, split flow dampers, fire resistant flexible connection
between Package Unit and ducting, frames for diffusers / grills, fire
dampers in supply air ducts, air flow switch in main supply air ducts,
inspection windows for access to damper operation and heater maintenance
and duct supporting arrangement with anchor fasteners.

- Return/Exhaust air ducting system as required as per Ventilation and Air-


conditioning Scheme in compliance to Technical Specification of Ducting
Systems (HVAC) (I301.KK34.0.0.OW.TS.WD008) comprising of air
ducting and duct insulation (for return air system), return air diffusers/grills,
fire resistant flexible connection between Package Unit/Exhaust fans and
ducting, frames for diffusers / grills, fire dampers in return/exhaust air paths
(as applicable), return air grilles / diffusers for covering all return air slits
along with anodised aluminium angle frame required and duct supporting
arrangement with anchor fasteners. HEPA filters and aerosol filters shall be
envisaged as applicable as per Ventilation and Air-conditioning schemes for
buildings.

5. Painting of site structure work (including touch up painting of main equipment at


site) as per project painting specification.

6. Foundation nuts and bolts, virgin neoprene vibration isolation pads for package
units etc.

7. Civil works like grouting of equipment, including supply of grouting material,


supply and fixing of steel supports for duct/cable/pipe/tubing etc, breaking and
making good of openings in wall and temporary scaffolding related to erection,
OW/01 September, 2012
NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 6 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Sl. No. Description


testing and commissioning.

8. Structural steel works as required for equipment support, base frame of equipment
and pipe supports etc.

9. Controls, Instruments and safety devices required for smooth and unattended
operation of equipment/plants.

10. Electrical panels and electrical works as per attached electrical specification.

11. Self standing/ wall mounted audio-visual annunciation panel for all the
faults/conditions specified in this Specification.

12. A set of special tools and tackles as per clause SPARE PARTS of this
specification.

13. Spare parts for commissioning and start up (Price of these spares shall be included
in the lump sum price of the equipment)

14. Recommended spares for five years of normal operation including those required
for Electrical as specified in their specifications. (spares for 5 years of normal
operation to be quoted separately and list of spares with itemised prices and
quantity to be furnished with the bid).

15. Mandatory spares as per clause SPARE PARTS of this specification.

c. Split air-conditioning system


(System consisting of but not limited to the following)

Sl. No. Description


1 Supply, installation and commissioning of single phase air-cooled Split air
conditioners complete with all accessories and fittings. Split unit shall have wall/
floor mounted indoor unit and remotely located air cooled condenser (outdoor unit)
with insulated refrigerant piping, Controls and line accessories, Initial charge of
refrigerant, oil and lubricants, Electrical and civil works (e.g. civil work related to
concealing of refrigerant piping, drain piping, cabling in AC space and outside
upto the outdoor unit) as required including the structural steel framework,
pedestal to mount the indoor/outdoor units, supports for indoor/outdoor units,
supports & clamps for refrigerant piping/cables, stabilizer, hold down nuts & bolts.
Spares for commissioning and start up & Mandatory Spares. Cost of
commissioning and start-up spares shall be included by bidder in the lump sum
cost of equipment.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 7 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Sl. No. Description

d. Ventilation System :
(Pressurisation system shall consist of but not limited to the following)

Sl. No. Description


1. Centrifugal/Axial supply & exhaust fans as required as per Basic scheme of
ventilation & Air conditioning system within building in compliance to Technical
Specification of Centrifugal Fans (HVAC) (Doc No -
I301.KK34.0.0.OW.TS.WD011) and Technical Specification of Axial Fans
(HVAC) (Doc No - I301.KK34.0.0.OW.TS.WD012), with electric motor and
accessories. Centrifugal fans shall have volume control outlet damper, non-return
damper, fire resistant flexible connection with flanges at fan outlet, chicken wire-
mesh guard, common base frame and other accessories. Static Pressure of fan
shall be minimum 50 mm WG.

2. Air-distribution system comprising of following:

- Fresh air arrangement with intake louvers, bird screen, volume control
dampers, ducting for interconnections, fire damper for fresh air and fire
resistance flexible connection between ducting and fan inlet etc.

- Supply air ducting as per Technical Specification of Ducting Systems


(HVAC) (I301.KK34.0.0.OW.TS.WD008) comprising of supply air
diffusers/grills, volume control dampers for ducts, split flow dampers, fire
resistant flexible connection between fans and ducting, frames for
diffusers / grills, fire dampers in supply air ducts, air flow switch in main
supply air ducts, inspection windows for access to damper operation and
duct supporting arrangement with anchor fasteners.

- Exhaust air ducting system as required as per Ventilation and Air-


conditioning Scheme in compliance to Technical Specification of Ducting
Systems (HVAC) (I301.KK34.0.0.OW.TS.WD008) comprising of air
ducting, return air diffusers/grills, fire resistant flexible connection
between fans and ducting, frames for diffusers / grills, fire dampers in
return/exhaust air paths (as applicable), return air grilles / diffusers for
covering all return air slits along with anodised aluminium angle frame
required and duct supporting arrangement with anchor fasteners. HEPA
filters and aerosol filters shall be envisaged as applicable as per Basic
Ventilation and Air-conditioning schemes for buildings.

3. Painting of site structure work (including touch up painting of main equipment at


site) as per project painting specification.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 8 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Sl. No. Description

4. Foundation nuts and bolts, virgin neoprene vibration isolation pads for centrifugal
fans, etc.

5. Civil works like grouting of equipment, including supply of grouting material,


supply and fixing of steel supports for duct/cable/ tubing etc, breaking and making
good of openings in wall and temporary scaffolding related to erection, testing
and commissioning.

6. Structural steel works as required for equipment support, base frame of equipment
and pipe supports etc.

7. Controls, Instruments and safety devices required for smooth and unattended
operation of equipment/plants.

8. Electrical panels and electrical works as per electrical specification.

9. Self standing/ wall mounted audio-visual annunciation panel for all the
faults/conditions specified in this Specification.

10. A set of special tools and tackles as per clause SPARE PARTS of this
specification.

11. Spare parts for commissioning and start up (Price of these spares shall be included
in the lump sum price of the equipment)

12. Recommended spares for five years of normal operation including those required
for Electrical/instrumentation as specified in their specifications. (spares for 5
years of normal operation to be quoted separately and list of spares with itemised
prices and quantity to be furnished with the bid)

13. Mandatory spares as per clause SPARE PARTS of this specification.

1.3 SCOPE OF BUILDING LIST WITH TYPE OF VENTILATION AND AIR-


CONDITIONING SYSTEM

A. The buildings/SSCs to be provided with ventilation and air-conditioning system in


Electrical Area Package are identified in the table given below:

Reference Basic scheme for


KKS Name of
Sr. Type of ventilation system Ventilation & Air-conditioning
Code buildings
System within building

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 9 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Reference Basic scheme for


KKS Name of
Sr. Type of ventilation system Ventilation & Air-conditioning
Code buildings
System within building
400 kV GIS I301.KK34.0UAB.0.OW.OK.WD001
1. 0 UAB Ventilation System
Building
Switchyard Packaged air-conditioning
2. 0 UAC Central Control system I301.KK34.0UAC.0.OW.OK.WD001
Building Ventilation System
220 kV GIS
3. 0 UAD Ventilation System I301.KK34.0UAD.0.OW.OK.WD001
Building
Reserve power
4. 0 1UBG Packaged air-conditioning
supply building
Reserve power system
5. 0 2UBG
supply building I301.KK34.0UBG.0.OW.OK.WD001
Common-unit
Ventilation System
6. 0 3UBG power supply
building

Specific ventilation and air-conditioning requirement are tabulated roomwise for each
building in Ventilation and Air-Conditioning System Summary of Plant Buildings
covered in Electrical Area Package (Refer Annexure 1 )

B. The buildings/SSCs to be provided with ventilation and air-conditioning system in


Main Area Package are identified in the table given below:

Reference Basic scheme for


KKS Name of Type of ventilation
Sr. Ventilation & Air-conditioning
Code buildings system
System within building
Domestic water
1. 0 UGG treatment Ventilation System I301.KK36.0UGG.0.OW.OK.WD001
building
Fire-fighting and Packaged air-
2. 0 3UGF service water conditioning system I301.KK34.0UGF.0.OW.OK.WD001
pump house Ventilation System
3. 0 1UGH Storm water
Ventilation System I301.KK34.0UGH.0.OW.OK.WD001
4. 0 2UGH Pump house
Oil containing Packaged air-
5. 01 UGM water treatment conditioning system I301.KK36.0UGM.0.OW.OK.WD001
plant Ventilation System
Central Central air-conditioning
workshops of the system with chilled
6. 0 UKU water AHUs I301.KK34.0UKU.0.OW.OK.WD001
controlled access
area Ventilation System
Chlorination Split air-conditioning
7. 0 UPK I301.KK34.0UPK.0.OW.OK.WD001
plant system

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 10 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Reference Basic scheme for


KKS Name of Type of ventilation
Sr. Ventilation & Air-conditioning
Code buildings system
System within building
Ventilation System
Central air-conditioning
Chiller plant system with chilled
8. 0 UQR water AHUs I301.KK34.0UQR.0.OW.OK.WD001
building
Ventilation System
Central air-conditioning
system with chilled
Engineering water AHUs
utility and Split air-conditioning
9. 0 USV I301.KK34.0USV.0.OW.OK.WD001
laboratory system
building
Ventilation System
Split air-conditioning
Compressor system
10. 0 UTF I301.KK34.0UTF.0.OW.OK.WD001
building
Ventilation System
Supply
ventilation centre
Package air-conditioning
11. 0 1UUA of the bus duct
system
tunnels (0
5,6UAZ)
Exhaust
ventilation centre I301.KK34.UAZ.0.OW.OK.WD001
12. 0 2UUA Ventilation System
of the bus duct
tunnels (0 6UAZ)
Exhaust
ventilation centre
13. 0 3UUA Ventilation System
of the bus duct
tunnels 0 5UAZ)
Central air-conditioning
Health physics system with chilled
building water AHUs I301.KK34.0UYB.0.OW.OK.WD001
14. 0 UYB
(controlled-access (Sheet 1 & 2)
area) Ventilation System

Specific ventilation and air-conditioning requirement are tabulated roomwise for each
building in Ventilation and Air-Conditioning System Summary of Plant Buildings
covered in Main Area Package (Refer Annexure 2)

C. The buildings/SSCs to be provided with ventilation and air-conditioning system in


Auxiliary Area Package are identified in the table given below:

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 11 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Reference Basic scheme for


KKS Name of
Sr. Type of ventilation system Ventilation & Air-conditioning
Code buildings
System within building
Packaged air-conditioning
Electrical system
1. 0 UBS I301.KK34.0UBS.0.OW.OK.WD001
substation building
Ventilation System
Packaged air-conditioning
Common Control system
2. 0 UCS I301.KK36.0UCS.0.OW.OK.WD001
Room
Ventilation System
Split air-conditioning
Diesel fuel and oil system
3. 0 UEL I301.KK34.0UEL.0.OW.OK.WD001
pump house
Ventilation system
DM plant & post
4. 0 UGD Ventilation System I301.KK36.0UGD.0.OW.OK.WD001
treatment facility
Chemical storage Split air-conditioning
5. 0 1UGD and supply system I301.KK34.09UGD.0.OW.OK.WD001
building Ventilation System
Waste water Packaged air-conditioning
6. 0 1UGE neutralization system I301.KK36.0UGE.0.OW.OK.WD001
building Ventilation System
Hydrogen and
7. 0 UTQ Oxygen generating Ventilation System I301.KK16.0UTQ.0.OW.OK.WD001
plant
Nitrogen
8. 0 UTP Ventilation System I301.KK16.0UTP.0.OW.OK.WD001
generating plant
Nuclear Island
9. 01 UYE Ventilation System I301.KK34.01UYE.0.OW.OK.WD001
Group House
Package air-conditioning
Nuclear Island system
10. 02 UYE I301.KK34.02UYE.0.OW.OK.WD001
Group House
Ventilation System

Specific ventilation and air-conditioning requirement are tabulated roomwise for each
building in Ventilation and Air-Conditioning System Summary of Plant Buildings
covered in Auxiliary Area Package (Refer Annexure 3)

2.0 APPLICABLE CODES AND STANDARDS

The design, material, construction, manufacture, inspection, testing and performance of


the chillers shall comply with all currently applicable statutes, regulations and safety codes
in the locality where the equipment will be installed. The equipment shall also conform to
the latest editions as on bid due date of all national / international standards and codes
(along with all addenda), mentioned below. In Particular the chillers rating, manufacturing

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 12 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

and testing shall confirm to latest editions of following guiding standards. Nothing in this
specification shall be construed to relieve the contractor of this responsibility.

Equipment Code Number and Title


Centrifugal Fans IS:4894- Centrifugal Fans
AMCA-210-Laboratory Methods of Testing Fans for
Certified Aerodynamic Performance Rating.
Pressure vessels ASME Section VIII Div I - Boiler and Pressure vessel code-
Pressure Vessels.
Heat Exchangers TEMA-Tubular Exchanger Manufacturers Association
Copper and copper alloy ASTM B-111- Standard Specification for Copper and
Piping Copper Alloys Seamless Condenser Tubes and Ferrule
Stock
ASTM B-359- Standard Specification for Copper and
Copper Alloys Seamless Condenser and Heat Exchanger
Tubes with Integral Fins
ASTM B-280- Standard Specification for Seamless Copper
Tubes for Air Conditioning and Refrigeration Field Service.
Sheet metal ducting SMACNA-Sheet Metal and Air Conditioning Contractors'
National Association-HVAC Duct Construction Standards-
Metal and Flexible
IS:655 - Specification for Metal Air ducts
Air filters BS EN 779-Particulate air filters for general ventilation
Determination of the filtration performance
Fire Dampers UL-555-Specification for safety fire dampers
UL-555S-Specification for safety smoke dampers
Air-conditioning System NFPA-90A-Standard for Installation of Air-conditioning
and Ventilation Systems
Piping &Valves As per PMS
Ventilation and Air- ASHRAE-American Society for Heating, Refrigerating and
conditioning System Air-conditioning Engineers
ISO-17873- Nuclear facilities-Criteria for the design and
operation of ventilation systems for nuclear installations
other than nuclear reactors
Instrumentation ANSI/ASME- American National Standards
Institute/American Society of Mechanical
Engineers.
B 1.20.1 Pipe Threads General Purpose (Inch)

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 13 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Equipment Code Number and Title


B 16.5 Pipe Flanges and Flanged Fittings
B 16.20 Metallic Gaskets for pipe Flanges, Ring
Joint, Spiral wound and Jacketed.
B 16.47-B Larger diameter steel flanges
ANSI/FCI American National Standards Institute/Fluid
Control Institute
70.2 Control valve seat leakage classification
IEC International Electro technical Commission
IEC 60085 Thermal Evaluations and Classification of
Electrical Insulation.
IEC 60332 Test on bunched wires or cables. Part III Cat.
A
IEC 60529 Degree of protection provided by
enclosures.(IP code)
IEC 60534-2 Industrial Process Control Valves-Flow
capacity.
IEC 60584-2 Thermocouple Tolerances
IEC 60751 Industrial Platinum Resistance Thermometer
Sensors
IEC 61000-4 Electromagnetic compatibility for Industrial
Process measurement and Control
equipment.
IEC-61131-3:2003 PLC Programming
IEC-61511 Functional safety instrumented system for
process industry Sector.
IEC-60709 Adequate physical separation between
systems
ISA Instrumentation, Systems and Automation
Society
S-5.2 Binary logic diagrams for process operations.
S-5.4 Instrument Loop diagram
S-5.5 Graphic Symbols for process displays
S-75.xx Standard related to control valves.
ISO 5167 Measurement of fluid flow by means of
orifice plates, nozzles and venturi tubes,
inserted in circular cross-section conduits.
NACE National Association of Corrosion
Engineers
NEC National Electric code
NEMA National Electrical Manufacturer's
Association
NFPA-496 Purged and pressurized enclosures for
electrical equipment.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 14 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Equipment Code Number and Title


OSHA Occupational Safety and Health Authority
SAMA Scientific Apparatus Makers Association
IEEE 802.3 Standards for Ethernet based LAN
ASME PTC 19.3 Performance test code Temperature
Measurement
IS 3624 Specifications for pressure & vacuum
gauges
IS 9968(Part I) Specifications for elastomer insulated
cables for working voltage upto and
including 1100 volts
IS 6380 Specifications for elastomeric insulation and
sheath of electric cables.
ASTM-D-2843 Standard test method for density of smoke
from the burning or decomposition of
plastics.
ASTM-D-2863 Standard method for measuring the minium
oxygen concentration to support candle like
combustion of plastic (oxygen index and
temperature index)
IS-10810-58 Methods of tests for cables : Oxygen Index
test
IEC-754-1 Determination of the amount of halogen
acid gas evolved during the combustion of
polymeric materials taken from cables.
IS-10810-61 Flame retardant Test.
BS-6360 (or IS-8130) Specification for conductors for
insulated electric cables & flexible cables.
IS -10810 Method of tests for cables.
VG 95218-Part 66 Mutual capacitance for elastomeric
compounds
NES 713 Determination of the toxicity index of the
products of combustion from small
specimens of materials.
General AERB Codes

3.0 GENERAL FUNCTION AND DESCRIPTION

Ventilation and Air-conditioning systems shall ensure permissible microclimatic


conditions for work of the personnel during different operation conditions of the plant to
prevent air pollution in rooms/buildings and in atmosphere by radioactive and toxic
substances, and to keep up the optimum operation of the process equipment.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 15 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Design of Air-conditioning and Ventilation system depends on the atmospheric conditions


to be maintained in the rooms of different buildings. Following are some general
guidelines to develop HVAC systems:

3.1 Buildings of Nuclear Power Plant are broadly divided into following two categories:

a) Controlled-access area rooms, in which the possibility of radiation impact on


personnel exists. 0UYB and 0 UKU are covered under this category.

b) Uncontrolled-access area rooms, in which the radiation impact on the personnel is


practically eliminated and in which the personnel works constantly. All
buildings/structures other than the above two buildings are covered under this
category.

3.2 The exhaust air from the restricted-access area shall be discharged in a controlled way, i.e.,
only via paths planned for this process. Principle of separate ventilation for controlled and
uncontrolled-access area rooms is envisaged.

3.3 100% redundancy for AHUs, Package Units and ventilation fans shall be considered.
However, depending on system requirement, tentative equipment selection is provided with
Basic Ventilation & Air-conditioning Schemes. There shall be no redundancy in air-
distribution such as AC/ventilation ducting, air terminals etc.

3.4 General Description of ventilation and air-conditioning system:-

3.4.1 Fresh air system:- Fresh air system caters to the fresh air requirement of a specific
building/area. Fresh air system supplies filtered, cooled (if applicable) and de-humidified
(if applicable) air to the room/area/building. Fresh air system may/may not have supply air
fans. Suction effect created by the exhaust air fans (of the exhaust air system) or AHU
supply fan induces the flow in the room/area/building. Fresh air quantity shall be selected
based on criteria specified in Cl.- 4.1.2.3.2 and table provided in Cl 1.1.2 of this report.
However, minimum capacity as specified in Ventilation and Air-conditioning system
summary shall be considered. Fresh air intake system equipment and exhaust equipment
location shall be arranged separately.

3.4.2 Exhaust air system:-Exhaust air system draws air from the room/area/building. Exhaust air
system has exhaust air fans and filtration (only in specific application/area).

3.4.3 Recirculation type air-conditioning system:- Recirculation type air-conditioning system is


provided, in addition to fresh air supply for the area. Recirculation type air-conditioning
system draws partly fresh air from fresh air system and partly space circulated air. It, then,
filters the air for the desired filtration requirements, cool and de-humidify it by passing
through air-water/air-refrigerant finned heat exchanger coil and throw it in the room/space
building to remove the space sensible and latent heat requirement.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 16 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Cooled and de-humidified air from the respective AHU/self-contained AC unit shall be
ducted and supplied to the areas by distribution system comprising of ducting, dampers,
grills and diffusers. Normally false ceiling is provided to run and conceal the ducting above
it (as per Architectural drawing).
Completely separate AC/ventilation system is envisaged for free access areas and separate
AC/ventilation system for control access areas. For controlled access areas (rooms with
radioactive contamination) no return air is to be envisaged and the entire air is to be
exhausted in the controlled manner.
3.4.4 Air-distribution system:-Air-distribution system shall comprise of different type of damper/
valve such as inlet valve/outlet valve, check valve, motorised electrical operated fire valve,
flow regulation valve etc. Selection of suitable material for air distribution ducting for
different area/application shall be considered. To prevent fire propagation over the air ducts
of ventilation system, fire dampers shall be installed on them. Independent ventilation
systems are envisaged for fire hazardous rooms. Transit air ducts shall be insulated with
appropriate fire resistance rate. Fire hazard categorisation of all the rooms shall be
performed based on the fire hazard analysis. Ventilation fire dampers shall be used to
contain the fire spread in case of fire in higher fire hazard category rooms. Smoke removal
system shall be designed in case of fire if required to rehabilitate the areas and bring to
normal condition/ventilation. For localization of mechanical and aerodynamic noise within
a source of its formation soft pads shall be provided at ventilators; vibration bases, rubber
pads, noise suppressors shall be installed in ducts; ventilation systems shall be placed in
separate compartments.

4.0 REQUIREMENTS

4.1 DESIGN REQUIREMENTS:

4.1.1 INPUT DATA AND ASSUMPTIONS

4.1.1.1 Input Data:- Approved architectural layout drawings, equipment heat dissipation loads of
various equipments in various buildings/structures shall be referred as input data for
designing of ventilation and air-conditioning system of various buildings/SSCs.

4.1.1.2 Assumption: Failure of ventilation and air-conditioning system of NPCIL design scope of
plant building will not result in NPP safety.

4.1.2 DESIGN BASIS

4.1.2.1 Air-conditioning and ventilation system selection design basis shall be as follows:

Following approach for selection of Air-conditioning system shall be adopted:-

Window/split type AC unit if AC load requirement is less than 5 TR.


Air-cooled type package AC units if AC load requirement is between 5 TR to 45 TR.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 17 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Air-cooled/water-cooled type central chilled water type system with chillers and
AHUs/Air-coolers if load is above 45 TR.

Wherever chilled water from central chillers is available for HVAC (0 USV, 0 UYB, 0
UKU and 0 UQR) chilled water coil air-coolers/AHUs shall be envisaged. Chilled water
supply and return temperatures shall be considered as 6 deg C and 12 Deg C respectively
for these buildings.

Generally, for area requiring only ventilation, mechanical ventilation with supply/
exhaust fans shall be considered. Mechanical roof extractors may also be considered.
Buildings, where building architecture permits to utilize Stack effect, shall be provided
with natural ventilation system.

4.1.2.2 Fresh air requirement for re-circulated type air-conditioning system shall be decided
based on the following two criteria:

a. 17 CFM/Person or fresh air requirement as per ASHRAE Standard-62.1.


b. 1 Air Change Per Hour

Fresh air requirement shall be calculated based on the above two criteria and higher of
the two shall be considered for final selection.

4.1.2.3 Following design climatic data shall be considered for ventilation and air-conditioning
systems design:-

4.1.2.3.1 Outside Design data:-

Design climatic data to be accepted in the ventilation and air-conditioning system of KK-
3&4 are as follows:

Outdoor air temperature within confidence level 97,5 % for Plus 34 / 60 *


ventilation and conditioning systems design, 0
Average barometric pressure, gPa 1005
Dust in air, mg/m3 0.26
Wind velocity, m/s 7.7
Atmosphere type Maritime
Type of climate Tropical Humid
Air pollutionchlorides, mg/m2 per day(concentration,mg/m3) 20 (0.0212)
Air pollution sulphates, mg/m2 per day 50
Air pollution sulphurous gas, concentration, mg/m3 not more than 0.025
3
Air contamination 190
Calculated extreme temperature with confidence level 0,01 % 42
(maximum),
Calculated extreme temperature with confidence level 0,01 % 15

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 18 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

(minimum),
Geographical latitude 80010'6''

* Minimum 10% design margin on air quantity/ TR shall be considered while selecting
AC equipment over and above the calculated heat load of building/facility. This is
required to account for monsoon weather conditions. Like KK-1&2, no monsoon reheat
control has been envisaged in KK-3 &4.

Chilled water supply and return temperatures shall be 6 deg C and 12 Deg C respectively
for the buildings (0 USV, 0 UYB, 0 UKU and 0 UQR)) where chilled water is available.

4.1.2.3.2 Inside design data:-

Temperature (T) and relative humidity (RH) for various areas to be maintained is given
below:

i. Rooms of monitoring equipment, personnel, shift engineers, generator excitation


panels.
T = 260C 20C, RH = 45% 5%

ii. Rooms of technical support and calibration of radiation monitoring equipment


T = 250C 20C, RH = 55% 5%

iii. Computer control room (subject to suitability of the computer system)


T = 250C 10C, RH = 50% 5%

iv. For the electro-technical equipment rooms in absence of specific technological


requirements the inside air temperature shall be as follows:
T = 390C or 50C permissible temperature rise inside the ventilated
rooms above ambient incoming air.

v. Laboratory and Chemical Storage Area etc


T < 280C, RH = 50% 5%
Non-re-circulating type once through air-conditioning system shall be considered for
above area. No return air from these areas shall be permitted.

vi. Battery Room and Gas generation/chemical storage facility


These areas shall be exhaust ventilated with 50C permissible temperature rise inside
the ventilated rooms above ambient incoming air. Any specific temperature and RH
requirement related to chemical storage shall be explored during detailing based on
the chemicals to be stored in the storage area.
Design temperature inside battery rooms should be chosen to minimize rate of
Hydrogen generation.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 19 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Emergency ventilation shall be provided if chemical contamination of areas is


envisaged to perform more no of ACH to avoid chemical concentration and
hazardness.

vii. In all other rooms as specified below, air parameters shall be according to the
technological requirements and sanitary norms.

S No. Rooms Air parameters to be maintained


1 Toilet/Washroom No specific Temperature requirement, Exhaust
ventilation based on 10 ACH
2 Pantry No specific Temperature requirement, Exhaust
ventilation based on 12 ACH
3 Store Room/Locker No specific Temperature requirement, Exhaust
Room ventilation based on 06 ACH

4.1.2.4 In general, all the equipments shall be designed based on 30 years life period.

4.1.2.5 Toilets, pantry shall have separate forced exhaust systems with separate ducting (as
applicable as per Basic Ventilation and Air-conditioning System Scheme).

4.1.2.6 Fresh air intake system equipment and exhaust equipment location shall be arranged
separately with optimum ducting routing. All the wall mounted axial flow supply air fans
shall be provided with external hood to avoid splashing of rain water inside building.

4.1.2.7 Local exhaust systems shall be installed near machine tools, to meet internal air quality
requirement (as per Basic Ventilation & Air-conditioning System Scheme).

4.1.2.8 For control access area buildings, AHUs shall be placed in free access area only.

4.1.2.9 Controlled-access area rooms i.e. 0UYB and 0 UKU, in which the possibility of radiation
impact on personnel exists, ventilation systems shall have filter at exhaust to remove air
borne contamination using HEPA filters. Also for contaminated exhaust ventilation
system, HEPA filters shall be used to limit the activity below the admissible limits to the
environment. Refer Technical Specification of Air Filters (HVAC) (Doc No -
I301.KK34.0.0.OW.TS.WD007) for HEPA filter specification.

4.1.3 SAFETY AND SEISMIC CLASSIFICATION

Classification of the Ventilation shall be same as that of the SSC. Classification of


ventilation and air-conditioning systems belong to safety class 4N and seismic category
III except HEPA filters which belong to safety class 3N and seismic class IIb.

4.2 OTHER TECHNICAL REQUIREMENTS:

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 20 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

4.2.1 The equipment supplied shall be suitable for safe and proper operation under all
conditions described or implied in this specification without undue strain, vibrations,
corrosion or other operating difficulties. All parts subjected to substantial temperature
changes shall be designed and supported so as to permit free expansion or contraction
without resulting in leakage, distortion and excessive strains in the equipment. The parts
subjected to wear, corrosion or other deterioration or requiring adjustment, inspection on
repairs, shall be accessible and have reasonable convenience for removal, replacement
and repair. All such parts shall be of suitable material or suitably lined for keeping
maintenance to a minimum.

4.2.2 Sound pressure level for the complete unit shall not exceed 85 dBA at 1 mtr distance. If
sound level exceeds 85 dBA then, necessary acoustic treatment for the AHU/Package
Units/Fans shall be provided to limit sound level within the specified limit.

4.2.3 Air Handling Unit :

Refer Technical Specification of Air Handling Unit (HVAC) (Doc No -


I301.KK34.0.0.OW.TS.WD006).

4.2.4 HEPA Filters :

4.2.4.1 Controlled-access area rooms i.e. 0UYB and 0 UKU, in which the possibility of radiation
impact on personnel exists, ventilation systems shall have filter at exhaust to remove air
borne contamination using HEPA filters. Also for contaminated exhaust ventilation
system HEPA filters shall be used to limit the activity below the admissible limits to the
environment.

4.2.4.2 For detailed Technical Specification of HEPA Filter, refer Technical Specification of Air
Filters (HVAC) (Doc No - I301.KK34.0.0.OW.TS.WD007)

4.2.5 Split Air-conditioners :

Single phase air-cooled Split Air-condition Units shall consist of hermetically sealed
Scroll/reciprocating/rotary compressor, motor, air cooled condenser, integral refrigerant
piping and wiring, stabilizer, complete with all accessories and fittings, all mounted on a
steel frame. Indoor unit to be installed for Split Unit within building, shall be housed in
insulated cabinet consisting of cooling coil, blower with motor, filter & insulated drain
pan.

4.2.6 Air-cooled Packaged Air-conditioning Unit :

4.2.6.1 Air Cooled Packaged Unit shall consist of hermetically sealed Scroll/reciprocating
compressor, motor, integral refrigerant piping and control panel duly wired to compressor
and air cooled condenser all mounted on a steel frame. The Air cooled condenser with
fan duly mounted on a common frame shall be installed on the wall openings or outside

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 21 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

floor with suitable angle iron / channel frame. The suitable starters, switches, power
control cabling between Air Cooled Packaged Unit and Air Cooled Condenser shall be
included by the contractor.

4.2.6.2 Compressor shall be hermetic reciprocating / Scroll / rotary, serviceable type and shall
have dual pressure stat, and an operating oil charge. The motor shall be suction gas
cooled and shall be sealed against dirt and moisture. The motor shall be suitable for
41510% / volts or 23010 % volts, 50 Hz, A.C. supply.

4.2.6.3 Interconnecting refrigerant piping and fittings shall be all copper and valves shall be
brass / gunmetal construction.

4.2.6.4 Casing:-Indoor & outdoor units shall be sectionalised / cabinet construction. Indoor units
shall be consisting of fan section, coil section, filter section, and drain pan. The
compressor shall be mounted within the indoor units. Each section shall be constructed of
thick sheet steel all welded / bolted construction, adequately reinforced with structural
members and provided with sufficient access panels for proper lubrication and
maintenance. Base panel shall be constructed of fabricated steel structure provided with
an under frame suitably braced. Each unit shall include one piece drain pan constructed
of 20 gauge galvanised sheet steel plate. Drain pan shall extend under coil and fan
sections with drain connections. Removable panels in fan and coil sections shall provide
access to all internal parts. Panels shall be internally lined with minimum 25 mm thick
fibreglass thermal insulation and acoustic lining.

4.2.6.5 Fan:- Fan wheels and housing shall be fabricated from heavy gauge steel. Fan wheels
shall be of double-width, double inlet forward-curve, multi-blade type enclosed in a
housing and mounted on a common shaft. Fan housing shall be made of die-formed steel
sheets with stream-lined inlets to ensure smooth air flow into the fans, fan shaft bearing
shall be oil/grease lubricated. All rotating parts shall be dynamically balanced
individually, and the complete assembly shall be statically and hydraulically balanced.

4.2.6.6 Cooling Coil:- Cooling coils shall be of fin and tube type having aluminium fins firmly
bonded to copper tubes assembled in zinc coated steel frame. The coil shall be pitched in
the unit casing for proper drainage. Each coil shall be factory-tested at 21 Kg. per sq.cm
air pressure under water. Tube shall be mechanically / hydraulically expanded for
minimum thermal contract resistance with fins. The number of fins per cm. shall be 4 to
5.

4.2.6.7 The indoor and outdoor units shall be provided with ribbed rubber pad vibration isolators.

4.2.7 Centrifugal fans

For detailed Technical Specification of Centrifugal Fans, refer Technical Specification of


Centrifugal Fans (HVAC) (Doc No - I301.KK34.0.0.OW.TS. WD011)

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 22 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

4.2.8 Axial Flow Fan

For detailed Technical Specification of Axial Fans, refer Technical Specification of Axial
Fans (HVAC) (Doc No - I301.KK34.0.0.OW.TS.WD012)

4.2.9 Propeller Fan

For detailed Technical Specification of Propeller Fans, refer Technical Specification of


Axial Fans (HVAC) (Doc No - I301.KK34.0.0.OW.TS.WD012)

4.2.10 Propeller Axial Fans (Roof Extractors)

For detailed Technical Specification of Propeller Axial Fans, refer Technical


Specification of Axial Fans (HVAC) (Doc No - I301.KK34.0.0.OW.TS.WD012)

4.2.11 Air Distribution System:

For detailed Air distribution system refer the following specifications :

Technical Specification of Ducting Systems (HVAC) (Doc No - I301.KK34.0.0.OW.


TS.WD008)
Technical Specification of Dampers (HVAC) (Doc No - I301.KK34.0.0.OW.TS.
WD009)

4.2.12 Insulation :

For detailed Technical Specification of Duct Insulation, refer Technical Specification of


Ducting Systems (HVAC) (Doc No - I301.KK34.0.0.OW.TS.WD008)

4.3 MATERIALS SELECTION

Material of construction of major equipment of ventilation and air-conditioning system


shall be as follows.

4.3.1 Air Handling Units (AHUs)

The material of construction of main components of AHUs shall be as follows:

AHU Casing - Double skin construction with 0.6 mm precoated


Galvanised Steel Sheet (GSS) outer and inner skin
with sandwiched PUF insulation in between.
Generally PUF insulated panel thickness shall be
minimum 25 mm. However, for the area, where
AHU is placed outside in ambient and not in AHU
Room, i.e. return air is ducted, PUF insulated panel

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 23 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

thickness shall be considered as minimum 50 mm.


For such area, AHU shall be provided with thermal
break profile.

Drain Pan - 18 G Stainless steel (SS-304) construction

Cooling Coil - Copper tubes with aluminium fins

Coil casing - GSS

Cooling coil tubes - 24 G (minimum) thick copper tubes

Coil fin pitch - 12 Fins per Inch

Filter mounting frame - GSS/ Aluminium

Pipeline header of AHU - SS304/SS304L (with flange connections)

4.3.2 Centrifugal Fans

Casing and inlet cone - Welded construction, fabricated from heavy gauge
carbon steel.
SS welded construction for control room, battery
room chemical storage rooms and acid room
ventilation.

Impeller - Die-formed blades of CS/GI, Backward curved


blades. SS construction for Control room, battery
room, chemical storage and acid room.

4.3.3 Axial flow fans

Casing/Rings - Carbon steel with epoxy painted


Impeller - Cast aluminium aerofoil blades integrally cast
with/fixed on cast aluminium hub.

4.3.4 Air distribution system

The material of construction of main components of air distribution system shall be as


follows:

Air Ducts - a) Battery & chemical rooms of 0UAC and 0UGD


shall be stainless steel of welded construction of
1.5 or 2mm thickness.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 24 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

b) All smoke exhaust system shall be 2mm CS


welded ducting with anti-corrosive painting and
insulation of 1.5 hr fire rating.
c) All free access area building shall have GI
ducting of different thickness based on size of
ducting as per IS.
d) All controlled access area ducting shall be 2mm
CS welded construction with anti-corrosive
painting of radiation resistance painting.

Air terminals (Grills/diffusers) - Anodised Aluminium/Powder coated steel (in


controlled access area shall be CS with anti
corrosive painting)

Louvers - CS/SS for area where contaminated air involved,


GSS-for all other area

Dampers/Fire Dampers - CS/SS for area where contaminated air involved,


GSS-for all other area.

4.3.5 Duct insulation - 50 mm thick Resin bonded fibreglass (24 kg/m 3


density) with factory laminated aluminium foil. 25
mm thick for return air ducts passing through air-
conditioned area.

Equipments such as HEPA filter housing, centrifugal supply & exhaust fans of controlled
access area shall be of SS welded construction of about 3-5 mm thick.

4.4 ENVIRONMENTAL QUALIFICATION

a. Ventilation and air-conditioning system shall be designed so as to restrict the noise


level within 85 dBA at 1 mtr distance from Air-conditioning / ventilation equipment.
Also noise level in the occupied space shall be restricted within NC-35. Necessary
measures such as sound attenuators, acoustic treatment shall be adopted, if required,
to meet the above noise limitation. Also Manufacturers published data shall be
taken into account for proper air throw/distribution, noise, and pressure drop in the
air-distribution system.

b. Controlled-access area rooms i.e. 0UYB and 0 UKU, in which the possibility of
radiation impact on personnel exists, ventilation systems shall have filter at exhaust
to remove air borne contamination using HEPA filters. Also for contaminated
exhaust ventilation system HEPA filters shall be used to limit the activity below the
admissible limits to the environment.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 25 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

5.0 INSTRUMENTATION AND CONTROL REQUIREMENTS

5.1 Control system

Control & instrumentation shall be designed for safe & efficient operation of Ventilation
and Air-conditioning system of NPCIL design scope of plant building. Purpose of control
system for Ventilation & Air conditioning system of NPCIL design scope of plant
building complex will be equipped in required volume with technical means of
monitoring and control with use of control software, responding to application conditions
at KK-NPP.

5.2 Design approach

5.2.1 Control System Design Basis

The main constituents of the HVAC control system shall be control & monitoring system
and HVAC instrumentation of the system. Following type instrument & control system of
ventilation & air conditioning is to be considered:

1. Split type ideally no instrumentation and control system


2. Package type AC system- Microprocessor based control panel

Control & monitoring system shall provide centralised control structure with semi
automatic controls. Control of individual Package AC system shall be provided with a
dedicated microprocessor based control cabinets to control the HVAC unit as equipment.
With the above defined concept the package AC system shall ensure for the fulfilment of
following minimum functional requirements:

Detection of the process parameters,


Transmission of the signal to the control panel,
Signal reception and signal processing,
Automatic & manual control of the process based on the pre-defined interlock &
logics and control algorithms,
Manipulation of control loops including changing set point, mode, output,
configuration, tuning and computational constants.
Indicating of all analog and digital process variables of control loops, open loops
and all loop related parameters.
Self Diagnostics,
Ability to configure the control parameters,

5.2.2 Control system equipment & instruments selection

Following minimum requirement shall be ensured:-


OW/01 September, 2012
NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 26 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Supply air fan of air handling unit and fresh air fan shall be started from the HVAC
control Panel. In case standby (reserve) unit is provided; standby unit shall be change
over automatically by the failure signal of the running fan.

5.2.2.1 All electric motor driven equipment shall be provided with local Start/Stop Push button
stations for operational requirements. Local /Remote selector switch shall be provided
for motors having remote startup & it shall be a master switch.

Following type of instrument shall be used with applicable codes & standards as
minimum:
Pressure Transmitter: PT/DPT shall be of capacitance type. Electronic transmitters
shall generally be smart (two wire) type. These shall have transmission/output signal
of 4-20 mA DC.
Pressure Gauges: Pressure gauge sensing element shall be an elastic element like
bourdon tube of SS316 and movement of Stainless steel, as a minimum.
Thermowell : Welded type thermowells with seal welding shall be used. Thermo
wells shall be minimum of 316 SS or better material to suit the service conditions.
Temperature Element : For remote temperature indication/recording/control/ etc., K
type thermocouples or RTD shall be used as per specification. Elements shall be
spring loaded, mineral insulated and shall have SS 316 sheath as minimum.
Temperature Gauges : Temperature gauges shall be bimetallic type. Case material
shall be SS304. Filled type temperatures gauges are envisaged only for underground
locations
Temperature Transmitter: All temperature transmitters shall be universal type i.e.
capable of accepting inputs from any type of Thermocouple like K and any type of
RTD like Pt-100 etc. and grounded/ ungrounded type.
Flow Switch : Paddle type flow switch shall be used.
Control Valves : Control valves shall normally be Globe type single seated and
guiding shall be top /cage type. Electric actuators shall be used with positioner
providing 4 to 20 ma output. Open & close limit switches as per P&ID and torques
switches shall be provided for electric actuators.
Special instrumentation: During detailed design, any special instrumentation, if
required, shall be suitably selected to fulfil the purpose.

5.2.3 Control system modes of operation

Instrumentation and control circuit has been provided from manual and automatic
operation of each package AC system from the local control panel in each building.
Control system shall be controlled by dedicated microprocessor based control system for
package type AC system. The local / remote selector switch shall be provided at local
control panel. The Remote mode means that equipment shall be controlled by chilled
water control system PLC control panels. The Local mode shall be used only for
standalone operation & control & testing purpose.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 27 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Control, monitoring, sequence, interlock and trip logics for system will be provided by
microprocessor based control system located in respective building.

Control & monitoring operational modes viz. configuration, run mode etc. shall be
clearly identifiable and function of the control system shall be known

5.2.4 Design Analysis and Engineering with P&ID

5.2.4.1 Process and Instrumentation

5.2.4.1.1 The process instrumentation selected based on the process requirements shall be
tagged as per P&ID, covering the process requirements.

5.2.4.1.2 Refer Annexure5 Instrument Index format for monitoring parameters with
information on sensor type, ranges, engineering unit, nominal value of operation,
alarm/interlock/annunciation set-points, output signal level, operating condition, tap-
off point/sampling point, sensor location, signalling/alarming display information,
logic and interlock identifier. Table annexed is a typical format & further detailing
shall be done by EPC contractor.

5.2.4.1.3 Process related interlocks shall be provided as per P&ID to meet the functional
requirement of the system. Minimum set of logics to be implemented in the system are
listed below.

a) After fire suppression, fire dampers shall be opened manually through reset
button.

b) Air-conditioning/ventilation system shall shut down under the following


circumstances:
i. On receipt of signal from Fire control panel.
ii. In case of power supply failure.

c) Potential free contact shall be provided by HVAC vendor for closing of fire
dampers and simultaneously tripping the AHU blower motor on receiving the fire
alarm signal from relevant Fire control Panel.

d) Annunciation in HVAC control panel/room shall be provided. It shall consist of


facia type Annunciators having translucent plastic window of 35 mm x 50 mm
(min.) size engraved with appropriate function in block letters for each alarm trip
point.

e) Annunciators shall be provided for all faults covering atleast the following:-

i. Air handling unit motors overload.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 28 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

ii. Open/close position of fire/smoke dampers.


iii. Fresh Air Fan/Exhaust Air Fan status-Run/Stop.
iv. AHU fan status-Run/Stop.
v. Auto change-over of standby equipment-Status
vi. Any other as necessary.

In the event of a fault, the particular window shall glow and the window will remain
lighted till the fault is rectified.

5.2.4.2 Performance Characteristics of control system & instruments :

The system design shall ensure for the performance characteristics namely, sensitivity,
accuracy, drift, response time, fault tolerance, signal processing & detection of the
signal failure, input & output signal levels, isolation level, for each operating condition
of concern. The performance requirements specified above shall be selected so as to
ensure the stable control and protection operation of the process and equipment.
Whenever the ranges of control is maintained by overlapping instrument channels,
appropriate interlocks shall be provided in the increasing and decreasing directions for
automatic selection of the required ranges or provide clear alarm for operator action.
Factors like instrument saturation, overload etc. should not cause loss of accuracy over
the entire range.
The effects of transient and normal variations in power supply characteristics (i.e.
voltage, frequency) and grounding and signal transmission losses shall be accessed in
the design of the I&C systems to ensure satisfactorily performance of safety related
functions. Galvanic or optical isolation shall be provided for all field signals.
All sub system of control system shall also be able to operate satisfactorily in case of
air conditioning failure with ambient temperature of 50 Deg C and 90% non condensing
humidity. The minimum period of continuous operation shall be 48 hours at least once
in a month without any damage or degradation of system performance.

5.2.4.3 Environmental Qualification:

All I&C equipments shall comply with detailed environmental requirements specified
in document Technical Requirements to Thermal Monitoring hardware for Strength,
Resistance and Stability against External Effects-R01.KK.0.0.AP.TT.WD001 and
General requirements and methods of qualification for resistance to seismic effects
aircraft and blast wave impacts-R01.KK.0.0.AP.PZ.WD001. Method of qualification
shall be as per applicable IS/IEC standards. Material selected for C&I items shall suit to
the process fluid and environment condition.

5.2.4.4 Reliability

The System shall be designed to ensure fault avoidant as a minimum by selecting


high grade components of proven quality and proper design of system deploying design

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 29 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

principles (viz, segregation, single failure, fail safe state etc.) to the extent necessary
for the systems reliable and appropriate operation.

Apart from system modules, power supply units shall be replaceable on line without
disrupting the process and without affecting the system redundancies. This will ensure
the reduced down time of the system and thus improve the system availability with
maintenance based on self diagnostic feature of the control system.

5.2.4.5 Qualification and Verification & Validation :

The control system components shall be comply with the APCS quality policy
document for I&C APCS Categories of quality. Classification and application -
R01.KK.0.0.AP.KL.WD001.
The equipment shall undergo the type tests (seismic, environmental, EMI/RFI etc.) and
the routines tests (functional test, IR tests etc.) specified as per the reference applicable
standards.
Inspection shall be carried out as per approved QAP & test procedure. The QAP shall
be prepared to ensure that all the tests on components/equipment of the system and
final assembled system are included for quality assurance. A detailed test procedure
shall be prepared by the supplier and submitted to the purchaser for review & approval.
After satisfactory completion of system integration test, validation of the system shall
be carried out as per approved procedure.

5.2.4.6 Surveillance, In-service, Inspection and Testing requirements of Control System:

The package AC control system shall be designed with self diagnostics features so as to
identify and alarm the failure in the systems components from sensor to functional
module level to operator. It shall facilitate the maintenance personnel with better and
accurate level of troubleshooting capabilities for ease of operation, ease of maintenance
and be 'fit for purpose'.
In general, all instruments and instrument control systems, like Controller for Interlock,
protection function and control, Field instruments, etc. offered by contractor shall have
a well proven performance record of operating satisfactorily in the Nuclear power plant
etc. for a minimum of 8000 running hours.

5.2.4.7 Miscellaneous Characteristics :

5.2.4.7.1 Control wiring, Instrument electronic signal & alarm cables, single pair as well as
multipair shall be 0.7 - 1.5 mm solid bare/tinned annealed copper conductor EPR
insulated over all Low Halogen Low Smoke (LHLS) PVC sheathed instrumentation &
control cables shall be used. The selection of the cable core diameters shall match the
terminal block of the control system. Individual & overall shielded cables shall be used.

Instrument cables and cable trays should be physically separated from power cables and
power cable trays. Standard for cabling, Cabling practice and interface shall be

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 30 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

complied. Separate cables shall be used for Analog/Contact signal & binary (0V & 24
V) signals. The analog signal of two loop shall not be shared in the same pair of wires.

5.2.4.7.2 Suitable cable as per system requirements shall be used for inputs and outputs wiring.
The field signal cable shall be terminable on terminal blocks. All the instruments &
control equipment shall be provided with proper metallic tag as per numbering
procedure.

5.2.4.7.3 Shields catering to various signals shall be grounded. The control system ground shall
be connected to electronic earthpit.

5.2.4.7.4 Painting requirements of the equipments shall be as per the detailed painting
specification submitted as part of main plant job specification.

5.2.4.7.5 Impulse tubing (Stainless Steel or suiting the process condition, 10mm./12mm) shall be
suitably used ensuring the transportation lag of the process variable to the primary
sensing elements. S.S. tubes shall be terminated by using approved make of leak tight
fitting at the instrument end and welded at the sampling end and in between..Impulse
tubing shall be laid in galvanized light channel trays with SS/chrome clamps at regular
distance.
All the instruments shall be mounted on instrument support stand (No instrument shall
be mounted on process pipes and supports). The redundant structure shall be mounted
on independent structures in the field having adequate physical separation.

5.3 Interfaces/Terminal points:

5.3.1 Interface with other control system.


5.3.1.1 Interface with main plant system.
5.3.1.1.1 There shall be no interface provided with main plant system for package AC system. It
shall be local dedicated control only.
5.3.1.2 Associated process system shall be monitored & controlled through dedicated package
AC control system.
5.3.2 Motor running indication /Auto start/ Trip signal shall be hardwired between control
system and MCC. Contact interface shall be through interposing relays having dry type
contacts. The process interlock will be implemented in control system. MOV open /
close Command and MOV status indication shall be provided for Interlock /shutdown
in package AC control system based on P&ID.

5.4 Control system operation:

Package AC system shall be monitored & controlled locally from Local Control Panel.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 31 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

5.5 Power supply requirement:

Control power supplies (CPS) shall be of 24 VDC, 220 VDC and 240 VAC levels.
Power supplies for the sensors and contact interrogation voltage for the discrete sensors
shall be designed to be fed from the control system unless otherwise specified. The
interrogation supply voltage shall be 24 VDC and power supply voltage shall be 240
VAC for control equipments and displays.
Inload power supply for control panel & instruments are to be generated from 415VAC
Power supplies to meet the voltage level requirements.

6.0 ELECTRICAL REQUIREMENTS

6.1 General

6.1.1 This specification covers major aspects of design, manufacture, supply, installation,
testing and commissioning of Ventilation & Air conditioning system for buildings
included as part of Mechanical specification.
6.1.2 6.1.2 The equipment shall conform to this specification, enclosed data sheets and
technical specifications.

6.1.3 In case of conflict between requirements specified in various documents, the most
stringent requirements shall apply.

6.1.4 The Electrical scope of work for Ventilation & Air conditioning has been described in the
scope of work. However, all the electrical items / equipments, even if not defined here,
but required for completion & commissioning of the Ventilation & Air conditioning
system shall be included in the vendors scope.

6.1.5 For Air conditioning system and ventilation system, separate Power Distribution Board
(PDB) shall be provided by vendor in each AC Plant Room/AC Package Room, &
Ventilation Room for the buildings included as part of the Tender.

6.2 Site Conditions

The equipments offered in the package shall be suitable for continuous operation under
the following site conditions as specified in the mechanical Specifications.

Power Supply system from Main EPC Contractor

All buildings
Power supply : 415V TPN
System frequency : 50Hz
Voltage variation : 10%
Frequency variation : 5%
Combined voltage and frequency variation : 10%

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 32 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

6.3 Utilization Voltage

Motor rated upto 0.18KW : 240V, 1Ph AC


Motors rated above 0.18KW upto 200 kW : 415V, 3 ph AC
Heaters : 415V, 3 ph AC
Anti-condensation heaters(Space heaters) : 240V, 1 ph AC

6.4 Equipment specification

All equipment shall conform to attached Technical standard specification. In addition,


equipments shall conform to the additional requirements mentioned below.

6.5 Power Distribution Board

6.5.1 For air-conditioning and ventilation, EPC Contractor shall provide 2 feeders at 415V,
TPN power supply for each building i.e. at incomer of PDB..

6.5.2 In case of building having both air-conditioning and ventilation system, separate PDBs
shall be provided for air conditioning and Ventilation system

6.5.3 All PDBs shall be rated at 415V, 25kA/50kA (depending on up stream switchboard fault
level), TPN, 50Hz and shall be single front, fixed and Flush mounting type (with no rear
access requirement). The number of feeders in the PDB shall be as per the Electrical
loads where PDB is located.

6.5.4 All PDBs shall be suitable for Top Cable entry. Minimum clear space of 1000mm shall
be maintained in front of PDBs.

6.5.5 PDBs with two incomers shall have provision of manual transfer between incomer with
mechanical interlocking.

6.5.6 For Air-conditioning, all blowers shall trip and all Fire Dampers shall automatically
close on receipt of Fail-safe FIRE signal i.e normally closed but open on Fire condition
contact. This contact shall be provided by Contractor at Vendors PDB in each building.
Further distribution of fire signal to each vendors PDB (for air-conditioning system)
shall be in vendors scope.

6.5.7 LED for Space heater ON indication shall be provided for all feeders.

6.5.8 Spare feeders in PDB shall be considered as per following philosophy:

- 20% or 1 no. Whichever is maximum for motor rating up to 15 kW.


- 10% or 1 no. whichever is maximum for motors rated above 15kW up to 55kW.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 33 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

6.6 Motors

6.6.1 All LV motors shall conform to enclosed Technical specification I301.KK34.0.0.ET.TS.


PR029.

6.7 Cables

6.7.1 All power and control cables shall comply to Technical specification.I301.KK34.0.0.
ET.TS.PR061

6.7.2 Power cables used for LV motors shall be with 3 cores. The conductor size shall be
minimum 4 mm2. The conductor material for L.V. power cables shall be as below:
- Upto 16 mm cross-section : Copper
- Above 16 mm cross-section : Aluminium

6.7.3 Control cables shall be with 2.5mm2 copper conductor.

6.7.4 Outer sheath of all power and control cables shall be FRLS type.

6.8 Earthing

6.8.1 For Earthing of various equipments included in the package refer attached technical
specification for grounding and lightning installation I301.KK34.0.0.ET.TS.PR-069

6.9 Spares

6.9.1 Mandatory spares for electrical equipment for Air conditioning and ventilation systems
shall be provided as per the list included in the EPC Tender

6.9.2 Vendor shall furnish a list with unit prices for spares for Five years of normal operation
for all electrical equipment provided as part of air conditioning and ventilation systems.

6.9.3 All commissioning spares shall be included in Vendors scope.

6.10 Makes of Equipment and Components

Makes of Equipments/Components shall be selected from the approved vendor list


attached with the Tender.

7.0 INSPECTION AND TESTING REQUIREMENTS

Refer Cl 4.0 : Inspection, Testing and Examination of Technical Specification for


welding, erection, commissioning, inspection and testing (HVAC) (Doc No -
I301.KK34.0.0.OW.TS.WD010)

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 34 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

8.0 PERFORMANCE TESTING AND GUARANTEE

8.1 All the equipment covered by this specification shall be guaranteed for a period as
specified in the tender. The contractor shall guarantee that upon completion and
satisfactory commissioning and acceptance of the plant by purchaser all portions thereof
will be in accordance with requirement of this contract and will be perfect as to design,
material, workmanship etc. The contractor shall further guarantee that during the
guarantee period, he will repair all defective equipment and work and replace all defective
material furnished or installed under this contract free of cost to the purchaser.

8.2 Performance Testing for Air-conditioning System.

a. Vendor shall give three seasonal tests for (i) summer, (ii) monsoon & (iii) winter to
determine the equipment capacity and performance of the system in accordance with
applicable Standards. Period of each test shall be at least 24 hours and time for each
test will be fixed up mutually with the purchaser.

b. The vendor shall operate, test and adjust all equipment and balance the system.

c. Following test parameters shall be recorded during the performance testing for air-
conditioning system:

S.No. Parameter Unit of Test Reading


Measurement
1. Compressor
i. Operating speed RPM
ii. Power consumption at 100% load and KW/TR
at each step of capacity regulation.
2. Evaporator (for chilled water
system only)
i. Water flow rate CMH
0
ii. Water temperature - entering C
0
iii. Water temperature - leaving C
iv. Water pressure - entering kg/cm2 g
v. Water pressure -leaving kg/cm2 g
3. Condenser
i. Air/Water flow rate CMH
0
ii. Air/Water temperature - entering C
0
iii. Air/Water temperature - leaving C
iv. Water pressure entering kg/cm2 g
v. Water pressure - leaving kg/cm2 g
4. Air handling unit
0
i. Air temperature entering (D.B) C
0
ii. Air temperature entering (W.B) C

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 35 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

0
iii. Air temperature leaving (D.B) C
0
iv. Air temperature leaving (W.B) C
v. Water pressure - entering coil (In case kg/cm2 g
of chilled water coil)
vi. Water pressure - leaving coil (In case kg/cm2 g
of chilled water coil)
0
vii. Water Temperature - entering coil C
(In case of chilled water coil)
0
viii. Water Temperature - leaving coil C
(In case of chilled water coil)
ix. Blower air flow CMH
x. Blower speed RPM
xi. Blower Static/Total Pressure mm WC
xii. Blower outlet velocity m/s
xiii. Direction of rotation CW/CCW
xiv. Velocity of air across various m/s
components of air handling unit.
5. Electric motor
i. Starting current/No load current A
ii. Motor terminal current A
iii. Power factor
iv. Supply voltage Volts
v. kwh for compressor motor
6. Supply Air Grilles/ Diffusers
i. Air flow rate CMH
0
ii. Air temperature (D.B) C
0
iii. Air temperature (W.B) C
7. Room conditions
0
i. D.B.T C
0
ii. W.B.T C
iii. Differential Pressure with respect to mm WC
atmosphere/adjacent area (for
pressurized area)

d. Vendor shall bring all required testing instruments at site duly calibrated. Plant shall
be formally taken over by purchaser after witnessing the seasonal performance tests
successfully.

8.3 Performance Testing for Ventilation System.

1. The vendor shall operate, test and adjust all equipment and balance the system.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 36 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

2. Following test parameters shall be recorded during the performance testing for air-
conditioning system:

S.No. Parameter Unit of Test Reading


Measurement
1. Fans
xv. Blower air flow CMH
xvi. Blower speed RPM
xvii. Blower Static/Total Pressure mm WC
xviii.Blower outlet velocity m/s
xix. Direction of rotation CW/CCW
xx. Velocity of air across various m/s
components of air handling unit.
2. Electric motor
vi. Starting current/No load current A
vii. Motor terminal current A
viii. Power factor
ix. Supply voltage Volts
x. kwh for compressor motor
3. Supply Air Grilles/ Diffusers
iv. Air flow rate CMH
0
v. Air temperature (D.B) C

8.4 Guarantees

The vendor guarantees that all equipment and accessories shall meet the design and
operating conditions throughout the year, as specified in this specification and Job
Specification/Data Sheet.

9.0 SPARE PARTS

Vendor shall submit list of spare parts with recommended quantities and itemised prices
for first five (5) years of operation of the equipment. Proper coding and referencing of
spare parts shall be done so that later identification with appropriate equipment is
facilitated.

Recommended spares and their quantities should take into account related factors of
equipment reliability, effect of equipment downtime upon production or safety, cost of
parts and availability of vendor's service facilities around the proposed location of
equipment.

Vendor shall also submit a list of commissioning spares with quantities. The
commissioning spares shall be sufficient for trouble free commissioning of the system at
site. Any commissioning spare required during commissioning, over and above, the
commissioning spares supplied, shall be made available by the vendor without any cost

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 37 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

and time implication to purchaser. If for any reason during commissioning vendor needs to
utilise spares from five (5) years operation spares, the same shall be replenished by
vendor within a reasonable time without any cost implication to purchaser. Any unused
commissioning spares shall be handed over to owner.

Mandatory Spares:- Vendor shall supply the following mandatory spares for each system:

S. No. Item Description Qty.


One full charge of refrigerant along with storage
1. 1 Set
cylinder/s
Mandatory spares as defined
2. Mandatory spares for Electrical
in Electrical specifications.
Mandatory spares as defined
3. Mandatory spares for Instrumentation in Instrumentation
specifications.

Special tools and tackles:- Vendor shall provide one set of following special tools &
tackles as a minimum for operation & maintenance of Air-conditioning plant. One entire
set shall be considered for each building.

S.No. Item Description Qty.

1. Flaring Tools up to 3/4" (19 mm) Size One Set


2. Gas Charging manifold with Cylinder Adopter One Set
3. Halide Leak Detector One
4. Digital Psychrometer One
Pressure Gauge 0-300 PSI and Compound
5. Gauge 30" Vacuum-150 PSI for Refrigerant One Set
Line
6. Digital Anemometer One
7. Pitot Tube One

10.0 SPECIAL CLEANING, PROTECTION AND PAINTING

10.1 All the equipments shall be neatly finished. All exposed metal surfaces shall be smooth
and free from burrs. Finished surface shall be protected against corrosion and mechanical
damage. Surface preparation and painting shall be done as per Job specification for Shop
and Field Painting (Doc. No.-A209-0642-PT-A12).

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 38 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

10.2 All carbon steel external surfaces including structural supports shall be thoroughly cleaned
to remove scales rust etc by using brushing or shot / sand blasting as required.

10.3 Interior surfaces of all vessels shall be cleaned of all scales rusts and foreign matter by
sand blasting. There after immediately suitable protective coating shall be applied on it.

10.4 Before the equipment are closed, they shall be carefully checked to ensure that all
extraneous matters such as rags, tools, rubbish, foreign matter, loose scale and dirty weld
rod stubs, bolts etc. have been removed. After the interior is cleared and dried by blowing
hot air all opening shall be closed with blank flanges, caps etc. to prevent entry of water,
dirt or any other foreign material.

11.0 PACKING AND SHIPMENT

All equipment / material shall be protected for inland transport to Site and outdoor storage
during transit and at the Site, strictly according to the instructions give in this
Specification. The Vendor shall pack the Equipment and spares at his own cost
sufficiently and properly to ensure that they are free from loss or damage while in transit
to the ultimate destination. The Vendor shall be responsible for any damage to the item
during transit and storage in all climatic conditions due to improper and inadequate
packing.

Only packages constructed out of sound material and of dimensions, proportional to the
size and weight of contents shall be used. Each package shall be limited to the size and
weight that are permissible under existing sea/rail/road transport limitations as the case
may be.

Bundled materials shall be strapped rigidly with steel band over the protective covering.
Loose material, e.g. bolts, nuts, etc shall be packed in gunny bags sealed in polythene bags
with proper tagging.

All flanges and similar surfaces which are prone to scratching shall be provided with
either metal or wooden caps (to suit material of equipment) bolted in place. Metal caps
should have a minimum thickness of 3mm and wooden caps should be made from two
layers of wood, each of 10mm thickness, nailed together with the grain of each layer
located at right angles to the other. All openings in the Equipment shall be tightly covered,
plugged or capped to prevent foreign material from entering.

In the case of large and bulky equipment, the Vendor shall be responsible for ascertaining
transport limitations and supply the Equipment in the minimum number of components or
sub-assemblies, within the frame work of transport limitations. Wherever necessary,
proper arrangement for attaching slings for lifting shall be provided on the packages.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 39 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

The contents of the packages (Packing slip) shall be sealed in thick polythene sheets and
all the inside walls of the packages shall be lined with water proof paper to protect the
Equipment from damage due to dust and moisture.

All Equipment shall be protected for the entire period of dispatch, storage and erection,
against corrosion, incidental damage due to vermin, sunlight, rain, high temperature,
humid atmosphere, rough handling in transit, and storage in the open including possible
delays in transit. All machined and plated parts shall be protected with anti-rust grease.
Precautions shall be taken to protect shafts and journals where they rest on wooden or
other supports likely to contain moisture, at such points, wrappings impregnated with anti-
rust composition or vapor phase inhibitors shall be used. These shall have sufficient
strength to resist cutting and indentation due to the protective wrappings and impregnation
shall last for a minimum period of three months.

Instrument connections shall be plugged with suitable caps to avoid ingress of dust and
moisture during shipment and storage. Silica gel or approved equivalent moisture
absorbing material in small cotton bags shall be placed and tied at various points on the
Equipment, in package wherever necessary.

Adequate provision of skids or pallets shall be made to keep the packages above the
collecting drainage. Crates and other large containers should have drain holes in the
bottom to prevent collection of water within the packing. This is especially important
where the cargo itself is subject to condensation (cargo sweat).

All cases, where applicable, shall be provided with suitable cut outs, closed by blotted
wooden planks to facilitate inspection by customs authorities. Water proof transparent
papers shall be provided at the cutout locations to prevent water ingress into the casing
through the cutout.

Each crate or package shall contain a packing list in a water proof envelope. Copies of the
packing list, in triplicate, shall be forwarded to NPCIL prior to dispatch. All items of
materials shall be clearly marked for easy identification.

All spare, if any, shall be packed and treated for long storage conditions at Site. NPCIL
may require inspecting and approving the packing before the items are dispatched.
However, the Vendor shall be entirely responsible for ensuring that the packing is suitable
for the mode of shipment and such inspection will not exonerate the Vendor from any loss
or damage due to faulty packing.

Any material found short inside the intact packing cases shall be supplied by the Vendor at
no extra cost to NPCIL. All packing cover and packing material shall become the property
of NPCIL.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 40 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

12.0 TRAINING FOR NPCIL O&M PERSONNEL

The supplier shall impart the training covering O&M requirement and other safety aspects
of the ventilation and air-conditioning system to NPCIL O&M personnel through
experienced and technically competent engineers.

13.0 SERVICING REQUIREMENTS

Supplier shall have the ventilation and air-conditioning system /equipment servicing
centre in India to take care of servicing / overhauling requirements, if any.

14.0 DATA / DOCUMENTS TO BE SUBMITTED (VENDOR DATA REQUIREMENT)

Vendor Data Requirement provides minimum list of documents to be submitted. Review/


information category documents listed shall be taken as guidance. However, approved
Document Control Index (DCI), including all required deliverables for completion of
Bidders scope of work, shall be governing.

The following Data marked shall be furnished by Vendor

Final
After order
Docume-
placement
With nts
S. No. Description
Bid For For For
Review Infor- Records
mation
1 2 3 4 5 6
1. Document Control Index (DCI)
2. List of deviations to specifications ( if any)

3. Design Basis
HVAC heat load and ventilation air quantity
4.
calculations.
5. Equipment Schedule and selection details
Filled-in equipment Data sheet with
6. selection/deration sheet for design parameters and
GA drawing.
7. P&IDs and PFDs for Ventilation and air-
conditioning system, Instrumentation and control
philosophy
Description of the standard shop inspection and
8. quality control procedures of the manufacturer

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 41 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Final
After order
Docume-
placement
With nts
S. No. Description
Bid For For For
Review Infor- Records
mation
1 2 3 4 5 6
Duct /Piping layout drawings and Equipment layout
9.
drawings
10. Detailed fabrication drawing, Bill of Material, Name
plate description, Elementary drawing
11. General arrangement of local control panel, panel
drawing, cable schedule
12. Equipment load data and foundation plan
13. Test certificates for
i) Materials and all standard products.
ii) Non destructive test
iii) Hydrostatic test
iv) Performance test
v) Field leakage test procedures
vi) Other test reports as required
14. Battery limits (interface) dwg. / information.

15. Utility requirements including power consumption

16. Detail of wiring diagram, interlock/ shutdown/


control scheme with write up on operation.
17. Itemised list of spares for two years of normal
operation.
18. List of commissioning and start up spares.

19. List of Mandatory spares.

20. List of Special tools and tackles.

21. Installation, commissioning, operation, maintenance


and spares manual.
22. Performance guarantee test procedure at site

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 42 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Final
After order
Docume-
placement
With nts
S. No. Description
Bid For For For
Review Infor- Records
mation
1 2 3 4 5 6
23. Storage instructions

24. Load data as per enclosed format


25. Switch-Boards ( PDB)
i) Single Line Diagrams
ii) Dimensional/Assembly Drawings
a. GA Drawings
b. Installation Plan/Mounting Details
c. Cross Sectional View
d. Cubical Arrangement Drawing
iii)Electrical Wiring Drawings
a. Control Schematics & Wiring Diagrams
b. Interpanel Wiring Diagram And Terminal Details
26. Motors
GA and Terminal Box Details
Completed Motor Data Sheets
Performance Curves

a. Speed Torque Curves


b. Speed-Current/Time curves
c. Thermal Withstand Curves ( Hot & Cold)
d. Pf & Efficiency Curves
27. Test Record ( For all Electrical Items)
28. Equipment Layout
29. Cable Layout
30. Data Book/Manual

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 43 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

Final
After order
Docume-
placement
With nts
S. No. Description
Bid For For For
Review Infor- Records
mation
1 2 3 4 5 6
31. As built drawing & documents
32. Construction completion certificate
33. Project schedule and network

Vendor to also submit the documents as listed in Cl 8.1.1 of Technical Specification of


Ducting Systems (HVAC) (Doc No - I301.KK34.0.0.OW.TS.WD008) before
commencement with testing and balancing for commissioning

15.0 QUALITY ASSURANCE PLAN

The QA plan of the work clearly showing the NPCIL hold points, review points of
vendor has to be submitted along with the offer. Quality assurance plan for the work
covered by this specification shall be as per the NPCIL approved QAP.

16.0 LIST OF ABBREVIATIONS

AC Air-Conditioning
ACH Air Change per Hour
AERB Atomic Energy Regulatory Board
AHU Air Handling Unit
AMCA Air Movement and Control Association
ASME American Standards for Mechanical Engineers
ASTM American Society for Testing and Materials
BS British Standards
DX Direct Expansion
GI Galvanised Iron
GUI Graphical User Interface
HEPA High Efficiency Particulate Air
I &C Instrumentation & Control
IS Indian Standard
ISO International Organisation for Standardization
KKNPP Kudankulam Nuclear Power Project
LCC Local Control Cubical

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 44 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

NFPA National Fire Protection Association


NPCIL Nuclear Power Corporation of India Limited
PLC Programmable Logic Control
PMS Piping Material Specification
SMACNA Sheet Metal and Air-conditioning Contractors National Association
SIL Safety Instrument Level
TLCS Top Level Control System
UL Underwriters Laboratories
ULCS Upper Level Control System

17.0 REFERENCES AND ATTACHMENTS

Sl. .No. Description Document No. Rev.


1. Datasheet of Ventilation and Air- I301 KK34 0 0 OW DS WD001
conditioning Systems of NPCIL design
scope of plant buildings
2. Technical Specification of Air I301.KK34.0.0.OW.TS.WD006
Handling Unit (HVAC)
3. Technical Specification of Air Filters I301.KK34.0.0.OW.TS.WD007
(HVAC)
4. Technical Specification of Ducting I301.KK34.0.0.OW.TS.WD008
System (HVAC)
5. Technical Specification of Dampers I301.KK34.0.0.OW.TS.WD009
(HVAC)
6. Technical Specification for welding, I301.KK34.0.0.OW.TS.WD010
erection, commissioning, inspection and
testing (HVAC)
7. Technical Specification of I301.KK34.0.0.OW.TS.WD011
Centrifugal Fans (HVAC)
8. Technical Specification of Axial Fans I301.KK34.0.0.OW.TS.WD012
(HVAC)
9. Basic ventilation and air-conditioning As per Table attached in Cl
scheme inside building 1.1.2 of this specification
10. LV Motor data sheet I301.KK34.0.0.ET.TS.PR028
11. Technical specification for grounding I301.KK34.0.0.ET.TS.PR-069
& Lightning installation.
12. Tech spec for 415 V MCCs I301.KK34.0.0.ET.TS.PR-055
13. Tech spec for 415 V Motors I301.KK34.0.0.ET.TS.PR-029
14. Tech spec for MV & LV Cables and I301.KK34.0.0.ET.TS.PR-061
accessories
15. Tech spec for Cabling Installation I301.KK34.0.0.ET.TS.PR075.
16. Inspection and test plan for MV fixed 6-81-1012 0
type Switch Board for package
equipment

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 45 OF 45


TECHNICAL SPECIFICATION & SCOPE OF WORK FOR REV. NO. : R0
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 10.09.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

17. Inspection and test plan for MV 6-81-1032 2


motors
18. Inspection and test plan for HV & 6-81-1051 2
MV cables and accessories
19. Typ. Earth plate fixing details. 7-51-0103 5
20. Electrical load Data Format(Typical) 1650-1281
21. Job specification for Shop and Field A209-0642-PT-A12
Painting

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 1 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

ANNEXURE-1

LIST OF BUILDINGS COVERED IN ELECTRICAL AREA PACKAGE :

1. 0 UAB - 400 KV GIS SUB-STATION


2. 0 UAC - SWITCHYARD CENTRAL CONTROL BUILDING
3. 0 UAD - 220 KV GIS BUILDING
4. 01/02/03 UBG - POWER SUPPLY BUILDING

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 2 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Notes :

1. Bidder to crosscheck the estimated plant capacity in his own interest before accepting the quantities given in the
table below. However, minimum capacity of the plant shall be as indicated in this table. Bidder shall guarantee the
inside conditions throughout the year irrespective of variation in outside weather condition and/or inside heat
loads.

2. The air-conditioning loads and air quantities provided in the table are tentative and liable to change during detailed
engineering. Detailed AC load and air quantity calculations are to be done by contractor during detailed engineering
to maintain the indoor conditions provided in the table. However value provided in the table are minimum to be
considered by the contractor for Ventilation and Air-conditioning equipment selection and further downstream
engineering (ducting, piping etc. design).

3. Minimum air changes to be considered for air quantity are provided in the table below. However, where temperature
conditions are to be maintained as per the table provided below, fresh air/outdoor air quantities shall be calculated
based on both of these conditions (ACPH basis and temp. basis) and higher of the two shall be used for used for
equipment selection.

4. Above notes shall be applicable for all buildings.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 3 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

1.0 0 UAB - 400 KV GIS SUB-STATION

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH) Duty humidifi Air
(0C) (0C) nt Heat ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Basement Plan - (Level : -5.00)
Conductor Room - 1 34 60 - - NA 5 - 6 2866 - - - 2866
Conductor Room 2 34 60 - - NA 5 - 6 3152 - - - 3152
Ground Floor Plan - (Level : 0.00)
34 60 Ambie - Not Available 5 - 3 108400 - - - 108400
GIS Switch gear
nt+50
room
C
Stationary Fire- 34 60 - - NA 5 - 2 440 - - - 440
extinguishing
installations control
point room
Corridor @ El 0.00 m 34 60 - - NA 5 - 2 205 - - - -
Stock Room 34 60 - - NA 5 2 - - - - 90
Toilet 34 60 - - NA 5 - 10 - - - 450
Mezzanine Floor Plan - (Level : 3.60)
Power distribution 34 60 - - NA 5 - 6 450 - - - 450
centre room
Corridor @ El 3.60 m 34 60 - - NA 5 - 2 120 - - - -

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 4 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH) Duty humidifi Air
(0C) (0C) nt Heat ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Exhaust ventilation 34 60 - - NA 5 - - - - - - 1280
compartment
First Floor Plan - (Level : 7.20)
Ventilation 34 60 - - NA 5 - 2 1280 - - - 1280
Equipment Room
Foreman's Room 34 60 - - NA 5 - 2 310 - - - 310
Corridor @ El 7.20 m 34 60 - - NA 5 - 2 250 - - - 250

Equipment Selection :
- 0 SAZ54 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 6100 CMH for Conductor Rooms
- 0 SAZ34 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 2900 CMH for Conductor Room - 1
- 0 SAZ35 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 3200 CMH for Conductor Room - 2
- 0 SAC47 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of capacity 54200 CMH for Switchgear room
- 0 SAC43 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 55000 CMH for Switchgear room
- 0 SAC24 AN001/../.007 & 0 SAC26 AN001/./007 14 Nos (7W + 7S) centrifugal exhaust air fans each of 72275 CMH for
switchgear room
- 0 SAC41 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 2805 CMH for Stationary fire extinguisher room, Power dist
centre, vent equipt room, foreman room and corridors

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 5 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

- 0 SAC21 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 2260 CMH for Stationary fire extinguisher room, Power dist
centre, exhaust vent chamber and stock room
- 0 SAC71 1 Nos (1W) Axial exhaust air fans of 450 CMH for lavatory.
- 0 SAC25 AN001/007 7 Nos Roof Extractors each of 5160 CMH for 400 kV Switchgear Room
- 0 SAC27 AN001/007 7 Nos Roof Extractors each of 5160 CMH for 400 kV Switchgear Room during emergency

Reference :
1. Architectural Drawing : I301.KK34.0UAB.0.AR.OK.WD101. Sheet 1 to 4
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UAB.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 6 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

2.0 0 UAC - Switchyard Central Control Building

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
DB RH DB RH Panel/Equipme W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) nt Heat (ACPH (CMH Duty humidifi Air
(0C) (0C) Dissipation ) ) (TR) ed Air (CMH)
Load (KW) Qty.
(CMH)
Basement Plan - (Level : -3.60)
34 60 - NA 5 - 2 670 - - - 670 /
Cable Room - 1 -
15110
34 60 - NA 5 - 2 670 - - - 670 /
Cable Room - 2 -
15110
34 60 - NA 5 - 2 1200 - - - 1200 /
Cable Room - 3 -
13230
34 60 - NA 5 - 2 570 - - - 570 /
Cable Room - 4 -
13500
34 60 - NA 5 - 2 560 - - - 560 /
Cable Room - 5 -
14960
Tambour - 1 34 60 - - NA 5 - - 1000 - - - -
Tambour - 2 34 60 - - NA 5 - - 1000 - - - -
Ground Floor Plan - (Level : 0.00)
Relay Panel Room 34 60 <250C 50+5 18 5 - - 4200 10.3 4200 0 3990

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 7 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
DB RH DB RH Panel/Equipme W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) nt Heat (ACPH (CMH Duty humidifi Air
(0C) (0C) Dissipation ) ) (TR) ed Air (CMH)
Load (KW) Qty.
(CMH)
Switchyard control 34 60 3 5 - - 310 6.2 3120 2810 -
<250C 50+5
room
34 60 80 5 - - 18450 30.6 18450 0 18200
Auxiliary Switchgear <250C 50+5

Monitoring and 34 60 1 5 - - 220 1.2 590 370 -


0
control system <25 C 50+5
compartment
Meeting room 34 60 <260C 50+5 NA 5 - - 110 0.5 220 110 -
Hall 34 60 <250C 50+5 NA 5 - - 150 0.3 150 - -
Rest Room 34 60 <260C 50+5 NA 5 - - 60 0.4 180 120 -
Toilet 34 60 - - NA 5 - 10 504 - - - 504
First Floor Plan - (Level : 4.20)
Repair & 34 60 Not Available - 1350 4.8 1950 600 600
Maintemance <250C 50+5 5 -
workshop
Laboratoty 34 60 <280C 50+5 Not Available 5 - - 765 2.9 1165 400 400

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 8 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
DB RH DB RH Panel/Equipme W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) nt Heat (ACPH (CMH Duty humidifi Air
(0C) (0C) Dissipation ) ) (TR) ed Air (CMH)
Load (KW) Qty.
(CMH)
Communication 34 60 Not Available - 285 0.8 365 80 80
<250C 50+5 5 -
Room
Battery Storage 34 60 Not Available - 2370 3.2 2370 0 2570
<250C 50+5 5 -
Room - 1
Battery Storage 34 60 Not Available 5 - - 2330 3.2 2330 0 2540
<250C 50+5
Room - 2
Acid Room - 1 34 60 <250C 50+5 NA 5 - 12 225 0.3 225 0 275
Acid Room - 2 34 60 <250C 50+5 NA 5 - 12 220 0.3 220 0 270
Tambour 34 60 <250C 50+5 NA 5 - - 0 0.7 500 0 0
Store Room - 1 34 60 - - NA 5 - 2 - - - - 173
Store Room - 2 34 60 - - NA 5 - 6 - - - - 173
Ventilation 34 60 - NA 5 - - 1300 - - - 1300
-
Compartment
Compartment of 34 60 - NA 5 - - 685 - - - -
-
inflow ventilation
Compartment of 34 60 - NA 5 - - - - - - 240
-
exhaust ventilation

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 9 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
DB RH DB RH Panel/Equipme W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) nt Heat (ACPH (CMH Duty humidifi Air
(0C) (0C) Dissipation ) ) (TR) ed Air (CMH)
Load (KW) Qty.
(CMH)
Toilet 34 60 - - NA 5 - 10 - - - - 432

Equipment Selection :

- 0 SAZ90 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 20000 CMH for tambour
- 0 SAZ44 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 3670 CMH for cable rooms
- 0 SAZ24 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 3670 CMH for cable rooms
- 0 SAC76 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1282 CMH for Lavatory at El 0.00 & 4.20 and storerooms
- 0 SAC03 AN001//004 22 TR X 4 Nos. Air -cooled PU (2W + 2S) each of 9000 CMH (min) capacity for Auxiliary switchgear and
relay panel room
- 0 SAC73 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 22190 CMH for Auxiliary switchgear and relay panel room
- 0 SAC02 AN001/002 8.5 TR X 2 Nos. Air-cooled PU (1W+1S) each of 4260 CMH (min) capacity for Control monitoring system,
switchyard control room,meeting room, rest room and hall
- 0 SAC60 AN001/002 8.5 TR X 2 Nos. Air -cooled PU (1W+1S) each of 3480 CMH (min) capacity for Repair and maintenance w/s,
laboratory and communication room
- 0 SAC74 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1320 CMH for for Repair and maintenance w/s, laboratory,
communication room and compartment of exhaust ventilation
- 0 SAC69 AN001/002 8.5 TR X 2 Nos. Air -cooled PU (1W+1S) each of 6330 CMH (min) capacity for battery room and acid room with
OW/01 September, 2012
NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 10 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

tambour
- 0 SAC76 AN001 1 Nos (1W) Centrifugal fans each of 500 CMH bypass of Package units
- 0 SAC75 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 5655 CMH for Battrey room and acid storage room
- 0 SAZ80 AN001/002 2 Nos of Roof Extractors each of 14400 CMH for Cable Rooms.
- 0 SAZ80 AN003/004 2 Nos of Roof Extractors each of 12930 CMH for Cable Rooms.
- 0 SAZ80 AN005 1 Nos of Roof Extractors of 12030 CMH for Cable Room.

Reference :
1. Architectural Drawing : I301.KK34.0UAC.0.AR.OK.WD101. Sheet 1 to 3
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UAC.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 11 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

3.0 0 UAD - 220 kV GIS Building

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Basement Plan - (Level : -4.20)
Conductor Room 34 60 - - Not Available 5 - 6 2200 - - - 2200
Cable Room 34 60 - - Not Available 5 - 6 1850 - - - 1850
Corridor 34 60 - - NA 5 - - - - - 9300
Air-lock Room 34 60 - - NA 5 - - 10530 - - -
Ground Floor Plan - (Level : 0.00)
34 60 Ambie - Not Available 5 - 4/8# 33750 - - - 33750
GIS Switchgear room
nt+50C
Power distribution 34 60 - 5 - 6 450 - - - 450
-
centre room

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 12 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Stationary fire 34 60 - - 5 - 4 830 - - - 830
extinguishing
-
installation control
point room
GIS Bottle storage 34 60 - 5 - 4/8# 345 - - - 345
- NA
room
Vestibule 34 60 - - NA 5 2 138 - - - -
First Floor Plan - (Level : 3.60)
Store Room 34 60 - - NA 5 2 340 - - - 340
Foreman's Room 34 60 - - NA 5 2 415 - - - 415
Ventilation 34 60 - 5 2 300 - - - 300
- NA
Equipment Room
Second Floor Plan - (Level : 7.20)

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 13 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Ventilation 34 60 - 5 - - 470 - - - 470
- NA
Equipment Room -1
Ventilation 34 60 - 5 - 310 - - - 310
- NA
Equipment Room -2
Ventilation 34 60 - 5 - 160 - - - 160
- NA
Equipment Room -3

# - During normal ventilation 4 ACPH is to be maintained and during emergency 8 ACPH is to be maintained.

Equipment Selection :

- 0 SAZ52 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 2200 CMH for Conductor room
- 0 SAZ32 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 2200 CMH for Conductor Room
- 0 SAZ53 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 1850 CMH for Cable Room

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 14 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

- 0 SAZ33 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 2010 CMH for cable room and ventilation equipment room
- 0 SAZ93 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 10530 CMH for Air lock lobby
- 0 SAC46 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 34565 CMH for Switchgear room, GIS bottling room and vent
equipment room
- 0 SAC68 AN001/./006 6 Nos (6W) Axial flow supply air fans each of 5625 CMH for switchgear room in emergency condition
- 0 SAC64 AN001/002/003 & 0 SAC66 AN001/002/003 6 Nos (3W + 3S) Centrifugal exhaust air fans each of 7410 CMH for switchgear
room during emergency
- 0 SAC45 AN001 1 Nos (1W) Dry type AHU for supply, of 345 CMH for GIS bottle storage during emergency condition
- 0 SAC44 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 2473 CMH for power dist centre, stationary fire extinguisher room,
vestibule, vent equip room, foreman room and storeroom
- 0 SAC63 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1590 CMH for stationary fire extinguisher, power dist centre and
vent equipt room
- 0 SAC62 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 690 CMH for GIS bottle
store room
- 0 SAC65 AN001/003 3 Nos Roof Extractors each of 3700 CMH for 220 kV Switchgear Room
- 0 SAC67 AN001/003 3 Nos Roof Extractors each of 3700 CMH for 220 kV Switchgear Room
during emergency
- 0 SAZ81 AN001 1 Nos Roof Extractors of 9300 CMH for smoke removal from corridor.

Reference :
1. Architectural Drawing : I301.KK34.0UAD.0.AR.OK.WD101. Sheet 1 to 3
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UAD.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 15 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

4.0 01/02/03 UBG - Power Supply Building

Outside Design Inside Design Electrical PanelLighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Area Description Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Basement Plan - (Level : -3.60)
Cable Compartment - 34 60 - Not available 5 - 1 / 15# 130 / - - - 130 /
- 2030 2030
1
Cable Compartment - 34 60 - Not available 5 - 1 / 15# 160 / - - - 160 /
- 2030 2030
2
Cable Compartment - 34 60 - Not available 5 - 1 / 5# 135 / - - - 135 /
- 660 660
3
Cable Compartment - 34 60 - Not available 5 - 1 / 5# 150 / - - - 150 /
- 660 660
4
Cable Compartment - 34 60 - Not available 5 - 6 1550 - - - 1550
-
5

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 16 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Cable Compartment - 34 60 - Not available 5 - 6 600 - - - 600


-
6
Cable Compartment - 34 60 - Not available 5 - 6 780 - - - 780
-
7
Cable Compartment - 34 60 - Not available 5 - 1 / 5# 130 / - - - 130 /
- 660 660
8
Cable Compartment - 34 60 - Not available 5 - 1 / 5# 150 / - - - 150 /
- 660 660
9
Cable Compartment - 34 60 - Not available 5 - 1 / 15# 135 / - - - 135 /
- 2030 2030
10
Cable Compartment - 34 60 - Not available 5 - 1 /15# 150 / - - - 150 /
- 2030 2030
11
Cable Compartment - 34 60 - Not available 5 - 5 360 - - - 360
-
12
Cable Compartment - 34 60 - Not available 5 - 5 360 - - - 360
-
13
Cable Compartment - 34 60 - Not available 5 - 5 210 - - - 210
-
14
Corridor -1 34 60 - - NA 5 - - - - - - 10000
Corridor -2 34 60 - - NA 5 - - - - - - 10000
Air Lock Room -1 34 60 - - NA 5 - - 10000 - - - -
Air Lock Room -2 34 60 - - NA 5 - - 10000 - - - -
Ventilation Centre 34 60 - NA 5 - - - - - - 60
-
room -1

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 17 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Ventilation Centre 34 60 - NA 5 - - 135 - - - -


-
room -2
Ventilation Centre 34 60 - NA 5 - - 30 - - - -
-
room -3
Ventilation Centre 34 60 - NA 5 - - - - - - 156
-
room -4
Ground Floor Plan - (Level : 0.00) - Double Height.-
6 kW Common 34 60 Not available 5 - - 840 / 2.1 840 / - 840 /
Station Auxiliary 1420# 1420 1420
<250C 50+5
Switchgear
compartment - 1
6 kW Common 34 60 Not available 5 - - 850 / 2.1 850 / - 850 /
Station Auxiliary 1430# 1430 1430
<250C 50+5
Switchgear
compartment - 2
6 kW Common 34 60 Not available 5 - - 4740 11.5 4740 - 4740
Station Auxiliary
<250C 50+5
Switchgear
compartment - 3
6 kW Common 34 60 Not available 5 - - 840 / 2.1 840 / - 840 /
Station Auxiliary 1420# 1420 1420
<250C 50+5
Switchgear
compartment - 4

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 18 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

6 kW Common 34 60 Not available 5 - - 850 / 2.1 850 / - 850 /


Station Auxiliary 1430# 1430 1430
<250C 50+5
Switchgear
compartment - 5
Corridor 34 60 - - NA 5 - - - - - - 20000
34 60 Ambie - Not available 5 - - 390 1.1 390 - 390
Power distribution nt+50C
centre compartment

34 60 Ambie - Not available 5 - - 80 0.3 80 - 80


Stationary installation nt+50C
control unit
compartment

34 60 Not available 5 - - 480 0.7 480 - 480


Ventilation chamber <250C 50+5
Lock Room -1 34 60 - - NA 5 - - 10000 - - - -
Lock Room -2 34 60 - - NA 5 - - 10000 - - - -

# - X / Y, where X is during normal operation and Y is during emergency operation.

Equipment Selection :

- 0 SAZ47 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 5185 CMH for Cable compartments in Mode-I operation
(during normal condition)
- 0 SAZ48 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 5770 CMH for Unit - 3 cable compartments during Mode-

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 19 OF 19


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN ELECTRICAL REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

II operation (during emergency ventilation)


- 0 SAZ49 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 5380 CMH for Unit - 4 cable compartments during Mode-
II operation (during emergency ventilation)
- 0 SAZ27 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 5150 CMH for Cable compartments in Mode-I operation
(during normal condition)
- 0 SAZ28 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 5740 CMH for Unit-3 cable compartments during Mode-
II operation (during emergency ventilation)
- 0 SAZ29 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 5440 CMH for Unit-4 cable compartments during Mode-
II operation (during emergency ventilation)
- 0 SAZ91 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 40000 CMH for air-lock lobby in El - -3.6 & 0.0m
- 0 SAC57 AN001//004 22 TR X 2 Nos. Air -cooled PU (1W + 1S) each of 9070 CMH (min) capacity for 6 KW common station
auxiliaries switchgear compartment during Mode - I (normal) operation
- 0 SAC59 AN001//004 8.5 TR X 2 Nos. Air -cooled PU (1W + 1S) each of 2930 CMH (min) capacity for Unit -4 6KW common
station auxiliaries switchgear compartment during Mode - II (emergency) operation
- 0 SAC58 AN001//004 8.5 TR X 2 Nos. Air -cooled PU (1W + 1S) each of 3240 CMH (min) capacity for Unit -3 6KW common
station auxiliaries switchgear compartment during Mode - II (emergency) operation
- 0 SAC37 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 8880 CMH for 6KW common station auxiliaries
switchgear compartment in Mode-I operation (during normal condition)
- 0 SAC39 AN001 1 Nos Roof Extractors of 1160 CMH for 6 kV switchgear compartment in Mode II (during emergency).
- 0 SAZ82 AN001 1 Nos Roof Extractors of 20000 CMH for Smoke removal from corridor .
- 0 SAZ83 AN001 1 Nos Roof Extractors of 20000 CMH for Smoke removal from corridor .
- 0 SAZ38 AN001 1 Nos Roof Extractors of 1160 CMH for 6 kV switchgear compartment in Mode II (during emergency).

Reference :
1. Architectural Drawing : I301.KK34.0UBG.0.AR.OK.WD101. Sheet 1 to 2
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UBG.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 1 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

ANNEXURE 2

LIST OF BUILDINGS COVERED IN MAIN PLANT AREA PACKAGE :

1. 0 UQR CHILLER BUILDING


2. 0 UTF COMPRESSOR BUILDING
3. 0 UPK CHLORINATION PLANT
4. 0 3UGF FIRE-FIGHTING SERVICE WATER PUMP STATION
5. 01/02 UGH STORM WATER PUMP HOUSE 1 & 2
6. 05,6 UAZ VENTIATION CENTRE FOR BUS DUCT TUNNEL
7. 01 UGM OIL CONTAINING WATER TREATMENT PLANT
8. 01 UGG DOMESTIC WATER TREATMENT BUILDING
9. 0 UKU CONTROL ACCESS AREA CENTRAL WORKSHOP
10. 0 USV ENGINEERING UTILITY AND LABORATORY BUILDING
11. 0 UYB HEALTH PHYSICS BUILDING (CONTROLLED ACCESS AREA)

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 2 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Notes :

1. Bidder to crosscheck the estimated plant capacity in his own interest before accepting the quantities given in the
table below. However, minimum capacity of the plant shall be as indicated in this table. Bidder shall guarantee the
inside conditions throughout the year irrespective of variation in outside weather condition and/or inside heat
loads.

2. The air-conditioning loads and air quantities provided in the table are tentative and liable to change during detailed
engineering. Detailed AC load and air quantity calculations are to be done by contractor during detailed engineering
to maintain the indoor conditions provided in the table. However value provided in the table are minimum to be
considered by the contractor for Ventilation and Air-conditioning equipment selection and further downstream
engineering (ducting, piping etc. design).

3. Minimum air changes to be considered for air quantity are provided in the table below. However, where temperature
conditions are to be maintained as per the table provided below, fresh air/outdoor air quantities shall be calculated
based on both of these conditions (ACPH basis and temp. basis) and higher of the two shall be used for used for
equipment selection.

4. Above notes shall be applicable for all buildings.

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 3 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

1.0 0 UQR CHILLER BUILDING.

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentation Load ancy air Requirement Air
DB RH DB RH Panel/Equipment W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Heat Dissipation (ACPH (CMH) Duty humidifi Air
(0C) (0C) Load (KW) ) (TR) ed Air (CMH)
Qty.
(CMH)
Basement Plan - (Level : -5.90)
Room of arrangement 34 60 - - NA 5 - 4 50000 - - - 50000 /
of pipeline 57600
Basement Plan - (Level : -2.90)
Cable Floor - 1 34 60 - - Required 5 - 12 2400 - - - 2400
Cable Floor - 2 34 60 - - Required 5 - 12 2400 - - - 2400
Ground Floor Plan - (Level : 0.00)
34 60 Ambie - 671.50 5 6 / 12# 60000 / - - - 65880 /
Chiller Room nt+50 120000 121900
C
Switch Gear Room 34 60 25+1 50+5 125.00 5 - 1 500 41 22000 21500 500
Control Room 34 60 25+1 50+5 3.49 5 - 1 60 4.8 2600 2540 -
Rooms for Personel 34 60 25+1 50+5 1.00 5 - 1 30 2.2 1200 1170 -
Room for Control 34 60 Ambie - 5 2 1200 - - - 1200
Panel of ventilation nt+50 2.00
system C
Room for ventilation 34 60 - - 5 - - 500 - - - 500
NA
centre

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 4 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentation Load ancy air Requirement Air
DB RH DB RH Panel/Equipment W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Heat Dissipation (ACPH (CMH) Duty humidifi Air
(0C) (0C) Load (KW) ) (TR) ed Air (CMH)
Qty.
(CMH)
Room for cleaning 34 60 - - 5 - 2 - - - - 72
NA
implements
Service Room 34 60 - - NA 5 - 2 - - - - 100
Toilet 34 60 - - NA 5 - 10 - - - - 360

# - Air quantity is calculated based on ACPH basis only in Chiller room. Contractor should calculate air quantity requirement based on temp also and air
quantity shall be selected based on the higher of the two. Also note that 12 ACPH shall be considered for emergency ventilation situation (like refrigerant
leakage from chillers, etc.).

Equipment Selection :

- 0 SAJ41 AN001/002/AC001/002 28 TR X 2 Nos. AHU (1W + 1S) each of 14800 CMH (min) for Switchgear room, control panel room and personnel
room
- 0 SAJ42 AN001/002/AC001/002 21 TR X 2 Nos. AHU (1W + 1S) each of 11000 CMH (min) for Switchgear room
- 0 SAJ40 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 50000 CMH for Rooms for arrangement of pipes and cable floor
- 0 SAJ20 AN003/004 2 Nos (1W + 1S) Axial exhaust air fans each of 50000 CMH for Rooms for arrangement of pipes and cable floor
- 0 SAJ40 AN003/004 2 Nos (1W + 1S) Dry type AHU for supply, each of 66500 CMH for Rooms for Chiller room, cable room & control room of vent
chamber
- 0 SAJ22 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 5300 CMH for Rooms for cable room and vent room
- 0 SAJ23 AN001 1 Nos Centrifugal exhaust air fan of 1300 CMH for control room of vent centre and service room

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 5 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

- 0 SAJ24 AN001 1 Nos (1W) Centrifugal exhaust air fans of 432 CMH for WC and cleaning implements room
- 0 SAJ20 AN001/AN002 2 Nos (1W + 1S) Axial exhaust air fans each of 65880 CMH for Chiller Room
- 0 SAJ20 AN005 1 Nos (1W) Axialexhaust air fans each of 63820 CMH for Chiller Room and rooms of pipeline during emergency operation

Reference :

1. Architectural Drawing : I301.KK34.0UQR.0.AR.OK.WD101. Sheet 1 to 5


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UQR.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 6 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

2.0 0 UTF COMPRESSOR BUILDING

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Basement Plan - (Level : -1.90)
Cable Room 1 34 60 - - Not Available 5 - 15 3500 - - - 3500
Cable Room 2 34 60 - - Not Available 5 - 15 3500 - - - 3500
Switchgear fire 34 60 - NA 5 - 15 500 - - - 500
-
extinguish room
Tunnel 0 1UTZ/1 34 60 - - NA - - - 1800 - - - 1800
Tunnel 0 1UTZ/2 34 60 - - NA - - - 1800 - - - 1800
Tunnel 0 2UTZ/1 34 60 - - NA - - - 1800 - - - 1800
Tunnel 0 2UTZ/2 34 60 - - NA - - - 1800 - - - 1800
Ground Floor Plan - (Level : 0.00)
Turbine 34 60 Ambie - Not Available 5 - 6# 40000 - - - 40000
Compartment nt+50C
34 60 Ambie - Not Available 5 - 15 14500 - - - 14500
Switchgear Room
nt+50C #
Control Room 34 60 25+1 50+5 3.49 5 - 1 - 2.5 2450 2450 -
Electric Board Room 34 60 - - 5 - 15 1700 - - - 1700

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 7 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Toilet 34 60 - - NA 5 - 10 - - - - 200
First Floor Plan - (Level : +4.80)
Room of exhaust vent 34 60 - NA 5 - - 240 - - - 240
-
centre
Room of plenum vent 34 60 - NA 5 - - 1150 - - - 1150
-
centre
Platform of exhaust 34 60 - NA 5 - - 1000 - - - -
-
vent centre

# - Air quantity is calculated based on ACPH basis only. Contractor should calculate air quantity requirement based on temp also and air quantity shall be
selected based on the higher of the two. Also note that 12 ACPH shall be considered for emergency ventilation situation (like refrigerant leakage from chillers,
etc.).

Equipment Selection :

- 0 SAS45 AN001/002/003 3 Nos. (2W + 1S) 3 TR Split AC units for Control Room
- 0 SAS46 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 7740 CMH for Rooms for cable floor room, switchgear fire extinguisher
room and room of exhaust ventilation chamber
- 0 SAZ40 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 7200 CMH for tunnel ventilation of 1 UTZ and 2 UTZ
- 0 SAS27 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7240 CMH for Rooms for cable floor room, room of exhaust ventilation

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 8 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

chamber
- 0 SAZ20 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7700 CMH for tunnel ventilation of 1 UTZ and 2 UTZ and switchgear fire
extinguisher room
- 0 SAS47 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 15650 CMH for switchgear room and room of plenum ventilation chamber
- 0 SAS28 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 15650 CMH for switchgear room and room of plenum ventilation
chamber
- 0 SAS44 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 42700 CMH for Turbine compartment, Elect board room and vent chamber
- 0 SAS24 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 41700 CMH for switchgear room and elect board room
- 0 SAS26 AN001 1 Nos (1W ) axial exhaust fans each of 200 CMH for toilet

Reference :

1. Architectural Drawing : I301.KK34.0UTF.0.AR.OK.WD101. Sheet 1 to 2


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UTF.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 9 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

3.0 0 UPK CHLORINATION PLANT

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation air Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH) Duty humidifi Air
(0C) (0C) ) (TR) ed Air (CMH)
Qty.
(CMH)
Ground Floor Plan (Level : 0.00 m)
Chlorination Plant 34 60 - - Not Available 5 - 12 - - - - 124000
34 60 Ambie 5 - 20 / 27000 / - - - 27000 /
Converter Plant nt - Required 30% 40000 40000
+50C
34 60 Ambie 5 - 15 13700 - - - 13700
$
Transformer Plant nt - 22
+50C
Cable tunnel 01 34 60 5 - - 2400 - - - 2400
- - NA
UBZ
Cable tunnel 34 60 5 - - 2400 - - - 2400
- - NA
012UBZ

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 10 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation air Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH) Duty humidifi Air
(0C) (0C) ) (TR) ed Air (CMH)
Qty.
(CMH)
Toilet 34 60 - - NA 5 - 10 - - - - 175
First Floor Plan (Level : +4.80 m)
Ambie 11000 / - - - 11000 /
Switchgear Room 34 60 nt - Required 5 - 15 / 20 17000 17000
+50C
Control Room 34 60 25+1 50+5 Required 5 - 1 95 6 3900 3900 95
Distribution centre 34 60 - 5 - 2 225 - - - 225
- Required
for fire-fighting
Master Room 34 60 26+1 50+5 - 5 6 90 2 1020 1020 90
34 60 - 5 5 590 6.6 3700 3700 300 /
Laboratory - Required
1100&
Ventilation Chamber 34 60 - - - 5 - - 160 - - - -
Corridor 34 60 - - - 5 - 95 - - - -

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 11 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

% - Air quantity is calculated based


$ - Equipment load provided is tentative and is to be verified by contractor during detailed engineering
& - During emergency 1100 CMH is to be exhausted from laboratory

Equipment Selection :

- 0 SAS04 AH001//003 3 Nos (2W + 1S) - 3 TR Split AC for Control Room


- 0 SAS06 AH001/002/003 2 Nos (2W) - 3 TR Split AC for Laboratory
- 0 SAS07 AH001/002 2 Nos (1W + 1S) - 2 TR Split AC for Master Room
- 0 SAS02 AN001/004 4 Nos (2W + 2S) axial flow supply air fans each of capacity 13500 CMH for Converter room. One standby fan will operate
during emergency.
- 0 SAS12 AN002/004 4 Nos (2W + 2S) axial flow exhaust air fans each of capacity 13500 CMH for Converter room. One standby fan will operate
during emergency.
- 0 SAS01 AN001/002 2 Nos (1W + 1S) axial flow supply air fans each of capacity 13700 CMH for transformer room
- 0 SAS11 AN001/002 2 Nos (1W + 1S) axial flow exhaust air fans each of capacity 13700 CMH for transformer room
- 0 SAS03 AN001 2 Nos (1W + 1S) axial flow supply air fans each of capacity 11000 CMH for Switchgear room
- 0 SAS03 AN002 2 Nos (1W + 1S) axial flow supply air fans each of capacity 6000 CMH for switchgear room during emergency operation
- 0 SAS13 AN002 2 Nos (1W + 1S) axial flow exhaust air fans each of capacity 11000 CMH for Switchgear room
- 0 SAS13 AN001 2 Nos (1W + 1S) axial flow exhaust air fans each of capacity 6000 CMH for switchgear room during emergency operation
- 0 SAS05 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 1160 CMH for Control room, Master room, Dist centre for fire fighting,
Lab and Vent chamber
- 0 SAS14 AN001 1 Nos (1W) Centrifugal exhaust air fans of 800 CMH for Laboratory during emergency operation
- 0 SAS08 AN001 1 Nos (1W) axial flow supply air fans of capacity 2400 CMH for Cable tunnel 01 UBZ
- 0 SAS09 AN001 1 Nos (1W) axial flow supply air fans of capacity 2400 CMH for Cable tunnel 02 UBZ
- 0 SAS17 AN001 1 Nos (1W) axial flow exhaust air fans of capacity 2400 CMH for Cable tunnel 01 UBZ
- 0 SAS18 AN001 1 Nos (1W) axial flow exhaust air fans of capacity 2400 CMH for Cable tunnel 02 UBZ
- 0 SAS15 AN001 1 Nos (1W) axial flow exhaust air fans of capacity 175 CMH for toilet

Reference :

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 12 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

1. Architectural Drawing : I301.KK34.0UPK.0.AR.OK.WD101. Sheet 1 to 2 & I301.KK34.0UPK.0.AR.OK.WD102. Sheet 1


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UPK.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 13 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

4.0 0 3UGF FIRE-FIGHTING SERVICE WATER PUMP HOUSE

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Turbine Hall 34 60 28 - Not Available 5 - 15 12500 16.5 11000 - 12500
Electrical 34 60 Ambie - 3.00 5 - 15 1800 - - - 1800
Switchboard Room nt+50C
Attendant's 34 60 - NA 5 - 6 180 - - - 180
-
Compartment
Ventilation Plant 34 60 - 5 - - - - - 150
- NA
Room

Equipment Selection :
- 0 SAS41 AN001 16.5 TR Air -cooled PU of 11000 CMH (min) capacity for Turbine Hall under emergency operation (will operate when fire-fighting
pumps will start)
- 0 SAS40 AN001 1 Nos Dry type AHU for supply, of 3480 CMH for Turbine hall, Electric switchyard and attendant compartment
- 1 No (1W) Axial flow exhaust air fan of capacity 150 CMH in Ventilation plant room

Reference :
1. Architectural Drawing : I301.KK34.03UGF.0.AR.OK.WD101. Sheet 1 to 2
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.03UGF.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 14 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

5.0 01/02 UGH STORM WATER PUMP HOUSE 1 & 2

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
34 60 Ambie - Not Available 5 - 6# 2000 - - - 2000
Turbine Hall
nt+50C
Attendant's 34 60 Ambie - NA 5 - 6 180 - - - 180
Compartment nt+50C
Toilet 34 60 - - NA 5 - 10 - - - - 300

# - Air quantity is calculated based on ACPH basis only. Contractor should calculate air quantity requirement based on temp also and air quantity shall be
selected based on the higher of the two. Also note that 12 ACPH shall be considered for emergency ventilation situation (like refrigerant leakage from chillers,
etc.).

Equipment Selection :
- 0 SAS42 AN001/AN002 1 Nos Dry type AHU for supply, of 2180 CMH for Turbine hall and attendant compartment
- 1 Nos (1W) axial exhaust fans each of 300 CMH for toilet

Reference :
1. Architectural Drawing : I301.KK34.01UGH.0.AR.OK.WD101. Sheet 1 & I01.KK34.02UGH.0.AR.OK.WD101. Sheet 1
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UGH.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 15 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

6.0 05,6 UAZ VENTIATION CENTRE FOR BUS DUCT TUNNEL

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
0 1UUA Supply
ventilation centre of
34 60 - - - 5 - - 6950 10.5 6950 - -
the bus duct tunnels
(0 5,6UAZ)
Air Plenum
ventilation room of 34 60 - - - 5 - - 320 0.5 320 - -
01UUA
0 2UUA Exhaust
ventilation centre of
34 60 - - - 5 - - - - - - 6950
the bus duct tunnels
(0 6UAZ)
Air exhaust
ventilation centre of 34 60 - - - 5 - - - - - - 100
02UUA
0 3UUA Exhaust
ventilation centre of 34 60 - - - 5 - - - - - - 6950
the bus duct tunnels

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 16 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
(0 5UAZ)
Air exhaust
ventilation centre of 34 60 - - - 5 - - - - - - 100
03UUA

Equipment Selection :

- 0 SAZ58 AN001/AC001/AN002/AC002 11 TR X 2 Nos. (1W + 1S) Air-cooled PU of min 7270 CMH each for 0 6UAZ tunnel
- 0 SAZ58 AN003/AC003/AN004/AC004 11 TR X 2 Nos. (1W + 1S) Air-cooled PU of min 7270 CMH each for 0 5UAZ tunnel
- 0 SAZ38 AN003/AN004 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7050 CMH for 0 5UAZ and 0 3UUA
- 0 SAZ38 AN001/AN002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7050 CMH for 0 6UAZ and 0 2UUA

Reference :

1. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UAZ.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 17 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

7.0 01 UGM OIL CONTAINING WATER TREATMENT PLANT

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation air Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH) (CMH) Duty humidifi Air
(0C) (0C) nt Heat (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Ground Floor Plan
Oil Containing water Ambie - Not available 5 - 10 64600 - - - 64600
34 60
treatment plant nt+50C
Local Control Room 34 60 25+1 50+5 2.32 5 - 1 290 5.8 4500 4210 -
Ambie - Not available 5 - 12 5400 - - - 5400 /
Electric Room 34 60
nt+50C 10800
Toilet 34 60 - - 5 - 10 - - - - 900

Equipment Selection :

- 0 SAP 41 AN 001/002 8.5 TR X 2 Nos. (1W + 1S) Air-cooled PU of min 4500 CMH for Local Control Cubicle.
- 0 SAP 40 AN 001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 70000 CMH for Treatment Plan t and Electrical Room
- 0 SAP 20 AN 001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 70000 CMH for Treatment Plan t and Electrical Room
- 0 SAP 23 AN 001 1 No axial exhaust fan of 900 CMH for toilet

Reference :
1. Architectural Drawing : I301.KK36.0UGM.0.AR.OK.WD101. Sheet 1
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK36.0UGM.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 18 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

8.0 01 UGG DOMESTIC WATER TREATMENT BUILDING

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Ground Floor Plan
Domestic water - Required 5 15 - - - - 15400
Ambie
storage and pump 34 60
nt+50C
house

Equipment Selection :

4 Nos (2W + 2S) Axial flow exhaust air fans each of 7800 CMH at roof (roof extractors).

Reference :

1. Architectural Drawing : I301.KK36.01UGG.0.AR.OK.WD101. Sheet 1


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK36.01UGG.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 19 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

9.0 0 UKU CONTROL ACCESS AREA CENTRAL WORKSHOP

Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
Area Description condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH
Dissipation Qty. )
Load (KW) (CMH)
Ground Floor Plan - (Level : 0.00)
Storage & Revision
room of TPE (full 34 60 - - Required 5 - - 66500 - - - 65680
height)
Decontamination
Solution Storage 34 60 - - NA 5 - - 350 - - - 350
Room
Room of pumps of
34 60 - - Required 5 - - 470 - - - 470
Decontamination

Garage 34 60 - - NA 5 - - 14050 - - - 14050

Section of pipeline
34 60 - - NA 5 - - 5520 - - - 5520(*)
valve repair

Winding Sector 34 60 - - NA 5 - - 360 - - - 360(*)

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 20 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Diassembling & 2120


34 60 - - NA 5 - - 2120 - - -
washing sector (*)
Mechanical and
34 60 - - NA 5 - - 500 - - - 500(*)
assembling sector
Hydraulic shock
34 60 - - NA 5 - - 5620 - - - 5620
absorber test sector
Store room of material
electric repair 34 60 - - NA 5 - - 100 - - - 100
workshop
Testing centre of
34 60 - - Required 5 - - 400 - - - 400
electric engines
Cable article repair
34 60 - - Required 5 - - 1230 - - - 1230
workshop
Electrical assembly
34 60 - - Required 5 - - 1100 1.62 1100 - 1100
room
Tools room 34 60 - - NA 5 - - 600 600
Tools room 34 60 - - NA 5 - - 100 100
Common store house 34 60 - - NA 5 - - 200 200
Luminaries repair
34 60 - - NA 5 - - 250 250
workshop
Cable entrance room 34 60 - - NA 5 - - 600 600
Storage of cleaning
and decontamination 34 60 - - NA 5 - - 150 200
means room

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 21 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Electrolyte Room 34 60 - - Required 5 - - 280 - - - 280

Machinery Room 34 60 - - Required 5 - - 2480 - - - 2480

Charging Room 34 60 - - Required 5 - - 660 - - - 660

Repair Room of
34 60 - - NA 5 - - 1130 - - - 1130
Electric Truck

Welding Room 34 60 - - Required 5 - - 4070 - - - 4070

Briqueting Section of
34 60 - - NA 5 - - 1630 - - - 1630
metal chip

Machine Shop 34 60 - - NA 5 - - 3430 - - - 3430

Electric assembly
34 60 - - Required 5 - - 1200 - - - 1200
room

Cable Shaft Room 34 60 - - NA 5 - - 600 - - - -

Plenum vent.
34 60 - - NA 5 - - 750 - - - 370
Chamber room
Tools room of
34 60 - - NA 5 - - 60 - - - 60
machine sector
Drying & 1050 / 1300 /
34 60 - - NA 5 - - - - -
impregnating sector 4000# 4750#

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 22 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Air-lock lobby 34 60 - - NA 5 - - 250 - - - -

Toilet 34 60 - - NA 5 - 10 - - - - 640

Corridor 34 60 - - NA 5 - - 750 - - - -
First Floor Plan - (Level : +3.60)
Electrical assembly
34 60 26+1 50+5 Required 5 - - 3918 5.8 3918 - 3918
room
Communication Room 34 60 26+1 50+5 Required 5 - - 2568 3.8 2568 - 2568
CPS Drives workshop
34 60 26+1 50+5 Required 5 - - 3652 5.4 3652 - 3652
room
Electrical assembly
34 60 26+1 50+5 Required 5 - - 1000 1.5 1000 - 1000
room
Foreman's room 34 60 - - NA 5 - - 60 - - - 60
Toilet 34 60 - - NA 5 - 10 - - - - 640
Switchgear fire
34 60 - - NA 5 - - 300 - - - 300
extinguisher room
Cable Floor for
34 60 - - Required 5 - - 5970 - - - 5970
auxiliary switchgear
Cable shaft room 34 60 - - NA 5 - - 600 - - - 600
Room of day head 34 60 - - NA 5 - - 100 - - - 100

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 23 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Corridor 34 60 - - NA 5 - - 4690 - - - 4050


Room of bathtub for
decontamination
34 60 - - NA 5 - - 200 - - - 200
solutions of
decontamination unit
Box contamination
34 60 - - NA 5 - - 200 - - - 200
unit (El : +2.50)
Second Floor Plan - (Level : +6.90)
Room of CRW head,
34 60 - - NA 5 - - 300 - - - 300
deputy & Foreman
Instructing room of
34 60 - - NA 5 - - 200 - - - 200
repair teams
Metal laboratory
mechanical testing 34 60 - - NA 5 - - 200 - - - 200
group
Metal laboratory flaw
detection and 34 60 - - NA 5 - - 200 - - - 200
metallography group
Tools distribution
34 60 - - NA 5 - - 200 - - - 200
room
Technical archive 34 60 - - NA 5 - - 150 - - - 150
I&C Repair Room 34 60 26+1 50+5 NA 5 - - 5169 7.6 5169 - 4969
Storeroom of Process
34 60 - - NA 5 - - 200 - - - 200
equipment

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 24 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Sector of repair of
transport process
34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3852
equipment and lifting
device
Sector repair of means
of mechanization of 34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3852
auxiliary operations
Tool Room 34 60 26+1 50+5 NA 5 - - 1563 2.3 1563 - 1563
Room of exhaust
34 60 - NA 5 - - 10536 15 10536 - 10536
ventilation centre
Aerosol filter room - 1 34 60 - NA 5 - - 200 - - - 200
Aerosol filter room - 2 34 60 - NA 5 - - 200 - - - 200
Room for precast
34 60 26+1 50+5 NA 5 - - 2634 3.9 2634 - 2634
exhaust vent. Box
Electrical assembly
34 60 26+1 50+5 Required 5 - - 1975 2.9 1975 - 1975
ACS Room
Electrical assembly
34 60 26+1 50+5 Required 5 - - 1097 1.6 1097 - 1097
room
Corridor 34 60 - - NA 5 - - 1170 - - - -
Cable Shaft Room 34 60 - - NA 5 - - 600 - - - 600
Foreman's Room 34 60 - - NA 5 - - 70 - - - 70
Room for Auxiliary
34 60 26+1 50+5 Required 5 - - 13170 19.4 13170 - 13170
switchgear

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 25 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Lobby 34 60 - - NA 5 - - 250 - - - -
Plenum ventilation
centre of central repair 34 60 - - NA 5 - - 3000 - - - 3000
workshop
Workshop of control
and reactor protection 34 60 - - NA 5 - - 370 - - - 370
system
Storeroom of
combustible 34 60 - - NA 5 - - 250 - - - 250
lubricating materials
Exhaust vent. Centre
of imprignating and 34 60 - - NA 5 - - 250 - - - 350
drying sector
Electrical assembly
34 60 26+1 50+5 Required 5 - - 1097 1.6 1097 - 1097
room
Toilet 34 60 - - NA 5 - 10 - - - - 640
Decontamination unit
foreman's room (El : 34 60 - - NA 5 - - 100 - - - 100
+6.10)
Third Floor Plan - (Level : +10.50)
Storage of cleaning
and decontamination 34 60 - - NA 5 - - 50 - - - 50
means of room
Mechanics workshop 34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3852

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 26 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Storeroom for
emergency set of 34 60 - - NA 5 - - 200 - - - 200
dosimetric instruments
Room for cleaning
and washing of
measuring devices and 34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3652
I&C
(decontamination)
Temerature device
34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3652
workshop
Pressure device
34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3652
workshop
Flowrate and level
34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3652
devices workshop
Workshop of MCDS
34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3852
devices
Storeroom for devices
to be repaired after 34 60 - - NA 5 - - 50 - - - 50
decontamination
Materials and tools
34 60 - - NA 5 - - 100 - - - 100
storeroom
Storeroom of
individual protection 34 60 - - NA 5 - - 200 - - - 200
means
workshop of devices
of matter composition 34 60 26+1 50+5 NA 5 - - 3852 5.7 3852 - 3852
and features
OW/01 September 2012
NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 27 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Checked device
storeroom (Exchange 34 60 - - NA 5 - - 50 - - - 50
inventory)
Room for radiation
monitoring of exhaust 34 60 26+1 50+5 NA 5 - - 1876 2.8 1876 - 1876
in ventilation - 1
Room for radiation
monitoring of exhaust 34 60 26+1 50+5 NA 5 - - 1317 2.0 1317 - 1317
in ventilation - 2
Electrical assembly
34 60 26+1 50+5 NA 5 - - 1393 2.0 1393 - 1393
room
Corridor (all area) 34 60 - - NA 5 - - 1540 - - - -
Room for plenum
ventilation chamber of 34 60 - - NA 5 - - 1050 - - - -
garage
Intake chamber rooms 34 60 - - NA 5 - - 7070 - - - -
Room of exhaust
34 60 - - NA 5 - - - - - - 1050
chamber of garage
Room of metrological
34 60 26+1 50+5 NA 5 - - 100 - - - 100
service head
cable shaft room 34 60 - - NA 5 - - 50 - - - 50
Radiometric
34 60 26+1 50+5 NA 5 - - 3021 7.6 3021 - 2821
instrument workshop
Spare part tools &
34 60 - - NA 5 - - 50 - - - 50
accessories storeroom

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 28 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Room for personel of


34 60 - - NA 5 - - 150 - - - 150
metrological service
Room of exhaust
34 60 - - NA 5 - - 500 - - - 250
chamber of cable floor
Nutron flux
monitoring equipment 34 60 26+1 50+5 NA 5 - - 4352 6.4 4352 - 4152
workshop
Room of
34 60 - - NA 5 - - 50 - - - 50
communication shaft
High precision
34 60 26+1 50+5 NA 5 - - 4352 6.4 4352 - 4152
mechanics workshop
Apparatus measuring
devices and I&C 34 60 - - NA 5 - - 600 - - - 600
storeroom
Electrical assembly
34 60 - - NA 5 - - 658 1.0 658 - 658
room
Room of exhaust vent.
34 60 - - NA 5 - - 50 - - - 50
chamber of WCS
Toilet 34 60 - - NA 5 - 10 - - - - 640
Fourth Floor Plan - (Level : +14.10)
Goods Lift machine
34 60 26+1 50+5 Required 5 - - 3951 5.8 3951 - 3951
room
Room for exhaust
34 60 - - NA 5 - - 8560 12 8560 - 8160
ventilation centre
Room for exhaust 34 60 - - NA 5 - - 400 - - - 400

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 29 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

vent. chamber of
industrial rooms of
category C I.
*:Local ventilation of 1500 & 150 CMH to be considered.
# - During drying time more CHM to be envisaged

Equipment Selection :

- 70 TR X 2 Nos. AHU (1W + 1S) each of 45823 CMH (min)


- 83 TR X 2 Nos. AHU (1W + 1S) each of 56444 CMH (min)
- 0 KLE83 AN001/002/AH001/002 18 TR X 2 Nos. AHU (1W + 1S) each of 12238 CMH (min)
- 0 KLE90 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 7080 CMH
- 0 KLE86 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 6210 CMH
- 0 KLE84 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 2300 CMH
- 0 KLE81 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 32040 CMH
- 0 KLE85 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 69500 CMH
- 0 KLE88 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 7690 CMH
- 0 KLE87 AN001/002 2 Nos (1W + 1S) Centrifugal supply air fans each of 15100 CMH
- 0 KLE89 AN001 1 No Centrifugal supply air fan of 4000 CMH for Drying & Impregnating center
- 0 KLE71 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 2610 CMH
- 0 KLE64 AN003/004 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1650 CMH
- 0 KLE69 AN003/004 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 4000 CMH for Drying & Impregnating center.
- 0 KLE70 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 6820 CMH
- 0 KLE68 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7700 CMH
- 0 KLE66 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 3230 CMH
- 0 KLE63 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 39151 CMH
- 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 56778 CMH
- 0 KLE60 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1620 CMH with aerosol filters.
- 0 KLE65 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 65680 CMH
- 0 KLE61 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 31450 CMH

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 30 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

- 0 KLE67 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 15100 CMH
- 0 KLE27 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of Room for cleaning & washing of measuring devices and
I&C (decontamination).
- 0 KLE28 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of Temperature devices workshop.
- 0 KLE29 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of Pressure devices workshop.
- 0 KLE30 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of Flowrate & level devices workshop.
- 0 KLE31 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of High precision mechanics workshop.
- 0 KLE32 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of Neutron flux monitoring equipment workshop.
- 0 KLE33 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of Room for personnel of metrological service.
- 0 KLE34 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of Radiometric instruments workshop.
- 0 KLE26 AN001 1 no centrifugal exhaust air fan of 200 CMH for local exhaust of I&C repair room.
- 0 KLE11/12/13/14 AN001 4 nos centrifugal exhaust air fans of total 1200 CMH for local exhaust of Machine shop.
- 0 KLE16/17 AN001 2 nos centrifugal exhaust air fans of total 1200 CMH for local exhaust of TTE storage & revision room.
- 0 KLE18 AN001 1 no centrifugal exhaust air fan of 1800 CMH for local exhaust of TTE storage & revision room.
- 0 KLE19 AN001 1 no centrifugal exhaust air fan of 1200 CMH for local exhaust of Disassembling & washing sector.
- 0 KLE20/25 AN001 2 nos centrifugal exhaust air fans of total 1800 CMH for local exhaust of Disassembling & washing sector.
- 0 KLE24 AN001 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of Disassembling & washing sector.
- 0 KLE21/22/23 AN001 3 nos centrifugal exhaust air fans of total 1800 CMH for local exhaust of Welding sector.
- 0 KLE15 AN001 1 no centrifugal exhaust air fan of 1200 CMH for local exhaust of Repair room of electric trucks.
- 0 KLE74 AN001/002 2 nos (1W + 1S) axial exhaust air fans each of 370 CMH for Plenum vent chamber room at El: 0.0m.
- 0 KLE73 AN001 1 no axial exhaust air fan of 300 CMH for Switchgear fire-extinguish room.
- 0 KLE72 AN001 1 no axial exhaust air fan of 3000 CMH for Plenum vent centre of central repair workshop.
- 0 KLE62 AN001/002 2 nos (1W + 1S) axial exhaust air fans each of 13170 CMH for Room of auxiliary switchgear.

Reference :

1. Architectural Drawing : I301.KK34.0UKU.0.AR.OK.WD001. Sheet 1 to 10


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UKU.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 31 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

10.0 0 USV ENGINEERING UTILITY AND LABORATORY BUILDING

Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
Area Description condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Basement Plan - (Level : -3.60)
Material Room -1 34 60 - - NA 5 - - - - - - 70

Material Room -2 34 60 - - NA 5 - - - - - - 260

Material Room -3 34 60 - - NA 5 - - - - - - 260

Material Room -4 34 60 - - NA 5 - - - - - - 260

Material Room -5 34 60 - - NA 5 - - - - - - 260

Material Room -6 34 60 - - NA 5 - - - - - - 200

Material Room -7 34 60 - - NA 5 - - - - - - 130

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 32 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Material Room -8 34 60 - - NA 5 - - - - - - 130

Staircase (for all


34 60 - - NA 5 - - 70 - - -
floors)
Fire extinguishing
34 60 - - NA 5 - - 100 - - - 100
switchgear room
Storekeeper room 34 60 - - NA 5 - - 130 - - - 130
Ground Floor Plan - (Level : 0.00)
Workshop 34 60 - - Required 5 - - 25500 - - - 23695
Room of sector head
34 60 - - NA 5 - - - - - - 120
-1
Room of sector head
34 60 - - NA 5 - - - - - - 140
-2
Toilet 34 60 - - NA 5 - - 605 - - - 605

First Floor Plan - (Level : 3.60)


Service Room - 1 34 60 26+1 - Required 5 - - 260 2 1020 - 260

Service Room - 2 34 60 - - Required 5 - - 120 - - - 120

Service Room - 3 34 60 - - Required 5 - - 120 - - - 120


Second Floor Plan - (Level : 7.20)
Cloakroom of home
34 60 26+1 50+5 NA 5 - - 402 6 4025 3623 -
clothes (man) - 1

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 33 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Storeroom-1 34 60 - - NA 5 - - - - - - 20
Washroom - 1 34 60 - - NA 5 - - 180 - - - 80
Toilet - 1 34 60 - - NA 5 - - - - - - 130
Store Room - 2 34 60 - - NA 5 - - - - - - 20
Cloakroom of work
34 60 26+1 50+5 NA 5 - - 384 6 3842 3457
wears (man) - 1
Cloakroom of home
34 60 26+1 50+5 NA 5 - - 334 6 3343 3010
clothes (man) - 2
Storeroom-3 34 60 - - NA 5 - - - - - - 20
Washroom - 2 34 60 - - NA 5 - - 150 - - - 80
Toilet - 2 34 60 - - NA 5 - - - - - - 130
Store Room - 4 34 60 - - NA 5 - - - - - - 20
Cloakroom of work
34 60 26+1 50+5 NA 5 - - 314 6 3143 2828
wears (man) - 2
Passportization
34 60 26+1 50+5 NA 5 - - 173 1.5 1734 1560
Group
Reserve 34 60 26+1 50+5 NA 5 - - 161 1.5 1611 1560
Cloakroom of home
34 60 26+1 50+5 NA 5 - - 289 6 2890 2601
clothes
Storeroom-5 34 60 - - NA 5 - - - - - - 20
Washroom - 3 34 60 - - NA 5 - - 150 - - - 80
Toilet - 3 34 60 - - NA 5 - - - - - - 130
Store Room - 6 34 60 - - NA 5 - - - - - - 20

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 34 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Cloakroom of work
34 60 26+1 50+5 NA 5 - - 260 6 2600 2339 -
wears
Toilet 34 60 - - NA 5 - - - - - - 605
corridor 34 60 - - NA 5 - - 605 - - - -
Third Floor Plan - (Level : 10.80)
Temperature Devices
34 60 26+1 50+5 Required 5 - - 510 6 5093 4583 -
workshop
Spare parts tools and
accessories 34 60 26+1 50+5 NA 5 - - 106 1.5 1062 956 -
storehouse - 1
Facilities Storeroom 34 60 26+1 50+5 NA 5 - - 91 1.5 916 824 -
Spare parts tools and
accessories 34 60 26+1 50+5 NA 5 - - 81 1.5 810 729 -
storehouse - 2
Spare parts tools and
accessories 34 60 26+1 50+5 NA 5 - - 68 1.5 680 612 -
storehouse - 3
Vent. Shaft 34 60 - - NA 5 - - 107 1.5 1062 956 -
Spare parts tools and
accessories 34 60 26+1 50+5 NA 5 - - 81 1.5 810 729 -
storehouse - 4
Room of foremen of
sector of centralized 34 60 26+1 50+5 NA 5 - - 81 1.5 810 729 -
repair
Room for rest 34 60 26+1 50+5 NA 5 - - 226 1.5 2261 2034 -

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 35 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Spare parts tools and


accessories 34 60 26+1 50+5 NA 5 - - 134 2 1345 1210 -
storehouse - 5
Workshop of devices
of matter composition 34 60 26+1 50+5 Required 5 - - 400 2 2665 2265 -
and features
Room for group of
checking the devices
34 60 26+1 50+5 NA 5 - - 173 1.5 1732 1559 -
of matter composition
and matter
Locksmith's
34 60 26+1 50+5 NA 5 - - 398 2 3978 3580 -
workshop
Electrical measuring
34 60 26+1 50+5 Required 5 - - 400 1.5 1725 1325 -
device workshop
Defectoscopy
34 60 26+1 50+5 Required 5 - - 400 1.5 1042 642 -
workshop
Intermediate store
34 60 26+1 50+5 NA 5 - - 105 1.5 1042 958 -
store
Room for group of
checking the 34 60 26+1 50+5 Required 5 - - 435 6 4350 3915 -
temperature devices
Room of sector head
34 60 26+1 50+5 NA 5 - - 121 2 1214 1093 -
of centralised repair
Toilet 34 60 - - NA 5 - - - - - - 605
corridor 34 60 - - NA 5 - - 605 - - - -
Fourth Floor Plan - (Level : 14.40)

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 36 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Room for group of


checking the flowrate 34 60 26+1 50+5 NA 5 - - 204 2 2040 1836 -
and level devices
Tool Storeroom 34 60 26+1 50+5 NA 5 - - 86 1.5 867 780 -
Room for group of
checking the electric 34 60 26+1 50+5 NA 5 - - 204 2 2040 1836 -
measuring devices
Reference device
34 60 26+1 50+5 NA 5 - - 86 1.5 867 780 -
storeroom
Workshop of MCDS
34 60 26+1 50+5 Required 5 - - 400 2 1870 1470 -
devices
CPS devices
34 60 26+1 50+5 Required 5 - - 400 2 2296 1896 -
workshop
PPPE device
34 60 26+1 50+5 Required 5 - - 400 2 3000 2600 -
workshop
Room for head of
ACS Metrological 34 60 26+1 50+5 NA 5 - - 129 2 1292 1162 -
laboratory
Flowrate and level
34 60 26+1 50+5 Required 5 - - 400 2 2706 2306 -
device workshop
Room for shop head
of technical facilities
complex and 34 60 26+1 50+5 NA 5 - - 173 2 1725 1552 -
automated control
system
Foremen's room 34 60 26+1 50+5 NA 5 - - 130 1.5 1302 1171 -

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 37 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Room for group of


checking the pressure 34 60 26+1 50+5 NA 5 - - 435 6 4352 3916 -
devices
Workshop of pressure
34 60 26+1 50+5 Required 5 - - 400 2 1081 681 -
devices
Toilet 34 60 - - NA 5 - - - - - - 605
corridor 34 60 - - NA 5 - - 605 - - - -
Fifth Floor Plan - (Level : 18.00)
Room for group of
checking of devices
34 60 26+1 50+5 Required 5 - - 259 2 2597 2337 -
of linear angle
measurements
Room for group of
checking of vibro-
34 60 26+1 50+5 Required 5 - - 162 1.5 1623 1461 -
noise measuring
devices
Rest Room 34 60 26+1 50+5 NA 5 - - 190 1.5 1907 1716 -
Spare parts tools &
accessories storeroom 34 60 26+1 50+5 NA 5 - - 118 2 1183 1064 -
-1
Room for group of
checking of
34 60 26+1 50+5 Required 5 - - 148 1.5 1482 1334 -
radiometric
instruments device
Spare parts tools &
34 60 26+1 50+5 NA 5 - - 118 2 1183 1064 -
accessories storeroom

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 38 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

-2
Radiometric
34 60 26+1 50+5 Required 5 - - 400 1.5 1620 1220 -
instrument workshop
Secondary device
functional units and 34 60 26+1 50+5 Required 5 - - 400 1.5 1907 1507 -
regulators workshop
Spare parts tools &
accessories storeroom 34 60 26+1 50+5 NA 5 - - 207 2 2070 1863 -
-3
Workshop of devices
of linear angle 34 60 26+1 50+5 Required 5 - - 400 2 2706 2306 -
measurements
Room for group of
checking of devices 34 60 26+1 50+5 Required 5 - - 323 6 3230 2907 -
of dismetric control
Spare parts tools &
accessories storeroom 34 60 26+1 50+5 NA 5 - - 93 1.5 931 838 -
-4
Domestic control
34 60 26+1 50+5 Required 5 - - 400 1.5 1441 1041 -
device workshop
Room for group of
checking of
secondary devices, 34 60 26+1 50+5 Required 5 - - 172 1.5 1725 1552 -
functional units and
regulators
Toilet 34 60 - - NA 5 - - - - - - 605

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 39 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

corridor 34 60 - - NA 5 - - 605 - - - -
Sixth Floor Plan - (Level : 21.60)
Reserve -1 34 60 - - NA 5 - - 250 - - - 250
Reserve -2 34 60 - - NA 5 - - 250 - - - 250
Ventilation Chamber
34 60 - - NA 5 - - 770 - - - 770
-1
Reserve - 3 34 60 - - NA 5 - - 260 - - - 260
Ventilation Chamber
34 60 - - NA 5 - - 1010 - - -
-2
Toilet 34 60 - - NA 5 - - - - - - 605
corridor 34 60 - - NA 5 - - 605 - - - -
Seventh Floor Plan - (Level : 26.40)
Service Room 34 60 - - NA 5 - - - - - - 140
Lobby 34 60 - - NA 5 - - 140 - - - -
Turbine compartment
34 60 26+1 50+5 Required 5 - - - 6 3060 - -
of lift
Equipment Selection:

- 75.5TR X 2 Nos. AHU (1W + 1S) each of 54723 CMH (min)


- 56.5TR X 2 Nos. AHU (1W + 1S) each of 51598 CMH (min)
- 8 Nos (4W + 4S) 2 TR each Split AC units in Service Room (El 0.00m) and Turbine compartment of lift (El 25.20m)
- 0 SAK64 AN001/002 - 2 Nos (1W + 1S) Centrifugal supply air fans each of 6695CMH
- 0 SAK63 AN001/002 - 2 Nos (1W + 1S) Centrifugal supply air fans each of 6905 CMH
- 0 SAK61 AN001/002 - 2 Nos (1W + 1S) Centrifugal supply air fans each of 26010 CMH
- 0 SAK26 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 4020CMH
- 0 SAK22 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 24465 CMH
- 0 SAK24 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1160CMH

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 40 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

- 0 SAK21 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 5300 CMH
- 0 SAK11 AN001 - 1 no centrifugal exhaust air fan of 1200 CMH for local exhaust of workshops (level 0.00).
- 0 SAK12/13 AN001 - 2 nos centrifugal exhaust air fans of total 510 CMH for local exhaust of temperature devices workshop (level 10.8).
- 0 SAK14 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of electrical measuring devices workshop. (level 10.8).
- 0 SAK15 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of defecdoscopy workshop. (level 10.8).
- 0 SAK16 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of W/s of devices of matter composition and feature. (level
10.8).
- 0 SAK17 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of flow rate and level device w/s (level 14.4).
- 0 SAK18 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of w/s of pressure devices (level 14.4).
- 0 SAK31/32 AN001 - 2 nos centrifugal exhaust air fans of total 400 CMH for local exhaust of w/s of MCDS devices (level 14.4).
- 0 SAK19/20 AN001 - 2 nos centrifugal exhaust air fans of total 400 CMH for local exhaust of PPPE devices w/s (level 14.4)
- 0 SAK29/30 AN001 - 2 nos centrifugal exhaust air fans of total 400 CMH for local exhaust of CPS device w/s (level 14.4).
- 0 SAK33 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of w/s of devices of linear angle measurement (level 18.0).
- 0 SAK34 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of dosimetric control devices w/s (level 18.0).
- 0 SAK36 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of radiometric instruments w/s (level 18.0).
- 0 SAK35 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of secondary devices functional units and regulators w/s
(level 18.0).
- 2 nos (1 W+1S) 2 TR split AC for service room (level 3.6).
- 6 nos (3 W+3S) 2 TR split AC for turbine compartment of lift (level 26.4).

Reference:

1. Architectural Drawing: I301.KK34.0USV.0.AR.OK.WD101. Sheet 1 to 6


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0USV.0.OW.OK.WD001

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 41 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

11.0 0 UYB HEALTH PHYSICS BUILDING (CONTROLLED ACCESS AREA)

Outside Design Inside Design Electrical Panel Lighting Occup


Fresh/Ventilation Air-conditioning Capacity Exhaust
Area Description condition Conditions /Instrumentatio Load ancy
air Requirement Air
DB RH DB RH n W/sq.m. Nos.Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH
Dissipation Qty. )
Load (KW) (CMH)
Ground Floor Plan - (Level : 0.00)
Filtering Hall (double 34 60 - 5 - - 27100 - - - 32520
- NA
height)
Evaporator Room 34 60 - - Required 5 - - 6000 - - -
Sampling Room 34 60 - - NA 5 - - 550 - - - 660
Lift Lobby 34 60 - - NA 5 - - 150 - - - -
Corridor ( free access 34 60 - 5 - - 1100 - - - -
- NA
area)
Room for cleaning 34 60 5 - - 1000 - - - 1320
- - NA
solution preparation
Reagent facility 34 60 - - NA 5 - - 950 - - - 950
Room for weighting 34 60 - - NA 5 - 270 - - - 270
Chemical and 34 60 5 - - 2140 - - - 1360
analytical control - - Required
room

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 42 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Radiometry room 34 60 - - Required 5 - - 1100 - - - 1360


Electrical assembly
34 60 26+1 50+5 Required 5 - - 408 4 4080 3672 -
room
Reagent store room 34 60 - - NA 5 - - - - - - 200
Toilet 34 60 - - NA 5 - 10 - - - - 450
I&C Room 34 60 - - NA 5 - 1280 - - - 1280
Hot water supply
34 60 - - Required 5 - - 2500 - - - 2500
tank
Cloth reception and
sorting room for 34 60 - - NA 5 - - 240 - - - 300
washing
Washing & drying 3310 /
34 60 - - NA 5 - - 3780 - - -
section 4330@
Ironing compartment 34 60 - - NA 5 - - 5380 - - - 5120
Work wear sorting
34 60 - - NA 5 - - 120 - - - 180
room
work wear repair
34 60 - - NA 5 - - 120 - - - 120
room
Work wear store
34 60 - - NA 5 - 60 - - - 60
room
Personnel room 34 60 26+1 50+5 NA 5 - - 340 2 3400 3060 -
Entrance hall 34 60 - - NA 5 - - 370 - - - -
Corridor (control
34 60 - - NA 5 - - 2170 - - - 2170
access area)

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 43 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

First Floor Plan - (Level : + 3.60)


I&C Sensor Room 34 60 - - NA 5 - - 200 - - - 200
Corridor (free access) 34 60 - - NA 5 - - 160 - - - -
Corridor (control 2930 2930
access)
Electrical assembly 34 60 5 - 1030 - - - 1030
room (Free access - - Required
area)
Room of disinfection 34 60 5 - - 900 - - - 1060
- - NA
chamber (loading)
Room of disinfection 34 60 5 - 900 - - - 1060
- - NA
chamber (unloading)
Room of washing of 34 60 5 - - 1000 - - - 1200
work wear - II
- - NA
contamination group
(loading)
Room of washing of 34 60 5 - - 750 - - - 900
work wear - II
- - NA
contamination group
(unloading)
Room of washing of 34 60 5 - 3720 - - - 4650
clothes, towels &
work wear - I - - NA
contamination group
(loading)

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 44 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Room of washing of - - - -
clothes, towels &
work wear - I 34 60 - - NA 5 2000 2600
contamination group
(unloading)
Drying compartment 34 60 - - NA 5 - - 1550 - - - 1890
Room of work wear - - - -
receiving, sorting & 34 60 - - NA 5 - 4800 6000
storing
Work wear store -
34 60 26+1 50+5 NA 5 - 1360 2 1360 - 1360
house
Room of treatment of -
work footwear &
34 60 - - NA 5 - 1100 - - - 1430
individual protection
means
Radiation Control -
Room of work wear,
work footwear & 34 60 26+1 50+5 NA 5 - 2720 4 2720 - 2720
individual protection
means
Room for equipping
with work wear, work
footwear & 34 60 26+1 50+5 NA 5 - - 135 2 1360 1225 -
individual protection
means

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 45 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Storeroom of clean
footwear &
34 60 - - NA 5 - - 160 - - - 160
individual protection
means
Room of shop head 34 60 26+1 50+5 NA 5 - - 85 1 850 765 -
I&C Room 34 60 26+1 50+5 Required 5 - - 127 1.5 1275 1148 -
Electrical assembly - - - -
room (controlled 34 60 - - Required 5 1030 1030
access area)
Sanitary lock cloak - - - -
room of additional 34 60 - - NA 5 - 100 100
work wear
Sanitary lock - - - -
decontamination 34 60 - - NA 5 - 100 100
room
Toilet 34 60 - - NA 5 - 130 130
Ironing compartment 34 60 - - NA 5 - - 2850 - - - 2650
Workwear sorting
34 60 26+1 50+5 NA 5 - - 272 4 2720 2448 -
and repair room
Work wear store
34 60 26+1 50+5 NA 5 - - 136 2 1360 1224 -
room
Lift lobby 34 60 - - NA 5 - - 150 - - - -
Second Floor Plan - (Level : + 7.20)
ACS Electrical - -
34 60 26+1 50+5 Required 5 - 1360 2 1360 1360
assembly room

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 46 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Radiation control - - - -
34 60 26+1 50+5 Required 5 12 8160 8160
board room (RC)
Room for storing and - -
distribution of
34 60 26+1 50+5 NA 5 - 1360 2 1360 1360
devices of individual
domestic control
Room for storing and - -
distribution of
34 60 26+1 50+5 NA 5 - 2720 4 2720 2720
additional individual
protection means
Lift lobby 34 60 - - NA 5 - - 150 - - - -
Corridor - 1 34 60 - - NA 5 - 150 - - - -
Toilet 34 60 - - NA 5 - 10 - - - - 450
Electrical assembly
34 60 - - Required 5 - - 860 - - - 860
room
Sanitary lock cloak
room of work wear
per 110 people of 34 60 26+1 50+5 NA 5 - - 1720 15 10200 8480 -
personnel (woman)
(free access area)
Shower Room 34 60 - - NA 5 - - 1200 - - - 1200
Toilet (controlled - - -
34 60 - - NA 5 - 10 520 520
access)

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 47 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Sanitary lock cloak


room of work wear
per 110 people of
34 60 26+1 50+5 NA 5 - - 10200 15 10200 10200
personnel (woman)
(controlled access
area)
Room of radiation - - - -
control of
contaminated work 34 60 - - NA 5 - 420 420
wear and work
footwear
Contaminated clothes - - - -
34 60 - - NA 5 - 100 100
storeroom
Thermal chamber - - - -
34 60 - - NA 5 - 170 170
(bath of dry heat)
Clean clothes
34 60 - - NA 5 - - 100 - - - 100
storeroom
Corridor -2 34 60 - - NA 5 - - 650 - - - 650
Room of drying body
34 60 - - NA 5 - - 600 - - - -
domestic control
Amenity room 34 60 26+1 50+5 NA 5 - 136 2 1360 1224 -
Room of reloading 34 60 - - NA 5 - 230 - - - 230
Cleaning equipment
34 60 26+1 50+5 NA 5 - - 102 1.5 1020 918 -
room (free access)
Electrical assembly
34 60 - - Required 5 - - 860 - - - 860
room

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 48 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Duty personnel room 34 60 26+1 50+5 NA 5 - 1 136 2 1360 1224 -


Cleaning equipment - -
room (controlled 34 60 26+1 50+5 NA 5 1360 2 1360 - 1360
access)
Corridor (controlled - - -
34 60 - - NA 5 - - 1050 -
access area)
Main Toilet - - -
34 60 - - NA 5 - 10 130 130
(controlled access)
Third Floor Plan - (Level : + 10.80)
Evaporator room 34 60 - - Required 5 - - - - - - 7500
Workshop of electric - -
34 60 26+1 50+5 NA 5 - 2720 4 2720 2450
measuring device
Workshop of - -
secondary devices
34 60 26+1 50+5 NA 5 - 2720 4 2720 2450
functional units and
regulators
Corridor 34 60 - - NA 5 - - 1100 - - - 1100
Electrical assembly
room - (free access 34 60 - - Required 5 - - 1030 - - - 1030
area)
Room of radiation
control of
contaminated work 34 60 - - NA 5 - 6 500 - - - 500
wear and work
footwear

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 49 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Sanitary lock
cloakroom of work
wear per 220 people 34 60 26+1 50+5 NA 5 - - 1720 15 10200 8480 -
of personnel (man)
( free access area)
Contaminated clothes -
34 60 - - NA 5 - 140 - - - 140
storeroom
Shower room with 31 -
34 60 - - NA 5 2330 2330
shower chamber
Toilet 34 60 - - NA 5 - 10 - - - - 450
Thermal Chamber - - - -
34 60 - - NA 5 - 170 170
(bath of dry heat)
Room for drying
body dosimetric 34 60 - - NA 5 - - 870 - - - -
control
Clean clothes
34 60 - - NA 5 - - 100 - - - 100
storeroom
Toilet (controlled
34 60 - - NA 5 - 10 216 - - - 216
access)
Sanitary lock
cloakroom of private
clothes per 220people
34 60 26+1 50+5 NA 5 - - 10200 15 10200 8354
of personnel (man)
(controlled access
area)
Amenity room 34 60 26+1 50+5 NA 5 - - 272 4 2720 2448 -

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 50 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Reserve 34 60 26+1 50+5 NA 5 - - 136 2 1360 1224 -


Room of machine
compartment of
goods capacity = 34 60 26+1 50+5 Required 5 - - 2720 4 2720 - 2720
5000 kg (double
height)
Toilet Men &
450 &
Women (free access 34 60 - - NA 5 10 - - - -
450
area)
Duty personnel room
34 60 26+1 50+5 NA 5 - - 136 2 1360 1224 -
(free access area)
Cleaning equipment
room (free access 34 60 26+1 50+5 NA 5 - - 68 1 680 612 -
area)
Room of radiation
34 60 - - NA 5 - - 600 - - - 600
control
Communication room 34 60 26+1 50+5 NA 5 - - 1360 2 1360 - 1360
Electrical assembly - - - -
room controlled 34 60 - - NA 5 - 500 500
access area
Duty personnel room - -
controlled access 34 60 26+1 50+5 NA 5 680 1 680 680
area)
Cleaning equipment - -
room ( controlled 34 60 26+1 50+5 NA 5 - 680 1 680 680
access area)

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 51 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Lift lobby 34 60 - - NA 5 - - 150 - - - -


Corridor (controlled - - -
34 60 - - NA 5 - - 730 -
access area)
Toilet men
34 60 - - NA 5 - 10 216 100 - - 100
(controlled access)
Toilet women
34 60 - - NA 5 - 10 216 100 - - 100
(controlled access)
Fourth Floor Plan - (Level : + 14.40)
Room of tank of - - -
34 60 - - NA 5 - - 520 120
foam extinguisher
PPPE devices -
34 60 26+1 50+5 NA 5 - - 2720 4 2720 2450
workshop
Radiometric -
instrument control 34 60 26+1 50+5 NA 5 - - 4080 6 4080 3672
workshop
Radiation Control -
34 60 26+1 50+5 Required 5 - - 1360 2 1360 1360
Room
Corridor 34 60 - - NA 5 - - 1360 - - - 1360
Electrical assembly
room - (free access 34 60 - - Required 5 - - 1030 - - - 1030
area)
Room of radiation - - -
control of
contaminated work 34 60 - - NA 5 - - 500 500
wear and work
footwear

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 52 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Sanitary lock
cloakroom of work
wear per 220 people 34 60 26+1 50+5 NA 5 - - 1720 15 10200 8480 -
of personnel (man)
(free access area)
Contaminated clothes - - - -
34 60 - - NA 5 - 140 140
storeroom
Shower room with 31 - - - -
34 60 - - NA 5 - 2330 2330
shower chamber
Toilet 34 60 - - NA 5 - 10 - - - - 450
Thermal Chamber - - -
34 60 - - NA 5 - - 170 170
(bath of dry heat)
Room for drying
body dosimetric 34 60 - - NA 5 - - 870 - - - -
control
Clean clothes
34 60 - - NA 5 - - 70 - - - 70
storeroom
Sanitary lock
cloakroom of private
clothes per 220people
34 60 26+1 50+5 NA 5 - - 10200 15 10200 - 8354
of personnel (man)
(controlled access
area)
Amenity room 34 60 26+1 50+5 NA 5 - - 272 4 2720 2448 -
Reserve 34 60 26+1 50+5 NA 5 - - 136 2 1360 1224 -

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 53 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Duty personnel room


34 60 26+1 50+5 NA 5 - 136 2 1360 1224 -
- (free access area)
Cleaning equipment
room (free access 34 60 26+1 50+5 NA 5 - - 68 1 680 612 -
area)
Workshop of special
system electrical 34 60 26+1 50+5 NA 5 - - 2720 4 2720 - 2450
instruments
Electrical assembly - - -
room ( controlled 34 60 - - Required 5 - - 850 850
access area)
Duty personnel room
(controlled access 34 60 26+1 50+5 NA 5 - - 1360 2 1360 - 1360
area)
Cleaning equipment - - -
room - (controlled 34 60 - - NA 5 - - 60 60
access area)
Corridor (controlled
34 60 - - NA 5 - - 730 - - - -
access area)
Toilet men
34 60 - - NA 5 - 10 216 100 - - 100
(controlled access)
Toilet women
34 60 - - NA 5 - 10 216 100 - - 100
(controlled access)
Fifth Floor Plan - (Level : + 18.00)
Aerosol filter room -
34 60 - - NA 5 - - 200 - - - 200
1

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 54 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Aerosol filter room -


34 60 - - NA 5 - - 200 - - - 200
2
Aerosol filter room -
34 60 - - NA 5 - - 200 - - - 200
3
Aerosol filter room -
34 60 - - NA 5 - - 200 - - - 200
4
Corridor (controlled
34 60 - - NA 5 - - 8360 - - - 10500
access area)
Exhaust ventilation
chamber of cable 34 60 - - NA 5 - 400 - - - 500
shaft
Electrical assembly
34 60 26+1 50+5 Required 5 - - 510 6 5100 4590 -
room - 1
Electrical assembly
34 60 26+1 50+5 Required 5 - - 510 6 5100 4590 -
room - 2
Aerosol filter room -
34 60 - - NA 5 - - 200 - - - 200
5
Aerosol filter room -
34 60 - - NA 5 - - 200 - - - 200
6
Plenum exhaust
ventilation centre 34 60 - - NA 5 - - 3400 - - - 1770
room
Corridor (free
34 60 - - NA 5 - - 450 - - - -
access area)
Corridor (controlled
34 60 - - NA 5 - - 250 250
access area)

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 55 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

Vent shaft 34 60 - - NA 5 - - - - - - 150


Lift Lobby 34 60 - - NA 5 - - - - - - 150
Sixth Floor Plan - (Level : + 23.40)
Corridor - (free
34 60 - - NA 5 - - 300 - - - -
access area)
Corridor -
(controlled access 34 60 - - NA 5 - - 100 - - - -
area)
Machine
compartment of Lift 34 60 26+1 50+5 Required 5 - - 340 5 3400 3060 -
(free access area)
Machine
compartment of Lift -
34 60 26+1 50+5 Required 5 - - 2720 4 2720 - 2450
- (controlled access
area)

@ - During drying exhaust shall be 4330 CMH and dedicated 1020 CMH centrifugal blower is envisaged for the purpose.

Equipment Selection:

1. Free access area

- 45 TR X 2 Nos. AHU (1W + 1S) each of 30600 CMH (min) for Sanitary lock rooms at El : 7.2m, 10.8m & 14.4m
- 56 TR X 2 Nos. AHU (1W + 1S) each of 44625 CMH (min) for all AC areas except sanitary lock rooms
- 0 SAB41 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 15790 CMH
- 0 SAB42 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 17370 CMH
- 0 SAB24 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1020 CMH for washing and drying section

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 56 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

- 0 SAB25 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 270 CMH for clean clothes storeroom
- 0 SAB20 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 5680 CMH
- 0 SAB22 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7270 CMH for plenum exhaust vent room and plenum exhaust vent
chamber.
- 0 SAB21 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 15860 CMH
- 0 SAB23 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fan of 5850 CMH for toilets
- 0 SAB80 AN001 - 1 Nos (1W) Centrifugal exhaust air fans each of 24200 CMH for smoke removal from corridors during emergency.

2. Controlled access area

- 45 TR X 2 Nos. AHU (1W + 1S) each of 30600 CMH (min) for Sanitary lock rooms at El : 7.2m, 10.8m & 14.4m
- 66 TR X 2 Nos. AHU (1W + 1S) each of 44880 CMH (min) for all AC areas except sanitary lock rooms
- 0 KLR43 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 7620 CMH
- 0 KLR40 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 6300 CMH
- 0 KLR41 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 6000 CMH
- 0 KLR42 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 31030 CMH
- 0 KLS43 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 24510 CMH
- 0 KLS40 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 12350 CMH
- 0 KLS41 AN001/002 - 2 Nos (1W + 1S) Dry type AHU for supply, each of 7210 CMH
- 0 KLR28 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7310 CMH with aerosol filters.
- 0 KLR20 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 33930 CMH
- 0 KLR22 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7900 CMH with aerosol filters.
- 0 KLS21 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7710 CMH
- 0 KLS20 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 45932 CMH
- 0 KLS22 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 25618 CMH
- 0 KLS23 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 6812 CMH
- 0 KLS24 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 660 CMH for toilets
- 0 KLR21 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7180 CMH
- 0 KLR24 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 7760 CMH with aerosol filters.
- 0 KLS25 AN001/001 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 17700 CMH
- 0 KLR25 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 3380 CMH
- 0 KLR26 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1000 CMH

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 57 of 57


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN MAIN PLANT REV. NO. : R0
PACKAGE DATE : 10.09.12

- 0 KLR27 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 1720 CMH
- 0 KLR23 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 700 CMH
- 0 KLS27 AN001/002 - 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 510 CMH
- 0 KLS10 AN001 - 1 no centrifugal exhaust air fan of 270 CMH for local exhaust of workshop of electric measuring device.
- 0 KLS11 AN001 - 1 no centrifugal exhaust air fan of 270 CMH for local exhaust of workshop of secondary device.
- 0 KLS12 AN001 - 1 no centrifugal exhaust air fan of 270 CMH for local exhaust of workshop of special system electrical instrumentation.
- 0 KLS13 AN001 - 1 no centrifugal exhaust air fan of 270 CMH for local exhaust of PPPE device workshop.
- 0 KLS14 AN001 - 1 no centrifugal exhaust air fan of 400 CMH for local exhaust of radiometric instruments control workshop.

Reference:

1. Architectural Drawing: I301.KK34.0UYB.0.AR.OK.WD101. Sheet 1 to 6


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UYB.0.OW.OK.WD001 -2 sheets

OW/01 September 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 1 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

ANNEXURE-3

LIST OF BUILDINGS COVERED IN AUXILIARY AREA PACKAGE :

1. 0 UEL OIL & DIESEL PUMP STATION


2. 0 UGD DM PLANT
3. 0 UGE WATSE WATER NEUTRALIZATION BUILDING
4. 0 UTP NITROGEN GENERATION PLANT
5. 0 UTQ HYDROGEN AND OXYGEN GENERATION PLANT
6. 01 UYE NUCLEAR ISLAND GUARD HOUSE
7. 02 UYE NUCLEAR ISLAND GUARD HOUSE
8. 0 UCS COMMON CONTROL ROOM
9. 01 UGD CHEMICAL STORAGE
10. 0 UBS COMMON SUB-STATION

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 2 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Notes :

1. Bidder to crosscheck the estimated plant capacity in his own interest before accepting the quantities given in the
table below. However, minimum capacity of the plant shall be as indicated in this table. Bidder shall guarantee the
inside conditions throughout the year irrespective of variation in outside weather condition and/or inside heat
loads.

2. The air-conditioning loads and air quantities provided in the table are tentative and liable to change during detailed
engineering. Detailed AC load and air quantity calculations are to be done by contractor during detailed engineering
to maintain the indoor conditions provided in the table. However value provided in the table are minimum to be
considered by the contractor for Ventilation and Air-conditioning equipment selection and further downstream
engineering (ducting, piping etc. design).

3. Minimum air changes to be considered for air quantity are provided in the table below. However, where temperature
conditions are to be maintained as per the table provided below, fresh air/outdoor air quantities shall be calculated
based on both of these conditions (ACPH basis and temp. basis) and higher of the two shall be used for used for
equipment selection.

4. Above notes shall be applicable for all buildings.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 3 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

1.0 0 UEL OIL AND DIESEL PUMP STATION

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
DB RH DB RH n W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) Panel/Equipme (ACPH (CMH Duty humidifi Air
(0C) (0C) nt Heat ) ) (TR) ed Air (CMH)
Dissipation Qty.
Load (KW) (CMH)
Diesel fuel pumping 34 60 Ambie - 5 - 6 / 12# 7200 - - - 7200 /
station (Double nt+50C Not Available 17620#
height)
Power Distribution 34 60 Ambie - 5 - 15 1260 - - - 1260
Not Available
Centre Room nt+50C
Exhaust Ventilation 34 60 - - 5 - - - - - - 480
NA
Chamber
Foam Fire-fighting 34 60 Ambie - 5 - - 1360 - - - 1360
Not Available
Pump House nt+50C
Forced ventilation 34 60 - - 5 - - 460 - - - -
NA
chamber
Operator's Room 34 60 26+ 1 45+5 NA 5 - 1 - 3 1400 1400 -
Amenity Room 34 60 26+ 1 45+5 NA 5 - 1 - 3 1400 1400 -
Store Room 34 60 - - NA 5 - 2 - - - - 150
Corridor 34 60 - - NA 5 - - 490 - - - -
Air intake chamber 34 60 - - NA 5 - -
Sanitary facility 34 60 - - NA 5 - 10 - - - - 340

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 4 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

# - During emergency condition 12 ACPH is to be considered.

Equipment Selection :
3 TR X 1 Nos. Split AC for Operator Room
3 TR X 1 Nos. Split AC for Amenity Room
0 SAP50 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 7200 CMH for Diesel Fuel Pumping Station.
0 SAP30 AN001/002 2 Nos (1W + 1S) Centrifugal exhaust air fans each of 5480 CMH for Diesel Fuel Pumping Station.
0 SAP33 AN001 1 Nos (1W) Centrifugal exhaust air fans of 12140 CMH for Diesel Fuel Pumping Station during emergency operation
0 SAP51 AN001/002 2 Nos (1W + 1S) Dry type AHU for supply, each of 3570 CMH for Power distribution, Foam fire-fighting corridor and forced
ventilation chmaber'
1 Nos (1W) axial exhaust fans each of 340 CMH for sanitory facility
0 SAP36 AN001 - 1 No. Roof Extractor of 1260 CMH for Power Distribution centre room

Reference :
1. Architectural Drawing : I301.KK34.0UEL.0.AR.OK.WD101. Sheet 1 to 2
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UEL.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 5 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

2.0 0 UGD DM PLANT

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
DB RH DB RH Panel/Equipme W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) nt Heat (ACPH (CMH) Duty humidifi Air
(0C) (0C) Dissipation ) (TR) ed Air (CMH)
Load (KW) Qty.
(CMH)
Diesel, DM & Plant
water treatment
34 60 - - Not available 5 - 15 110000 - - - 110000
system

Equipment Selection :

12 Nos (8W + 4S) axial flow supply air fans each of capacity 13750 CMH.
12 Nos (8W + 4S) axial flow Roof extractors each of capacity 13750 CMH.

Reference :

1. Architectural Drawing : I301.KK36.0UGD.0.AR.OK.WD101. Sheet 1


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UGD.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 6 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

3.0 0 UGE WATSE WATER NEUTRALIZATION BUILDING

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Local control cubicle 34 60 251 505 2.32 5 - 1 150 6.8 5600 5450 -
Electrical Room 34 60 - - Required 5 20 9000 - - - 9000
34 60 Ambie - NA 5 15 15000 - - - 15000
Pump House
nt+50C
Storeroom 34 60 - - NA 5 6 200 - - - -
Toilet 34 60 - - NA 5 10 - - - - 560

Equipment Selection :

8.5 TR Air-cooled PU (1W+1S) each of 5600 CMH (min) capacity


2 Nos (1W + 1S) Centrifugal supply air fans each of 24200 CMH for Pump house, store room and Electric room
2 Nos (1W + 1S) Centrifugal exhaust air fans each of 15000 CMH for Pump house
2 Nos (1W + 1S) axial exhaust fans each of 560 CMH for toilet

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 7 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

1 No. Roof Extractor of 9000 CMH for Electrical Room

Reference :

1. Architectural Drawing : I301.KK34.0UEL.0.AR.OK.WD101. Sheet 1 to 2


2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UEL.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 8 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

4.0 0 UTP NITROGEN GENERATION PLANT

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
34 60 Ambie - 5 - 12 45000 - - - 45000
N2 Generation Plant Required
nt+50C
Attendant Room 34 60 - - NA 5 - 6 200 - - - -
Toilet 34 60 - - NA 5 10 - - - - 420

Equipment Selection :
2 Nos (1W + 1S) Centrifugal supply air fans each of 45200 CMH for N2 genaration Room & Attendent room.
1 Nos axial exhaust fan of 420 CMH for toilet
6 Nos (4W + 2S) axial exhaust fans each of 11250 CMH for N2 generation plant

Reference :
1. Architectural Drawing : I301.KK16.0UTP.0.AR.OK.WD101. Sheet 1
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK16.0USF.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 9 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

5.0 0 UTQ HYDROGEN AND OXYGEN GENERATION PLANT

Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Area Description Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH) Duty humidifi Air
(0C) (0C) ) (TR) ed Air (CMH)
Qty.
(CMH)
Ambie - 100000
H2 O2 generation
34 60 nt - Required 5 - 20 - - -
room
+50C
Maintenance and - 2400
34 60 - - Required 5 - 12 2400 - -
preparation room
Electrical panel room 34 60 - - Required 5 - 12 2400 - - - 2400
Ventilation room 34 60 - - Required 5 - 2 400 - - - -
Toilet 34 60 - - NA 5 - 10 - - - - 720

$ - Exhaust fans (axial flow fans) shall operate only during emergency operation.

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 10 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Equipment Selection :

2 Nos (1W + 1S) Centrifugal supply air fans each of 5200 CMH for maintenance and preparation room, elect panel room and vent room
10 Nos axial flow exhaust air fans each of capacity 10000 CMH for H2-O2 generation Room
1 No axial flow exhaust air fans each of capacity 700 CMH for toilet
2 Nos (1W + 1S) axial flow exhaust air fans each of capacity 2400 CMH for Maintenance and preparation room
2 Nos (1W + 1S) axial flow exhaust air fans each of capacity 2400 CMH for Electrical panel room

Reference :
1. Architectural Drawing : I301.KK16.010UTQ.0.AR.OK.WD101. Sheet 1
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0USE.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 11 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

6.0 01 UYE NUCLEAR ISLAND GUARD HOUSE

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Ground Floor Plan
Pass Room 34 60 - - NA 5 6 400 - - - -
Guard Room 34 60 - - NA 5 6 130 - - - -
Toilet 34 60 - - NA 5 10 - - - - 100

Equipment Selection :
2 Nos (1W + 1S) axial supply air fans each of 400 CMH for Pass Room
2 Nos (1W + 1S) axial supply air fans each of 130 CMH for Guard Room
1 No axial exhaust fan of 100 CMH for toilet

Reference :
1. Architectural Drawing : I301.KK34.01UYE.0.AR.OK.WD101. Sheet 1
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.01UYE.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 12 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

7.0 02 UYE NUCLEAR ISLAND GUARD HOUSE

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
Inside Design n
Conditions Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Ground Floor Plan
Reception Room 34 60 26+ 1 45+5 NA 5 - 1 22 0.98 695 673 22
Security Office 34 60 26+ 1 45+5 NA 5 - 1 22 0.98 695 673 22
Security Lobby 34 60 26+ 1 45+5 NA 5 - 1 118 5.22 3700 3582 118
CISF 34 60 26+ 1 45+5 NA 5 - 1 20 0.87 618 598 20
VHF Wireless Room 34 60 26+ 1 45+5 Required 5 - 1 23 1.03 729 706 23
PPS Maintenance 26+ 1 45+5 NA 5 - 1 22 0.99 700 678 22
34 60
Room
UPS-PPS-IPS-PS 26+ 1 45+5 NA 5 - 1 53 2.33 1650 1597 53
34 60
Room
CAS Console Area 34 60 26+ 1 45+5 NA 5 - 1 59 2.61 1850 1791 59

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 13 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
Inside Design n
Conditions Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
REC Store 34 60 - - NA 5 - 2 300 - - - -
Dish Wash Room 34 60 - - NA 5 - 6 450 - - - -
Dining Hall 34 60 26+ 1 45+5 NA 5 - 1 170 5.9 4000 3830 -
Hash Wash Room 34 60 - - NA 5 - 6 450 - - - -
Toilet 34 60 - - NA 5 - 10 - - - - 100

Equipment Selection :
8.5 TR X 2 Nos. (1W + 1S) Air cooled PU of 4000 CMH (min) for Dining Room
16.5 TR X 2 Nos. (1W + 1S) Air cooled PU of 10600 CMH (min) for west-side part of the building
2 Nos (1W + 1S) axial supply air fans each of 300 CMH for Record Room
1 No axial supply air fan of 450 CMH for Dish wash room
1 No axial supply air fan of 450 CMH for hand wash room
1 No axial exhaust fan of 760 CMH for toilet

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 14 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Reference :
1. Architectural Drawing : I301.KK34.02UYE.0.AR.OK.WD101. Sheet 1 to 2
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.02UYE.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 15 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

8.0 0 UCS COMMON CONTROL ROOM

Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Area Description Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Common Control 5 - 1 643 10.1 7220 6577 -
34 60 25+1 50+5 Required
Room
Common equipment 5 - 1 545 8.6 6120 5575 -
34 60 25+1 50+5 Required
Room
Clean Agent 34 60 - - Required 5 - 6 1080 - - - -
Lobby 34 60 25+1 50+5 NA 5 - - 113 1.8 1260 1147 -
Storeroom 34 60 - - NA 5 - 6 1800 - - - -
Inst. Store 34 60 - - NA 5 - 6 600 - - - -
Toilet 34 60 - - NA 5 - 10 - - - - 1000
Laboratory (02UGD) 34 60 25+1 50+5 NA 5 - 16.5 11220

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 16 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Equipment Selection :
22 TR Air-cooled PU (1W+1S) each of 14600 CMH (min) capacity for common control room, common equipment room and lobby.
2 Nos (1W + 1S) axial supply air fans each of 1080 CMH for Clean Agent Room
2 Nos (1W + 1S) axial supply air fans each of 1800 CMH for Storeroom
2 Nos (1W + 1S) axial supply air fans each of 600 CMH for Instru store Room
1 No axial exhaust air fan of 1000 CMH for toilet
16.5 TR 2 Nos Air-cooled PU (1W+1S) each of 11220 CMH (min) capacity for Laboratory (02 UGD)

Reference :
1. Architectural Drawing : I301.KK36.UCS.0.AR.OK.WD101. Sheet 1
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK36.UCS.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 17 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

9.0 01 UGD CHEMICAL STORAGE

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Ground Floor Plan - (Level : 0.00)
Nitric acid measuring 5 - # 2700 / - - - 2700 /
34 60 - - NA 5 / 20
& pumping room 10500 13200
Sulphuric acid NA 5 - # 2700 / - - - 2700 /
5 / 20
measuring & 34 60 - - 10500 13200
pumping room
Ammonia measuring NA 5 - # 2700 / - - - 2700 /
34 60 - - 5 / 20
& pumping room 10500 13200
Caustic soda NA 5 - # 2700 / - - - 2700 /
5 / 20
measuring & 34 60 - - 10500 13200
pumping room

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 18 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
Hydrazine storage & NA 5 - # 4900 / - - - 4900 /
34 60 - - 5 / 20
pumping room 19200 23900
Trisodium phosphate NA 5 - # 4300 / - - - 4300 /
5 / 20
storage & pumping 34 60 - - 16500 20800
room
Chemical storage NA 5 - # 1750 / - - - 1750 /
34 60 - - 5 / 20
rooms 7000 8750
FirstFloor Plan - (Level : +3.00)
Operator room/office NA 5 - 1 - 2 1700 1700 -
34 60 26+ 1 45+5
area
Instrumentation tool NA 5 - 12 1480 - - - 1480
34 60 - -
room
Electrical tool room 34 60 - - NA 5 - 12 1480 - - - 1480
Mechanical tool 34 60 - - NA 5 - 12 1480 - - - 1480

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 19 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH Duty humidifi Air
(0C) (0C) ) ) (TR) ed Air (CMH)
Qty.
(CMH)
room

# - For normal operation 5 ACPH shall be considered, for emergency ventilation 25 ACPH shall be considered.

Equipment Selection :
3 TR X 2 Nos. (1W + 1S) Split AC for Operator Room
2 Nos (1W + 1S) centrifugal supply air fans each of 20000 CMH for chemical unloading/transfer rooms
2 Nos (1W + 1S) centrifugal supply air fans each of 6200 CMH for chemical storage, Instrumentation, Electrical and Mechanical tool room
2 Nos (1W + 1S) centrifugal exhaust air fans each of 2700 CMH for Nitric acid measuring and pumping room
2 Nos (1W + 1S) centrifugal exhaust air fans each of 2700 CMH for Sulphuric acid measuring and pumping room
2 Nos (1W + 1S) centrifugal exhaust air fans each of 2700 CMH for Ammonia measuring and pumping room
2 Nos (1W + 1S) centrifugal exhaust air fans each of 2700 CMH for Caustic soda measuring and pumping room
2 Nos (1W + 1S) centrifugal exhaust air fans each of 4900 CMH for Hydrazine measuring and pumping room
2 Nos (1W + 1S) centrifugal exhaust air fans each of 4300 CMH for trisodium phosphate measuring and pumping room
2 Nos (1W + 1S) centrifugal exhaust air fans each of 1800 CMH for chemical storage rooms
2 Nos (1W + 1S) centrifugal exhaust air fans each of 4400 CMH for instru, elect and mech tool room

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 20 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

1 Nos centrifugal exhaust air fan of 10500 CMH for Nitric acid measuring and pumping room during emergency operation
1 Nos centrifugal exhaust air fan of 10500 CMH for Sulphuric acid measuring and pumping room during emergency operation
1 Nos centrifugal exhaust air fan of 10500 CMH for Ammonia measuring and pumping room during emergency operation
1 Nos centrifugal exhaust air fan of 10500 CMH for Caustic soda measuring and pumping room during emergency operation
1 Nos centrifugal exhaust air fan of 19200 CMH for Hydrazine measuring and pumping room during emergency operation
1 Nos centrifugal exhaust air fan of 16500 CMH for trisodium phosphate measuring and pumping room during emergency operation
1 Nos centrifugal exhaust air fan of 7000 CMH for Chemical storage room during emergency operation

Reference :
1. Architectural Drawing : I301.KK34.01UGD.0.AR.OK.WD101. Sheet 1 to 2
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.09UGD.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 21 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

10.0 0 UBS COMMON SUB-STATION

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH) Duty humidifi Air
(0C) (0C) ) (TR) ed Air (CMH)
Qty.
(CMH)
Basement Plan - (Level : -3.600)
Cable Room 34 60 - - NA 5 - 6 27100 - - - 27100
Ground Floor Plan - (Level : 0.00)
Ambie - Not available 5 - 12 47000 - - - 47000
Switchgear Room 34 60
nt+50C
SCADA 50+5 Not available 5 - 1 170 4.9 3950 3780 -
RTU/Battery Charger 34 60 25+1
Room
Ambie - Not available 5 - 12 2300 - - - 2300
220V Battery Room 34 60
nt+50C
Ambie - Not available 5 - 6 7600 - - - 7600
Transformer 34 60
nt+50C

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : Page 22 of 22


VENTILATION AND AIR-CONDITIONING SYSTEM SUMMARY OF PLANT BUILDINGS COVERED IN AUXILIARY REV. NO. : R0
AREA PACKAGE DATE : 10.09.12

Area Description Outside Design Inside Design Electrical Panel Lighting Occup Fresh/Ventilation Air-conditioning Capacity Exhaust
condition Conditions /Instrumentatio Load ancy air Requirement Air
n
Panel/Equipme
nt Heat
Dissipation
Load (KW)
DB RH DB RH W/sq.m. Nos. Rate Qty Heat De- Return CMH
Temp. (%) Temp. (%) (ACPH (CMH) Duty humidifi Air
(0C) (0C) ) (TR) ed Air (CMH)
Qty.
(CMH)
Supply air centrifugal - NA 5 - 2 800 - - - -
34 60 -
fan room

Equipment Selection :

5.5 TR Air-cooled PU (1W+1S) each of 3950 CMH (min) capacity FOR scada rtu/ Battery charger room
2 Nos (1W + 1S) centrifugal supply air fans each of 84800 CMH for Cable room, switchgear room, battery room and Transformers
2 Nos (1W + 1S) centrifugal exhaust air fans each of 81700 CMH for Cable room, switchgear room and Transformers
2 Nos (1W + 1S) axial exhaust air fans each of 2300 CMH for 220V Battery Room
1 No centrifugal supply air fan of 54200 CMH for cable room during emergency operation

Reference :
1. Architectural Drawing : I301.KK34.0UBS.0.AR.OK.WD101. Sheet 1 to 2
2. Basic scheme of ventilation & Air conditioning system within building - Drawing Number I301.KK34.0UBS.0.OW.OK.WD001

OW/01 September, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 1 OF 2


TECHNICAL SPECIFICATION FOR REV. NO. : P1
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 03.08.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

ANNEXURE-4

VENDOR'S SCOPE OF WORK-ELECTRICAL

Erection, Testing
S.No. Description Supply
& Commissioning
1 All MV Motors
2 All LV motors and other LV loads
3 PCC/PMCC
PDBs for all motors & other loads of air-conditioning/
4
ventilation system
(Refer Technical Specification for 415V MCCs for
requiremnet of PDBs)
5 Lighting Distribution board
6 Lighting/Power panels
7 Lighting within package battery limits
8 Welding receptacles
Incoming bus-duct/cables from transformer to
9
PCC/PMCC
Cabling from PDB onwards for all LV loads
10
(Excluding Motor Loads)
11 Cabling from PDB onwards for all LV motors
12 Transformers (Distribution/ Lighting etc.)
13 Civil work for transformers
All Cable trays, as required, for cabling inside AC
14
plant room/AC package rooms & ventilation rooms
15 Portable, chargeable emergency lamps
Equipment Earthing for all vendor supplied
16
equipments
17 Local control stations/Local control panel, as reqd.
18 Telephone system within package battery limits
Plant communication system within package battery
19
limits
20 Fire alarm system within package battery limits
21 Earthpits for lightning conductors
22 Earthpits for transformer neutral
23 UPS & Battery along with ACDB
24 Battery & Battery Charger along with DCDB
25 Data Concentrator Panel
Incoming cabling from Owner's PCC to Vendor's
26
MCC
27 Incoming cabling from Owner's LDB to Vendor's
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 2 OF 2


TECHNICAL SPECIFICATION FOR REV. NO. : P1
VENTILATION AND AIR-CONDITIONING SYSTEMS OF DATE : 03.08.12
NPCIL DESIGN SCOPE OF PLANT BUILDINGS

S.No. Description Supply Erection, Testing


LDB/Lighting/Power panels
Incoming cabling from Owner's DCDB, UPS to
28
Vendor's DCDB, ACDB
Incoming cabling from Owner's Emg. Swbd to
29
Vendor's Emg. Swbd

2 Battery limits
S.No. Description By vendor By Contractor
1 MV Cable termination at transformer
2 Cable termination on MV motors
3 Cable termination on LV motors
Cable termination at Vendor's PDB incomers in AC
4
Plant rooms/AC package room .
Cable termination at Vendor's PDB incomers in
5
Ventilation Room
1 No. earth plate inside AC Plant rooms/AC package
6
room.
7 1 No. earth plate inside Ventilation Room
Interconnection of Contractor's earth plate provided in
8 AC plant room/AC package room & Ventilation
Room to Plant main earth grid at 2 points
NUCLEAR POWER CORPORATION OF INDIA LIMITED

KUDANKULAM NUCLEAR POWER PROJECT - 3&4 PAGE NO. : 1OF 1


TECHNICAL SPECIFICATION FOR REV. NO. : P1
VENTILATION AND AIR-CONDITIONING SYSTEMS OF NPCIL DESIGN SCOPE OF PLANT BUILDINGS DATE : 06.08.12

ANNEXURE-5- INSTRUMENT INDEX FORMAT (TYPICAL)


ANNEXURE-5 - INSTRUMENT INDEX FORMAT (TYPICAL)
Information Allocation Primary Measuring
Sampling Point Parameter Value Medium Note
Analog Discrete Transducer Level
Tag No. Measuring Unit Interlock Process of
Room Pmax Alarming Sensor Type Signal
Operating min. Description
Tag no.
Coordinates Operating max. Tmax. In-situ II WS Set point ILP WS Set Point Designation Range

REMARKS
1 Parameter & details shall be provided by EPC contractor during detailed engineering.

ENGINEERS INDIA LIMITED

NEW DELHI REV DATE BY


Note:-This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are mereley loaned and on the borrower's express agreement that they will not be reproduced, copied, loaned, exhibited nor used except to the
limited way and private use permitted by any written consent given by the lender to borrower.

OW/02 August, 2012


NOT FOR PUBLICATION / PRESENTATION OUTSIDE NPCIL & EIL
N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

OUAB - 400 KV GIS BUILDING


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

12.06.2012 12.06.2012 12.06.2012

I301.KK34.0UAB.0.OW.OK.WD001
A209-0M1-16-44-1001 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

2. MODE-I = NORMAL OPERATION.


3. MODE-II = EMERGENCY OPERATION.

1 A ISSUED FOR COMMENTS

230 KV GIS BUILDING


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

13.06.2012 13.06.2012 13.06.2012

I301.KK34.0UAD.0.OW.OK.WD001
A209-0M1-16-44-1002 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

+4,200
+4,200 +4,200 +4,200 +4,200 +4,200 +4,200 +4,200
+4,200 +4,200 +4,200
+4,200 +4,200 +4,200
+4,200 +4,200

-3,600
-3,600 -3,600 -3,600 -3,600 -3,600 -3,600 0,000 0,000 0,000 0,000 0,000
0,000 0,000 0,000 0,000

1 A ISSUED FOR COMMENTS

SWITCHYARD CENTRAL CONTROL BLDG.


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

14.06.2012 14.06.2012 14.06.2012

I301.KK34.0UAC.0.OW.OK.WD001
A209-0M1-16-44-1003 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

2. MODE-I = NORMAL OPERATION.


3. MODE-II = EMERGENCY OPERATION.

1 A ISSUED FOR COMMENTS

POWER SUPPLY BUILDING 01,02,03 UBG


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

14.06.2012 14.06.2012 14.06.2012

I301.KK34.0UBG.0.OW.OK.WD001
A209-0M1-16-44-1004 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

COMPRESSOR BUILDING
BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

18.06.2012 18.06.2012 18.06.2012

I301.KK34.0UTF.0.OW.OK.WD001
A209-0M1-16-44-1005 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

CHILLER BUILDING
BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

18.06.2012 18.06.2012 18.06.2012

I301.KK34.0UQR.0.OW.OK.WD001
A209-0M1-16-44-1006 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

OIL & DIESEL PUMP STATION


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

18.06.2012 18.06.2012 18.06.2012

I301.KK34.0UEL.0.OW.OK.WD001
A209-0M1-16-44-1007 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

CHLORINATION PLANT
BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

19.06.2012 19.06.2012 19.06.2012

I301.KK34.0UPK.0.OW.OK.WD001
A209-0M1-16-44-1008 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

FIRE FIGHTING SERVICE WATER PUMP HOUSE


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

19.06.2012 19.06.2012 19.06.2012

I301.KK34.03UGF.0.OW.OK.WD001
A209-0M1-16-44-1009 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

STORM WATER PUMP HOUSE


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

20.06.2012 20.06.2012 20.06.2012

I301.KK34.0UGH.0.OW.OK.WD001
A209-0M1-16-44-1010 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

TUNNEL VENTILATION - 05, 6UAZ


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

20.06.2012 20.06.2012 20.06.2012

I301.KK34.UAZ.0.OW.OK.WD001
A209-0M1-16-44-1011 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

NUCLEAR ISLAND GUARD HOUSE-01 UYE


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

21.06.2012 21.06.2012 21.06.2012

I301.KK34.01UYE.0.OW.OK.WD001
A209-0M1-16-44-1012 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

NUCLEAR ISLAND GUARD HOUSE-02 UYE


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

21.06.2012 21.06.2012 21.06.2012

I301.KK34.02UYE.0.OW.OK.WD001
A209-0M1-16-44-1013 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

ENGINEERING UTILITY & LABORATORY BUILDING


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

29.06.2012 29.06.2012 29.06.2012

I301.KK34.0USV.0.OW.OK.WD001
A209-0M1-16-44-1014 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

HEALTH PHYSICS BUILDING


(CONTROLLED ACCESS AREA)
BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING
PREM SD SM

25.06.2012 25.06.2012 25.06.2012

A209-0M1-16-44-1015 (SHT. 1 OF 2) A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

HEALTH PHYSICS BUILDING


(COMMON ACCESS AREA)
BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING
PREM SD SM

25.06.2012 25.06.2012 25.06.2012

A209-0M1-16-44-1016 (SHT. 2 OF 2) A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

OIL CONTAINING WATER TREATMENT PLANT


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

25.06.2012 25.06.2012 25.06.2012

I301.KK36.0UGM.0.OW.OK.WD001
A209-0M1-16-44-1017 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

WASTE WATER NEUTRALIZATION BUILDING


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

26.06.2012 26.06.2012 26.06.2012

I301.KK36.0UGE.0.OW.OK.WD001
A209-0M1-16-44-1018 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

DOMESTIC WATER TREATMENT BUILDING


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

26.06.2012 26.06.2012 26.06.2012

I301.KK36.0UGG.0.OW.OK.WD001
A209-0M1-16-44-1019 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

DM PLANT
BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

26.06.2012 26.06.2012 26.06.2012

I301.KK36.0UGD.0.OW.OK.WD001
A209-0M1-16-44-1020 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

COMMON SUBSTATION IN AUXILIARY AREA


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

26.06.2012 26.06.2012 26.06.2012

I301.KK34.0UBS.0.OW.OK.WD001
A209-0M1-16-44-1021 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

CHEMICAL STORAGE
BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

27.06.2012 27.06.2012 27.06.2012

I301.KK34.01UGD.0.OW.OK.WD001
A209-0M1-16-44-1022 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

NITROGEN GENERATION PLANT


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

27.06.2012 27.06.2012 27.06.2012

I301.KK16.0USF.0.OW.OK.WD001
A209-0M1-16-44-1023 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

HYDROGEN & OXYGEN GENERATION PLANT


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

27.06.2012 27.06.2012 27.06.2012

I301.KK16.0USE.0.OW.OK.WD001
A209-0M1-16-44-1024 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

COMMON CONTROL ROOM IN AUXILIARY AREA


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

27.06.2012 27.06.2012 27.06.2012

I301.KK36.0UCS.0.OW.OK.WD001
A209-0M1-16-44-1025 A

3-1641-0500 REV.2 A1- 0841 x 0594


N
NOTES :-
1. ALL DIMENSIONS ARE IN MM. & LEVELS IN METRES.

1 A ISSUED FOR COMMENTS

CENTRAL WORKSHOP OF THE CONTROLLED ACCESS AREA


BASIC SCHEME OF VENTILATION & AIR CONDITIONING SYSTEM WITHIN BUILDING

PREM SD SM

27.06.2012 27.06.2012 27.06.2012

I301.KK34.0UKU.0.OW.OK.WD001
A209-0M1-16-44-1026 A

3-1641-0500 REV.2 A1- 0841 x 0594