QA/QC Inspection Checklist

design coordinates, inc. CP No. __________________


VECTOR THREE
Northgate, Cyberzone, Filinvest Corporate City,
Alabang, Muntinlupa City

Building Element/System: D20 Plumbing Systems


Category: D2020 Domestic Water Distribution / Hot & Cold Water Supply
Items to be Inspected: Valves/Hot & Cold Water Distribution
Date Inspected:
Supplier:
Location:

Non - Not Remarks / Due


ITEM / REQUIREMENT Conform.
Conform. Avail.
N/A
Corrective Actions Date
Open Close

A SUBMITTALS:
A.1 Materials:
a.1.1 Body
a.1.2.Disc
a.1.3 Stem
a.1.4 Seat Ring :
a.1.5 Actuator Type
a.1.6 End Connections
a.1.7 Working Pressure
a.1.8 Conformance to ASTM or
other standards:
a.1.9 Brand:
a.1.10 Origin:
A.2 Shopdrawings
INSTALLATIONS: flanged,
B
threaded, welded or braced
B.1 Valves:
b.1.1 gate valve
b.1.2 check valve
b.1.3 ball valve
b.1.4 butterfly valve
b.1.5 globe valve
b.1.6 pressure reducing valve
b.1.7 solenoid shut-off valve
b.1.8 modulating float valve
b.1.9 float valve
b.1.10 pressure relief valve
b.1.11 angle valve strainer
b.1.12 surge anticipating
control valve:
b.1.12.1 isolation
b.1.12.2 stop
b.1.12.3 rising stem
b.1.12.4 screwed
bonnet

DCI-QIC rev. 01 Page 1 of 2


QA/QC Inspection Checklist
design coordinates, inc. CP No. __________________
VECTOR THREE
Northgate, Cyberzone, Filinvest Corporate City,
Alabang, Muntinlupa City

Remarks /
Non - Not Due
ITEM / REQUIREMENT Conform.
Conform. Avail.
N/A Corrective
Date
Open Close
Actions
b.1.12.5 inside screw
and wedge
gate
b.1.12.6 bronze body
and trim
b.1.12.7 bolted bonnet
b.1.12.8 outside screw
and yoke
b.1.12.9 iron body
b.1.12.10 flanged ends
b.1.12.11 pressure
rating (WOG)
as specified
C TESTING PROCEDURES:
C.1 Hydrostatic test
C.2 Leaks

General Notes, Comments and Recommendations:

Inspected by : Noted by : Concurred by :

________________________________ ____________________________________ ________________________________


Construction Project Engineer / Architect Construction Project Manager Supplier

Distribution:

Supplier Customer/ Developer DCI File

Note: A separate Notice to Comply (DCI-NTC) can be issued to the supplier/contractor if the non-conforming item may
take time to rectify and complete.

DCI-QIC rev. 01 Page 2 of 2