Removing top soil to a depth not exceeding 6" & depositing as directed within site.
2
Excavation over site to reduce level, in any material except rock requiring blasting
including depositing and leveling as directed up to distance not exceeding 30' 0"
3 Excavation in trenches for walls/ column pits in soft/ loose soil from 0' 0" to 5' 0" deep
and depositing excavated materiel to a distance not exceeding 30' 0" (Earth work
support to be paid separately where necessary).
4 Excavation in trenches for walls/ column pits in ordinary soil from 0' 0" to 5' 0" deep
and depositing excavated material not exceeding 30' 0".
5 Excavation in trenches for walls/ column pits in Hard/ dense soil up to a depth of 5' 0"
and depositing excavated material up to a distance not exceeding 30' 0".
6 Excavation in trenches for walls/ column pits in Mud/ wet soil up to a depth of 5' 0"
and depositing excavated material to distance not exceeding 30' 0". (Earth work &
dewatering paid for separately.)
7 Excavation in trenches for walls/ column pits in soft disintegrated rock (not requiring
blasting) up to depth of 5' 0" and depositing excavated material to distance not
exceeding 30' 0".
8 Excavation in trenches for walls/ column pits in Hard rock requiring blasting up to a
depth of 5' 0" and depositing excavated material to distance not exceeding 30' 0".
Per cube
13 Filling under floors including leveling, watering & compacting in 3" layers with
available and selected earth at site.
14 Filling under floors including leveling, watering & compacting in 3" layers with
imported selected earth.
15 Cutting turf sods, landing to hand carts and transporting up to 30 yards, laying and
watering for 30 days. (Royalty for turf, pegging and transport beyond 30 yards paid
separately)
Earth work support (open planking) in trenches up to a depth of 5' 0"
16 Consider trench 15' 0" long 3' 0" wide and 5' 0" depth open planking to both faces.
Total area - 2/ 15' 0" x 5' 0"
. = 150 sq.ft
18 Earth work support (close planking) in deep excavation in trenches up to 15' 0" depth.
- Consider trench of length of 15' 0" width 5' 6" at top 3' 6" at bottom Then
area supported is 2/ 15' x 15' ie 450 sq.ft.
CONCRETE
19 Mixing concrete 1: 3: 6 (1 1/2")
24 2" thick cement concrete screed in foundation at depths not exceeding 5' 0"
25 3" thick cement concrete screed in foundation at depths not exceeding 5' 0"
29 Cement concrete in 9" x 9" colomns in ground floor. - Consider 8 No. 9" x 9" columns
each 10' 0" high ie 0.45 cubes.
Curing
Curing
Curing
33 Cement concrete in 9" x 6" beam up to 1st floor level. -
Consider 120 L.ft of beam 9" x 6" beam
I.e 0.45 cubes.
Curing
Curing
35 5" thick R.CC floor slab in 1st floor. -
Consider 5" thick slab 10' 0" x 12' 0" volume of concrete 50.00 cu.ft
Curing
Curing
37 Cement concrete in 4 1/2" x 6" lintels in ground floor. -
Consider 240 l.ft I.e 45 cu.ft
Curing
Curing
39 Cement concrete in 9" x 12" lintels in ground floor. -
Consider length 60' 0" of lintel
= 45 cu.ft
Curing
Curing
FORMWORKS
41 Sawn timber form work to 9" x 9" cement concrete column in ground floor.
Making Moulds (15 sqft) Consider column length of 5' 0"
MASONRY
45 Brick work in cement sand 1:5: in foundation up to D.P.C
47 Brick work in cement and sand 1:5 in 4 1/2" thick walls in ground floor
Rate per square
48 9" thick brick wall cement sand 1:5 in ground floor
Rate per square
49 Brick work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor
Rate per square
51 4 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor ( Facing to
brickwork measured separately)
Rate per square
52 9" thick in cement and sand 1:5 with wire cut bricks (Facing to brick work measured
separately)
Rate per square
53 13 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to
brick work measured separately)
Rate per square
54 Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1
mixture in ground floor
Rate per square
57 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces with 1'6" ramp including necessary
excavation.
Rate per 10 L. ft
58 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces without ramp including necessary
excavation.
Rate per 10 L. ft
59 8" thick Hollow block work in cement and sand mortar 1:5 in ground floor (cavities
unfilled)
Rate per square
60 4" thick Hollow block mesonry in cement and sand mortar 1:5 with cavities unfilled
Rate per square
64 Glazed tiles fixed to walles including bedding in cement morter 1:2 and raking in
ground floor. (specials measured separately)
Rate per square
65 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Rate per square
66 Timber framework for calicut pattern tile hip roof in single storey building consisting o
f wall plate, beam, ridge plate, rafters etc. (Preservutive treatment to be measured
separately)
Rate per 6 squares
67 Roof covering with calicut pattern clay tiles in single storeyod building (Timber frame
work & ridge covering measured separately)
Rate per 6 squares
68 Timber framework for corrugated asbestos sheet roof in angle storied building
Rate per 3.6 squares
69 Roof covering with corrugated asbestos sheets (timber frame work & ridge covering
measured separately)
Rate per 3.6 squares
70 One layer half round clay tiles over corrugated asbestos roof covering.
Rate per 3.6 squares
71 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
Rate per 13'4" length
72 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
Rate per 12' length
73 3/4" x 9" high valance board fixed with brass screws to ends of rafters ( for tile
roofing)
Rate per 100' length
74
3/4" x 9" high barge board fixed with brass screws at 2' 0" centres to sides of rafters.
Rate per 100' length
75 ROOF PLUMBING -
18 B.W.G (1.2 mm) galvanised from sheet valley gutter 3' 0" girth
overall once bent with end laps not less then 9" width including 3/4" tongued and
grooved planks laid to slope and grooved planks laid to slope and profile on timber
members.
76 18 B.W.G (1.2 mm) galvanised iron flashing 1' 6" girth overall 3 times bent with end
laps not less than 6", lead soldered, turned and tucked up to not less than 6" in to
cement mortar 1:2 lower end dressed over roof covering not less than 1' 0" wide.
Rate per 15' length
77 Timber Framework for 4' 0" x 4' 0" flat asbestos ceiling (Sheet measured separately)
comprising of 4" x 2" joists and 2" x 2" bearers in class I timber
Rate per 1.95 squre
78 Horisontal ceiling lining using 4' 0" x 4' 0"flat asbestos cement sheets fixed with and
including beading and cove mouldings on timber framework. (timber framework &
painting measured separated)
Rate per 1.95 squre
79 3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4" x 2"
class I timber joists at 2' 0" centers with 1 1/2" brass nails.
Rate per 15' x 13' I.e 1.95 squares
80 3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of
roof rafters, (existing) with 1 1/2" brass nails including leveling with timber strips
where necessary.
Rate per 15' x 12' I.e 1.80 squares
81 Door single hung 3' 3" x 7' 0" high overall with frame having 1 1/4" thick sash and 3
1/4" x 2 1/4" timber frames. (glazing, ironmongery & painting measured separately)
Per 22.75 square feet (3' 3" x 7' 0")
82 Door glazed and panolled double hung 4' 0" x 7' 0" high overall with frame including 1
1/4" thick sash and 3 3/4" x 2 3/4" frame. (glazing, ironmongery and painting measured
separately).
Per 28 square feet (4' 0" x 7' 0")
83 Plywood door single hung 3' 1 1/2" x 6' 1 1/2" overall with frame having 1 1/4" thick
sash and 3 3/4" x 2 3/4" frame. ( iron - mongery and painting measured separately)
Per 21.75 square feet (3' 1 1/2" x 6' 1 1/2")
84 Door ledged, braced and battened single hung 2' 6" x 6' 6" overall, with frame having
7/8" thick tongued & grooved planks and 3 3/4" x 2 3/4" frame.
( Ironmongery and painting measured separately)
Per 16.25 so.ft (2' 6" x 6' 6")
85 Window, glazed 7' 0" x 4' 0" high overall with frame comprising 3 No openable sashes
and 3 3/4" x 2 3/4" frame and mullions
(Clasing, ironmongery and painting measured separately)
Per window 7' 0" x 4' 0" (sashes) ie per 28.00 sq.ft
86 1/4" clear sheet glass panes exceeding 1' 0" but not exceeding 4 square feet cut and
fixed with timber beadings to doors and windows.
Consider sash 3' 0" x 4' 0" high with 3" x 1 1/4" style and 4 Nos.glass
panes.
Per window 9.00 sq.ft
87 IRONMONGERY
Butt hinges 5" x 2 1/2"
Per 1 1/2 pairs
89 Rim lock
Per 1 No
90 Mortice lock
Per 1 No.
91 Casement stays.
Per 4 Nos.
95 Casement fasteners.
Per 6 Nos.
96 Spring louded fanlight catches
Per 6 Nos.
97 Draw rings
Per 6 Nos.
98
3/4" thick DPC, in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.
99
5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
100
5/8" thick plastering to wall in cement sand 1:3 including cement floating
101
3/8" thick plastering to soffit slab in cement and sand 1:3 including floating with lime
putty
102
3/8" thick plastering to sides and soffit of beams in cement & sand 1:3 including
floating with lime putty
103
5/8" thick to wall in lime cement and sand 1:1:5 finished semi - rough with wooden
float.
104
5/8" thick plastering to wall in lime and sand 1:1:5 finished smooth with lime putty
floating.
105
1/2" thick rendering in cement and sand 1:3 finished smooth
106
1/2" thick rendering in cement and sand 1:2 in floors, finished smooth.
107
3/4" thick rendering in cement and sand 1:2 in floors finished smooth.
109
3/4" thick rendering in cement and sand 1:2 in coloured cement floors finished smooth.
110
1/2" x 6" skirting in cement and sand 1:3 projected or flush to walls finished with
floating including forming groove.
111
Prepare and apply one coat of preservative (oil type) to structural timber including
touching up cut ends etc. after fixing.
112
Prepare surface of steel truse and apply two coats of anti - corrosive primer.
113
Apply one coat of anti - corrosive primer and two coats enamel paint on already shop
rimed and arected steel roof truss.
114
Prepare and apply two coats primer and finishing coat of enemel paint to mild steel
(angle / flat) gate.
115
Painting steel on mew work with 2 coats of anti - corrosive paint
116
Painting new timber work with two coats wood preservative
117
Preparing and painting wood work with primer and 2 coats enamel paint.
118
119
120
Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint
to walls.
121
123
Prepare and apply one coat alkali resistant primer and two caoats of emulsion paint to
soffit of slabs.
124
Varnishing two coats with copal varnish after sandpapering
125
Wax polishing to timber in panels & floors.
126
PLUMBING - PVC PIPES
1/2" diameter PVC pipes fixed
to walls ( specials paid separately)
127
128
1" dia meter PVC pipes fixed to walls ( specials paid separately)
129
1 1/2" dia meter PVC pipes laid to walls ( specials paid separately)
131
2" dia meter PVC pipes laid to walls ( specials paid separately)
132
3" dia meter PVC pipes fixed to walls ( specials paid separately)
133
Excavation for laying 1/2" to 3" dia meter PVC pipes in ground not less than 1' 6"
deep, back filling & compacting.
134
Chasing brickwork for laying 1/2" to 1 1/2" dia PVC pipes and making good average
depth 2" - ( Pipes and specials paid separately)
135
Chasing brickwork for laying 1 1/2" to 3" dia PVC pipes in ground or floop and
making good. Average depth 3" - ( Pipes and specials measured separately)
136
1/2" dia PVC specials viz - albows / bends / sockets
137
3/4" dia PVC specials viz elbows / bends / sockets.
138
1" dia PVC specials viz - elbows / bends / sockets.
139
1 1/4" dia PVC specials viz - elbows / bends / sockets.
140
1 1/2" dia PVC specials viz - elbows / bends / sockets.
141
2" dia specials viz elbows / bends / sockets.
142
2 1/2" dia PVC specials viz elbows / bends / sockets.
143
3" dia PVC specials viz elbows / bends / sockets.
144
1/2" dia PVC specials viz. Tees.
145
3/4" dia PVC specials viz. Tees.
146
1" dia PVC specials viz Tees
147
1 1/4" dia PVC specials viz Tees
148
1 1/2" dia PVC specials viz Tees
149
2" dia PVC specials viz Tees
150
2 1/2" dia PVC specials viz Tees
151
3" dia PVC specials viz Tees
152
4" dia glazed earthenware pipes laid on 6" thick bedding in cement concrete 1: 3 : 6 ( 1
1/2") including excavation average 2' 0" depth, backfilling with selected excavated
materials and concrete haunching to joints.
153
4" dia C.I. Soil / vent pipe fixed vertically to walls jointed with cement caulking.
(Specials measured separately)
154
4" dia C.I. Pipes fixed for walls jointed with lead caulking. (Specials measured
separately)
155
4" dia stoneware gulley with 6" x 6" x 6" gulley box including excatatio, 4" cement
concrete 1: 2: 4 ( 3/4") base, surrounded by 4 1/2" thick cement and sand 1: 5 extanded
6" above top of gulley box including making connection, 1/2" cement and sand 1:2
rendering internally and exposed faces finished smooth with neat cement flasting and
providing G.I. grating on top of gulley.
156
Marihole 2' 0" x 2' 0" internally with invert depth not exceeding 2' 0" including
excavation, beckfilling 6" cement concrete 1: 2: 4 ( 3/4") base with 3/8" dia meter mild
steel rods at 4" centres hothways, forming channels and benching in similar concrets, 4
1/2" walls in brick in cement 1 : 5, 1/2" thick cement and sand 1:2 rendering internally
and exposed surfaces including channels, benching and 2" thick RCC removable cover
slab 2' 3" x 2' 3" inlet and outlet connection all complete to working order.
157
22" x 16"glazed fireclay wash basin with 1/2" dia chromium plated pillar tap, waste
plug, chromium plated waste cnain and stay, including fixing wash basin on brackets.
( water supply and waste water connection measured separately)
159
Closet pendestal type with L/L flushing cistern, flush pipe double plastic seat cover,
1/2" dia stop cock, trap supplied & fixed cemplete to working order
160
Closet squatting type with trap including high level cistern fixed complete with flush
pipe and 1/2" dia stop cock, all complete to working order.
161
Vitreous China bidet suite fixed cemplete to working order
162
4 No. Bowl type urinal with trap and 2 gals capacity automatic flushing cestern and
spreaders complete to working orders.
163
6" dia half round PVC eaves gutter fixed to timber valance board including gutter
joiner and brackets fixed at 18" centres. (Other specials paid separately)
Consider an area of 10.00 sqrs. Ie 5.00 cubes of
excavation.10 day a U/Sk labourer.
Rate per
Per cube
cube
1 5/ 8 day U/ Sk labourer
1 day U/ Sk labourer
Labour
1 day Sk labourer
Materials
0.75 lbs blasting powder
10 lft fuse
1 lb jumper steel
Material
Labour
1/2 day U/ Sk labourer
Materials
16 lbs D.D.T. powder (8% in 20 gals of water)
20 gals water
Labour
1 day U/ Sk labourer
Materials
Labour
1 1/4 U/Sk labourer
Materials
1.00 cube earth delivered at site.
Allow 15% compaction
Filling & Compacting
Labour
2 day U/ Sk labourer
Materials
Labour
2 days U/Sk labourer
Materials
1.00 cube earth delivered at site.
Allow 15% compaction
Rate per
Note
sqrare
Labour
Royalty for turf
Cutting turf sods, loading and transporting to site and
b)
unloading 2
2,600.00 Transport of
1/2 day U/ Sk labourer
turf
Materials
60 gals. water
Labour
1 days carpenter
3 days U/ Sk labourer
Materials
17.50 cu.ft class II timber (4 uses)
1,800.00
Add 5% on above for wedges.
3,600.00
Labour
2 days carpenter
6 days U/ Sk labourer.
Materials
30.00 cu.ft class II timber (4 uses)
Add 5% on above for wedges.
Rate per
12,800.00
Labour cube
8 days carpenter Total per 450
20 days U/Sk Labourer sq.ft.
Materials
100.00 cu.ft class II Timber (4 uses)
Add 5% on above for wedge.
b) If, water is
Labour not
Noteavailable
1 day skilled labourer allowances
6 days U/ Sk labourer should be
made for
transport of
Materials water.
13 cwt (50 kg bags) cement
0.53 cubes sand
0.92 cubes 1 1/2" metal
Water (110 gals) a)c) Sand -
Water
includes 15%
available at
Equipments for bulking.
site.
1/3 day hire of mixer
3,000.00
b) If, water is
not available
allowances
6 days U/ Sk labourer should be
made for
transport of
Materials water.
23 cwt (50 kg bags) cement
0.42 cubes sand
3,000.00
0.82 cubes 3/4" metal
Water (150 gals) a)c) Sand -
Water
includes
available15%
at
Equipments for
site.bulking.
1/3 day hire of mixer
Labour
1/8 days skilled labourer
3/4 days unskilled labourer
Materials
1/4 cube concrete (Add 10% for wastage )
Labour
1/2 days skilled labourer
1 1/2 days unskilled labourer
Materials
1/2 cube concrete (Add 10% for wastage )
200 gal of water
Labour
1 day mason
1day carpenter
3 days U/Sk labourer
1 day Sk labourer (Vibrator)
Materials
0.45 cube concrete (Add 10% for wastage )
Equipments
1 day hire of vibrator
Labour
1 day mason
1day carpenter
3 days U/Sk labourer 1) For column
1 day Sk labourer (Vibrator) in 1 st floor
add 3% to
Materials ground floor
rate.
0.45 cube concrete (Add 10% for wastage )
Equipments
1 day hire of vibrator 2)
For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
3 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )
Equipments 4) Water
1 day hire of vibrator available at
site.
Rate per cube
5) If
water is not
available
allowance
must be made
for transport
of water.
1) For column
in 1 st floor
Labour add 3% to
1 1/2 days U/Sk labourer ground floor
rate.
Materials
Jute Hessian - 80 sq.ft
Equipments 4) Water
1 day hire of vibrator available at
site.
Rate per cube
5) If
Labour 1) Foriscolumn
water not
1/2 days U/Sk labourer in 1 st floor
available
add 3% to
allowance
Materials ground
must befloor
made
Jute Hessian - 60 sq.ft
rate.
for transport
Water - 100 gals of water.
4) Water
available at
Equipments site.
1 day hire of vibrator
5) If
water is not
available
allowance
must be made
for transport
of water.
add 3% to
ground floor
rate.
2)
Rate per cube For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
3 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.51 cube concrete (Add 5% for wastage )
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
1) For column
5) If
Labour in 1 st floor 2)
Note
water is not
1 1/2 days U/Sk labourer If water
add 3% tois not
available
available
ground floor
allowance
allowance
rate.
Materials
Jute Hessian - 45 sq.ft must be made
must be made
for transport
for transport
Water - 100 gals of water.
of water.
2)
Rate per cube For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note is not 2)
water
1 1/2 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 90 sq.ft must be made
must be made
for transport
for transport
Water - 180 gals of water.
of water.
add 3% to
ground floor
rate.
2)
Rate per cube For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
1) For column
5) If
Labour in 1 st floor 2)
Note
water is not
1 1/2 days U/Sk labourer If water
add 3% tois not
available
available
ground floor
allowance
allowance
rate.
Materials
Jute Hessian - 75 sq.ft must be made
must be made
for transport
for transport
Water - 150 gals of water.
of water.
2)
Rate per cube For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note is not 2)
water
1 1/2 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 60 sq.ft must be made
must be made
for transport
for transport
Water - 120 gals of water.
of water.
ground floor
rate.
2)
For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
50 cuft of concrete (Add 10% for wastage )
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube 1) For column
in 1 st floor
Labour add
Note 3%5) to If 2)
water
ground is not
1 1/2 days U/Sk labourer If waterfloor
is not
available
rate.
available
allowance
allowance
Materials
Jute Hessian - 30 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water. 2)
of water.
For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
50 cuft of concrete (Add 10% for wastage )
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note is not 2)
water
1 1/2 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 25 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water.
of water.
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube 1) For column
in 1 st floor
Labour add
Note 3%5) to If 2)
water
ground is not
1 1/2 days U/Sk labourer If waterfloor
is not
available
rate.
available
allowance
allowance
Materials
Jute Hessian - 10 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water. 2)
of water.
For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
45 cuft of concrete (Add 10% for wastage )
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note 2)
water is not
1 1/2 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 60 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water.
of water.
2)
For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
45 cuft of concrete (Add 10% for wastage )
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note
1) Foriscolumn 2)
water not
1 1/2 days U/Sk labourer If
in water is
1 st floornot
available
available
add 3% to
allowance
allowance
ground
Materials
Jute Hessian - 55 sq.ft must befloor
made
must
rate. be made
for transport
for transport
Water - 90 gals of water.
of water.
Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note 2)
water is not
1 3/4 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 40 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water.
of water.
Materials
18.15" sq.ft 1" thick class II timber
17.10 L.ft 2" x 2" class II timber in yokes.
16.12 L.ft 2" x 1" class II timber battens
1 1/2 lb wire nails.
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
12 Nos. 16 mm 18" long bolts (20 uses)
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Labour
1/2 day carpenter
2 day U/Sk labourer
Allowin: 4 uses cost
of mould per use
10% for repair
Materials
60 sq.ft 1" timber planks
24 l.ft 2" x 1" battens
45 l.ft 2" x 2" ledgers
30 l.ft 4" x 2" bearers at bottom of mould.
2 lbs wire mails
10% for repair
Labour
1 day carpenter
2 day U/Sk labourer
Materials
110 l.ft 4" x 2" vertical props
80 l.ft 2" x 2" bracing to mould and props.
50 l.ft 2" x 2" bracing to a set of props
6.0 sq.ft 1" timber base plate to props
22 Nos wdges
Add 10% of cost of materials for repairs
1/2 gal mould oil
1/2 lbs nail
Labour
1/2 day carpenter
2 day U/Sk labourer
Labour
3 days carpenter
3 days U/Sk labourer
Allowin: 4 uses cost
of mould per use
20% for repair
Materials
220 se.ft 1" thick tongue and grooved timber planks.
121 L.ft 4" x 2" runners at 2' 0" centers.
4 lbs. were nails.
Labour
1 day carpenter
4 day U/Sk labourer
1 gal mould oil for assembling.
2 lbs wire nails
Materials
690 l.ft 4" x 2" vertical timber props.(10 uses)
66 l.ft 2" x 2" bracing for props.
122 No. wedges
33 sq.ft 1" bass plates for props
Add 20% of cost of materials for repairs
Labour
1/2 day carpenter
2 day U/Sk labourer
Materials
1 cwt M.S. / per steel.rods including transport to site.
(Allow for wastage 15%)
1 1/2 lbs 16 BWG binding wire
Add 1.5% of steel cost for spacers or dhairs.
Labour
3 days mason
4 days U/Sk labourer
Materials
1450 bricks Add 5% wastage
4.00 cwt cement (50 kg bags)
0.25 cubes sand
Water (150 gals)
Labour
3 days mason
4 days U/Sk labourer
Materials
1450 bricks Add 5% wastage
2 1/3 cwt cement (50 kg bags)
3/8 cubes sand
Water (150 gals)
Labour
1 1/2 days mason
2 days U/Sk labourer
Scaffolding - Add 5%
Materials
550 bricks Add 5% wastage
1.3 cwt cement (50 kg bags)
0.10 cubes sand
Water (50 gals)
Labour
1 1/4 days mason
3 3/4 days U/Sk labourer
Scaffolding - Add 3%
Materials
1090 bricks Add 5% wastage
3.00 cwt cement (50 kg bags)
0.20 cubes sand
Water (115 gals)
Labour
3 1/2 days mason
5 1/2 days U/Sk labourer
Scaffolding - Add 2%
Materials
1630 bricks Add 5% wastage
4.50 cwt cement (50 kg bags)
0.30 cubes sand
Water (170 gals)
Labour
2 1/4 days mason
3 days U/Sk labourer
Scaffolding - Add 3%
Materials
1090 bricks Add 5% wastage
1.75 cwt cement (50 kg bags)
0.30 cubes sand
Water (115 gals)
Labour
1 1/2 days mason
2 days U/Sk labourer
Scaffolding - Add 5%
Materials
550 wire cut bricks Add 5% wastage
1.20 cwt cement (50 kg bags)
0.08 cubes sand
Water (30 gals)
Labour
2 1/4 days mason
3 3/4 days U/Sk labourer
Scaffolding - Add 3%
Materials
1050 wire cut bricks Add 4% wastage
2.50 cwt cement (50 kg bags)
0.18 cubes sand
Water (100 gals)
Labour
3 3/4 days mason
5 1/2 days U/Sk labourer
Scaffolding - Add 2%
Materials
1630 wire cut bricks Add 2% wastage
4.50 cwt cement (50 kg bags)
0.60 cubes sand
Water (50 gals)
Labour
5 days mason
3 1/2 days U/Sk labourer
Materials
0.50 cwt cement (50 kg bags)
1.00 cubes sand
1/10 gals acid
Water (10 gals)
Labour
1 1/4 days mason
2 1/2 days U/Sk labourer
Materials
350 bricks
1.20 cwt cement (50 kg bags)
0.11 cubes sand
Water (45 gals)
Labour
1/2 days mason
1/2 days U/Sk labourer
Materials
120 bricks
0.50 cwt cement (50 kg bags)
0.05 cubes sand
Water (15 gals)
Labour
1 1/4 days mason
1 1/4 days U/Sk labourer
Materials
140 bricks
0.80 cwt cement (50 kg bags)
0.05 cubes sand
Water (20 gals)
Labour
1 days mason
1 1/4 days U/Sk labourer
Materials
110 bricks
0.70 cwt cement (50 kg bags)
0.04 cubes sand
Water (15 gals)
Materials
112 Hollow cement blocks Allow 5% for wastage
0.75 cwt cement (50 kg bags)
0.06 cubes sand
Labour
1 days mason
2 days U/Sk labourer
Scaffolding - Add 5%
Materials
112 Hollow cement blocks(size of each block 16" x
8" x 4") Allow 5% for wastage
0.40 cwt cement (50 kg bags)
0.03 cubes sand
Labour
4 days mason
6 days U/Sk labourer
Materials
1.30 cubes 6" - 9" rubble
5.00 cwt cement (50 kg bags)
0.30 cubes sand
Water 100 gals
Labour
4 1/2 days mason
7 days U/Sk labourer
Scaffolding - Add 3%
Materials
1.30 cubes 6" - 9" rubble
5.00 cwt cement (50 kg bags)
0.30 cubes sand
Water 100 gals
Rate per cube
Labour
4 days mason
4 days U/Sk labourer
1/2 day U/Sk labourer for polishing
Materials
225 pressed tiles 8" x 8" Add 5% for wastage
1 1/4 cwt cement (50 kg bags)
0.07 cubes sand
1/4 lb wax polish
1/4 lb coloured pigment
2 lbs cotton waste
Labour
4 days mason 4.00 1,300.00 5200
4 days U/Sk labourer 4.00 1,000.00 4000
1/4 day U/Sk labourer for cleaning 0.25 1,000.00 250
0
Materials 0
400 glazed tiles 6" x 6" Add 10% for wastage 110.00 130.00 14300
2 1/2 cwt cement (50 kg bags) 2.98 872.00 2598.56
0.11 cubes sand 0.11 10,512.00 1156.32
1 lb white cement 0.45 800.00 362.4
Labour
4 days mason
3 days U/Sk labourer
1/2 day U/Sk labourer for polishing
Materials
100 12" x 12" terrazzo tiles Add 5% for wastage
1 1/4 cwt cement (50 kg bags)
0.07 cubes sand
coloured pigment (2 lbs)
1/2 lb wax polish
2 lb cotton waste
Materials
34.00 cu.ft timber Add 10% for wastage
660 1.ft 2" x 1" reepers Add 5% wastage
8 lbs wire nails 6" long
2 lbs wire nails 2" long
Labour
3 days carpenter
3 days U/Sk labourer
Materials
750 tiles
Labour
2 1/2 days carpenter
3 days U/Sk labourer
Materials
13 1/4 cu.ft timber purloins Add 10% for wastage
Labour
1 day carpenter
2 days U/Sk labourer
Materials
420 sq.ft asbestos corrugated sheets.
72 Nos. roofing screws and washers.
Labour
2 days U/Sk labourer
Materials
650 half round clay tiles
Rate per square
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
4 pairs ridges 3' 8" long
16 roofing screws or bolts
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
9 ridge tiles
1/3 cwt cement (50 kg bags)
0.02 cubes sand
15 lbs slaked lime
1/2 lb colouring powder
Labour
3 days carpenter
3 days U/Sk labourer
Scaffolding - Add 5%
Materials
75.00 sq.ft 1" planks Add 5% for wastage
70 Nos. 1 1/2" brass screws
Labour
3 days carpenter
3 days U/Sk labourer
Scaffolding - Add 5%
Materials
75.00 sq.ft 1" planks Add 5% for wastage
50 Nos. 1 1/2" brass screws
1 day carpenter
1 day U/Sk labourer
b) Making and fixing G.I sheets -
1/2 day tinker
1/2 day U/Sk labourer
c) Building sides -
1/4 day mason
1/2 day U/Sk labourer
Materials
2 G.I sheet (8' x 4')
1/4 gal wood preservative
0.10 cwt cement (50 kg bags)
0.05 cwt slaked lime
1.00 cu.ft sand
50.00 sq.ft planks
2 lbs 1 1/2" wire nails
Labour
Cutting bending, soldering & fixing -
1/2 day tinker
1/9 day mason (caulking)
3/4 day U/Sk labourer
Materials
1 G.I sheet (8' x 4')
0.05 cwt cement (50 kg bags)
1.00 cu.ft sand
1 lb soldering lead
Labour
2 1/2 days carpenter
1/2 days mason
1 1/2 days U/Sk labourer
Scaffolding - Add 3%
Materials
8.00 cu.ft timber class I
1 lb 2" nails
25 lbs cement
2.00 cu.ft sand
2" brush - 1/4 use
1/3 gal tarnap
Labour
1 1/2 days carpenter
2 days U/Sk labourer
Scaffolding - Add 3%
Materials
210 sq.ft flat asbestos sheets
60 l.ft 2" x 2" halmilla cove mouldings
125 l.ft 1 1/12" x 1/2" halmilla beadings
3/4 lb - 1/4" lb out nails
8 doz 1 1/2" brass screws
Labour
Making holes, fixing joists & making roof
1 day mason
1 day carpenter
3 days U/Sk labourer
Materials
115 l.ft 4" x 2" timber joists
215 so.ft 6" x 3/4" Lunumidella ceiling planks.
Ceiling planks.
3 lbs cement
4.00 cu.ft sand
4 kg 1 1/2" brass nails
Labour
3 days carpenter
6 days U/Sk labourer
Scaffolding - Add 3%
Materials
220.00 sq.ft ceiling planks
40.00 l.ft 2" x 1/4" timber strips
2.00 kg 3/4" nails
4.00 kg 1 1/2" brass nails.
Labour
5 days carpenter.
1 1/2 days U/Sk labourer
Materials
a) Frame -
1 1/2 cu.ft 4" x 3" timber
2 No. spur stones
6 No. fiber/ plastic plugs With 4" long brass screws.
2 No. 5/8" mild steel dowels 4" long,
b) Sash -
14 sq.ft 1 1/2" planks
5 sq.ft 1" planks
Labour
6 days carpenter.
2 days U/Sk labourer
Materials
a) Frame -
1 2/3 cu.ft 4" x 3" timber
2 No. spur stones
6 No. fiber/ plastic plugs With 4" long brass screws.
2 No. 5/8" mild steel dowels 4" long,
b) Sashes -
16 sq.ft 1 1/2" planks
7 sq.ft 1" planks
Labour
3/4 day carpenter.
3/8 day U/Sk labourer
1/4 day mason (fixing frame)
1/4 day U/Sk labourer ( - do -)
Materials
a) Frame -
1.80 cu.ft 4" x 3" timber
2 No. spur stones
6 No. fiber/ plastic plugs With 4" long brass screws.
b) Sashe -
1 No 6' 9" x 2' 9" plywood sash.
Labour
2 1/4 days carpenter.
1 day U/Sk labourer
1/4 day mason (fixing frame)
1/4 day U/Sk labourer ( - do -)
Materials
a) Frame -
1.70 cu.ft 4" x 3" timber
2 No. spur stones
6 No. fiber/ plastic plugs With 4" long brass screws.
2 No 5/8" mild steel dowels
b) Sashe -
21.00 sq.ft 1" thick planks
3 doz 1 1/4 long brass screws.
Labour
6 days carpenter.
2 1/2 days U/Sk labourer
1/2 day mason (fixing frame)
1/2 day U/Sk labourer ( - do -)
Materials
a) Frame -
3.20 cu.ft 4" x 3" timber
4 No. fiber/ plastic plugs With 4" long brass screws.
b) Sashes -
9.25 sq.ft 3" x 1 1/2" timber
Rate per sqft
Labour
1/2 day glazier
1/2 day U/Sk labourer
Materials
9.00 sq.ft glass panes
30 L.ft 1/2" x 1/2" beading
4 doz brass panel pins
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
1 1/2 pairs butt hinges
2 Doz 3/4" brass screws
Rate per No
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
1 pair Tee hinges
1 1/2 Doz 3/4" brass screws
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
1 rim lock with screws
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
1 mortice look with screws
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
4 casement stays
16 1/2" brass screws
Labour
1/4 day carpenter
1/4 day U/Sk labourer
Materials
1 door closer
8 3/4" brass screws
Labour
1/2 day carpenter
1/2 day U/Sk labourer
Materials
1 Tower / Skeleton Bolt
10 1/2" brass screws
Labour
1/2 day carpenter
1/2 day U/Sk labourer
Materials
1 barrel bolt
8 1/2" brass screws
Labour
1/2 day carpenter
1/2 day U/Sk labourer
Materials
6 casement fasteners
24 1/2" brass screws
Labour
1/2 day carpenter
1/2 day U/Sk labourer
Materials
6 brass fanlight catches
2 doz 1/2" brass screws
Labour
1/8 day carpenter
1/8 day U/Sk labourer
Materials
6 draw rings
1doz 1/2" brass screws
Scaffolding -
1
1/2 days U/Sk
1.40 cwt cement (50 kg bags) labourer
0.06 cube sand
Water 10 gals.
Scaffolding -
Add 3%
2 1/2 days
0.80 cwt cement (50 kg bags)
U/Sk labourer
0.16 cwt slaked lime
0.05 cubes sand
Water 5 gals.
Scaffolding -
Add 3%
2
0.80 cwt cement (50 kg bags) days U/Sk
0.16 cwt slaked lime labourer
0.03 cubes sand
Water 5 gals.
Scaffolding -
Add 3%
1 3/4
0.80 cwt cement (50 kg bags) days U/Sk
0.40 cwt slaked lime labourer
0.07 cubes sand
Water 10 gals.
Scaffolding -
Add 3%
1 1/2 days
0.80 cwt cement (50 kg bags)
U/Sk labourer
0.60 cwt slaked lime
(1 1/2)
0.07 cubes sand
Water 10 gals.
Scaffolding -
Add 3%
1/4 day
2 days
1.75 cwt cement ( 50 kg bags)
U/Sk labourer
0.08 cube sand
Water 10 gals
1/4
day U/Sk
2.25 cwt cement 2 days
0.08 cube sand U/Sk labourer
Water 10 gals
1/4
day U/Sk
Total per
10.00 sqrs.
Per square
Materials Labour
painter
1 st coat -
1/6 gal emulsion paint
2 nd coat -
1/7 gal emulsion paint Scaffolding -
6" brush - (1/10 use) Add 3%
0.10 gals water
painter
0.40 gals ( 1.80 ltr.) varnish
3" brush (1/3 use)
1/2 day U/Sk
3/4 lb. Wax polish
1/2 doz. Sheets sandpaper 3 hrs. U/Sk
1/10 floor brush labourer
1/2 yards flannel cloth
Per 10 l.ft Rate per
Materials Labour L.ft
13 l.ft pipes
1 hr. U/Sk
3 clips and nails
labourer
2 grms solvent cement
13 l.ft pipes
1 hr. U/Sk
3 clips and nails
labourer
2 grms solvent cement
Total
per 100 L.ft
0.10 cwt cement
3 days U/Sk
0.01 cube sand
labourer
Per 10 specials
Rate per No.
Materials Labour
10 - 1/2" elbows / bends / socket
20 grms solvent cement
Total per 10
10 - 3/4" dia elbows / bends / sockets
30 grms solvent cement
Total per 10
10 - 1" dia elbows / bends / sockets
40 grms solvent cement
Total per 10
10 - 1 1/4" dia elbows / bends / sockets
60 grms solvent cement
Total per 10
plumber
10 - 1 1/2" dia elbows / bends / sockets
80 grms solvent cement
Total
per 10 No.
plumber
10 - 2" dia elbows / bends / sockets
140 grms solvent cement
Total
per 10 No.
plumber
10 - 2 1/2" dia elbows / bends / sockets
200 grms solvent cement
Total
per 10 No.
plumber
10 - 3" dia elbows / bends / sockets
240 grms solvent cement
Total
per 10 No.
Per 10 Tees
Materials Labour
plumber
10 - 1/2" Tees
30 grms solvent cement
Total
per 10 No.
plumber
10 - 3/4" Tees
45 grms solvent cement
Total
per 10 No.
plumber
10 - 1" dia Tees
60 grms solvent cement
Total
per 10 No.
plumber
10 - 1 1/4" dia Tees
90 grms solvent cement
Total
per 10plumber
1 day No.
Laying and
50 - 4" dia Ew pipes
testing pipes -
0.75 cubes cement concrete - 1: 3: 6: ( 1 1/2")
2 days
2 lbs yarn
plumber
0.50 cwt cement
(jointing) 4.00 cubes
2 days U/Sk
excavation
labourer
Backfilling - 2
1/2 days U/Sk
labourer
Per No.
Rate per No.
Materials Labour
1 - 4" S.W. gulley
1/2 day mason
4.00 cu.ft excavation
5.50 sq.ft 4 1/2" brickwork
0.80 cu.ft cement
1/2
concrete ( 1: 2 : 4 ( 3/4") 1.00
day U/Sk
sq.ft 1/2" cement rendering 1:2
labourer
1 - 4" G.I. grating.
mason
35.00 cu.ft excavation
7.00 cu.ft cement concrete
1 : 2 : 4 (3/4") in base & channels
2 1/2 days
33.00 sq.ft 4 1/2" brickwork
U/Sk labourer
in cement 1:5 28.00 sq.ft 1/2"
cement rendering 1:2 1-
RCC cover slab.
1 bidet
1 day U/Sk
4 Urinal Bowls labourer
1-2 gal. Cistern
8 rawl plugs 1 day
1 spreader plumber
4 wooden plugs
(for cistern) 4-1
1/2" brass screws 1 day
4 lbs cement U/Sk labourer
1/8 cu.ft sand
a) Copper
Naphthenat
e (5% in 4
to 8 gals of
fuel oil)
Note.b)-
Sodium
Alternati
Arsenate
ve Mixes
(10% in 12
to 20 gals)
of water.
C)
Bieldrine
(0.3% in 19
Note
Note
Note
a) Water
available at
site.
b) If,
water is not
available
allowances
should be
3,500.00 made for
transport of
water.
c) Sand -
includes
15% for
bulking.
4.00 1,300.00 5200 4.00 1,300.00 5200
4.00 1,000.00 4000 4.00 1,000.00 4000
0.25 1,000.00 250 0.25 1,000.00 250
0 0
0 0
70.00 280.00 19600 30.00 950.00 28500
2.98 872.00 2598.56 2.98 872.00 2598.56
0.11 10,512.00 1156.32 0.11 10,512.00 1156.32
0.45 800.00 362.4 0.45 800.00 362.4
2 Excavation over site to reduce level, in any material except rock requiring blasting
including depositing and leveling as directed up to distance not exceeding 30' 0" per
cube
3 Excavation in trenches for walls/ column pits in soft/ loose soil from 0' 0" to 5' 0" deep
and depositing excavated materiel to a distance not exceeding 30' 0" (Earth work
support to be paid separately where necessary) per cube.
4 Excavation in trenches for walls/ column pits in ordinary soil from 0' 0" to 5' 0" deep
and depositing excavated material not exceeding 30' 0" per cube.
5 Excavation in trenches for walls/ column pits in Hard/ dense soil up to a depth of 5' 0"
and depositing excavated material up to a distance not exceeding 30' 0".
6 Excavation in trenches for walls/ column pits in Mud/ wet soil up to a depth of 5' 0"
and depositing excavated material to distance not exceeding 30' 0". (Earth work &
dewatering paid for separately.)
7 Excavation in trenches for walls/ column pits in soft disintegrated rock (not requiring
blasting) up to depth of 5' 0" and depositing excavated material to distance not
exceeding 30' 0".
8
Excavation in trenches for walls/ column pits in Hard rock requiring blasting up to a
depth of 5' 0" and depositing excavated material to distance not exceeding 30' 0".
Per cube
13 Filling under floors including leveling, watering & compacting in 3" layers with
available and selected earth at site.
14 Filling under floors including leveling, watering & compacting in 3" layers with
imported selected earth.
15 Cutting turf sods, landing to hand carts and transporting up to 30 yards, laying and
watering for 30 days. (Royalty for turf, pegging and transport beyond 30 yards paid
separately)
Earth work support (open planking) in trenches up to a depth of 5' 0"
16 Consider trench 15' 0" long 3' 0" wide and 5' 0" depth open planking to both faces.
Total area - 2/ 15' 0" x 5' 0"
. = 150 sq.ft
18 Earth work support (close planking) in deep excavation in trenches up to 15' 0" depth.
- Consider trench of length of 15' 0" width 5' 6" at top 3' 6" at bottom Then
area supported is 2/ 15' x 15' ie 450 sq.ft.
Rates Labour Materials Rate per unit
Labour
Consider an area of 10.00 sqrs. Ie 5.00 cubes of
4,000.00 4,000.00
excavation.10 day a U/Sk labourer.
Material 0.00
Labour
1 5/ 8 day U/ Sk labourer 650.00 650.00
Material 0.00
Labour
1 day U/ Sk labourer 400.00 400.00
Material 0.00
Labour
2 1/4 days U/ Sk labourer. 900.00 900.00
Material 0.00
Labour
3 1/2 days U/Sk labourer 1,400.00 1,400.00
Material 0.00
Labour
3 days U/Sk labourer. 1,200.00 1,200.00
Material 0.00
Labour
2 1/2 days U/Sk labourer 1,000.00 1,000.00
Material 0.00
Labour
1 day Sk labourer
600.00
2 days U/Sk labourer 800.00 1,400.00
Materials
0.75 lbs blasting powder
0.00
10 lft fuse 0.00
1 lb jumper steel 0.00 0.00
Labour
Drilling, chipping & wedging 1 1/2 day Sk labourer 900.00
Steel, fuel & forge - 25% of labour cost 225.00
Collecting & Disposing 1 1/2 day U/Sk labourer per
600.00 1,725.00
10 sq.ft
Material 0.00
Labour
1/2 day U/ Sk labourer 200.00 200.00
Materials
16 lbs D.D.T. powder (8% in 20 gals of water) 0.00
20 gals water 40.00 40.00
Materials 0.00
Labour
1 1/4 U/Sk labourer 500.00 500.00
Materials
1.00 cube earth delivered at site.
Allow 15% compaction
402.50
Filling & Compacting
402.50
Labour
2 day U/ Sk labourer 800.00 800.00
Materials 0.00
Labour
2 days U/Sk labourer 800.00 800.00
Materials
1.00 cube earth delivered at site.
Allow 15% compaction 402.50 402.50
Labour
Materials
60 gals. water 120.00 120.00
Rate per square 2,320.00
Labour
1 days carpenter
600.00
3 days U/ Sk labourer 1,200.00 1,800.00
Materials
17.50 cu.ft class II timber (4 uses)
0.00 0.00
Add 5% on above for wedges.
Labour
2 days carpenter 1,200.00
6 days U/ Sk labourer. 2,400.00 3,600.00
Materials
30.00 cu.ft class II timber (4 uses) 0.00 0.00
Add 5% on above for wedges.
Labour
8 days carpenter 4,800.00
20 days U/Sk Labourer 8,000.00 12,800.00
Materials
100.00 cu.ft class II Timber (4 uses)
0.00 0.00
Add 5% on above for wedge.
24 2" thick cement concrete screed in foundation at depths not exceeding 5' 0"
25 3" thick cement concrete screed in foundation at depths not exceeding 5' 0"
Curing
29 Cement concrete in 9" x 9" colomns in ground floor. - Consider 8 No. 9" x 9" columns
each 10' 0" high ie 0.45 cubes.
Curing
Curing
Curing
Curing
Curing
Curing
Rates Labour Materials Rate per unit
Labour
1 day skilled labourer 600.00
6 days U/ Sk labourer 2,400.00 3,000.00
Materials
13 cwt (50 kg bags) cement 7,150.00
0.53 cubes sand 2,332.00
0.92 cubes 1 1/2" metal 3,036.00
Water (110 gals) 220.00 12,738.00
Equipments
1/3 day hire of mixer 495.00 495.00
Labour
1 day skilled labourer 600.00
5 days U/ Sk labourer 2,000.00 2,600.00
Materials
14 cwt (50 kg bags) cement 7,700.00
0.60 cubes sand 2,640.00
0.92 cubes 1" metal 3,128.00
Water (100 gals) 200.00 13,668.00
Equipments
1/3 day hire of mixer 495.00 495.00
Labour
1 day skilled labourer 600.00
6 days U/ Sk labourer 2,400.00 3,000.00
Materials
18 cwt (50 kg bags) cement 9,900.00
0.50 cubes sand 2,200.00
0.88 cubes 3/4" metal 3,080.00
Water (120 gals) 240.00 15,420.00
Equipments
1/3 day hire of mixer 495.00 495.00
Labour
1 day skilled labourer 600.00
6 days U/ Sk labourer 2,400.00 3,000.00
Materials
23 cwt (50 kg bags) cement 12,650.00
0.42 cubes sand 1,848.00
0.82 cubes 3/4" metal 3,080.00
Water (150 gals) 300.00 17,878.00
Equipments
1/3 day hire of mixer 495.00 495.00
Labour
1 day skilled labourer 600.00
6 days U/ Sk labourer 2,400.00 3,000.00
Materials
31 cwt (50 kg bags) cement 17,050.00
0.44 cubes sand 1,936.00
0.96 cubes 3/4" metal 3,080.00
Water (200 gals) 400.00 22,466.00
Equipments
1/3 day hire of mixer 495.00 495.00
Labour
1/8 days skilled labourer 75.00
1/2 days unskilled labourer 200.00 275.00
Materials
1/6 cube concrete (Add 10% for wastage ) 0.00
Labour
1/8 days skilled labourer 75.00
3/4 days unskilled labourer 300.00 375.00
Materials
1/4 cube concrete (Add 10% for wastage ) 0.00
Labour
1/2 days skilled labourer 300.00
1 1/2 days unskilled labourer 600.00 900.00
Materials
1/2 cube concrete (Add 10% for wastage )
200 gal of water 400.00 400.00
Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00
Materials
0.45 cube concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00
Materials
0.45 cube concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1 1/2 days U/Sk labourer 600.00 600.00
Materials
Jute Hessian - 80 sq.ft
0.00
Water - 140 gals 280.00 280.00
Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00
Materials
0.45 cube concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1/2 days U/Sk labourer 200.00 200.00
Materials
Jute Hessian - 60 sq.ft
0.00
Water - 100 gals 200.00 200.00
Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00
Materials
0.50 cube concrete (Add 10% for wastage )
40 so.ft - Jute Hessian 0.00
Water (100 gals) 200.00 200.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00
Materials
0.51 cube concrete (Add 5% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Rate per cube 8,823.53
Labour
1 1/2 days U/Sk labourer 600.00 600.00
Materials
Jute Hessian - 45 sq.ft
0.00
Water - 100 gals 200.00 200.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
0.45 cube concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1 1/2 days U/Sk labourer 600.00 600.00
Materials
Jute Hessian - 90 sq.ft
0.00
Water - 180 gals 360.00 360.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
0.45 cube concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Rate per cube 10,888.89
Labour
1 1/2 days U/Sk labourer 600.00 600.00
Materials
Jute Hessian - 75 sq.ft
0.00
Water - 150 gals 300.00 300.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
0.45 cube concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1 1/2 days U/Sk labourer 600.00 600.00
Materials
Jute Hessian - 60 sq.ft
0.00
Water - 120 gals 240.00 240.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
50 cuft of concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Rate per cube 9,800.00
Labour
1 1/2 days U/Sk labourer 600.00 600.00
Materials
Jute Hessian - 30 sq.ft
0.00
Water - 90 gals 180.00 180.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
50 cuft of concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1 1/2 days U/Sk labourer 600.00 600.00
Materials
Jute Hessian - 25 sq.ft
0.00
Water - 90 gals 180.00 180.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
45 cuft of concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Materials
Jute Hessian - 10 sq.ft
0.00
Water - 90 gals 180.00 180.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
45 cuft of concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1 1/2 days U/Sk labourer 600.00 600.00
Materials
Jute Hessian - 60 sq.ft
0.00
Water - 90 gals 180.00 180.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
45 cuft of concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Materials
Jute Hessian - 55 sq.ft
0.00
Water - 90 gals 180.00 180.00
Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00
Materials
45 cuft of concrete (Add 10% for wastage ) 0.00
Equipments
1 day hire of vibrator 1,500.00 1,500.00
Labour
1 3/4 days U/Sk labourer 700.00 700.00
Materials
Jute Hessian - 40 sq.ft
0.00
Water - 90 gals 180.00 180.00
3,000.00
a) Water available at site.
b)
If, water is not available allowances should be
made for transport of water.
c) Sand -
includes 15% for bulking.
3,000.00
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.
Note
Note
Note
Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00
Allowin: 4 uses cost
of mould per use
Materials
18.15" sq.ft 1" thick class II timber 635.25
17.10 L.ft 2" x 2" class II timber in yokes. 222.30
16.12 L.ft 2" x 1" class II timber battens 112.84
1 1/2 lb wire nails. 60.00 1,030.39
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
12 Nos. 16 mm 18" long bolts (20 uses)
300.00
1/2 liter mould oil 210.00
35 L.ft 4" x 2" props (10 uses) 875.00 1,385.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Labour
1/2 day carpenter 300.00
2 day U/Sk labourer 800.00
Allowin: 4 uses cost
of mould per use
10% for repair 110.00 1,210.00
Materials
60 sq.ft 1" timber planks 2,100.00
24 l.ft 2" x 1" battens 168.00
45 l.ft 2" x 2" ledgers 585.00
30 l.ft 4" x 2" bearers at bottom of mould. 600.00
2 lbs wire nails 80.00
10% for repair 353.30 3,886.30
Labour
1 day carpenter 600.00
2 day U/Sk labourer 800.00 1,400.00
Materials
110 l.ft 4" x 2" vertical props
80 l.ft 2" x 2" bracing to mould and props. 1,040.00
50 l.ft 2" x 2" bracing to a set of props 650.00
6.0 sq.ft 1" timber base plate to props 210.00
22 Nos wdges 1,958.00
Add 10% of cost of materials for repairs 385.80
1/2 gal mould oil 60.00
1/2 lbs nail 20.00 4,323.80
Labour
1/2 day carpenter 300.00
2 day U/Sk labourer 800.00 1,100.00
Labour
3 days carpenter 1,800.00
3 days U/Sk labourer 1,200.00
Allowin: 4 uses cost
of mould per use
20% for repair 600.00 3,600.00
Materials
220 se.ft 1" thick tongue and grooved timber planks. 7,700.00
121 L.ft 4" x 2" runners at 2' 0" centers. 2,420.00
4 lbs. were nails. 160.00 10,280.00
Labour
1 day carpenter 600.00
4 day U/Sk labourer 1,600.00
1 gal mould oil for assembling. 120.00
2 lbs wire nails 80.00 2,400.00
Materials
690 l.ft 4" x 2" vertical timber props.(10 uses) 13,800.00
66 l.ft 2" x 2" bracing for props. 858.00
122 No. wedges 10,858.00
33 sq.ft 1" bass plates for props 1,155.00
Add 20% of cost of materials for repairs 5,334.20 32,005.20
Labour
1/2 day carpenter 300.00
2 day U/Sk labourer 800.00 1,100.00
Materials
1 cwt M.S. / per steel.rods including transport to site.
69.00
(Allow for wastage 15%)
1 1/2 lbs 16 BWG binding wire 60.00
Add 1.5% of steel cost for spacers or dhairs. 1.04 130.04
47 Brick work in cement and sand 1:5 in 4 1/2" thick walls in ground floor
Rate per square
51 4 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor ( Facing to
brickwork measured separately)
Rate per square
52 9" thick in cement and sand 1:5 with wire cut bricks (Facing to brick work measured
separately)
Rate per square
53 13 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to
brick work measured separately)
Rate per square
54 Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1
mixture in ground floor
Rate per square
56 Steps 1' - 1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and
sand 1:2 redering including necessary excavation.
Rate per 10 L. ft
57 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces with 1'6" ramp including necessary
excavation.
Rate per 10 L. ft
58 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces without ramp including necessary
excavation.
Rate per 10 L. ft
59 8" thick Hollow block work in cement and sand mortar 1:5 in ground floor (cavities
unfilled)
Rate per square
60 4" thick Hollow block mesonry in cement and sand mortar 1:5 with cavities unfilled
Rate per square
FLOOR FINISHES
63 Pressed floor tiles bedded in 1/2" cement morter 1:2 and pointing in neat cement in
ground floor
Rate per square
64 Glazed tiles fixed to walles including bedding in cement morter 1:2 and raking in
ground floor. (specials measured separately)
Rate per square
65 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Rate per square
Rates Labour Materials Rate per unit
Labour
3 days mason 1,800.00
4 days U/Sk labourer 1,600.00 3,400.00
Materials
1450 bricks Add 5% wastage 7,612.50
4.00 cwt cement (50 kg bags) 2,200.00
0.25 cubes sand 1,100.00
Water (150 gals) 300.00 11,212.50
Labour
3 days mason 1,800.00
4 days U/Sk labourer 1,600.00 3,400.00
Materials
1450 bricks Add 5% wastage 7,612.50
2 1/3 cwt cement (50 kg bags) 1,281.50
3/8 cubes sand 1,650.00
Water (150 gals) 300.00 10,844.00
Labour
1 1/2 days mason 900.00
2 days U/Sk labourer 800.00
Scaffolding - Add 5% 85.00 1,785.00
Materials
550 bricks Add 5% wastage 2,887.50
1.3 cwt cement (50 kg bags) 715.00
0.10 cubes sand 660.00
Water (50 gals) 100.00 4,362.50
Labour
1 1/4 days mason 750.00
3 3/4 days U/Sk labourer 1,500.00
Scaffolding - Add 3% 67.50 2,317.50
Materials
1090 bricks Add 5% wastage 5,722.50
3.00 cwt cement (50 kg bags) 1,650.00
0.20 cubes sand 880.00
Water (115 gals) 230.00 8,482.50
Rate per square 10,800.00
Labour
3 1/2 days mason 2,100.00
5 1/2 days U/Sk labourer 2,200.00
Scaffolding - Add 2% 86.00 4,386.00
Materials
1630 bricks Add 5% wastage 8,557.50
4.50 cwt cement (50 kg bags) 2,475.00
0.30 cubes sand 1,320.00
Water (170 gals) 340.00 12,692.50
Labour
2 1/4 days mason 1,350.00
3 days U/Sk labourer 1,200.00
Scaffolding - Add 3% 76.50 2,626.50
Materials
1090 bricks Add 5% wastage 5,722.50
1.75 cwt cement (50 kg bags) 962.50
0.30 cubes sand 7,700.00
Water (115 gals) 230.00 14,615.00
Labour
1 1/2 days mason 900.00
2 days U/Sk labourer 800.00
Scaffolding - Add 5% 51.00 1,751.00
Materials
550 wire cut bricks Add 5% wastage 5,775.00
1.20 cwt cement (50 kg bags) 660.00
0.08 cubes sand 352.00
Water (30 gals) 60.00 6,847.00
Labour
2 1/4 days mason 1,350.00
3 3/4 days U/Sk labourer 1,500.00
Scaffolding - Add 3% 85.50 2,935.50
Materials
1050 wire cut bricks Add 4% wastage 10,920.00
2.50 cwt cement (50 kg bags) 1,375.00
0.18 cubes sand 792.00
Water (100 gals) 200.00 13,287.00
Labour
3 3/4 days mason 2,250.00
5 1/2 days U/Sk labourer 2,200.00
Scaffolding - Add 2% 89.00 4,539.00
Materials
1630 wire cut bricks Add 2% wastage 16,626.00
4.50 cwt cement (50 kg bags) 2,475.00
0.60 cubes sand 2,640.00
Water (50 gals) 100.00 21,841.00
Labour
5 days mason 3,000.00
3 1/2 days U/Sk labourer 1,400.00 4,400.00
Materials
0.50 cwt cement (50 kg bags) 275.00
1.00 cubes sand 4,400.00
1/10 gals acid 50.00
Water (10 gals) 20.00 4,745.00
Labour
1 1/4 days mason 750.00
2 1/2 days U/Sk labourer 1,000.00 1,750.00
Materials
350 bricks 1,750.00
1.20 cwt cement (50 kg bags) 660.00
0.11 cubes sand 484.00
Water (45 gals) 90.00 2,984.00
Labour
1/2 days mason 300.00
1/2 days U/Sk labourer 200.00 500.00
Materials
120 bricks 600.00
0.50 cwt cement (50 kg bags) 275.00
0.05 cubes sand 220.00
Water (15 gals) 30.00 1,125.00
Labour
1 1/4 days mason 750.00
1 1/4 days U/Sk labourer 500.00 1,250.00
Materials
140 bricks 700.00
0.80 cwt cement (50 kg bags) 440.00
0.05 cubes sand 220.00
Water (20 gals) 40.00 1,400.00
Labour
1 days mason 600.00
1 1/4 days U/Sk labourer 500.00 1,100.00
Materials
110 bricks 550.00
0.70 cwt cement (50 kg bags) 385.00
0.04 cubes sand 176.00
Water (15 gals) 30.00 1,141.00
Labour
1 1/2 days mason 900.00
2 1/2 days U/Sk labourer 1,000.00
Scaffolding - Add 3% 57.00 1,957.00
Materials
112 Hollow cement blocks Allow 5% for wastage 1,764.00
0.75 cwt cement (50 kg bags) 412.50
0.06 cubes sand 264.00 2,440.50
Materials
112 Hollow cement blocks(size of each block 16" x
1,764.00
8" x 4") Allow 5% for wastage
0.40 cwt cement (50 kg bags) 220.00
0.03 cubes sand 132.00 2,116.00
Labour
4 days mason 2,400.00
6 days U/Sk labourer 2,400.00 4,800.00
Materials
1.30 cubes 6" - 9" rubble 2,210.00
5.00 cwt cement (50 kg bags) 2,750.00
0.30 cubes sand 1,320.00
Water 100 gals 200.00 6,480.00
Labour
4 1/2 days mason 2,700.00
7 days U/Sk labourer 2,800.00
Scaffolding - Add 3% 165.00 5,665.00
Materials
1.30 cubes 6" - 9" rubble 2,210.00
5.00 cwt cement (50 kg bags) 2,750.00
0.30 cubes sand 1,320.00
Water 100 gals 200.00 6,480.00
Labour
4 days mason 2,400.00
4 days U/Sk labourer 1,600.00
1/2 day U/Sk labourer for polishing 200.00 4,200.00
Materials
225 pressed tiles 8" x 8" Add 5% for wastage 11,812.50
1 1/4 cwt cement (50 kg bags) 687.50
0.07 cubes sand 308.00
1/4 lb wax polish 100.00
1/4 lb coloured pigment 62.50
2 lbs cotton waste 100.00 13,070.50
Labour
4 days mason 2,400.00
4 days U/Sk labourer 1,600.00
1/4 day U/Sk labourer for cleaning 100.00 4,100.00
Materials
400 glazed tiles 6" x 6" Add 10% for wastage 26,400.00
2 1/2 cwt cement (50 kg bags) 1,375.00
0.11 cubes sand 484.00
1 lb white cement 50.00 28,309.00
Labour
4 days mason 2,400.00
3 days U/Sk labourer 1,200.00
1/2 day U/Sk labourer for polishing 200.00 3,800.00
Materials
100 12" x 12" terrazzo tiles Add 5% for wastage 5,250.00
1 1/4 cwt cement (50 kg bags) 687.50
0.07 cubes sand 308.00
coloured pigment (2 lbs) 500.00
1/2 lb wax polish 200.00
2 lb cotton waste 100.00 7,045.50
99 5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
100 5/8" thick plastering to wall in cement sand 1:3 including cement floating
101 3/8" thick plastering to soffit slab in cement and sand 1:3 including floating with lime
putty
102 3/8" thick plastering to sides and soffit of beams in cement & sand 1:3 including
floating with lime putty
103 5/8" thick to wall in lime cement and sand 1:1:5 finished semi - rough with wooden
float.
104 5/8" thick plastering to wall in lime and sand 1:1:5 finished smooth with lime putty
floating.
105 1/2" thick rendering in cement and sand 1:3 finished smooth
106 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth.
107 3/4" thick rendering in cement and sand 1:3 finished smooth.
108 3/4" thick rendering in cement and sand 1:2 in floors finished smooth.
109 3/4" thick rendering in cement and sand 1:2 in coloured cement floors finished smooth.
110 1/2" x 6" skirting in cement and sand 1:3 projected or flush to walls finished with
floating including forming groove.
Per 10 Lft
111 Prepare and apply one coat of preservative (oil type) to structural timber including
touching up cut ends etc. after fixing.
Per square
112 Prepare surface of steel truse and apply two coats of anti - corrosive primer.
Per square
113 Apply one coat of anti - corrosive primer and two coats enamel paint on already shop
rimed and arected steel roof truss.
Per square
114 Prepare and apply two coats primer and finishing coat of enemel paint to mild steel
(angle / flat) gate.
Consider 50 sq.ft
115 Painting steel on mew work with 2 coats of anti - corrosive paint
Consider per square
116 Painting new timber work with two coats wood preservative
Consider per square
117 Preparing and painting wood work with primer and 2 coats enamel paint.
Consider per square
120 Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint
to walls.
Per square
123 Prepare and apply one coat alkali resistant primer and two caoats of emulsion paint to
soffit of slabs.
Per square
Labour
1 1/4 days mason
750.00
1 1/2 days U/Sk labourer 600.00
Materials
2.25 cwt cement
0.11 cube sand
1 1/2 gals bitumen
Firewood (10 lbs)
Water 10 gals
Labour
1 day mason 600.00
1 3/4 days U/Sk labourer 600.00
Scaffolding - Add 3%
Materials
1.30 cwt slaked lime
0.07 cubes sand
Water 10 gals
Labour
1 day mason 600.00
11/2 days U/Sk labourer 600.00
Scaffolding - Add 3%
Materials
1.40 cwt cement (50 kg bags)
0.06 cubes sand
Water 10 gals
Labour
2 1/2 day mason 1,500.00
21/2 days U/Sk labourer 1,000.00
Scaffolding - Add 3%
Materials
0.80 cwt cement (50 kg bags)
0.16 cubes sand
Water 5 gals
Labour
2 day mason 1,200.00
2 days U/Sk labourer 800.00
Scaffolding - Add 3%
Materials
0.80 cwt cement (50 kg bags)
0.16 cubes sand
Water 5 gals
Labour
1 day mason 600.00
1 3/4 days U/Sk labourer 700.00
Scaffolding - Add 3%
Materials
0.80 cwt cement (50 kg bags)
0.40 cubes sand
Water 10 gals
Labour
1 1/2 days mason 900.00
1 1/2 days U/Sk labourer 600.00
Scaffolding - Add 3%
Materials
0.80 cwt cement (50 kg bags)
0.60 cwt slaked lime
0.07 cubes sand
Water 10 gals
Labour
1 days mason RATES!B4
1 1/2 days U/Sk labourer (curing) 600.00
Materials
1.07 cwt cement (50 kg bags)
0.05 cubes sand
Water 10 gals
Labour
1 days mason 600.00
1 1/2 days U/Sk labourer 600.00
1/4 day U/Sk labourer (curing) 100.00
Materials
1.50 cwt cement (50 kg bags)
0.05 cubes sand
Water 10 gals
Labour
1 1/4 days mason 750.00
2 days U/Sk labourer 800.00
1/4 day U/Sk labourer (curing) 100.00
Materials
1.75 cwt cement (50 kg bags)
0.05 cubes sand
Water 10 gals
Labour
1 1/4 days mason 750.00
2 days U/Sk labourer 800.00
1/4 day U/Sk labourer (curing) 100.00
Materials
2.25 cwt cement (50 kg bags)
0.08 cubes sand
Water 10 gals
Labour
1 1/4 days mason 750.00
2 days U/Sk labourer 800.00
3/4 day U/Sk labourer (curing) 300.00
Materials
2.25 cwt cement (50 kg bags)
0.08 cubes sand
5lbs powdered pigment
Water 10 gals
Labour
3/8 days mason 225.00 0.38 1,300.00 487.5
5/16 days U/Sk labourer 125.00 0.31 1,000.00 312.5
0
Materials 0
0.10 cwt cement (50 kg bags) 0.08 872.00 73.248
0.003 cubes sand 0.00 10,512.00 31.536
0.25 lbs powdered pigment 0.12 700.00 84
Labour
3/4 day painter 450.00
1/2 day U/Sk labourer 200.00
Materials
2.75 ltr. Wood preservative (oil type)
3" brush (1/10 use)
Labour
1 1/2 days painter 900.00
1 1/2 day U/Sk labourer 600.00
Materials
2 3/4 ltr. Anti - corrosive primer
0.15 ltr. Mineral turpentine or
thinner
1 wire brush
2" brush (1/3 use)
Labour
2 1/2 days painter 1,500.00
1 day U/Sk labourer 400.00
Scaffolding - Add 3%
Materials
0.20 lts. Anti - corrosive primer
1 1/3 ltr. Enamel paint
2" brush (1/5 use)
Labour
1/2 days painter 300.00
3/4 day U/Sk labourer 300.00
Materials
1 1/2 lts. Anti - corrosive primer
2/3 ltr. Enamel paint
Labour
1 1/2 days painter 900.00
Materials
2/3 ltr. Anti - carrosive paint
2" brush ( 1/5 use)
Labour
1/2 days painter
Materials
1/2 gal wood preservative
2" brush ( 1/5 use)
Labour
1 1/2 days painter 900.00
1/2 day U/Sk labourer 600.00
Materials
3/4 ltr. Primer
2.50 ltr. Enamel paint (2 coats)
2" brush ( 1/10 use)
2 sand papers
Labour
2 1/2 days painter 1,500.00
2 1/2 days U/Sk labourers 1,000.00
Scaffolding - Add 3%
Materials
0 - 50 cwt boiled lime
2 lbs salt
1/2 lb yellow ochre
2 ozs blue
6" brush (1/3 use)
Water 10 gals
Labour
3 days painter 1,800.00
3 days U/Sk labourers 1,200.00
Scaffolding - Add 6%
Materials
0 - 50 cwt boiled lime
2 lbs salt
1/2 lb yellow ochre
2 ozs blue
6" brush (1/3 use)
Water 10 gals
Labour
1 1/4 day painter 750.00
Scaffolding - Add 3%
Materials
Primer 0.90 ltr. Primer
1.40 ltr. Emulsion pant
Water 0.10 gals
6" brush (1/10 use)
2 sand papers
Labour
2 days painter 1,200.00
2 days U/Sk labourer 800.00
Scaffolding - Add 3%
Materials
5/8 cwt cement
1 - 6" coir brush
Water 5 gals
Labour
3/4 day painter 450.00
Scaffolding - Add 3%
Materials
1 st coat -
1/6 gal emulsion paint
2 nd coat -
1/7 gal emulsion paint
6" brush - (1/10 use)
0.10 gals water
Labour
1 3/4 day painter 1,050.00
Scaffolding - Add 3%
Materials
0.90 ltr. Primer
1.50 ltr. Emulsion paint
6" brush ( 1/10 use)
Labour
1/2 day painter 300.00
1/2 day U/Sk labourer 200.00
Materials
0.40 gals ( 1.80 ltr.) varnish
3" brush (1/3 use)
Labour
3 hrs. U/Sk labourer 150.00
Materials
3/4 lb. Wax polish
1/2 doz. Sheets sandpaper
1/10 floor brush
1/2 yards flannel cloth
Rate per square
324.42 395.79
66 Timber framework for calicut pattern tile hip roof in single storey building consisting o
f wall plate, beam, ridge plate, rafters etc. (Preservutive treatment to be measured
separately)
Rate per 6 squares
67 Roof covering with calicut pattern clay tiles in single storeyod building (Timber frame
work & ridge covering measured separately)
Rate per 6 squares
68 Timber framework for corrugated asbestos sheet roof in angle storied building
Rate per 3.6 squares
69 Roof covering with corrugated asbestos sheets (timber frame work & ridge covering
measured separately)
Rate per 3.6 squares
70 One layer half round clay tiles over corrugated asbestos roof covering.
Rate per 3.6 squares
71 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
Rate per 13'4" length
72 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
Rate per 12' length
73 3/4" x 9" high valance board fixed with brass screws to ends of rafters ( for tile
roofing)
Rate per 100' length
74
3/4" x 9" high barge board fixed with brass screws at 2' 0" centres to sides of rafters.
Rate per 100' length
75 ROOF PLUMBING -
18 B.W.G (1.2 mm) galvanised from sheet valley gutter 3' 0" girth
overall once bent with end laps not less then 9" width including 3/4" tongued and
grooved planks laid to slope and grooved planks laid to slope and profile on timber
members.
76 18 B.W.G (1.2 mm) galvanised iron flashing 1' 6" girth overall 3 times bent with end
laps not less than 6", lead soldered, turned and tucked up to not less than 6" in to
cement mortar 1:2 lower end dressed over roof covering not less than 1' 0" wide.
Rate per 15' length
77 Timber Framework for 4' 0" x 4' 0" flat asbestos ceiling (Sheet measured separately)
comprising of 4" x 2" joists and 2" x 2" bearers in class I timber
Rate per 1.95 squre
78 Horisontal ceiling lining using 4' 0" x 4' 0"flat asbestos cement sheets fixed with and
including beading and cove mouldings on timber framework. (timber framework &
painting measured separated)
Rate per 1.95 squre
79 3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4" x 2"
class I timber joists at 2' 0" centers with 1 1/2" brass nails.
Rate per 15' x 13' I.e 1.95 squares
80 3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of
roof rafters, (existing) with 1 1/2" brass nails including leveling with timber strips
where necessary.
Rate per 15' x 12' I.e 1.80 squares
81 Door single hung 3' 3" x 7' 0" high overall with frame having 1 1/4" thick sash and 3
1/4" x 2 1/4" timber frames. (glazing, ironmongery & painting measured separately)
Per 22.75 square feet (3' 3" x 7' 0")
82 Door glazed and panolled double hung 4' 0" x 7' 0" high overall with frame including 1
1/4" thick sash and 3 3/4" x 2 3/4" frame. (glazing, ironmongery and painting measured
separately).
Per 28 square feet (4' 0" x 7' 0")
83 Plywood door single hung 3' 1 1/2" x 6' 1 1/2" overall with frame having 1 1/4" thick
sash and 3 3/4" x 2 3/4" frame. ( iron - mongery and painting measured separately)
Per 21.75 square feet (3' 1 1/2" x 6' 1 1/2")
84 Door ledged, braced and battened single hung 2' 6" x 6' 6" overall, with frame having
7/8" thick tongued & grooved planks and 3 3/4" x 2 3/4" frame.
( Ironmongery and painting measured separately)
Per 16.25 sq.ft (2' 6" x 6' 6")
85 Window, glazed 7' 0" x 4' 0" high overall with frame comprising 3 No openable sashes
and 3 3/4" x 2 3/4" frame and mullions
(Clasing, ironmongery and painting measured separately)
Per window 7' 0" x 4' 0" (sashes) ie per 28.00 sq.ft
86 1/4" clear sheet glass panes exceeding 1' 0" but not exceeding 4 square feet cut and
fixed with timber beadings to doors and windows.
Consider sash 3' 0" x 4' 0" high with 3" x 1 1/4" style and 4 Nos.glass
panes.
Per window 9.00 sq.ft
87 IRONMONGERY
Butt hinges 5" x 2 1/2"
Per 1 1/2 pairs
89 Rim lock
Per 1 No
90 Mortice lock
Per 1 No.
91 Casement stays.
Per 4 Nos.
95 Casement fasteners.
Per 6 Nos.
96 Spring louded fanlight catches
Per 6 Nos.
97 Draw rings
Per 6 Nos.
Rates Labour Materials Rate per unit
Labour
7 days carpenter 4,200.00
8 days U/Sk labourer 3,200.00
1/2 day U/Sk labourer for polishing 200.00 7,600.00
Materials
34.00 cu.ft timber Add 10% for wastage 13,090.00
660 1.ft 2" x 1" reepers Add 5% wastage 9,900.00
8 lbs wire nails 6" long 200.00
2 lbs wire nails 2" long 50.00 23,240.00
Labour
3 days carpenter 1,800.00
3 days U/Sk labourer 1,200.00 3,000.00
Materials
750 tiles 15,750.00 15,750.00
Labour
2 1/2 days carpenter 1,500.00
3 days U/Sk labourer 1,200.00 2,700.00
Materials
13 1/4 cu.ft timber purloins Add 10% for wastage 7,287.50 7,287.50
Labour
1 day carpenter 600.00
2 days U/Sk labourer 800.00 1,400.00
Materials
420 sq.ft asbestos corrugated sheets. 21,000.00
72 Nos. roofing screws and washers. 720.00 21,720.00
Labour
2 days U/Sk labourer 800.00 800.00
Materials
650 half round clay tiles 3,250.00 3,250.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
4 pairs ridges 3' 8" long 200.00
16 roofing screws or bolts 96.00 296.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
9 ridge tiles 468.00
1/3 cwt cement (50 kg bags) 181.50
0.02 cubes sand 88.00
15 lbs slaked lime 300.00
1/2 lb colouring powder 125.00 1,162.50
Labour
3 days carpenter 1,800.00
3 days U/Sk labourer 1,200.00
Scaffolding - Add 5% 150.00 3,150.00
Materials
75.00 sq.ft 1" planks Add 5% for wastage 5,906.25
70 Nos. 1 1/2" brass screws 560.00 6,466.25
Labour
3 days carpenter 1,800.00
3 days U/Sk labourer 1,200.00
Scaffolding - Add 5% 150.00 3,150.00
Materials
75.00 sq.ft 1" planks Add 5% for wastage 5,906.25
50 Nos. 1 1/2" brass screws 400.00 6,306.25
Rate per L.ft 94.56
Labour
a) Fixing boarding and applying wood pressrvative -
Materials
2 G.I sheet (8' x 4') 4,000.00
1/4 gal wood preservative 62.50
0.10 cwt cement (50 kg bags) 55.00
0.05 cwt slaked lime 1.00
1.00 cu.ft sand 44.00
50.00 sq.ft planks 1,250.00
2 lbs 1 1/2" wire nails 40.00 5,452.50
Labour
Cutting bending, soldering & fixing -
1/2 day tinker 300.00
1/9 day mason (caulking) 66.67
3/4 day U/Sk labourer 300.00 666.67
Materials
1 G.I sheet (8' x 4') 2,000.00
0.05 cwt cement (50 kg bags) 27.50
1.00 cu.ft sand 44.00
1 lb soldering lead 50.00 2,121.50
Labour
2 1/2 days carpenter 1,500.00
1/2 days mason 300.00
1 1/2 days U/Sk labourer 600.00
Scaffolding - Add 3% 72.00 2,472.00
Materials
8.00 cu.ft timber class I 2,000.00
1 lb 2" nails 25.00
25 lbs cement 125.00
2.00 cu.ft sand 88.00
2" brush - 1/4 use 180.00
1/3 gal tarnap 39.60 2,457.60
Labour
1 1/2 days carpenter 900.00
2 days U/Sk labourer 800.00
Scaffolding - Add 3% 51.00 1,751.00
Materials
210 sq.ft flat asbestos sheets 5,250.00
60 l.ft 2" x 2" halmilla cove mouldings 960.00
125 l.ft 1 1/12" x 1/2" halmilla beadings 2,000.00
3/4 lb - 1/4" lb out nails 46.50
8 doz 1 1/2" brass screws 400.00 8,656.50
Labour
Making holes, fixing joists & making roof
1 day mason 600.00
1 day carpenter 600.00
3 days U/Sk labourer 1,200.00 2,400.00
Materials
115 l.ft 4" x 2" timber joists 2,070.00
215 sq.ft 6" x 3/4" Lunumidella ceiling planks. 8,600.00
3 lbs cement 15.00
4.00 cu.ft sand 176.00
4 kg 1 1/2" brass nails 480.00 11,341.00
Labour
3 days carpenter 1,800.00
6 days U/Sk labourer 2,400.00
Scaffolding - Add 3% 126.00 4,326.00
Materials
220.00 sq.ft ceiling planks 8,800.00
40.00 l.ft 2" x 1/4" timber strips 400.00
2.00 kg 3/4" nails 240.00
4.00 kg 1 1/2" brass nails. 480.00 9,920.00
Labour
5 days carpenter. 3,000.00
1 1/2 days U/Sk labourer 600.00 3,600.00
Materials
a) Frame -
1 1/2 cu.ft 4" x 3" timber 270.00
2 No. spur stones 40.00
6 No. fiber/ plastic plugs With 4" long brass screws. 90.00
2 No. 5/8" mild steel dowels 4" long, 240.00
b) Sash -
14 sq.ft 1 1/2" planks 630.00
5 sq.ft 1" planks 200.00 1,470.00
Labour
6 days carpenter. 3,600.00
2 days U/Sk labourer 800.00 4,400.00
Materials
a) Frame -
1 2/3 cu.ft 4" x 3" timber 298.80
2 No. spur stones 40.00
6 No. fiber/ plastic plugs With 4" long brass screws. 90.00
2 No. 5/8" mild steel dowels 4" long, 240.00
b) Sashes -
16 sq.ft 1 1/2" planks 720.00
7 sq.ft 1" planks 280.00 1,668.80
Labour
3/4 day carpenter. 450.00
3/8 day U/Sk labourer 150.00
1/4 day mason (fixing frame) 150.00
1/4 day U/Sk labourer ( - do -) 100.00 850.00
Materials
a) Frame -
1.80 cu.ft 4" x 3" timber 324.00
2 No. spur stones 40.00
6 No. fiber/ plastic plugs With 4" long brass screws. 90.00
b) Sashe -
1 No 6' 9" x 2' 9" plywood sash. 850.00 1,304.00
Labour
2 1/4 days carpenter. 1,350.00
1 day U/Sk labourer 400.00
1/4 day mason (fixing frame) 150.00
1/4 day U/Sk labourer ( - do -) 100.00 2,000.00
Materials
a) Frame -
1.70 cu.ft 4" x 3" timber 306.00
2 No. spur stones 40.00
6 No. fiber/ plastic plugs With 4" long brass screws. 90.00
2 No 5/8" mild steel dowels 240.00
b) Sashe -
21.00 sq.ft 1" thick planks 840.00
3 doz 1 1/4 long brass screws. 156.00 1,672.00
Labour
6 days carpenter. 3,600.00
2 1/2 days U/Sk labourer 1,000.00
1/2 day mason (fixing frame) 300.00
1/2 day U/Sk labourer ( - do -) 200.00 5,100.00
Materials
a) Frame -
3.20 cu.ft 4" x 3" timber 576.00
4 No. fiber/ plastic plugs With 4" long brass screws. 60.00
b) Sashes -
9.25 sq.ft 3" x 1 1/2" timber 518.00 1,154.00
Labour
1/2 day glazier 300.00
1/2 day U/Sk labourer 200.00 500.00
Materials
9.00 sq.ft glass panes 405.00
30 L.ft 1/2" x 1/2" beading 660.00
4 doz brass panel pins 200.00 1,265.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
1 1/2 pairs butt hinges 300.00
2 Doz 3/4" brass screws 100.00 400.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
1 pair Tee hinges 200.00
1 1/2 Doz 3/4" brass screws 75.00 275.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
1 rim lock with screws 450.00 450.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
1 mortice look with screws 450.00 450.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
4 casement stays 460.00
16 1/2" brass screws 80.00 540.00
Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
1 door closer 800.00
8 3/4" brass screws 80.00 880.00
Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00
Materials
1 Tower / Skeleton Bolt 500.00
10 1/2" brass screws 50.00 550.00
Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00
Materials
1 barrel bolt 150.00
8 1/2" brass screws 40.00 190.00
Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00
Materials
6 casement fasteners 1,200.00
24 1/2" brass screws 120.00 1,320.00
Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00
Materials
6 brass fanlight catches 624.00
2 doz 1/2" brass screws 240.00 864.00
Labour
1/8 day carpenter 75.00
1/8 day U/Sk labourer 50.00 125.00
Materials
6 draw rings 270.00
1doz 1/2" brass screws 120.00 390.00
Concrete
19 Mixing concrete 1: 3: 6 (1 1/2") 16,233.00
20 Mixing concrete 1: 2: 5 (1") 16,763.00
21 Mixing concrete 1: 2: 4 (3/4") 18,915.00
22 Mixing concrete 1: 1: 3 (3/4") 21,373.00
23 Mixing concrete 1: 1: 2 (3/4") 25,961.00
24 2" thick cement concrete screed in foundation at depths not exceeding 5' 0" 275.00
25
3" thick cement concrete screed in foundation at depths not exceeding 5' 0" 375.00
26 6" thick cement concrete floor (mass concrete). 1,300.00
27 Consider 24 No. columns each 4 1/2" x 6" x 10' 0" ie 0.45 cubes. 10,000.00
28 Cement concrete in 6" x 6" colomns in ground floor. -
Consider 18 No. columns 6" x 6" each 10' 0" high ie 0.45 cubes. 10,000.00
Curing 880.00
29 Cement concrete in 9" x 9" colomns in ground floor. - Consider 8 No. 9" x 9"
columns each 10' 0" high ie 0.45 cubes. 10,000.00
Curing 400.00
30 Cement concrete in 12" x 12" colomns in ground floor. -
Consider 5 No. 12"
Cement concrete inx13
12" columns
1/2" each
x 13 1/2" 10' 0" high.
colomns in ground floor. - 9,400.00
31 Consider 4 No. colomns 13 1/2" x 13 1/2" each 10' 0" high .
I.e 0.51 cubes. 8,823.53
Curing 800.00
32 Cement concrete in 6" x 6" beam up to 1st floor level. -
Consider 180 L.ft of beam 6" x 6"
I.e 0.45 cubes. 10,888.89
Curing 960.00
33 Cement concrete in 9" x 6" beam up to 1st floor level. -
Consider 120 L.ft of beam 9" x 6" beam
I.e 0.45 cubes. 10,888.89
Curing 900.00
34 Cement concrete in 9" x 9" beam up to 1st floor level. -
Consider 80' 0" length 9" x 9" beam
I.e 0.45 cubes. 10,888.89
Curing
5" thick R.CC floor slab in 1st floor. - 840.00
35 Consider 5" thick slab 10' 0" x 12' 0" volume of concrete 50.00 cu.ft
9,800.00
Curing 780.00
36 6" thick R.CC floor slab in 1st floor. -
Consider 10' 0" x 10' 0" panel = 50 cu.ft 9,800.00
Curing 780.00
37 Cement concrete in 4 1/2" x 6" lintels in ground floor. -
Consider 240 l.ft I.e 45 cu.ft 10,888.89
Curing
Cement concrete in 9" x 9" lintels in ground floor. - 780.00
38 Consider 80 L.ft of lintel I.e 45 cu.ft concrete.
10,888.89
Curing
Cement concrete in 9" x 12" lintels in ground floor. - 780.00
39 Consider length 60' 0" of lintel
= 45 cu.ft 10,888.89
Curing
Cement concrete in 12" x 15" lintels in ground floor. - 780.00
40 Consider length 36' 0"
i.e 45 cu.ft 10,888.89
Curing 880.00
Formwork & RF
41
Sawn timber form work to 9" x 9" cement concrete column in ground floor. 22,769.27
42 Sawn timber form work for concrete beams in ground floor. - 21,672.91
43 Sawn timber form work for underside of first floor slab. - 24,692.60
44 Mild steel / for steel reinforcement to lintels slab beams for columns bent to
shape laid in position and tied with G.I. Wire as directed. - 1,130.04
Capentary
66 Timber framework for calicut pattern tile hip roof in single storey building
consisting o f wall plate, beam, ridge plate, rafters etc. (Preservutive treatment
to be measured separately) 5,140.00
67 Roof covering with calicut pattern clay tiles in single storeyod building (Timber
frame work & ridge covering measured separately) 3,125.00
68
Timber framework for corrugated asbestos sheet roof in angle storied building 2,774.31
69 Roof covering with corrugated asbestos sheets (timber frame work & ridge
covering measured separately) 6,422.22
70 One layer half round clay tiles over corrugated asbestos roof covering. 1,125.00
71 Asbestos close fittings ridging fixed complete with roofing screws or bolts
(hook) 40.96
72 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar
1:1:4 117.71
73 3/4" x 9" high valance board fixed with brass screws to ends of rafters ( for tile
roofing) 96.16
74 3/4" x 9" high barge board fixed with brass screws at 2' 0" centres to sides of
rafters. 94.56
75 ROOF PLUMBING -
18 B.W.G (1.2 mm) galvanised from sheet valley
gutter 3' 0" girth overall once bent with end laps not less then 9" width
including 3/4" tongued and grooved planks laid to slope and grooved planks
laid to slope and profile on timber members. 486.83
18 B.W.G (1.2 mm) galvanised iron flashing 1' 6" girth overall 3 times bent
76 with end laps not less than 6", lead soldered, turned and tucked up to not less
than 6" in to cement mortar 1:2 lower end dressed over roof covering not less
than 1' 0" wide. 185.88
77 Timber Framework for 4' 0" x 4' 0" flat asbestos ceiling (Sheet measured
separately) comprising of 4" x 2" joists and 2" x 2" bearers in class I timber 2,528.00
78 Horisontal ceiling lining using 4' 0" x 4' 0"flat asbestos cement sheets fixed
with and including beading and cove mouldings on timber framework. (timber
framework & painting measured separated) 5,337.18
79 3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on
4" x 2" class I timber joists at 2' 0" centers with 1 1/2" brass nails. 7,046.67
80 3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to
underside of roof rafters, (existing) with 1 1/2" brass nails including leveling
with timber strips where necessary. 7,914.44
81 Door single hung 3' 3" x 7' 0" high overall with frame having 1 1/4" thick sash
and 3 1/4" x 2 1/4" timber frames. (glazing, ironmongery & painting measured
separately) 222.86
82 Door glazed and panolled double hung 4' 0" x 7' 0" high overall with frame
including 1 1/4" thick sash and 3 3/4" x 2 3/4" frame. (glazing, ironmongery
and painting measured separately). 216.74
83 Plywood door single hung 3' 1 1/2" x 6' 1 1/2" overall with frame having 1 1/4"
thick sash and 3 3/4" x 2 3/4" frame. ( iron - mongery and painting measured
separately) 99.03
84 Door ledged, braced and battened single hung 2' 6" x 6' 6" overall, with frame
having 7/8" thick tongued & grooved planks and 3 3/4" x 2 3/4" frame.
Window, glazed ( Ironmongery and overall
7' 0" x 4' 0" high paintingwith
measured separately)3 No openable
frame comprising 225.97
sashes and 3 3/4" x 2 3/4" frame and mullions
85 1/4" clear sheet glass panes exceeding 1' 0" but not exceeding 4 square feet
cut and fixed with(Clasing, ironmongery
timber beadings and painting
to doors measured separately)
and windows. 223.36
86 Consider sash 3' 0" x 4' 0" high with 3" x 1 1/4"
style and 4 Nos.glass panes. 196.11
87 IRONMONGERY
Butt hinges 5" x 2 1/2" 433.33
88 Tee hinges 6" x 12" 525.00
89 Rim lock 700.00
90 Mortice lock 700.00
91 Casement stays. 197.50
92 Door closer ( Hydraulic) 1,130.00
93 Tower / Skeleton brass bolts 1,050.00
94 Barrel bolt 4" 690.00
95 Casement fasteners. 303.33
96 Spring louded fanlight catches 227.33
97 Draw rings 85.83
Rate per square
Rate per No
Rate per pair
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Ref No Description Rate
Earth Warks
1 Removing top soil to a depth not exceeding 6" & depositing as directed within
site 4,000.00 Rate per square
2 Excavation over site to reduce level, in any material except rock requiring
blasting including depositing and leveling as directed up to distance not
exceeding 30' 0" per cube 650.00 Rate per cube
3 Excavation in trenches for walls/ column pits in soft/ loose soil from 0' 0" to 5'
0" deep and depositing excavated materiel to a distance not exceeding 30' 0"
(Earth work support to be paid separately where necessary) per cube. 400.00 Rate per cube
4 Excavation in trenches for walls/ column pits in ordinary soil from 0' 0" to 5' 0"
deep and depositing excavated material not exceeding 30' 0" per cube. 900.00 Rate per cube
5 Excavation in trenches for walls/ column pits in Hard/ dense soil up to a depth
of 5' 0" and depositing excavated material up to a distance not exceeding 30'
0". 1,400.00 Rate per cube
11 Backfilling to trenches with selected earth available at site. 400.00 Rate per cube
12 Back filling to trenches with imported material. 902.50 Rate per cube
13 Filling under floors including leveling, watering & compacting in 3" layers with
available and selected earth at site. 800.00 Rate per cube
14 Filling under floors including leveling, watering & compacting in 3" layers with
imported selected earth. 1,202.50 Rate per cube
Concrete
19 Mixing concrete 1: 3: 6 (1 1/2") 16,233.00 Rate per cube
20 Mixing concrete 1: 2: 5 (1") 16,763.00 Rate per cube
21 Mixing concrete 1: 2: 4 (3/4") 18,915.00 Rate per cube
22 Mixing concrete 1: 1: 3 (3/4") 21,373.00 Rate per cube
23 Mixing concrete 1: 1: 2 (3/4") 25,961.00 Rate per cube
24 2" thick cement concrete screed in foundation at depths not exceeding 5' 0" 275.00 Rate per square
25 3" thick cement concrete screed in foundation at depths not exceeding 5' 0" 375.00 Rate per square
26 6" thick cement concrete floor (mass concrete). 1,300.00 Rate per square
27 Consider 24 No. columns each 4 1/2" x 6" x 10' 0" ie 0.45 cubes. 10,000.00 Rate per cube
28 Cement concrete in 6" x 6" colomns in ground floor. -
Consider 18 No. columns 6" x 6" each 10' 0" high ie 0.45 cubes. 10,000.00 Rate per cube
Curing 880.00 Rate per cube
29 Cement concrete in 9" x 9" colomns in ground floor. - Consider 8 No. 9" x 9"
columns each 10' 0" high ie 0.45 cubes. 10,000.00 Rate per cube
Curing 400.00 Rate per cube
30 Cement concrete in 12" x 12" colomns in ground floor. -
Consider 5 No. 12"
Cement concrete inx13
12" columns
1/2" each
x 13 1/2" 10' 0" high.
colomns in ground floor. - 9,400.00 Rate per cube
31 Consider 4 No. colomns 13 1/2" x 13 1/2" each 10' 0" high .
I.e 0.51 cubes. 8,823.53 Rate per cube
Curing 800.00 Rate per cube
32 Cement concrete in 6" x 6" beam up to 1st floor level. -
Consider 180 L.ft of beam 6" x 6"
I.e 0.45 cubes. 10,888.89 Rate per cube
Curing 960.00 Rate per cube
33 Cement concrete in 9" x 6" beam up to 1st floor level. -
Consider 120 L.ft of beam 9" x 6" beam
I.e 0.45 cubes. 10,888.89 Rate per cube
Curing 900.00 Rate per cube
34 Cement concrete in 9" x 9" beam up to 1st floor level. -
Consider 80' 0" length 9" x 9" beam
I.e 0.45 cubes. 10,888.89 Rate per cube
Curing
5" thick R.CC floor slab in 1st floor. - 840.00 Rate per cube
35 Consider 5" thick slab 10' 0" x 12' 0" volume of concrete 50.00 cu.ft
9,800.00 Rate per cube
Curing 780.00 Rate per cube
36 6" thick R.CC floor slab in 1st floor. -
Consider 10' 0" x 10' 0" panel = 50 cu.ft 9,800.00 Rate per cube
Curing 780.00 Rate per cube
37 Cement concrete in 4 1/2" x 6" lintels in ground floor. -
Consider 240 l.ft I.e 45 cu.ft 10,888.89 Rate per cube
Curing
Cement concrete in 9" x 9" lintels in ground floor. - 780.00 Rate per cube
38 Consider 80 L.ft of lintel I.e 45 cu.ft concrete.
10,888.89 Rate per cube
Curing
Cement concrete in 9" x 12" lintels in ground floor. - 780.00 Rate per cube
39 Consider length 60' 0" of lintel
= 45 cu.ft 10,888.89 Rate per cube
Curing
Cement concrete in 12" x 15" lintels in ground floor. - 780.00 Rate per cube
40 Consider length 36' 0"
i.e 45 cu.ft 10,888.89 Rate per cube
Curing 880.00 Rate per cube
Formwork & RF
41 Sawn timber form work to 9" x 9" cement concrete column in ground floor. 22,769.27 Rate per square
42 Sawn timber form work for concrete beams in ground floor. - 21,672.91 Rate per square
43 Sawn timber form work for underside of first floor slab. - 24,692.60 Rate per square
44 Mild steel / for steel reinforcement to lintels slab beams for columns bent to
shape laid in position and tied with G.I. Wire as directed. - 1,130.04 Rate per cwt