Sie sind auf Seite 1von 392

1

Removing top soil to a depth not exceeding 6" & depositing as directed within site.

2
Excavation over site to reduce level, in any material except rock requiring blasting
including depositing and leveling as directed up to distance not exceeding 30' 0"

3 Excavation in trenches for walls/ column pits in soft/ loose soil from 0' 0" to 5' 0" deep
and depositing excavated materiel to a distance not exceeding 30' 0" (Earth work
support to be paid separately where necessary).
4 Excavation in trenches for walls/ column pits in ordinary soil from 0' 0" to 5' 0" deep
and depositing excavated material not exceeding 30' 0".
5 Excavation in trenches for walls/ column pits in Hard/ dense soil up to a depth of 5' 0"
and depositing excavated material up to a distance not exceeding 30' 0".
6 Excavation in trenches for walls/ column pits in Mud/ wet soil up to a depth of 5' 0"
and depositing excavated material to distance not exceeding 30' 0". (Earth work &
dewatering paid for separately.)
7 Excavation in trenches for walls/ column pits in soft disintegrated rock (not requiring
blasting) up to depth of 5' 0" and depositing excavated material to distance not
exceeding 30' 0".

8 Excavation in trenches for walls/ column pits in Hard rock requiring blasting up to a
depth of 5' 0" and depositing excavated material to distance not exceeding 30' 0".
Per cube

9 Benching rock in foundation in 3" - 6" steps. (Blasting prohibited)


Per 10 square feet

ANTI - TERMITE TREATMENT


10 Anti - termite treatment on excavated foundation and compacted soil under floors.
Earth work - Backfilling & Compacting
11 Backfilling to trenches with selected earth available at site.

12 Back filling to trenches with imported material.

13 Filling under floors including leveling, watering & compacting in 3" layers with
available and selected earth at site.

14 Filling under floors including leveling, watering & compacting in 3" layers with
imported selected earth.

15 Cutting turf sods, landing to hand carts and transporting up to 30 yards, laying and
watering for 30 days. (Royalty for turf, pegging and transport beyond 30 yards paid
separately)
Earth work support (open planking) in trenches up to a depth of 5' 0"
16 Consider trench 15' 0" long 3' 0" wide and 5' 0" depth open planking to both faces.
Total area - 2/ 15' 0" x 5' 0"
. = 150 sq.ft

Earth work support (close planking) in trenches up to 5' 0" depth.


17 Consider trench 15' 0" long 3' 0" wide and 5' 0" height of planking to both faces.
Total area of planking 2/ 15' 0" x 5' 0" ie 150 sq.ft

18 Earth work support (close planking) in deep excavation in trenches up to 15' 0" depth.
- Consider trench of length of 15' 0" width 5' 6" at top 3' 6" at bottom Then
area supported is 2/ 15' x 15' ie 450 sq.ft.
CONCRETE
19 Mixing concrete 1: 3: 6 (1 1/2")

20 Mixing concrete 1: 2: 5 (1")

21 Mixing concrete 1: 2: 4 (3/4")

22 Mixing concrete 1: 1: 3 (3/4")


23 Mixing concrete 1: 1: 2 (3/4")

24 2" thick cement concrete screed in foundation at depths not exceeding 5' 0"

25 3" thick cement concrete screed in foundation at depths not exceeding 5' 0"

26 6" thick cement concrete floor (mass concrete).


Cement concrete in 4 1/2" x 6" columns in ground floor.
27 Consider 24 No. columns each 4 1/2" x 6" x 10' 0" ie 0.45 cubes.

28 Cement concrete in 6" x 6" colomns in ground floor. -


Consider 18 No. columns 6" x 6" each 10' 0" high ie 0.45 cubes.

28 Cement concrete in 6" x 6" colomns in ground floor. -


Consider 18 No. columns 6" x 6" each 10' 0" high ie 0.45 cubes.
Curing

29 Cement concrete in 9" x 9" colomns in ground floor. - Consider 8 No. 9" x 9" columns
each 10' 0" high ie 0.45 cubes.

Curing

30 Cement concrete in 12" x 12" colomns in ground floor. -


Consider 5 No. 12" x 12" columns each 10' 0" high.
Per 0.5 cube
31 Cement concrete in 13 1/2" x 13 1/2" colomns in ground floor. -
Consider 4 No. colomns 13 1/2" x 13 1/2" each 10' 0" high .
I.e 0.51 cubes.

Curing

32 Cement concrete in 6" x 6" beam up to 1st floor level. -


Consider 180 L.ft of beam 6" x 6"
I.e 0.45 cubes.

Curing
33 Cement concrete in 9" x 6" beam up to 1st floor level. -
Consider 120 L.ft of beam 9" x 6" beam
I.e 0.45 cubes.

Curing

34 Cement concrete in 9" x 9" beam up to 1st floor level. -


Consider 80' 0" length 9" x 9" beam
I.e 0.45 cubes.

Curing
35 5" thick R.CC floor slab in 1st floor. -
Consider 5" thick slab 10' 0" x 12' 0" volume of concrete 50.00 cu.ft

Curing

36 6" thick R.CC floor slab in 1st floor. -


Consider 10' 0" x 10' 0" panel = 50 cu.ft

Curing
37 Cement concrete in 4 1/2" x 6" lintels in ground floor. -
Consider 240 l.ft I.e 45 cu.ft

Curing

38 Cement concrete in 9" x 9" lintels in ground floor. -


Consider 80 L.ft of lintel I.e 45 cu.ft concrete.

Curing
39 Cement concrete in 9" x 12" lintels in ground floor. -
Consider length 60' 0" of lintel
= 45 cu.ft

Curing

40 Cement concrete in 12" x 15" lintels in ground floor. -


Consider length 36' 0"
i.e 45 cu.ft

Curing
FORMWORKS
41 Sawn timber form work to 9" x 9" cement concrete column in ground floor.
Making Moulds (15 sqft) Consider column length of 5' 0"

Assembling per use

Demantling per use

42 Sawn timber form work for concrete beams in ground floor. -


Making Moulds Consider 9" x 12" beam of 20' 0" long. Contact area 55 sq.ft.

Assembling per use


Demantling per use

43 Sawn timber form work for underside of first floor slab. -


Making Moulds Consider a slab of desmensions 20" 0" x 10' 0"
Contact area = 2.0 sqrs.

Assembling per use

Demantling per use


REINFORCEMENTS
44 Mild steel / for steel reinforcement to lintels slab beams for columns bent to shape laid
in position and tied with G.I. Wire as directed. -

MASONRY
45 Brick work in cement sand 1:5: in foundation up to D.P.C

46 Brick work cement and sand 1:8 in foundation up to D.P.C


Rate per square

47 Brick work in cement and sand 1:5 in 4 1/2" thick walls in ground floor
Rate per square
48 9" thick brick wall cement sand 1:5 in ground floor
Rate per square

49 Brick work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor
Rate per square

50 9" Brick walls in cement sand 1:8in superstructure in ground floor


Rate per square

51 4 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor ( Facing to
brickwork measured separately)
Rate per square
52 9" thick in cement and sand 1:5 with wire cut bricks (Facing to brick work measured
separately)
Rate per square

53 13 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to
brick work measured separately)
Rate per square

54 Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1
mixture in ground floor
Rate per square

55 3" thick floor paved in lime mortar 2:5 in ground floor


Rate per square
56 Steps 1' - 1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and
sand 1:2 redering including necessary excavation.
Rate per 10 L. ft

57 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces with 1'6" ramp including necessary
excavation.
Rate per 10 L. ft

58 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces without ramp including necessary
excavation.
Rate per 10 L. ft
59 8" thick Hollow block work in cement and sand mortar 1:5 in ground floor (cavities
unfilled)
Rate per square

60 4" thick Hollow block mesonry in cement and sand mortar 1:5 with cavities unfilled
Rate per square

61 Random Rubble masonry in cement morter 1:5 in foundation


Rate per cube (14" thick)

62 Random Rubble masonry in cement morter 1:5 in superstructure


Rate per cube (14" thick)
FLOOR FINISHES
63 Pressed floor tiles bedded in 1/2" cement morter 1:2 and pointing in neat cement in
ground floor
Rate per square

64 Glazed tiles fixed to walles including bedding in cement morter 1:2 and raking in
ground floor. (specials measured separately)
Rate per square

65 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Rate per square
66 Timber framework for calicut pattern tile hip roof in single storey building consisting o
f wall plate, beam, ridge plate, rafters etc. (Preservutive treatment to be measured
separately)
Rate per 6 squares

67 Roof covering with calicut pattern clay tiles in single storeyod building (Timber frame
work & ridge covering measured separately)
Rate per 6 squares

68 Timber framework for corrugated asbestos sheet roof in angle storied building
Rate per 3.6 squares

69 Roof covering with corrugated asbestos sheets (timber frame work & ridge covering
measured separately)
Rate per 3.6 squares

70 One layer half round clay tiles over corrugated asbestos roof covering.
Rate per 3.6 squares
71 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
Rate per 13'4" length

72 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
Rate per 12' length

73 3/4" x 9" high valance board fixed with brass screws to ends of rafters ( for tile
roofing)
Rate per 100' length

74
3/4" x 9" high barge board fixed with brass screws at 2' 0" centres to sides of rafters.
Rate per 100' length
75 ROOF PLUMBING -
18 B.W.G (1.2 mm) galvanised from sheet valley gutter 3' 0" girth
overall once bent with end laps not less then 9" width including 3/4" tongued and
grooved planks laid to slope and grooved planks laid to slope and profile on timber
members.

Rate per 15' length

76 18 B.W.G (1.2 mm) galvanised iron flashing 1' 6" girth overall 3 times bent with end
laps not less than 6", lead soldered, turned and tucked up to not less than 6" in to
cement mortar 1:2 lower end dressed over roof covering not less than 1' 0" wide.
Rate per 15' length

77 Timber Framework for 4' 0" x 4' 0" flat asbestos ceiling (Sheet measured separately)
comprising of 4" x 2" joists and 2" x 2" bearers in class I timber
Rate per 1.95 squre
78 Horisontal ceiling lining using 4' 0" x 4' 0"flat asbestos cement sheets fixed with and
including beading and cove mouldings on timber framework. (timber framework &
painting measured separated)
Rate per 1.95 squre

79 3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4" x 2"
class I timber joists at 2' 0" centers with 1 1/2" brass nails.
Rate per 15' x 13' I.e 1.95 squares

80 3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of
roof rafters, (existing) with 1 1/2" brass nails including leveling with timber strips
where necessary.
Rate per 15' x 12' I.e 1.80 squares
81 Door single hung 3' 3" x 7' 0" high overall with frame having 1 1/4" thick sash and 3
1/4" x 2 1/4" timber frames. (glazing, ironmongery & painting measured separately)
Per 22.75 square feet (3' 3" x 7' 0")

82 Door glazed and panolled double hung 4' 0" x 7' 0" high overall with frame including 1
1/4" thick sash and 3 3/4" x 2 3/4" frame. (glazing, ironmongery and painting measured
separately).
Per 28 square feet (4' 0" x 7' 0")

83 Plywood door single hung 3' 1 1/2" x 6' 1 1/2" overall with frame having 1 1/4" thick
sash and 3 3/4" x 2 3/4" frame. ( iron - mongery and painting measured separately)
Per 21.75 square feet (3' 1 1/2" x 6' 1 1/2")
84 Door ledged, braced and battened single hung 2' 6" x 6' 6" overall, with frame having
7/8" thick tongued & grooved planks and 3 3/4" x 2 3/4" frame.
( Ironmongery and painting measured separately)
Per 16.25 so.ft (2' 6" x 6' 6")

85 Window, glazed 7' 0" x 4' 0" high overall with frame comprising 3 No openable sashes
and 3 3/4" x 2 3/4" frame and mullions
(Clasing, ironmongery and painting measured separately)
Per window 7' 0" x 4' 0" (sashes) ie per 28.00 sq.ft
86 1/4" clear sheet glass panes exceeding 1' 0" but not exceeding 4 square feet cut and
fixed with timber beadings to doors and windows.
Consider sash 3' 0" x 4' 0" high with 3" x 1 1/4" style and 4 Nos.glass
panes.
Per window 9.00 sq.ft

87 IRONMONGERY
Butt hinges 5" x 2 1/2"
Per 1 1/2 pairs

88 Tee hinges 6" x 12"


Per 1 pairs

89 Rim lock
Per 1 No

90 Mortice lock
Per 1 No.
91 Casement stays.
Per 4 Nos.

92 Door closer ( Hydraulic)


Per 1 No.

93 Tower / Skeleton brass bolts


Per 1 No.

94 Barrel bolt 4"


Per 1 No.

95 Casement fasteners.
Per 6 Nos.
96 Spring louded fanlight catches
Per 6 Nos.

97 Draw rings
Per 6 Nos.

98

3/4" thick DPC, in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.

99

5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.

100

5/8" thick plastering to wall in cement sand 1:3 including cement floating
101

3/8" thick plastering to soffit slab in cement and sand 1:3 including floating with lime
putty

102

3/8" thick plastering to sides and soffit of beams in cement & sand 1:3 including
floating with lime putty

103

5/8" thick to wall in lime cement and sand 1:1:5 finished semi - rough with wooden
float.

104

5/8" thick plastering to wall in lime and sand 1:1:5 finished smooth with lime putty
floating.

105
1/2" thick rendering in cement and sand 1:3 finished smooth

106

1/2" thick rendering in cement and sand 1:2 in floors, finished smooth.

107

3/4" thick rendering in cement and sand 1:3 finished smooth.


108

3/4" thick rendering in cement and sand 1:2 in floors finished smooth.

109

3/4" thick rendering in cement and sand 1:2 in coloured cement floors finished smooth.

110
1/2" x 6" skirting in cement and sand 1:3 projected or flush to walls finished with
floating including forming groove.

111
Prepare and apply one coat of preservative (oil type) to structural timber including
touching up cut ends etc. after fixing.

112

Prepare surface of steel truse and apply two coats of anti - corrosive primer.

113

Apply one coat of anti - corrosive primer and two coats enamel paint on already shop
rimed and arected steel roof truss.

114

Prepare and apply two coats primer and finishing coat of enemel paint to mild steel
(angle / flat) gate.
115
Painting steel on mew work with 2 coats of anti - corrosive paint

116
Painting new timber work with two coats wood preservative

117
Preparing and painting wood work with primer and 2 coats enamel paint.

118

White or colour washing two coats in single storey.

119

White or colour washing in two storeyed building

120
Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint
to walls.

121

Cement washing to walls of single storeyed builsing 2 coats


122

Painting walls with emulsion paint ( 2 coats)

123
Prepare and apply one coat alkali resistant primer and two caoats of emulsion paint to
soffit of slabs.

124
Varnishing two coats with copal varnish after sandpapering

125
Wax polishing to timber in panels & floors.

126
PLUMBING - PVC PIPES
1/2" diameter PVC pipes fixed
to walls ( specials paid separately)

127

3/4" dia meter PVC pipes to walls ( specials paid separately)

128

1" dia meter PVC pipes fixed to walls ( specials paid separately)

129

1 1/4" dia meter PVC fixed to walls ( specials paid separately)


130

1 1/2" dia meter PVC pipes laid to walls ( specials paid separately)

131

2" dia meter PVC pipes laid to walls ( specials paid separately)

132

3" dia meter PVC pipes fixed to walls ( specials paid separately)

133
Excavation for laying 1/2" to 3" dia meter PVC pipes in ground not less than 1' 6"
deep, back filling & compacting.

134
Chasing brickwork for laying 1/2" to 1 1/2" dia PVC pipes and making good average
depth 2" - ( Pipes and specials paid separately)

135

Chasing brickwork for laying 1 1/2" to 3" dia PVC pipes in ground or floop and
making good. Average depth 3" - ( Pipes and specials measured separately)

136
1/2" dia PVC specials viz - albows / bends / sockets

137
3/4" dia PVC specials viz elbows / bends / sockets.

138
1" dia PVC specials viz - elbows / bends / sockets.

139
1 1/4" dia PVC specials viz - elbows / bends / sockets.
140
1 1/2" dia PVC specials viz - elbows / bends / sockets.

141
2" dia specials viz elbows / bends / sockets.

142
2 1/2" dia PVC specials viz elbows / bends / sockets.

143
3" dia PVC specials viz elbows / bends / sockets.

144
1/2" dia PVC specials viz. Tees.

145
3/4" dia PVC specials viz. Tees.

146
1" dia PVC specials viz Tees

147
1 1/4" dia PVC specials viz Tees

148
1 1/2" dia PVC specials viz Tees

149
2" dia PVC specials viz Tees

150
2 1/2" dia PVC specials viz Tees

151
3" dia PVC specials viz Tees
152

4" dia glazed earthenware pipes laid on 6" thick bedding in cement concrete 1: 3 : 6 ( 1
1/2") including excavation average 2' 0" depth, backfilling with selected excavated
materials and concrete haunching to joints.

153

4" dia C.I. Soil / vent pipe fixed vertically to walls jointed with cement caulking.
(Specials measured separately)

154

4" dia C.I. Pipes fixed for walls jointed with lead caulking. (Specials measured
separately)

155
4" dia stoneware gulley with 6" x 6" x 6" gulley box including excatatio, 4" cement
concrete 1: 2: 4 ( 3/4") base, surrounded by 4 1/2" thick cement and sand 1: 5 extanded
6" above top of gulley box including making connection, 1/2" cement and sand 1:2
rendering internally and exposed faces finished smooth with neat cement flasting and
providing G.I. grating on top of gulley.
156
Marihole 2' 0" x 2' 0" internally with invert depth not exceeding 2' 0" including
excavation, beckfilling 6" cement concrete 1: 2: 4 ( 3/4") base with 3/8" dia meter mild
steel rods at 4" centres hothways, forming channels and benching in similar concrets, 4
1/2" walls in brick in cement 1 : 5, 1/2" thick cement and sand 1:2 rendering internally
and exposed surfaces including channels, benching and 2" thick RCC removable cover
slab 2' 3" x 2' 3" inlet and outlet connection all complete to working order.

157
22" x 16"glazed fireclay wash basin with 1/2" dia chromium plated pillar tap, waste
plug, chromium plated waste cnain and stay, including fixing wash basin on brackets.
( water supply and waste water connection measured separately)

159

Closet pendestal type with L/L flushing cistern, flush pipe double plastic seat cover,
1/2" dia stop cock, trap supplied & fixed cemplete to working order

160

Closet squatting type with trap including high level cistern fixed complete with flush
pipe and 1/2" dia stop cock, all complete to working order.

161
Vitreous China bidet suite fixed cemplete to working order

162

4 No. Bowl type urinal with trap and 2 gals capacity automatic flushing cestern and
spreaders complete to working orders.
163

6" dia half round PVC eaves gutter fixed to timber valance board including gutter
joiner and brackets fixed at 18" centres. (Other specials paid separately)
Consider an area of 10.00 sqrs. Ie 5.00 cubes of
excavation.10 day a U/Sk labourer.
Rate per
Per cube
cube

1 5/ 8 day U/ Sk labourer

1 day U/ Sk labourer

2 1/4 days U/ Sk labourer.

3 1/2 days U/Sk labourer

3 days U/Sk labourer.

2 1/2 days U/Sk labourer

Labour
1 day Sk labourer

2 days U/Sk labourer

Materials
0.75 lbs blasting powder

10 lft fuse
1 lb jumper steel

Rate per cube


Rate per
sq.ft
Labour
Drilling, chipping & wedging 1 1/2 day Sk labourer
Steel, fuel & forge - 25% of labour cost
Collecting & Disposing 1 1/2 day U/Sk labourer per
10 sq.ft

Material

Rate per Square

Labour
1/2 day U/ Sk labourer
Materials
16 lbs D.D.T. powder (8% in 20 gals of water)
20 gals water

Rate per Square

Labour
1 day U/ Sk labourer

Materials

Rate per cube

Labour
1 1/4 U/Sk labourer

Materials
1.00 cube earth delivered at site.
Allow 15% compaction
Filling & Compacting

Rate per cube

Labour
2 day U/ Sk labourer

Materials

Rate per cube

Labour
2 days U/Sk labourer

Materials
1.00 cube earth delivered at site.
Allow 15% compaction

Rate per cube

Rate per
Note
sqrare
Labour
Royalty for turf
Cutting turf sods, loading and transporting to site and
b)
unloading 2
2,600.00 Transport of
1/2 day U/ Sk labourer
turf

Laying turf rods at site 1 1/2 day U/ Sk labourer c)


Watering for 30 days 1 1/2 days U/Sk labourer

Materials
60 gals. water

Rate per square

Labour
1 days carpenter

3 days U/ Sk labourer

Materials
17.50 cu.ft class II timber (4 uses)
1,800.00
Add 5% on above for wedges.

Rate per square

3,600.00
Labour
2 days carpenter
6 days U/ Sk labourer.

Materials
30.00 cu.ft class II timber (4 uses)
Add 5% on above for wedges.

Rate per square

Rate per
12,800.00
Labour cube
8 days carpenter Total per 450
20 days U/Sk Labourer sq.ft.

Materials
100.00 cu.ft class II Timber (4 uses)
Add 5% on above for wedge.

Rate per square


a) Water
available at
site.

b) If, water is
Labour not
Noteavailable
1 day skilled labourer allowances
6 days U/ Sk labourer should be
made for
transport of
Materials water.
13 cwt (50 kg bags) cement
0.53 cubes sand
0.92 cubes 1 1/2" metal
Water (110 gals) a)c) Sand -
Water
includes 15%
available at
Equipments for bulking.
site.
1/3 day hire of mixer

Rate per cube


b) If, water is
Labour not
Noteavailable
1 day skilled labourer allowances
5 days U/ Sk labourer should be
made for
transport of
Materials water.
14 cwt (50 kg bags) cement
0.60 cubes sand
0.92 cubes 1" metal
Water (100 gals) a)c) Sand -
Water
includes
available15%
at
Equipments for bulking.
site.
1/3 day hire of mixer

Rate per cube


b) If, water is
Labour not
Noteavailable
1 day skilled labourer allowances
6 days U/ Sk labourer should be
made for
transport of
Materials water.
18 cwt (50 kg bags) cement
0.50 cubes sand
0.88 cubes 3/4" metal
Water (120 gals) a)c) Sand -
Water
includes
available15%
at
Equipments for
site.bulking.
1/3 day hire of mixer

Rate per cube


b) If, water is
Labour not
Noteavailable
1 day skilled labourer allowances
should be
made for
transport of
water.

3,000.00
b) If, water is
not available
allowances
6 days U/ Sk labourer should be
made for
transport of
Materials water.
23 cwt (50 kg bags) cement
0.42 cubes sand
3,000.00
0.82 cubes 3/4" metal
Water (150 gals) a)c) Sand -
Water
includes
available15%
at
Equipments for
site.bulking.
1/3 day hire of mixer

Rate per cube


b) If, water is
Labour not
Noteavailable
1 day skilled labourer allowances
6 days U/ Sk labourer should be
made for
transport of
Materials water.
31 cwt (50 kg bags) cement
0.44 cubes sand
0.96 cubes 3/4" metal
Water (200 gals) c) Sand -
includes 15%
Equipments for bulking.
1/3 day hire of mixer
for laying
Rate per cube concrete at
depths more 1/3 day hire of
500.00
than mixer
Labour Note5' 0", add
1/8 days skilled labourer 1/6 day
unskilled
1/2 days unskilled labourer
labourer for
each
Materials additional 5'
1/6 cube concrete (Add 10% for wastage ) 0" or part
there of per
Rate per square square

Labour
1/8 days skilled labourer
3/4 days unskilled labourer

Materials
1/4 cube concrete (Add 10% for wastage )

Rate per square

Labour
1/2 days skilled labourer
1 1/2 days unskilled labourer
Materials
1/2 cube concrete (Add 10% for wastage )
200 gal of water

Rate per square

Labour
1 day mason
1day carpenter
3 days U/Sk labourer
1 day Sk labourer (Vibrator)

Materials
0.45 cube concrete (Add 10% for wastage )

Equipments
1 day hire of vibrator

Rate per cube

Labour
1 day mason
1day carpenter
3 days U/Sk labourer 1) For column
1 day Sk labourer (Vibrator) in 1 st floor
add 3% to
Materials ground floor
rate.
0.45 cube concrete (Add 10% for wastage )

Equipments
1 day hire of vibrator 2)
For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
3 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )

Equipments 4) Water
1 day hire of vibrator available at
site.
Rate per cube
5) If
water is not
available
allowance
must be made
for transport
of water.
1) For column
in 1 st floor
Labour add 3% to
1 1/2 days U/Sk labourer ground floor
rate.
Materials
Jute Hessian - 80 sq.ft

Water - 140 gals 2)


For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
3 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )

Equipments 4) Water
1 day hire of vibrator available at
site.
Rate per cube
5) If
Labour 1) Foriscolumn
water not
1/2 days U/Sk labourer in 1 st floor
available
add 3% to
allowance
Materials ground
must befloor
made
Jute Hessian - 60 sq.ft
rate.
for transport
Water - 100 gals of water.

Rate per cube 2)


For column in
2 nd floor add
5%
Labour Noteto ground
floor rate.
1 day mason
1day carpenter
3 days U/Sk labourer
1 day Sk labourer (Vibrator) 3) For
columns in
Materials 3rd floor add
7% to ground
0.50 cube concrete (Add 10% for wastage )
floor rate.
40 so.ft - Jute Hessian
Water (100 gals)

4) Water
available at
Equipments site.
1 day hire of vibrator
5) If
water is not
available
allowance
must be made
for transport
of water.
add 3% to
ground floor
rate.

2)
Rate per cube For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
3 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.51 cube concrete (Add 5% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
1) For column
5) If
Labour in 1 st floor 2)
Note
water is not
1 1/2 days U/Sk labourer If water
add 3% tois not
available
available
ground floor
allowance
allowance
rate.
Materials
Jute Hessian - 45 sq.ft must be made
must be made
for transport
for transport
Water - 100 gals of water.
of water.
2)
Rate per cube For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note is not 2)
water
1 1/2 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 90 sq.ft must be made
must be made
for transport
for transport
Water - 180 gals of water.
of water.
add 3% to
ground floor
rate.

2)
Rate per cube For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
1) For column
5) If
Labour in 1 st floor 2)
Note
water is not
1 1/2 days U/Sk labourer If water
add 3% tois not
available
available
ground floor
allowance
allowance
rate.
Materials
Jute Hessian - 75 sq.ft must be made
must be made
for transport
for transport
Water - 150 gals of water.
of water.
2)
Rate per cube For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
0.45 cube concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note is not 2)
water
1 1/2 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 60 sq.ft must be made
must be made
for transport
for transport
Water - 120 gals of water.
of water.
ground floor
rate.

2)
For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
50 cuft of concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube 1) For column
in 1 st floor
Labour add
Note 3%5) to If 2)
water
ground is not
1 1/2 days U/Sk labourer If waterfloor
is not
available
rate.
available
allowance
allowance
Materials
Jute Hessian - 30 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water. 2)
of water.
For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
50 cuft of concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note is not 2)
water
1 1/2 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 25 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water.
of water.

Rate per cube


2)
For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
45 cuft of concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube 1) For column
in 1 st floor
Labour add
Note 3%5) to If 2)
water
ground is not
1 1/2 days U/Sk labourer If waterfloor
is not
available
rate.
available
allowance
allowance
Materials
Jute Hessian - 10 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water. 2)
of water.
For column in
Rate per cube 2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
45 cuft of concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note 2)
water is not
1 1/2 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 60 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water.
of water.

Rate per cube


rate.

2)
For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
45 cuft of concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note
1) Foriscolumn 2)
water not
1 1/2 days U/Sk labourer If
in water is
1 st floornot
available
available
add 3% to
allowance
allowance
ground
Materials
Jute Hessian - 55 sq.ft must befloor
made
must
rate. be made
for transport
for transport
Water - 90 gals of water.
of water.

Rate per cube 2)


For column in
2 nd floor add
5% to ground
floor rate.
Labour Note
1 day mason
1day carpenter 3) For
4 days U/Sk labourer columns in
1 day Sk labourer (Vibrator) 3rd floor add
7% to ground
floor rate.
Materials
45 cuft of concrete (Add 10% for wastage )

Equipments 4) Water
1) Water
1 day hire of vibrator available at
available at
site.
site.
Rate per cube
5) If
Labour Note 2)
water is not
1 3/4 days U/Sk labourer If water is not
available
available
allowance
allowance
Materials
Jute Hessian - 40 sq.ft must be made
must be made
for transport
for transport
Water - 90 gals of water.
of water.

Rate per cube


Labour
1/2 day carpenter
1/2 day U/Sk labourer
Allowin: 4 uses cost
of mould per use

Materials
18.15" sq.ft 1" thick class II timber
17.10 L.ft 2" x 2" class II timber in yokes.
16.12 L.ft 2" x 1" class II timber battens
1 1/2 lb wire nails.

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
12 Nos. 16 mm 18" long bolts (20 uses)

1/2 liter mould oil


35 L.ft 4" x 2" props (10 uses)

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Rate per square

Labour
1/2 day carpenter
2 day U/Sk labourer
Allowin: 4 uses cost
of mould per use
10% for repair

Materials
60 sq.ft 1" timber planks
24 l.ft 2" x 1" battens
45 l.ft 2" x 2" ledgers
30 l.ft 4" x 2" bearers at bottom of mould.
2 lbs wire mails
10% for repair

Labour
1 day carpenter
2 day U/Sk labourer

Materials
110 l.ft 4" x 2" vertical props
80 l.ft 2" x 2" bracing to mould and props.
50 l.ft 2" x 2" bracing to a set of props
6.0 sq.ft 1" timber base plate to props
22 Nos wdges
Add 10% of cost of materials for repairs
1/2 gal mould oil
1/2 lbs nail

Labour
1/2 day carpenter
2 day U/Sk labourer

Rate per square

Labour
3 days carpenter
3 days U/Sk labourer
Allowin: 4 uses cost
of mould per use
20% for repair

Materials
220 se.ft 1" thick tongue and grooved timber planks.
121 L.ft 4" x 2" runners at 2' 0" centers.
4 lbs. were nails.

Labour
1 day carpenter
4 day U/Sk labourer
1 gal mould oil for assembling.
2 lbs wire nails

Materials
690 l.ft 4" x 2" vertical timber props.(10 uses)
66 l.ft 2" x 2" bracing for props.
122 No. wedges
33 sq.ft 1" bass plates for props
Add 20% of cost of materials for repairs

Labour
1/2 day carpenter
2 day U/Sk labourer

Rate per square


Labour
1 days barbender
1 days U/Sk labourer

Materials
1 cwt M.S. / per steel.rods including transport to site.
(Allow for wastage 15%)
1 1/2 lbs 16 BWG binding wire
Add 1.5% of steel cost for spacers or dhairs.

Rate per cwt

Labour
3 days mason
4 days U/Sk labourer

Materials
1450 bricks Add 5% wastage
4.00 cwt cement (50 kg bags)
0.25 cubes sand
Water (150 gals)

Rate per square

Labour
3 days mason
4 days U/Sk labourer

Materials
1450 bricks Add 5% wastage
2 1/3 cwt cement (50 kg bags)
3/8 cubes sand
Water (150 gals)

Rate per square

Labour
1 1/2 days mason
2 days U/Sk labourer
Scaffolding - Add 5%

Materials
550 bricks Add 5% wastage
1.3 cwt cement (50 kg bags)
0.10 cubes sand
Water (50 gals)

Rate per square

Labour
1 1/4 days mason
3 3/4 days U/Sk labourer
Scaffolding - Add 3%

Materials
1090 bricks Add 5% wastage
3.00 cwt cement (50 kg bags)
0.20 cubes sand
Water (115 gals)

Rate per square

Labour
3 1/2 days mason
5 1/2 days U/Sk labourer
Scaffolding - Add 2%

Materials
1630 bricks Add 5% wastage
4.50 cwt cement (50 kg bags)
0.30 cubes sand
Water (170 gals)

Rate per square

Labour
2 1/4 days mason
3 days U/Sk labourer
Scaffolding - Add 3%

Materials
1090 bricks Add 5% wastage
1.75 cwt cement (50 kg bags)
0.30 cubes sand
Water (115 gals)

Rate per square

Labour
1 1/2 days mason
2 days U/Sk labourer
Scaffolding - Add 5%

Materials
550 wire cut bricks Add 5% wastage
1.20 cwt cement (50 kg bags)
0.08 cubes sand
Water (30 gals)

Rate per square

Labour
2 1/4 days mason
3 3/4 days U/Sk labourer
Scaffolding - Add 3%

Materials
1050 wire cut bricks Add 4% wastage
2.50 cwt cement (50 kg bags)
0.18 cubes sand
Water (100 gals)

Rate per square

Labour
3 3/4 days mason
5 1/2 days U/Sk labourer
Scaffolding - Add 2%

Materials
1630 wire cut bricks Add 2% wastage
4.50 cwt cement (50 kg bags)
0.60 cubes sand
Water (50 gals)

Rate per square

Labour
5 days mason
3 1/2 days U/Sk labourer

Materials
0.50 cwt cement (50 kg bags)
1.00 cubes sand
1/10 gals acid
Water (10 gals)

Rate per square

Labour
1 1/4 days mason
2 1/2 days U/Sk labourer

Materials
350 bricks
1.20 cwt cement (50 kg bags)
0.11 cubes sand
Water (45 gals)

Rate per square

Labour
1/2 days mason
1/2 days U/Sk labourer

Materials
120 bricks
0.50 cwt cement (50 kg bags)
0.05 cubes sand
Water (15 gals)

Rate per L.ft

Labour
1 1/4 days mason
1 1/4 days U/Sk labourer

Materials
140 bricks
0.80 cwt cement (50 kg bags)
0.05 cubes sand
Water (20 gals)

Rate per L.ft

Labour
1 days mason
1 1/4 days U/Sk labourer

Materials
110 bricks
0.70 cwt cement (50 kg bags)
0.04 cubes sand
Water (15 gals)

Rate per L.ft


Labour
1 1/2 days mason
2 1/2 days U/Sk labourer
Scaffolding - Add 3%

Materials
112 Hollow cement blocks Allow 5% for wastage
0.75 cwt cement (50 kg bags)
0.06 cubes sand

Rate per square

Labour
1 days mason
2 days U/Sk labourer
Scaffolding - Add 5%

Materials
112 Hollow cement blocks(size of each block 16" x
8" x 4") Allow 5% for wastage
0.40 cwt cement (50 kg bags)
0.03 cubes sand

Rate per square

Labour
4 days mason
6 days U/Sk labourer

Materials
1.30 cubes 6" - 9" rubble
5.00 cwt cement (50 kg bags)
0.30 cubes sand
Water 100 gals

Rate per cube

Labour
4 1/2 days mason
7 days U/Sk labourer
Scaffolding - Add 3%

Materials
1.30 cubes 6" - 9" rubble
5.00 cwt cement (50 kg bags)
0.30 cubes sand
Water 100 gals
Rate per cube

Labour
4 days mason
4 days U/Sk labourer
1/2 day U/Sk labourer for polishing

Materials
225 pressed tiles 8" x 8" Add 5% for wastage
1 1/4 cwt cement (50 kg bags)
0.07 cubes sand
1/4 lb wax polish
1/4 lb coloured pigment
2 lbs cotton waste

Rate per square

Labour
4 days mason 4.00 1,300.00 5200
4 days U/Sk labourer 4.00 1,000.00 4000
1/4 day U/Sk labourer for cleaning 0.25 1,000.00 250
0
Materials 0
400 glazed tiles 6" x 6" Add 10% for wastage 110.00 130.00 14300
2 1/2 cwt cement (50 kg bags) 2.98 872.00 2598.56
0.11 cubes sand 0.11 10,512.00 1156.32
1 lb white cement 0.45 800.00 362.4

Rate per square 27867.28 3,611.60

Labour
4 days mason
3 days U/Sk labourer
1/2 day U/Sk labourer for polishing

Materials
100 12" x 12" terrazzo tiles Add 5% for wastage
1 1/4 cwt cement (50 kg bags)
0.07 cubes sand
coloured pigment (2 lbs)
1/2 lb wax polish
2 lb cotton waste

Rate per square


Labour
7 days carpenter
8 days U/Sk labourer
1/2 day U/Sk labourer for polishing

Materials
34.00 cu.ft timber Add 10% for wastage
660 1.ft 2" x 1" reepers Add 5% wastage
8 lbs wire nails 6" long
2 lbs wire nails 2" long

Rate per square

Labour
3 days carpenter
3 days U/Sk labourer

Materials
750 tiles

Rate per square

Labour
2 1/2 days carpenter
3 days U/Sk labourer

Materials
13 1/4 cu.ft timber purloins Add 10% for wastage

Rate per square

Labour
1 day carpenter
2 days U/Sk labourer

Materials
420 sq.ft asbestos corrugated sheets.
72 Nos. roofing screws and washers.

Rate per square

Labour
2 days U/Sk labourer

Materials
650 half round clay tiles
Rate per square

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
4 pairs ridges 3' 8" long
16 roofing screws or bolts

Rate per L.ft

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
9 ridge tiles
1/3 cwt cement (50 kg bags)
0.02 cubes sand
15 lbs slaked lime
1/2 lb colouring powder

Rate per L.ft

Labour
3 days carpenter
3 days U/Sk labourer
Scaffolding - Add 5%

Materials
75.00 sq.ft 1" planks Add 5% for wastage
70 Nos. 1 1/2" brass screws

Rate per L.ft

Labour
3 days carpenter
3 days U/Sk labourer
Scaffolding - Add 5%

Materials
75.00 sq.ft 1" planks Add 5% for wastage
50 Nos. 1 1/2" brass screws

Rate per L.ft


Labour
a) Fixing boarding and applying wood pressrvative -

1 day carpenter
1 day U/Sk labourer
b) Making and fixing G.I sheets -
1/2 day tinker
1/2 day U/Sk labourer
c) Building sides -
1/4 day mason
1/2 day U/Sk labourer

Materials
2 G.I sheet (8' x 4')
1/4 gal wood preservative
0.10 cwt cement (50 kg bags)
0.05 cwt slaked lime
1.00 cu.ft sand
50.00 sq.ft planks
2 lbs 1 1/2" wire nails

Rate per L.ft

Labour
Cutting bending, soldering & fixing -
1/2 day tinker
1/9 day mason (caulking)
3/4 day U/Sk labourer

Materials
1 G.I sheet (8' x 4')
0.05 cwt cement (50 kg bags)
1.00 cu.ft sand
1 lb soldering lead

Rate per L.ft

Labour
2 1/2 days carpenter
1/2 days mason
1 1/2 days U/Sk labourer
Scaffolding - Add 3%

Materials
8.00 cu.ft timber class I
1 lb 2" nails
25 lbs cement
2.00 cu.ft sand
2" brush - 1/4 use
1/3 gal tarnap

Rate per square

Labour
1 1/2 days carpenter
2 days U/Sk labourer
Scaffolding - Add 3%

Materials
210 sq.ft flat asbestos sheets
60 l.ft 2" x 2" halmilla cove mouldings
125 l.ft 1 1/12" x 1/2" halmilla beadings
3/4 lb - 1/4" lb out nails
8 doz 1 1/2" brass screws

Rate per square

Labour
Making holes, fixing joists & making roof
1 day mason
1 day carpenter
3 days U/Sk labourer

Materials
115 l.ft 4" x 2" timber joists
215 so.ft 6" x 3/4" Lunumidella ceiling planks.
Ceiling planks.
3 lbs cement
4.00 cu.ft sand
4 kg 1 1/2" brass nails

Rate per square

Labour
3 days carpenter
6 days U/Sk labourer
Scaffolding - Add 3%

Materials
220.00 sq.ft ceiling planks
40.00 l.ft 2" x 1/4" timber strips
2.00 kg 3/4" nails
4.00 kg 1 1/2" brass nails.

Rate per square

Labour
5 days carpenter.
1 1/2 days U/Sk labourer

Materials
a) Frame -
1 1/2 cu.ft 4" x 3" timber
2 No. spur stones
6 No. fiber/ plastic plugs With 4" long brass screws.
2 No. 5/8" mild steel dowels 4" long,
b) Sash -
14 sq.ft 1 1/2" planks
5 sq.ft 1" planks

Rate per sqft

Labour
6 days carpenter.
2 days U/Sk labourer

Materials
a) Frame -
1 2/3 cu.ft 4" x 3" timber
2 No. spur stones
6 No. fiber/ plastic plugs With 4" long brass screws.
2 No. 5/8" mild steel dowels 4" long,
b) Sashes -
16 sq.ft 1 1/2" planks
7 sq.ft 1" planks

Rate per sqft

Labour
3/4 day carpenter.
3/8 day U/Sk labourer
1/4 day mason (fixing frame)
1/4 day U/Sk labourer ( - do -)
Materials
a) Frame -
1.80 cu.ft 4" x 3" timber
2 No. spur stones
6 No. fiber/ plastic plugs With 4" long brass screws.
b) Sashe -
1 No 6' 9" x 2' 9" plywood sash.

Rate per sqft

Labour
2 1/4 days carpenter.
1 day U/Sk labourer
1/4 day mason (fixing frame)
1/4 day U/Sk labourer ( - do -)

Materials
a) Frame -
1.70 cu.ft 4" x 3" timber
2 No. spur stones
6 No. fiber/ plastic plugs With 4" long brass screws.
2 No 5/8" mild steel dowels
b) Sashe -
21.00 sq.ft 1" thick planks
3 doz 1 1/4 long brass screws.

Rate per sqft

Labour
6 days carpenter.
2 1/2 days U/Sk labourer
1/2 day mason (fixing frame)
1/2 day U/Sk labourer ( - do -)

Materials
a) Frame -
3.20 cu.ft 4" x 3" timber
4 No. fiber/ plastic plugs With 4" long brass screws.
b) Sashes -
9.25 sq.ft 3" x 1 1/2" timber
Rate per sqft

Labour
1/2 day glazier
1/2 day U/Sk labourer

Materials
9.00 sq.ft glass panes
30 L.ft 1/2" x 1/2" beading
4 doz brass panel pins

Rate per sqft

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
1 1/2 pairs butt hinges
2 Doz 3/4" brass screws

Rate per No

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
1 pair Tee hinges
1 1/2 Doz 3/4" brass screws

Rate per pair

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
1 rim lock with screws

Rate per No.

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
1 mortice look with screws

Rate per No.

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
4 casement stays
16 1/2" brass screws

Rate per No.

Labour
1/4 day carpenter
1/4 day U/Sk labourer

Materials
1 door closer
8 3/4" brass screws

Rate per No.

Labour
1/2 day carpenter
1/2 day U/Sk labourer

Materials
1 Tower / Skeleton Bolt
10 1/2" brass screws

Rate per No.

Labour
1/2 day carpenter
1/2 day U/Sk labourer

Materials
1 barrel bolt
8 1/2" brass screws

Rate per No.

Labour
1/2 day carpenter
1/2 day U/Sk labourer

Materials
6 casement fasteners
24 1/2" brass screws

Rate per No.

Labour
1/2 day carpenter
1/2 day U/Sk labourer

Materials
6 brass fanlight catches
2 doz 1/2" brass screws

Rate per No.

Labour
1/8 day carpenter
1/8 day U/Sk labourer

Materials
6 draw rings
1doz 1/2" brass screws

Rate per No.

Per square Rate Per


Materials Labour square
1 1/4 days
2.25 cwt cement
mason
0.11 cube sand
1 1/2 gals bitumen
Firewood (10 lbs)
1 1/2 days
Water 10 gals
U/Sk labourer
1
3/4 days U/Sk
1.30 cwt slaked lime labourer
0.07 cubes sand
Water 10 gals

Scaffolding -
1
1/2 days U/Sk
1.40 cwt cement (50 kg bags) labourer
0.06 cube sand
Water 10 gals.
Scaffolding -
Add 3%
2 1/2 days
0.80 cwt cement (50 kg bags)
U/Sk labourer
0.16 cwt slaked lime
0.05 cubes sand
Water 5 gals.
Scaffolding -
Add 3%
2
0.80 cwt cement (50 kg bags) days U/Sk
0.16 cwt slaked lime labourer
0.03 cubes sand
Water 5 gals.
Scaffolding -
Add 3%

1 3/4
0.80 cwt cement (50 kg bags) days U/Sk
0.40 cwt slaked lime labourer
0.07 cubes sand
Water 10 gals.
Scaffolding -
Add 3%

1 1/2 days
0.80 cwt cement (50 kg bags)
U/Sk labourer
0.60 cwt slaked lime
(1 1/2)
0.07 cubes sand
Water 10 gals.
Scaffolding -
Add 3%

1.07 cwt cement (50 kg bags)


0.05 cube sand
Water 10 gals 1 1/2 days
U/Sk labourer
1
1.50 cwt cement (50 kg bags) 1/2 days U/Sk
0.05 cubes sand labourer
Water 10 gals.

1/4 day

2 days
1.75 cwt cement ( 50 kg bags)
U/Sk labourer
0.08 cube sand
Water 10 gals
1/4
day U/Sk
2.25 cwt cement 2 days
0.08 cube sand U/Sk labourer
Water 10 gals

1/4
day U/Sk

2.25 cwt cement (50 kg bags)


2 days
0.08 cube sand
U/Sk labourer
5lbs powdered
pigment
Water 10 gals
3/4
day U/Sk
Per 10 l.f t
Materials Labour
0.10 cwt cement ( 50 kg bags)
0.003 cube sand
0.25 lbs powdered pigment
5/16 U/Sk
Per one souare
Materials 3/4Labour
day
painter
2.75 ltr. Wood preservative (oil type)
3" brush (1/10 use)
1/2 day
1U/Sk
1/2 days
labourer
2 3/4 ltr. Anti - corrosive primer
painter
0.15 ltr. Mineral turpentine or
thinner
1 wire brush
1
2" brush
1/2 day U/Sk
(1/3 use)
labourer
0.20 lts. Anti - corrosive primer 1
1 1/3 ltr. Enamel paint day U/Sk
0.20 ltr. Mineral turpentine or labourer
thinner
2" brush (1/5
use) Scaffolding -
Add 3%
Consider 50 sq.ft
Materials Labour
1 1/2 lts. Anti - corrosive primer
2/3 ltr. Enamel paint
0.30 ltr. Mineral turpentine or 3/4 day U/Sk
thinner labourer
1/3 wire brush

2" brush (1/5 use)


Per squere
Materials Labour
2/3 ltr. Anti - carrosive paint 1 1/2 days
2" brush ( 1/5 use) painter
painter
1/2 gal wood preservative
2" brush (1/5 use)
painter
3/4 ltr. Primer
2.50 ltr. Enamel paint (2 coats)
2" brush ( 1/10 use)
2 sand papers
1/2 day U/Sk
Per 10 square
Materials Labour 2
1/2 days U/Sk
labourers
0 - 50 cwt boiled lime
2 lbs salt
1/2 lb yellow ochre Scaffolding
2 ozs blue - Add 3%
6" brush
(1/3 use)
Water 10 gals
Total
per 10.00
squares
(As per above)
Add 1/2 day painter
1/2 day U/Sk labourers
Scaffolding - Add 3%
Total
Per square
Materials Labour
1 1/4 day
Primer 0.90 ltr. Primer painter
1.40 ltr. Emulsion pant
Water 0.10 gals
6" brush (1/10 use)
2 sand papers Scaffolding -
Add 3%
Per 10 square
Materials Labour
2 days U/Sk
labourer

5/8 cwt cement


1 - 6" coir brush Scaffolding -
Water 5 gals Add 3%

Total per
10.00 sqrs.
Per square
Materials Labour
painter
1 st coat -
1/6 gal emulsion paint
2 nd coat -
1/7 gal emulsion paint Scaffolding -
6" brush - (1/10 use) Add 3%
0.10 gals water

0.90 ltr. Primer


Scaffolding
1.50 ltr. Emulsion paint
- Add 3%
6" brush ( 1/10 use)

painter
0.40 gals ( 1.80 ltr.) varnish
3" brush (1/3 use)
1/2 day U/Sk
3/4 lb. Wax polish
1/2 doz. Sheets sandpaper 3 hrs. U/Sk
1/10 floor brush labourer
1/2 yards flannel cloth
Per 10 l.ft Rate per
Materials Labour L.ft

13 l.ft pipes
1 hr. U/Sk
3 clips and nails
labourer
2 grms solvent cement

13 l.ft pipes
1 hr. U/Sk
3 clips and nails
labourer
2 grms solvent cement

Per 100 l.ft


Materials Labour
plumber
100 L.ft pipes
Add 5% for wastage
1/2 day
8 - 1" dia sockets
U/Sk labourer
32 grams. solvent cement
35 clips and nails
plumber
Total per
100 L.ft pipes
Add 5% for wastage
8 - 1 1/4" dia sockets 3/4 day
48 grams. solvent U/Sk labourer
cement 35 clips
and nails
Total per
plumber
100 L.ft pipes
Add 5% for wastage
8 - 1 1/2" dia sockets 3/4 day
64 grams. solvent U/Sk labourer
cement 35 clips
and nails
plumber
Total per
100 L.ft pipes
Add 5% for wastage
8 - 2" dia sockets 3/4 day
112 grams. solvent U/Sk labourer
cement 35 clips
and nails
Total per
100 L.ft pipes
Add 5% for wastage 1
8 - 3" dia sockets day U/Sk
200 grams. solvent labourer
cement 35 clips
and nails
2Total
1/4 per
days100
U/Sk labourer

Total
per 100 L.ft
0.10 cwt cement
3 days U/Sk
0.01 cube sand
labourer

0.20 cwt cement 3 1/2


0.03 cube sand days U/Sk
labourer

Per 10 specials
Rate per No.
Materials Labour
10 - 1/2" elbows / bends / socket
20 grms solvent cement
Total per 10
10 - 3/4" dia elbows / bends / sockets
30 grms solvent cement
Total per 10
10 - 1" dia elbows / bends / sockets
40 grms solvent cement
Total per 10
10 - 1 1/4" dia elbows / bends / sockets
60 grms solvent cement
Total per 10
plumber
10 - 1 1/2" dia elbows / bends / sockets
80 grms solvent cement
Total
per 10 No.
plumber
10 - 2" dia elbows / bends / sockets
140 grms solvent cement
Total
per 10 No.
plumber
10 - 2 1/2" dia elbows / bends / sockets
200 grms solvent cement
Total
per 10 No.
plumber
10 - 3" dia elbows / bends / sockets
240 grms solvent cement
Total
per 10 No.
Per 10 Tees
Materials Labour
plumber
10 - 1/2" Tees
30 grms solvent cement
Total
per 10 No.
plumber
10 - 3/4" Tees
45 grms solvent cement
Total
per 10 No.
plumber
10 - 1" dia Tees
60 grms solvent cement
Total
per 10 No.
plumber
10 - 1 1/4" dia Tees
90 grms solvent cement
Total
per 10plumber
1 day No.

10 - 1 1/2" dia Tees


120 grms solvent cement
Total per 10
1 day plumber
No. tees
10 - 2" dia Tees
210 grms solvent cement
Total per 10
No. tees
plumber
10 - 2 1/2" dia Tees
300 grms solvent cement
Total
per 10 No.
plumber
10 - 3" dia Tees
360 grms solvent cement
Total
per 10 No.
Per 100 l.ft Rate per
Materials Labour L.ft
bedding - 1
1/2 day U/Sk
labourer

Laying and
50 - 4" dia Ew pipes
testing pipes -
0.75 cubes cement concrete - 1: 3: 6: ( 1 1/2")
2 days
2 lbs yarn
plumber
0.50 cwt cement
(jointing) 4.00 cubes
2 days U/Sk
excavation
labourer

Backfilling - 2
1/2 days U/Sk
labourer

Per 6' 0" length


Materials Labour
1/4 day
U/Sk labourer
6' 0" L.ft 4" dia C.I. Pipe
Add 10% for wastage
5/16 lbs yarn
1 - timber plug 6" x 6" x 2"
Scaffolding
2 - 3" iron screws
- Add 5%
2 lbs
cement
Total for 6
L.ft

6' 0" L.ft 4" dia C.I. Pipe


Add 10%
(Add 10% for wastage)
for sundries in
6 lbs lead
cement
5/16 lbs yarn
1 - wood plug 6" x 6" x 2"
2 - 3" iron
screws
and sand
1/16 cwt firewood

Per No.
Rate per No.
Materials Labour
1 - 4" S.W. gulley
1/2 day mason
4.00 cu.ft excavation
5.50 sq.ft 4 1/2" brickwork
0.80 cu.ft cement
1/2
concrete ( 1: 2 : 4 ( 3/4") 1.00
day U/Sk
sq.ft 1/2" cement rendering 1:2
labourer
1 - 4" G.I. grating.
mason
35.00 cu.ft excavation
7.00 cu.ft cement concrete
1 : 2 : 4 (3/4") in base & channels
2 1/2 days
33.00 sq.ft 4 1/2" brickwork
U/Sk labourer
in cement 1:5 28.00 sq.ft 1/2"
cement rendering 1:2 1-
RCC cover slab.

1 wash basin complete with brackets 1/2 day mason


1 - 1/2" tap
Waste plug and chain
4 wooden plugs 1
6 - 1 1/2" brass screws day U/Sk
2 lbs cement labourer

1 low level suite complete


1 - 1/2" dia stop cock
1 day
2 lbs cement
plumber
1/4 cu.ft sand
2 - 1 1/2" brass screws
1 day
1 squatiing pan with trap
1/2 day mason
2 gals C.I cistern with 1 1/4" flush,
pipe , chain and overflow pipe
1 clip
1
5 wooden plugs
day plumber
1
doz. 1 1/2" brass screws
1 - 1/2" stop cock
1 day
1/4 cwt cement
U/Sk labourer
1/2 cu.ft metal
1/4 cu.ft sand
1 day plumber

1 bidet
1 day U/Sk
4 Urinal Bowls labourer
1-2 gal. Cistern
8 rawl plugs 1 day
1 spreader plumber
4 wooden plugs
(for cistern) 4-1
1/2" brass screws 1 day
4 lbs cement U/Sk labourer
1/8 cu.ft sand

Consider 24.00 L.ft Rate per


Materials Labour L.ft
1/2 day
U/Sk labourer

2 - 6" dia eaves gutter lengths


1 joiner
17 gutter brackets Scaffolding
34 - 3/4" brass Add 5%
screws
20 grms solvent cement
Total
Rate per
cube

a) Copper
Naphthenat
e (5% in 4
to 8 gals of
fuel oil)

Note.b)-
Sodium
Alternati
Arsenate
ve Mixes
(10% in 12
to 20 gals)
of water.

C)
Bieldrine
(0.3% in 19
Note

Note
Note

a) Water
available at
site.

b) If,
water is not
available
allowances
should be
3,500.00 made for
transport of
water.

c) Sand -
includes
15% for
bulking.
4.00 1,300.00 5200 4.00 1,300.00 5200
4.00 1,000.00 4000 4.00 1,000.00 4000
0.25 1,000.00 250 0.25 1,000.00 250
0 0
0 0
70.00 280.00 19600 30.00 950.00 28500
2.98 872.00 2598.56 2.98 872.00 2598.56
0.11 10,512.00 1156.32 0.11 10,512.00 1156.32
0.45 800.00 362.4 0.45 800.00 362.4

33167.28 4,298.48 42067.28 4,634.13


Note
coloured
skirting is
not
required,
delete
provision
4.00 1,300.00 5200 4.00 1,300.00 5200
4.00 1,000.00 4000 4.00 1,000.00 4000
0.25 1,000.00 250 0.25 1,000.00 250
0 0
0 0
110.00 160.00 17600 165.00 110.00 18150
2.98 872.00 2598.56 2.98 872.00 2598.56
0.11 10,512.00 1156.32 0.11 10,512.00 1156.32
0.45 800.00 362.4 0.45 800.00 362.4

31167.28 3,433.39 31717.28 3,493.98


EARTH WORKS
1 Removing top soil to a depth not exceeding 6" & depositing as directed within site

2 Excavation over site to reduce level, in any material except rock requiring blasting
including depositing and leveling as directed up to distance not exceeding 30' 0" per
cube

3 Excavation in trenches for walls/ column pits in soft/ loose soil from 0' 0" to 5' 0" deep
and depositing excavated materiel to a distance not exceeding 30' 0" (Earth work
support to be paid separately where necessary) per cube.

4 Excavation in trenches for walls/ column pits in ordinary soil from 0' 0" to 5' 0" deep
and depositing excavated material not exceeding 30' 0" per cube.

5 Excavation in trenches for walls/ column pits in Hard/ dense soil up to a depth of 5' 0"
and depositing excavated material up to a distance not exceeding 30' 0".

6 Excavation in trenches for walls/ column pits in Mud/ wet soil up to a depth of 5' 0"
and depositing excavated material to distance not exceeding 30' 0". (Earth work &
dewatering paid for separately.)
7 Excavation in trenches for walls/ column pits in soft disintegrated rock (not requiring
blasting) up to depth of 5' 0" and depositing excavated material to distance not
exceeding 30' 0".

8
Excavation in trenches for walls/ column pits in Hard rock requiring blasting up to a
depth of 5' 0" and depositing excavated material to distance not exceeding 30' 0".

Per cube

9 Benching rock in foundation in 3" - 6" steps. (Blasting prohibited)


Per 10 square feet

ANTI - TERMITE TREATMENT


10 Anti - termite treatment on excavated foundation and compacted soil under floors.
Earth work - Backfilling & Compacting
11 Backfilling to trenches with selected earth available at site.

12 Back filling to trenches with imported material.

13 Filling under floors including leveling, watering & compacting in 3" layers with
available and selected earth at site.

14 Filling under floors including leveling, watering & compacting in 3" layers with
imported selected earth.

15 Cutting turf sods, landing to hand carts and transporting up to 30 yards, laying and
watering for 30 days. (Royalty for turf, pegging and transport beyond 30 yards paid
separately)
Earth work support (open planking) in trenches up to a depth of 5' 0"
16 Consider trench 15' 0" long 3' 0" wide and 5' 0" depth open planking to both faces.
Total area - 2/ 15' 0" x 5' 0"
. = 150 sq.ft

Earth work support (close planking) in trenches up to 5' 0" depth.


17 Consider trench 15' 0" long 3' 0" wide and 5' 0" height of planking to both faces.
Total area of planking 2/ 15' 0" x 5' 0" ie 150 sq.ft

18 Earth work support (close planking) in deep excavation in trenches up to 15' 0" depth.
- Consider trench of length of 15' 0" width 5' 6" at top 3' 6" at bottom Then
area supported is 2/ 15' x 15' ie 450 sq.ft.
Rates Labour Materials Rate per unit

Labour
Consider an area of 10.00 sqrs. Ie 5.00 cubes of
4,000.00 4,000.00
excavation.10 day a U/Sk labourer.

Material 0.00

Rate per square 4,000.00

Labour
1 5/ 8 day U/ Sk labourer 650.00 650.00

Material 0.00

Rate per cube 650.00

Labour
1 day U/ Sk labourer 400.00 400.00

Material 0.00

Rate per cube 400.00

Labour
2 1/4 days U/ Sk labourer. 900.00 900.00

Material 0.00

Rate per cube 900.00

Labour
3 1/2 days U/Sk labourer 1,400.00 1,400.00

Material 0.00

Rate per cube 1,400.00

Labour
3 days U/Sk labourer. 1,200.00 1,200.00
Material 0.00

Rate per cube 1,200.00

Labour
2 1/2 days U/Sk labourer 1,000.00 1,000.00

Material 0.00

Rate per cube 1,000.00

Labour
1 day Sk labourer
600.00
2 days U/Sk labourer 800.00 1,400.00

Materials
0.75 lbs blasting powder
0.00
10 lft fuse 0.00
1 lb jumper steel 0.00 0.00

Rate per cube 1,400.00

Labour
Drilling, chipping & wedging 1 1/2 day Sk labourer 900.00
Steel, fuel & forge - 25% of labour cost 225.00
Collecting & Disposing 1 1/2 day U/Sk labourer per
600.00 1,725.00
10 sq.ft

Material 0.00

Rate per Square 17,250.00

Labour
1/2 day U/ Sk labourer 200.00 200.00

Materials
16 lbs D.D.T. powder (8% in 20 gals of water) 0.00
20 gals water 40.00 40.00

Rate per Square 240.00


Labour
1 day U/ Sk labourer 400.00 400.00

Materials 0.00

Rate per cube 400.00

Labour
1 1/4 U/Sk labourer 500.00 500.00

Materials
1.00 cube earth delivered at site.
Allow 15% compaction
402.50
Filling & Compacting
402.50

Rate per cube 902.50

Labour
2 day U/ Sk labourer 800.00 800.00

Materials 0.00

Rate per cube 800.00

Labour
2 days U/Sk labourer 800.00 800.00

Materials
1.00 cube earth delivered at site.
Allow 15% compaction 402.50 402.50

Rate per cube 1,202.50

Labour

Cutting turf sods, loading and transporting to site and


unloading 2
1,000.00
1/2 day U/ Sk labourer

Laying turf rods at site 1 1/2 day U/ Sk labourer 600.00


Watering for 30 days 1 1/2 days U/Sk labourer 600.00 2,200.00

Materials
60 gals. water 120.00 120.00
Rate per square 2,320.00

Labour
1 days carpenter
600.00
3 days U/ Sk labourer 1,200.00 1,800.00

Materials
17.50 cu.ft class II timber (4 uses)
0.00 0.00
Add 5% on above for wedges.

Rate per square 1,200.00

Labour
2 days carpenter 1,200.00
6 days U/ Sk labourer. 2,400.00 3,600.00

Materials
30.00 cu.ft class II timber (4 uses) 0.00 0.00
Add 5% on above for wedges.

Rate per square 2,400.00

Labour
8 days carpenter 4,800.00
20 days U/Sk Labourer 8,000.00 12,800.00

Materials
100.00 cu.ft class II Timber (4 uses)
0.00 0.00
Add 5% on above for wedge.

Rate per square 2,844.44


Note

Rate does not include for


a) Royalty for turf
b) Transport of turf
c) Pegs on sloping site
d) Water
a) Copper Naphthenate
Note. -(5% in 4 to 8 galsMixes
Alternative of fuel oil)
b) Sodium Arsenate (10% in 12 to 20 gals) of
water. C) Bieldrine (0.3% in 19 gals of
water)
CONCRETE
19 Mixing concrete 1: 3: 6 (1 1/2")

20 Mixing concrete 1: 2: 5 (1")

21 Mixing concrete 1: 2: 4 (3/4")

22 Mixing concrete 1: 1: 3 (3/4")


23 Mixing concrete 1: 1: 2 (3/4")

24 2" thick cement concrete screed in foundation at depths not exceeding 5' 0"

25 3" thick cement concrete screed in foundation at depths not exceeding 5' 0"

26 6" thick cement concrete floor (mass concrete).


Cement concrete in 4 1/2" x 6" columns in ground floor.
27 Consider 24 No. columns each 4 1/2" x 6" x 10' 0" ie 0.45 cubes.

28 Cement concrete in 6" x 6" colomns in ground floor. -


Consider 18 No. columns 6" x 6" each 10' 0" high ie 0.45 cubes.

Curing

29 Cement concrete in 9" x 9" colomns in ground floor. - Consider 8 No. 9" x 9" columns
each 10' 0" high ie 0.45 cubes.
Curing

30 Cement concrete in 12" x 12" colomns in ground floor. -


Consider 5 No. 12" x 12" columns each 10' 0" high.
Per 0.5 cube

31 Cement concrete in 13 1/2" x 13 1/2" colomns in ground floor. -


Consider 4 No. colomns 13 1/2" x 13 1/2" each 10' 0" high .
I.e 0.51 cubes.
Curing

32 Cement concrete in 6" x 6" beam up to 1st floor level. -


Consider 180 L.ft of beam 6" x 6"
I.e 0.45 cubes.

Curing

33 Cement concrete in 9" x 6" beam up to 1st floor level. -


Consider 120 L.ft of beam 9" x 6" beam
I.e 0.45 cubes.
Curing

34 Cement concrete in 9" x 9" beam up to 1st floor level. -


Consider 80' 0" length 9" x 9" beam
I.e 0.45 cubes.

Curing

35 5" thick R.CC floor slab in 1st floor. -


Consider 5" thick slab 10' 0" x 12' 0" volume of concrete 50.00 cu.ft
Curing

36 6" thick R.CC floor slab in 1st floor. -


Consider 10' 0" x 10' 0" panel = 50 cu.ft

Curing

37 Cement concrete in 4 1/2" x 6" lintels in ground floor. -


Consider 240 l.ft I.e 45 cu.ft
Curing

38 Cement concrete in 9" x 9" lintels in ground floor. -


Consider 80 L.ft of lintel I.e 45 cu.ft concrete.

Curing

39 Cement concrete in 9" x 12" lintels in ground floor. -


Consider length 60' 0" of lintel
= 45 cu.ft
Curing

40 Cement concrete in 12" x 15" lintels in ground floor. -


Consider length 36' 0"
i.e 45 cu.ft

Curing
Rates Labour Materials Rate per unit

Labour
1 day skilled labourer 600.00
6 days U/ Sk labourer 2,400.00 3,000.00

Materials
13 cwt (50 kg bags) cement 7,150.00
0.53 cubes sand 2,332.00
0.92 cubes 1 1/2" metal 3,036.00
Water (110 gals) 220.00 12,738.00

Equipments
1/3 day hire of mixer 495.00 495.00

Rate per cube 16,233.00

Labour
1 day skilled labourer 600.00
5 days U/ Sk labourer 2,000.00 2,600.00

Materials
14 cwt (50 kg bags) cement 7,700.00
0.60 cubes sand 2,640.00
0.92 cubes 1" metal 3,128.00
Water (100 gals) 200.00 13,668.00

Equipments
1/3 day hire of mixer 495.00 495.00

Rate per cube 16,763.00

Labour
1 day skilled labourer 600.00
6 days U/ Sk labourer 2,400.00 3,000.00

Materials
18 cwt (50 kg bags) cement 9,900.00
0.50 cubes sand 2,200.00
0.88 cubes 3/4" metal 3,080.00
Water (120 gals) 240.00 15,420.00

Equipments
1/3 day hire of mixer 495.00 495.00

Rate per cube 18,915.00

Labour
1 day skilled labourer 600.00
6 days U/ Sk labourer 2,400.00 3,000.00

Materials
23 cwt (50 kg bags) cement 12,650.00
0.42 cubes sand 1,848.00
0.82 cubes 3/4" metal 3,080.00
Water (150 gals) 300.00 17,878.00

Equipments
1/3 day hire of mixer 495.00 495.00

Rate per cube 21,373.00

Labour
1 day skilled labourer 600.00
6 days U/ Sk labourer 2,400.00 3,000.00

Materials
31 cwt (50 kg bags) cement 17,050.00
0.44 cubes sand 1,936.00
0.96 cubes 3/4" metal 3,080.00
Water (200 gals) 400.00 22,466.00

Equipments
1/3 day hire of mixer 495.00 495.00

Rate per cube 25,961.00

Labour
1/8 days skilled labourer 75.00
1/2 days unskilled labourer 200.00 275.00

Materials
1/6 cube concrete (Add 10% for wastage ) 0.00

Rate per square 275.00

Labour
1/8 days skilled labourer 75.00
3/4 days unskilled labourer 300.00 375.00

Materials
1/4 cube concrete (Add 10% for wastage ) 0.00

Rate per square 375.00

Labour
1/2 days skilled labourer 300.00
1 1/2 days unskilled labourer 600.00 900.00
Materials
1/2 cube concrete (Add 10% for wastage )
200 gal of water 400.00 400.00

Rate per square 1,300.00

Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00

Materials
0.45 cube concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,000.00

Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00

Materials
0.45 cube concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,000.00

Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 80 sq.ft
0.00
Water - 140 gals 280.00 280.00

Rate per cube 880.00

Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00
Materials
0.45 cube concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,000.00

Labour
1/2 days U/Sk labourer 200.00 200.00

Materials
Jute Hessian - 60 sq.ft
0.00
Water - 100 gals 200.00 200.00

Rate per cube 400.00

Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00

Materials
0.50 cube concrete (Add 10% for wastage )
40 so.ft - Jute Hessian 0.00
Water (100 gals) 200.00 200.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 9,400.00

Labour
1 day mason 600.00
1day carpenter 600.00
3 days U/Sk labourer 1,200.00
1 day Sk labourer (Vibrator) 600.00 3,000.00

Materials
0.51 cube concrete (Add 5% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00
Rate per cube 8,823.53

Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 45 sq.ft
0.00
Water - 100 gals 200.00 200.00

Rate per cube 800.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
0.45 cube concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,888.89

Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 90 sq.ft
0.00
Water - 180 gals 360.00 360.00

Rate per cube 960.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
0.45 cube concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00
Rate per cube 10,888.89

Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 75 sq.ft
0.00
Water - 150 gals 300.00 300.00

Rate per cube 900.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
0.45 cube concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,888.89

Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 60 sq.ft
0.00
Water - 120 gals 240.00 240.00

Rate per cube 840.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
50 cuft of concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00
Rate per cube 9,800.00

Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 30 sq.ft
0.00
Water - 90 gals 180.00 180.00

Rate per cube 780.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
50 cuft of concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 9,800.00

Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 25 sq.ft
0.00
Water - 90 gals 180.00 180.00

Rate per cube 780.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
45 cuft of concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,888.89


Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 10 sq.ft
0.00
Water - 90 gals 180.00 180.00

Rate per cube 780.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
45 cuft of concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,888.89

Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 60 sq.ft
0.00
Water - 90 gals 180.00 180.00

Rate per cube 780.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
45 cuft of concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,888.89


Labour
1 1/2 days U/Sk labourer 600.00 600.00

Materials
Jute Hessian - 55 sq.ft
0.00
Water - 90 gals 180.00 180.00

Rate per cube 780.00

Labour
1 day mason 600.00
1day carpenter 600.00
4 days U/Sk labourer 1,600.00
1 day Sk labourer (Vibrator) 600.00 3,400.00

Materials
45 cuft of concrete (Add 10% for wastage ) 0.00

Equipments
1 day hire of vibrator 1,500.00 1,500.00

Rate per cube 10,888.89

Labour
1 3/4 days U/Sk labourer 700.00 700.00

Materials
Jute Hessian - 40 sq.ft
0.00
Water - 90 gals 180.00 180.00

Rate per cube 880.00


a) Water available at site.
Note
b)
If, water is not available allowances should be
made for transport of water.
c) Sand -
includes 15% for bulking.

a) Water available at site.


Note
b)
If, water is not available allowances should be
made for transport of water.
c) Sand -
includes 15% for bulking.

a) Water available at site.


Note
b)
If, water is not available allowances should be
made for transport of water.
c) Sand -
includes 15% for bulking.

a) Water available at site.


Note
b)
If, water is not available allowances should be
made for transport of water.
c) Sand -
includes 15% for bulking.

3,000.00
a) Water available at site.
b)
If, water is not available allowances should be
made for transport of water.
c) Sand -
includes 15% for bulking.

3,000.00

a) Water available at site.


Note
b)
If, water is not available allowances should be
made for transport of water.
c) Sand -
includes 15% for bulking.

1/3 day hire of mixer


Note
for laying concrete at depths more than 5' 0", add
1/6 day unskilled labourer for each additional 5'
0" or part there of per square
Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.

Note

1) For column in 1 st floor add 3% to ground


floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.

Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.

Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.

Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.

Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.
Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.

Note
1) For column in 1 st floor add 3% to ground
floor rate.
2) For column in 2 nd
floor add 5% to ground floor rate.
3) For
columns in 3rd floor add 7% to ground floor rate.

4) Water available at site.


5) If water is not
available allowance must be made for transport
of water.

Note
1) Water available at site.
2) If water is not
available allowance must be made for transport
of water.
Note

Note
Note

a) Water available at site.


b) If, water
is not available allowances should be made for
500.00 3,500.00
transport of water.
c) Sand - includes 15% for bulking.
FORMWORKS
41 Sawn timber form work to 9" x 9" cement concrete column in ground floor.
Making Moulds (15 sqft) Consider column length of 5' 0"

Assembling per use

Demantling per use

42 Sawn timber form work for concrete beams in ground floor. -


Making Moulds Consider 9" x 12" beam of 20' 0" long. Contact area 55 sq.ft.

Assembling per use


Demantling per use

43 Sawn timber form work for underside of first floor slab. -


Making Moulds Consider a slab of desmensions 20" 0" x 10' 0"
Contact area = 2.0 sqrs.

Assembling per use

Demantling per use


44 Mild steel / for steel reinforcement to lintels slab beams for columns bent to shape laid
in position and tied with G.I. Wire as directed. -
Rates Labour Materials Rate per unit

Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00
Allowin: 4 uses cost
of mould per use

Materials
18.15" sq.ft 1" thick class II timber 635.25
17.10 L.ft 2" x 2" class II timber in yokes. 222.30
16.12 L.ft 2" x 1" class II timber battens 112.84
1 1/2 lb wire nails. 60.00 1,030.39

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Materials
12 Nos. 16 mm 18" long bolts (20 uses)
300.00
1/2 liter mould oil 210.00
35 L.ft 4" x 2" props (10 uses) 875.00 1,385.00

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Rate per square 22,769.27

Labour
1/2 day carpenter 300.00
2 day U/Sk labourer 800.00
Allowin: 4 uses cost
of mould per use
10% for repair 110.00 1,210.00

Materials
60 sq.ft 1" timber planks 2,100.00
24 l.ft 2" x 1" battens 168.00
45 l.ft 2" x 2" ledgers 585.00
30 l.ft 4" x 2" bearers at bottom of mould. 600.00
2 lbs wire nails 80.00
10% for repair 353.30 3,886.30

Labour
1 day carpenter 600.00
2 day U/Sk labourer 800.00 1,400.00
Materials
110 l.ft 4" x 2" vertical props
80 l.ft 2" x 2" bracing to mould and props. 1,040.00
50 l.ft 2" x 2" bracing to a set of props 650.00
6.0 sq.ft 1" timber base plate to props 210.00
22 Nos wdges 1,958.00
Add 10% of cost of materials for repairs 385.80
1/2 gal mould oil 60.00
1/2 lbs nail 20.00 4,323.80

Labour
1/2 day carpenter 300.00
2 day U/Sk labourer 800.00 1,100.00

Rate per square 21,672.91

Labour
3 days carpenter 1,800.00
3 days U/Sk labourer 1,200.00
Allowin: 4 uses cost
of mould per use
20% for repair 600.00 3,600.00

Materials
220 se.ft 1" thick tongue and grooved timber planks. 7,700.00
121 L.ft 4" x 2" runners at 2' 0" centers. 2,420.00
4 lbs. were nails. 160.00 10,280.00

Labour
1 day carpenter 600.00
4 day U/Sk labourer 1,600.00
1 gal mould oil for assembling. 120.00
2 lbs wire nails 80.00 2,400.00

Materials
690 l.ft 4" x 2" vertical timber props.(10 uses) 13,800.00
66 l.ft 2" x 2" bracing for props. 858.00
122 No. wedges 10,858.00
33 sq.ft 1" bass plates for props 1,155.00
Add 20% of cost of materials for repairs 5,334.20 32,005.20

Labour
1/2 day carpenter 300.00
2 day U/Sk labourer 800.00 1,100.00

Rate per square 24,692.60


Labour
1 days barbender 600.00
1 days U/Sk labourer 400.00 1,000.00

Materials
1 cwt M.S. / per steel.rods including transport to site.
69.00
(Allow for wastage 15%)
1 1/2 lbs 16 BWG binding wire 60.00
Add 1.5% of steel cost for spacers or dhairs. 1.04 130.04

Rate per cwt 1,130.04


MASONRY
45 Brick work in cement sand 1:5: in foundation up to D.P.C

46 Brick work cement and sand 1:8 in foundation up to D.P.C


Rate per square

47 Brick work in cement and sand 1:5 in 4 1/2" thick walls in ground floor
Rate per square

48 9" thick brick wall cement sand 1:5 in ground floor


Rate per square
49 Brick work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor
Rate per square

50 9" Brick walls in cement sand 1:8in superstructure in ground floor


Rate per square

51 4 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor ( Facing to
brickwork measured separately)
Rate per square

52 9" thick in cement and sand 1:5 with wire cut bricks (Facing to brick work measured
separately)
Rate per square
53 13 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to
brick work measured separately)
Rate per square

54 Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1
mixture in ground floor
Rate per square

55 3" thick floor paved in lime mortar 2:5 in ground floor


Rate per square

56 Steps 1' - 1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and
sand 1:2 redering including necessary excavation.
Rate per 10 L. ft
57 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces with 1'6" ramp including necessary
excavation.
Rate per 10 L. ft

58 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces without ramp including necessary
excavation.
Rate per 10 L. ft

59 8" thick Hollow block work in cement and sand mortar 1:5 in ground floor (cavities
unfilled)
Rate per square
60 4" thick Hollow block mesonry in cement and sand mortar 1:5 with cavities unfilled
Rate per square

61 Random Rubble masonry in cement morter 1:5 in foundation


Rate per cube (14" thick)

62 Random Rubble masonry in cement morter 1:5 in superstructure


Rate per cube (14" thick)

FLOOR FINISHES
63 Pressed floor tiles bedded in 1/2" cement morter 1:2 and pointing in neat cement in
ground floor
Rate per square
64 Glazed tiles fixed to walles including bedding in cement morter 1:2 and raking in
ground floor. (specials measured separately)
Rate per square

65 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Rate per square
Rates Labour Materials Rate per unit

Labour
3 days mason 1,800.00
4 days U/Sk labourer 1,600.00 3,400.00

Materials
1450 bricks Add 5% wastage 7,612.50
4.00 cwt cement (50 kg bags) 2,200.00
0.25 cubes sand 1,100.00
Water (150 gals) 300.00 11,212.50

Rate per square 14,612.50

Labour
3 days mason 1,800.00
4 days U/Sk labourer 1,600.00 3,400.00

Materials
1450 bricks Add 5% wastage 7,612.50
2 1/3 cwt cement (50 kg bags) 1,281.50
3/8 cubes sand 1,650.00
Water (150 gals) 300.00 10,844.00

Rate per square 14,244.00

Labour
1 1/2 days mason 900.00
2 days U/Sk labourer 800.00
Scaffolding - Add 5% 85.00 1,785.00

Materials
550 bricks Add 5% wastage 2,887.50
1.3 cwt cement (50 kg bags) 715.00
0.10 cubes sand 660.00
Water (50 gals) 100.00 4,362.50

Rate per square 6,147.50

Labour
1 1/4 days mason 750.00
3 3/4 days U/Sk labourer 1,500.00
Scaffolding - Add 3% 67.50 2,317.50

Materials
1090 bricks Add 5% wastage 5,722.50
3.00 cwt cement (50 kg bags) 1,650.00
0.20 cubes sand 880.00
Water (115 gals) 230.00 8,482.50
Rate per square 10,800.00

Labour
3 1/2 days mason 2,100.00
5 1/2 days U/Sk labourer 2,200.00
Scaffolding - Add 2% 86.00 4,386.00

Materials
1630 bricks Add 5% wastage 8,557.50
4.50 cwt cement (50 kg bags) 2,475.00
0.30 cubes sand 1,320.00
Water (170 gals) 340.00 12,692.50

Rate per square 17,078.50

Labour
2 1/4 days mason 1,350.00
3 days U/Sk labourer 1,200.00
Scaffolding - Add 3% 76.50 2,626.50

Materials
1090 bricks Add 5% wastage 5,722.50
1.75 cwt cement (50 kg bags) 962.50
0.30 cubes sand 7,700.00
Water (115 gals) 230.00 14,615.00

Rate per square 17,241.50

Labour
1 1/2 days mason 900.00
2 days U/Sk labourer 800.00
Scaffolding - Add 5% 51.00 1,751.00

Materials
550 wire cut bricks Add 5% wastage 5,775.00
1.20 cwt cement (50 kg bags) 660.00
0.08 cubes sand 352.00
Water (30 gals) 60.00 6,847.00

Rate per square 8,598.00

Labour
2 1/4 days mason 1,350.00
3 3/4 days U/Sk labourer 1,500.00
Scaffolding - Add 3% 85.50 2,935.50

Materials
1050 wire cut bricks Add 4% wastage 10,920.00
2.50 cwt cement (50 kg bags) 1,375.00
0.18 cubes sand 792.00
Water (100 gals) 200.00 13,287.00

Rate per square 16,222.50

Labour
3 3/4 days mason 2,250.00
5 1/2 days U/Sk labourer 2,200.00
Scaffolding - Add 2% 89.00 4,539.00

Materials
1630 wire cut bricks Add 2% wastage 16,626.00
4.50 cwt cement (50 kg bags) 2,475.00
0.60 cubes sand 2,640.00
Water (50 gals) 100.00 21,841.00

Rate per square 26,380.00

Labour
5 days mason 3,000.00
3 1/2 days U/Sk labourer 1,400.00 4,400.00

Materials
0.50 cwt cement (50 kg bags) 275.00
1.00 cubes sand 4,400.00
1/10 gals acid 50.00
Water (10 gals) 20.00 4,745.00

Rate per square 9,145.00

Labour
1 1/4 days mason 750.00
2 1/2 days U/Sk labourer 1,000.00 1,750.00

Materials
350 bricks 1,750.00
1.20 cwt cement (50 kg bags) 660.00
0.11 cubes sand 484.00
Water (45 gals) 90.00 2,984.00

Rate per square 4,734.00

Labour
1/2 days mason 300.00
1/2 days U/Sk labourer 200.00 500.00
Materials
120 bricks 600.00
0.50 cwt cement (50 kg bags) 275.00
0.05 cubes sand 220.00
Water (15 gals) 30.00 1,125.00

Rate per L.ft 162.50

Labour
1 1/4 days mason 750.00
1 1/4 days U/Sk labourer 500.00 1,250.00

Materials
140 bricks 700.00
0.80 cwt cement (50 kg bags) 440.00
0.05 cubes sand 220.00
Water (20 gals) 40.00 1,400.00

Rate per L.ft 265.00

Labour
1 days mason 600.00
1 1/4 days U/Sk labourer 500.00 1,100.00

Materials
110 bricks 550.00
0.70 cwt cement (50 kg bags) 385.00
0.04 cubes sand 176.00
Water (15 gals) 30.00 1,141.00

Rate per L.ft 224.10

Labour
1 1/2 days mason 900.00
2 1/2 days U/Sk labourer 1,000.00
Scaffolding - Add 3% 57.00 1,957.00

Materials
112 Hollow cement blocks Allow 5% for wastage 1,764.00
0.75 cwt cement (50 kg bags) 412.50
0.06 cubes sand 264.00 2,440.50

Rate per square 4,397.50


Labour
1 days mason 600.00
2 days U/Sk labourer 800.00
Scaffolding - Add 5% 70.00 1,470.00

Materials
112 Hollow cement blocks(size of each block 16" x
1,764.00
8" x 4") Allow 5% for wastage
0.40 cwt cement (50 kg bags) 220.00
0.03 cubes sand 132.00 2,116.00

Rate per square 3,586.00

Labour
4 days mason 2,400.00
6 days U/Sk labourer 2,400.00 4,800.00

Materials
1.30 cubes 6" - 9" rubble 2,210.00
5.00 cwt cement (50 kg bags) 2,750.00
0.30 cubes sand 1,320.00
Water 100 gals 200.00 6,480.00

Rate per cube 11,280.00

Labour
4 1/2 days mason 2,700.00
7 days U/Sk labourer 2,800.00
Scaffolding - Add 3% 165.00 5,665.00

Materials
1.30 cubes 6" - 9" rubble 2,210.00
5.00 cwt cement (50 kg bags) 2,750.00
0.30 cubes sand 1,320.00
Water 100 gals 200.00 6,480.00

Rate per cube 12,145.00

Labour
4 days mason 2,400.00
4 days U/Sk labourer 1,600.00
1/2 day U/Sk labourer for polishing 200.00 4,200.00

Materials
225 pressed tiles 8" x 8" Add 5% for wastage 11,812.50
1 1/4 cwt cement (50 kg bags) 687.50
0.07 cubes sand 308.00
1/4 lb wax polish 100.00
1/4 lb coloured pigment 62.50
2 lbs cotton waste 100.00 13,070.50

Rate per square 17,270.50

Labour
4 days mason 2,400.00
4 days U/Sk labourer 1,600.00
1/4 day U/Sk labourer for cleaning 100.00 4,100.00

Materials
400 glazed tiles 6" x 6" Add 10% for wastage 26,400.00
2 1/2 cwt cement (50 kg bags) 1,375.00
0.11 cubes sand 484.00
1 lb white cement 50.00 28,309.00

Rate per square 32,409.00

Labour
4 days mason 2,400.00
3 days U/Sk labourer 1,200.00
1/2 day U/Sk labourer for polishing 200.00 3,800.00

Materials
100 12" x 12" terrazzo tiles Add 5% for wastage 5,250.00
1 1/4 cwt cement (50 kg bags) 687.50
0.07 cubes sand 308.00
coloured pigment (2 lbs) 500.00
1/2 lb wax polish 200.00
2 lb cotton waste 100.00 7,045.50

Rate per square 10,845.50


FINISHING
98
3/4" thick DPC, in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.

99 5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.

100 5/8" thick plastering to wall in cement sand 1:3 including cement floating

101 3/8" thick plastering to soffit slab in cement and sand 1:3 including floating with lime
putty
102 3/8" thick plastering to sides and soffit of beams in cement & sand 1:3 including
floating with lime putty

103 5/8" thick to wall in lime cement and sand 1:1:5 finished semi - rough with wooden
float.

104 5/8" thick plastering to wall in lime and sand 1:1:5 finished smooth with lime putty
floating.

105 1/2" thick rendering in cement and sand 1:3 finished smooth
106 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth.

107 3/4" thick rendering in cement and sand 1:3 finished smooth.

108 3/4" thick rendering in cement and sand 1:2 in floors finished smooth.

109 3/4" thick rendering in cement and sand 1:2 in coloured cement floors finished smooth.
110 1/2" x 6" skirting in cement and sand 1:3 projected or flush to walls finished with
floating including forming groove.
Per 10 Lft

111 Prepare and apply one coat of preservative (oil type) to structural timber including
touching up cut ends etc. after fixing.
Per square

112 Prepare surface of steel truse and apply two coats of anti - corrosive primer.
Per square

113 Apply one coat of anti - corrosive primer and two coats enamel paint on already shop
rimed and arected steel roof truss.
Per square
114 Prepare and apply two coats primer and finishing coat of enemel paint to mild steel
(angle / flat) gate.
Consider 50 sq.ft

115 Painting steel on mew work with 2 coats of anti - corrosive paint
Consider per square

116 Painting new timber work with two coats wood preservative
Consider per square

117 Preparing and painting wood work with primer and 2 coats enamel paint.
Consider per square

118 White or colour washing two coats in single storey.


Per 10 square

119 White or colour washing in two storeyed building


Per 10 square

120 Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint
to walls.
Per square

121 Cement washing to walls of single storeyed builsing 2 coats


Per 10 square
122 Painting walls with emulsion paint ( 2 coats)
Per square

123 Prepare and apply one coat alkali resistant primer and two caoats of emulsion paint to
soffit of slabs.
Per square

124 Varnishing two coats with copal varnish after sandpapering


Per square

125 Wax polishing to timber in panels & floors.


Per square
Rates Labour Materials Rate per unit

Labour
1 1/4 days mason
750.00
1 1/2 days U/Sk labourer 600.00

Materials
2.25 cwt cement
0.11 cube sand
1 1/2 gals bitumen
Firewood (10 lbs)
Water 10 gals

Rate per square

Labour
1 day mason 600.00
1 3/4 days U/Sk labourer 600.00
Scaffolding - Add 3%

Materials
1.30 cwt slaked lime
0.07 cubes sand
Water 10 gals

Rate per square

Labour
1 day mason 600.00
11/2 days U/Sk labourer 600.00
Scaffolding - Add 3%

Materials
1.40 cwt cement (50 kg bags)
0.06 cubes sand
Water 10 gals

Rate per square

Labour
2 1/2 day mason 1,500.00
21/2 days U/Sk labourer 1,000.00
Scaffolding - Add 3%

Materials
0.80 cwt cement (50 kg bags)
0.16 cubes sand
Water 5 gals

Rate per square

Labour
2 day mason 1,200.00
2 days U/Sk labourer 800.00
Scaffolding - Add 3%

Materials
0.80 cwt cement (50 kg bags)
0.16 cubes sand
Water 5 gals

Rate per square

Labour
1 day mason 600.00
1 3/4 days U/Sk labourer 700.00
Scaffolding - Add 3%

Materials
0.80 cwt cement (50 kg bags)
0.40 cubes sand
Water 10 gals

Rate per square

Labour
1 1/2 days mason 900.00
1 1/2 days U/Sk labourer 600.00
Scaffolding - Add 3%

Materials
0.80 cwt cement (50 kg bags)
0.60 cwt slaked lime
0.07 cubes sand
Water 10 gals

Rate per square

Labour
1 days mason RATES!B4
1 1/2 days U/Sk labourer (curing) 600.00

Materials
1.07 cwt cement (50 kg bags)
0.05 cubes sand
Water 10 gals

Rate per square

Labour
1 days mason 600.00
1 1/2 days U/Sk labourer 600.00
1/4 day U/Sk labourer (curing) 100.00

Materials
1.50 cwt cement (50 kg bags)
0.05 cubes sand
Water 10 gals

Rate per square

Labour
1 1/4 days mason 750.00
2 days U/Sk labourer 800.00
1/4 day U/Sk labourer (curing) 100.00

Materials
1.75 cwt cement (50 kg bags)
0.05 cubes sand
Water 10 gals

Rate per square

Labour
1 1/4 days mason 750.00
2 days U/Sk labourer 800.00
1/4 day U/Sk labourer (curing) 100.00

Materials
2.25 cwt cement (50 kg bags)
0.08 cubes sand
Water 10 gals

Rate per square

Labour
1 1/4 days mason 750.00
2 days U/Sk labourer 800.00
3/4 day U/Sk labourer (curing) 300.00

Materials
2.25 cwt cement (50 kg bags)
0.08 cubes sand
5lbs powdered pigment
Water 10 gals

Rate per square

Labour
3/8 days mason 225.00 0.38 1,300.00 487.5
5/16 days U/Sk labourer 125.00 0.31 1,000.00 312.5
0
Materials 0
0.10 cwt cement (50 kg bags) 0.08 872.00 73.248
0.003 cubes sand 0.00 10,512.00 31.536
0.25 lbs powdered pigment 0.12 700.00 84

Rate per Lft 98.8784

Labour
3/4 day painter 450.00
1/2 day U/Sk labourer 200.00

Materials
2.75 ltr. Wood preservative (oil type)
3" brush (1/10 use)

Rate per square

Labour
1 1/2 days painter 900.00
1 1/2 day U/Sk labourer 600.00

Materials
2 3/4 ltr. Anti - corrosive primer
0.15 ltr. Mineral turpentine or
thinner
1 wire brush
2" brush (1/3 use)

Rate per square

Labour
2 1/2 days painter 1,500.00
1 day U/Sk labourer 400.00
Scaffolding - Add 3%

Materials
0.20 lts. Anti - corrosive primer
1 1/3 ltr. Enamel paint
2" brush (1/5 use)

Rate per square

Labour
1/2 days painter 300.00
3/4 day U/Sk labourer 300.00

Materials
1 1/2 lts. Anti - corrosive primer
2/3 ltr. Enamel paint

1/3 wire brush


2" brush (1/5 use)

Rate per sqft

Labour
1 1/2 days painter 900.00

Materials
2/3 ltr. Anti - carrosive paint
2" brush ( 1/5 use)

Rate per square

Labour
1/2 days painter

Materials
1/2 gal wood preservative
2" brush ( 1/5 use)

Rate per square

Labour
1 1/2 days painter 900.00
1/2 day U/Sk labourer 600.00

Materials
3/4 ltr. Primer
2.50 ltr. Enamel paint (2 coats)
2" brush ( 1/10 use)
2 sand papers

Rate per square

Labour
2 1/2 days painter 1,500.00
2 1/2 days U/Sk labourers 1,000.00
Scaffolding - Add 3%

Materials
0 - 50 cwt boiled lime
2 lbs salt
1/2 lb yellow ochre
2 ozs blue
6" brush (1/3 use)
Water 10 gals

Rate per square

Labour
3 days painter 1,800.00
3 days U/Sk labourers 1,200.00
Scaffolding - Add 6%

Materials
0 - 50 cwt boiled lime
2 lbs salt
1/2 lb yellow ochre
2 ozs blue
6" brush (1/3 use)
Water 10 gals

Rate per square

Labour
1 1/4 day painter 750.00
Scaffolding - Add 3%

Materials
Primer 0.90 ltr. Primer
1.40 ltr. Emulsion pant
Water 0.10 gals
6" brush (1/10 use)
2 sand papers

Rate per square

Labour
2 days painter 1,200.00
2 days U/Sk labourer 800.00
Scaffolding - Add 3%

Materials
5/8 cwt cement
1 - 6" coir brush
Water 5 gals

Rate per square

Labour
3/4 day painter 450.00
Scaffolding - Add 3%

Materials
1 st coat -
1/6 gal emulsion paint
2 nd coat -
1/7 gal emulsion paint
6" brush - (1/10 use)
0.10 gals water

Rate per square

Labour
1 3/4 day painter 1,050.00
Scaffolding - Add 3%

Materials
0.90 ltr. Primer
1.50 ltr. Emulsion paint
6" brush ( 1/10 use)

Rate per square

Labour
1/2 day painter 300.00
1/2 day U/Sk labourer 200.00

Materials
0.40 gals ( 1.80 ltr.) varnish
3" brush (1/3 use)

Rate per square

Labour
3 hrs. U/Sk labourer 150.00

Materials
3/4 lb. Wax polish
1/2 doz. Sheets sandpaper
1/10 floor brush
1/2 yards flannel cloth
Rate per square
324.42 395.79
66 Timber framework for calicut pattern tile hip roof in single storey building consisting o
f wall plate, beam, ridge plate, rafters etc. (Preservutive treatment to be measured
separately)
Rate per 6 squares

67 Roof covering with calicut pattern clay tiles in single storeyod building (Timber frame
work & ridge covering measured separately)
Rate per 6 squares

68 Timber framework for corrugated asbestos sheet roof in angle storied building
Rate per 3.6 squares

69 Roof covering with corrugated asbestos sheets (timber frame work & ridge covering
measured separately)
Rate per 3.6 squares

70 One layer half round clay tiles over corrugated asbestos roof covering.
Rate per 3.6 squares
71 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
Rate per 13'4" length

72 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
Rate per 12' length

73 3/4" x 9" high valance board fixed with brass screws to ends of rafters ( for tile
roofing)
Rate per 100' length

74
3/4" x 9" high barge board fixed with brass screws at 2' 0" centres to sides of rafters.
Rate per 100' length
75 ROOF PLUMBING -
18 B.W.G (1.2 mm) galvanised from sheet valley gutter 3' 0" girth
overall once bent with end laps not less then 9" width including 3/4" tongued and
grooved planks laid to slope and grooved planks laid to slope and profile on timber
members.

Rate per 15' length

76 18 B.W.G (1.2 mm) galvanised iron flashing 1' 6" girth overall 3 times bent with end
laps not less than 6", lead soldered, turned and tucked up to not less than 6" in to
cement mortar 1:2 lower end dressed over roof covering not less than 1' 0" wide.
Rate per 15' length

77 Timber Framework for 4' 0" x 4' 0" flat asbestos ceiling (Sheet measured separately)
comprising of 4" x 2" joists and 2" x 2" bearers in class I timber
Rate per 1.95 squre
78 Horisontal ceiling lining using 4' 0" x 4' 0"flat asbestos cement sheets fixed with and
including beading and cove mouldings on timber framework. (timber framework &
painting measured separated)
Rate per 1.95 squre

79 3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4" x 2"
class I timber joists at 2' 0" centers with 1 1/2" brass nails.
Rate per 15' x 13' I.e 1.95 squares

80 3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of
roof rafters, (existing) with 1 1/2" brass nails including leveling with timber strips
where necessary.
Rate per 15' x 12' I.e 1.80 squares
81 Door single hung 3' 3" x 7' 0" high overall with frame having 1 1/4" thick sash and 3
1/4" x 2 1/4" timber frames. (glazing, ironmongery & painting measured separately)
Per 22.75 square feet (3' 3" x 7' 0")

82 Door glazed and panolled double hung 4' 0" x 7' 0" high overall with frame including 1
1/4" thick sash and 3 3/4" x 2 3/4" frame. (glazing, ironmongery and painting measured
separately).
Per 28 square feet (4' 0" x 7' 0")

83 Plywood door single hung 3' 1 1/2" x 6' 1 1/2" overall with frame having 1 1/4" thick
sash and 3 3/4" x 2 3/4" frame. ( iron - mongery and painting measured separately)
Per 21.75 square feet (3' 1 1/2" x 6' 1 1/2")
84 Door ledged, braced and battened single hung 2' 6" x 6' 6" overall, with frame having
7/8" thick tongued & grooved planks and 3 3/4" x 2 3/4" frame.
( Ironmongery and painting measured separately)
Per 16.25 sq.ft (2' 6" x 6' 6")

85 Window, glazed 7' 0" x 4' 0" high overall with frame comprising 3 No openable sashes
and 3 3/4" x 2 3/4" frame and mullions
(Clasing, ironmongery and painting measured separately)
Per window 7' 0" x 4' 0" (sashes) ie per 28.00 sq.ft
86 1/4" clear sheet glass panes exceeding 1' 0" but not exceeding 4 square feet cut and
fixed with timber beadings to doors and windows.
Consider sash 3' 0" x 4' 0" high with 3" x 1 1/4" style and 4 Nos.glass
panes.
Per window 9.00 sq.ft

87 IRONMONGERY
Butt hinges 5" x 2 1/2"
Per 1 1/2 pairs

88 Tee hinges 6" x 12"


Per 1 pairs

89 Rim lock
Per 1 No

90 Mortice lock
Per 1 No.
91 Casement stays.
Per 4 Nos.

92 Door closer ( Hydraulic)


Per 1 No.

93 Tower / Skeleton brass bolts


Per 1 No.

94 Barrel bolt 4"


Per 1 No.

95 Casement fasteners.
Per 6 Nos.
96 Spring louded fanlight catches
Per 6 Nos.

97 Draw rings
Per 6 Nos.
Rates Labour Materials Rate per unit

Labour
7 days carpenter 4,200.00
8 days U/Sk labourer 3,200.00
1/2 day U/Sk labourer for polishing 200.00 7,600.00

Materials
34.00 cu.ft timber Add 10% for wastage 13,090.00
660 1.ft 2" x 1" reepers Add 5% wastage 9,900.00
8 lbs wire nails 6" long 200.00
2 lbs wire nails 2" long 50.00 23,240.00

Rate per square 5,140.00

Labour
3 days carpenter 1,800.00
3 days U/Sk labourer 1,200.00 3,000.00

Materials
750 tiles 15,750.00 15,750.00

Rate per square 3,125.00

Labour
2 1/2 days carpenter 1,500.00
3 days U/Sk labourer 1,200.00 2,700.00

Materials
13 1/4 cu.ft timber purloins Add 10% for wastage 7,287.50 7,287.50

Rate per square 2,774.31

Labour
1 day carpenter 600.00
2 days U/Sk labourer 800.00 1,400.00

Materials
420 sq.ft asbestos corrugated sheets. 21,000.00
72 Nos. roofing screws and washers. 720.00 21,720.00

Rate per square 6,422.22

Labour
2 days U/Sk labourer 800.00 800.00
Materials
650 half round clay tiles 3,250.00 3,250.00

Rate per square 1,125.00

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Materials
4 pairs ridges 3' 8" long 200.00
16 roofing screws or bolts 96.00 296.00

Rate per L.ft 40.96

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Materials
9 ridge tiles 468.00
1/3 cwt cement (50 kg bags) 181.50
0.02 cubes sand 88.00
15 lbs slaked lime 300.00
1/2 lb colouring powder 125.00 1,162.50

Rate per L.ft 117.71

Labour
3 days carpenter 1,800.00
3 days U/Sk labourer 1,200.00
Scaffolding - Add 5% 150.00 3,150.00

Materials
75.00 sq.ft 1" planks Add 5% for wastage 5,906.25
70 Nos. 1 1/2" brass screws 560.00 6,466.25

Rate per L.ft 96.16

Labour
3 days carpenter 1,800.00
3 days U/Sk labourer 1,200.00
Scaffolding - Add 5% 150.00 3,150.00

Materials
75.00 sq.ft 1" planks Add 5% for wastage 5,906.25
50 Nos. 1 1/2" brass screws 400.00 6,306.25
Rate per L.ft 94.56

Labour
a) Fixing boarding and applying wood pressrvative -

1 day carpenter 600.00


1 day U/Sk labourer 400.00
b) Making and fixing G.I sheets -
1/2 day tinker 300.00
1/2 day U/Sk labourer 200.00
c) Building sides -
1/4 day mason 150.00
1/2 day U/Sk labourer 200.00 1,850.00

Materials
2 G.I sheet (8' x 4') 4,000.00
1/4 gal wood preservative 62.50
0.10 cwt cement (50 kg bags) 55.00
0.05 cwt slaked lime 1.00
1.00 cu.ft sand 44.00
50.00 sq.ft planks 1,250.00
2 lbs 1 1/2" wire nails 40.00 5,452.50

Rate per L.ft 486.83

Labour
Cutting bending, soldering & fixing -
1/2 day tinker 300.00
1/9 day mason (caulking) 66.67
3/4 day U/Sk labourer 300.00 666.67

Materials
1 G.I sheet (8' x 4') 2,000.00
0.05 cwt cement (50 kg bags) 27.50
1.00 cu.ft sand 44.00
1 lb soldering lead 50.00 2,121.50

Rate per L.ft 185.88

Labour
2 1/2 days carpenter 1,500.00
1/2 days mason 300.00
1 1/2 days U/Sk labourer 600.00
Scaffolding - Add 3% 72.00 2,472.00

Materials
8.00 cu.ft timber class I 2,000.00
1 lb 2" nails 25.00
25 lbs cement 125.00
2.00 cu.ft sand 88.00
2" brush - 1/4 use 180.00
1/3 gal tarnap 39.60 2,457.60

Rate per square 2,528.00

Labour
1 1/2 days carpenter 900.00
2 days U/Sk labourer 800.00
Scaffolding - Add 3% 51.00 1,751.00

Materials
210 sq.ft flat asbestos sheets 5,250.00
60 l.ft 2" x 2" halmilla cove mouldings 960.00
125 l.ft 1 1/12" x 1/2" halmilla beadings 2,000.00
3/4 lb - 1/4" lb out nails 46.50
8 doz 1 1/2" brass screws 400.00 8,656.50

Rate per square 5,337.18

Labour
Making holes, fixing joists & making roof
1 day mason 600.00
1 day carpenter 600.00
3 days U/Sk labourer 1,200.00 2,400.00

Materials
115 l.ft 4" x 2" timber joists 2,070.00
215 sq.ft 6" x 3/4" Lunumidella ceiling planks. 8,600.00
3 lbs cement 15.00
4.00 cu.ft sand 176.00
4 kg 1 1/2" brass nails 480.00 11,341.00

Rate per square 7,046.67

Labour
3 days carpenter 1,800.00
6 days U/Sk labourer 2,400.00
Scaffolding - Add 3% 126.00 4,326.00
Materials
220.00 sq.ft ceiling planks 8,800.00
40.00 l.ft 2" x 1/4" timber strips 400.00
2.00 kg 3/4" nails 240.00
4.00 kg 1 1/2" brass nails. 480.00 9,920.00

Rate per square 7,914.44

Labour
5 days carpenter. 3,000.00
1 1/2 days U/Sk labourer 600.00 3,600.00

Materials
a) Frame -
1 1/2 cu.ft 4" x 3" timber 270.00
2 No. spur stones 40.00
6 No. fiber/ plastic plugs With 4" long brass screws. 90.00
2 No. 5/8" mild steel dowels 4" long, 240.00
b) Sash -
14 sq.ft 1 1/2" planks 630.00
5 sq.ft 1" planks 200.00 1,470.00

Rate per sqft 222.86

Labour
6 days carpenter. 3,600.00
2 days U/Sk labourer 800.00 4,400.00

Materials
a) Frame -
1 2/3 cu.ft 4" x 3" timber 298.80
2 No. spur stones 40.00
6 No. fiber/ plastic plugs With 4" long brass screws. 90.00
2 No. 5/8" mild steel dowels 4" long, 240.00
b) Sashes -
16 sq.ft 1 1/2" planks 720.00
7 sq.ft 1" planks 280.00 1,668.80

Rate per sqft 216.74

Labour
3/4 day carpenter. 450.00
3/8 day U/Sk labourer 150.00
1/4 day mason (fixing frame) 150.00
1/4 day U/Sk labourer ( - do -) 100.00 850.00

Materials
a) Frame -
1.80 cu.ft 4" x 3" timber 324.00
2 No. spur stones 40.00
6 No. fiber/ plastic plugs With 4" long brass screws. 90.00
b) Sashe -
1 No 6' 9" x 2' 9" plywood sash. 850.00 1,304.00

Rate per sqft 99.03

Labour
2 1/4 days carpenter. 1,350.00
1 day U/Sk labourer 400.00
1/4 day mason (fixing frame) 150.00
1/4 day U/Sk labourer ( - do -) 100.00 2,000.00

Materials
a) Frame -
1.70 cu.ft 4" x 3" timber 306.00
2 No. spur stones 40.00
6 No. fiber/ plastic plugs With 4" long brass screws. 90.00
2 No 5/8" mild steel dowels 240.00
b) Sashe -
21.00 sq.ft 1" thick planks 840.00
3 doz 1 1/4 long brass screws. 156.00 1,672.00

Rate per sqft 225.97

Labour
6 days carpenter. 3,600.00
2 1/2 days U/Sk labourer 1,000.00
1/2 day mason (fixing frame) 300.00
1/2 day U/Sk labourer ( - do -) 200.00 5,100.00

Materials
a) Frame -
3.20 cu.ft 4" x 3" timber 576.00
4 No. fiber/ plastic plugs With 4" long brass screws. 60.00
b) Sashes -
9.25 sq.ft 3" x 1 1/2" timber 518.00 1,154.00

Rate per sqft 223.36

Labour
1/2 day glazier 300.00
1/2 day U/Sk labourer 200.00 500.00

Materials
9.00 sq.ft glass panes 405.00
30 L.ft 1/2" x 1/2" beading 660.00
4 doz brass panel pins 200.00 1,265.00

Rate per sqft 196.11

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Materials
1 1/2 pairs butt hinges 300.00
2 Doz 3/4" brass screws 100.00 400.00

Rate per No 433.33

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Materials
1 pair Tee hinges 200.00
1 1/2 Doz 3/4" brass screws 75.00 275.00

Rate per pair 525.00

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Materials
1 rim lock with screws 450.00 450.00

Rate per No. 700.00

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00
Materials
1 mortice look with screws 450.00 450.00

Rate per No. 700.00

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Materials
4 casement stays 460.00
16 1/2" brass screws 80.00 540.00

Rate per No. 197.50

Labour
1/4 day carpenter 150.00
1/4 day U/Sk labourer 100.00 250.00

Materials
1 door closer 800.00
8 3/4" brass screws 80.00 880.00

Rate per No. 1,130.00

Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00

Materials
1 Tower / Skeleton Bolt 500.00
10 1/2" brass screws 50.00 550.00

Rate per No. 1,050.00

Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00

Materials
1 barrel bolt 150.00
8 1/2" brass screws 40.00 190.00

Rate per No. 690.00

Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00
Materials
6 casement fasteners 1,200.00
24 1/2" brass screws 120.00 1,320.00

Rate per No. 303.33

Labour
1/2 day carpenter 300.00
1/2 day U/Sk labourer 200.00 500.00

Materials
6 brass fanlight catches 624.00
2 doz 1/2" brass screws 240.00 864.00

Rate per No. 227.33

Labour
1/8 day carpenter 75.00
1/8 day U/Sk labourer 50.00 125.00

Materials
6 draw rings 270.00
1doz 1/2" brass screws 120.00 390.00

Rate per No. 85.83


Unskil Labour 400.00 Earth Soil 350.00 per cube Mixture 1,500.00 per day
Carpenter 600.00 Class II timber per cube Vibrator 1,500.00 per day
Mason 600.00 Cement 550.00 cwt
Barbender 600.00 Sand 4,400.00 per cube
Skill Labour Vibrator 600.00 Metal 1 1/2" 3,300.00 per cube
Skill Labour Blasting 600.00 Metal 1" 3,400.00 per cube
Drilling, chipping & wedging Sk labourer 600.00 Metal 3/4" 3,500.00 per cube
Tinker 600.00 Rubble 6" - 9" 1,700.00 per cube
glazier 600.00 Rubble 6" - 4" 2,000.00 per cube
Painter 600.00 Water 2.00 per gal
Jute Hussein 0.00 per sqft
Class II timber 1" thick planks 35.00 per sqft
Class II timber 2" x 1" 7.00 per L.ft
Class II timber 2" x 2" 13.00 per L.ft
Class II timber 2" x 4" 20.00 per L.ft
wire nails 40.00 per lb
per lb
Fuse per ft
Jumper steel per lb
D.D.T. powder (8% in 20 gals of water) per lb
16 mm 18" long bolts (20 uses) 25.00 per No
mould oil 420.00 Lt
4" x 2" props 25.00 L.ft
Wedges 89.00 Nos
mould oil 120.00 gal
Steel rebars 60.00 cwt
binding wires 40.00 per lb
Bricks 5.00 per No
Wirecut Bricks 10.00 per No
Acid 500.00 per gal
Hollow cement blocks 15.00 per No
Pressed tiles 8" x 8" 50.00 per No
wax polish 400.00 per lb
coloured pigment 250.00 per lb
cotton waste 50.00 per lb
White cement 50.00 per lb
12" x 12" terrazzo tiles 50.00 per No
glazed tiles 6" x 6" 60.00 per No

Timber for framework in calicut pattern


tile hip roof in single storey building
consisting of wall plate, beam, ridge
plate, rafters etc. (Preservutive treatment
to be measured separately)
350.00 per cuft
2" x 1" reepers for roof 15.00 per L.ft
wire nails 6" long for roof 25.00 per lb
wire nails 2" long for roof 25.00 per lb
Calicut tiles 21.00 per No
Purlings for roof 500.00 per cuft
asbestos corrugated sheets. 50.00 per sqft
roofing screws and washers. 10.00 per No
half round clay tiles 5.00 per No
ridges 3' 8" long 50.00 per pair
roofing screws or bolts 6.00 per No
ridge tiles 52.00 per No
slaked lime 20.00 lbs
1" thick planks for valance board 75.00 per sqft
1 1/2" brass screws 8.00 per No
G.I sheet (8' x 4') 2,000.00 per No
Wood Preservative 250.00 per gal
3/4" tongued and grooved planks 25.00 per sqft
1 1/2" wire nails 20.00 lbs
soldering lead 50.00 per lb
Class I Timber for Roof frame 250.00 per cuft
2" wire nails 25.00 per lb
2" brush - 1/4 use 180.00 per No
tarnap 120.00 per gal
flat asbestos sheets 25.00 per sqft
2" x 2" halmilla cove mouldings 16.00 per L.ft
1 1/12" x 1/2" halmilla beadings 16.00 per L.ft
1/4" out nails 62.00 per lb
8 doz 1 1/2" brass screws 50.00 per doz
4" x 2" timber joists 18.00 per L.ft
6" x 3/4" Lunumidella ceiling planks. 40.00 per sqft
1 1/2" brass nails for celling 120.00 per kg
2" x 1/4" timber strips 10.00 per L.ft
3/4" nails 120.00 per kg
4" x 3" timber 180.00 per cuft
spur stones 20.00 per No
fiber/ plastic plugs With 4" long brass
screws. 15.00 per No
5/8" mild steel dowels 4" long, 120.00 per No
1 1/2" planks for sash 45.00 per sqft
1" planks for sash 40.00 per sqft
6' 9" x 2' 9" plywood sash. 850.00 per No
1 1/4 long brass screws. 52.00 per doz
3" x 1 1/2" timber 56.00 per sqft
glass panes 45.00 per sqft
1/2" x 1/2" beading 22.00 per L.ft
brass panel pins 50.00 per doz
butt hinges 200.00 per pair
3/4" brass screws 50.00 per doz
Tee hinges 200.00 per pair
rim lock with screws 450.00 per No
mortice look with screws 450.00 per No
casement stays 115.00 per No
1/2" brass screws 5.00 per No
door closer 800.00 per No
3/4" brass screws 10.00 per No
Tower / Skeleton Bolt 500.00 per No
barrel bolt 4" 150.00 per No
casement fasteners 200.00 per No
brass fanlight catches 104.00 per No
1/2" brass screws 120.00 per doz
draw rings 45.00 per No
Ref No Description Rate
Earth Warks
1 Removing top soil to a depth not exceeding 6" & depositing as directed within
site 4,000.00
2 Excavation over site to reduce level, in any material except rock requiring
blasting including depositing and leveling as directed up to distance not
exceeding 30' 0" per cube 650.00
3 Excavation in trenches for walls/ column pits in soft/ loose soil from 0' 0" to 5'
0" deep and depositing excavated materiel to a distance not exceeding 30' 0"
(Earth work support to be paid separately where necessary) per cube. 400.00
4 Excavation in trenches for walls/ column pits in ordinary soil from 0' 0" to 5' 0"
deep and depositing excavated material not exceeding 30' 0" per cube. 900.00
5 Excavation in trenches for walls/ column pits in Hard/ dense soil up to a depth
of 5' 0" and depositing excavated material up to a distance not exceeding 30'
0". 1,400.00
6 Excavation in trenches for walls/ column pits in Mud/ wet soil up to a depth of
5' 0" and depositing excavated material to distance not exceeding 30' 0".
(Earth work & dewatering paid for separately.) 1,200.00
7 Excavation in trenches for walls/ column pits in soft disintegrated rock (not
requiring blasting) up to depth of 5' 0" and depositing excavated material to
distance not exceeding 30' 0". 1,000.00
8 Excavation in trenches for walls/ column pits in Hard rock requiring blasting
up to a depth of 5' 0" and depositing excavated material to distance not
exceeding 30' 0". 1,400.00
9 Benching rock in foundation in 3" - 6" steps. (Blasting prohibited) 17,250.00
10 Anti - termite treatment on excavated foundation and compacted soil under
floors. 240.00
11 Backfilling to trenches with selected earth available at site. 400.00
12 Back filling to trenches with imported material. 902.50
13 Filling under floors including leveling, watering & compacting in 3" layers with
available and selected earth at site. 800.00
14 Filling under floors including leveling, watering & compacting in 3" layers with
imported selected earth. 1,202.50
15 Cutting turf sods, landing to hand carts and transporting up to 30 yards, laying
and watering for 30 days. (Royalty for turf, pegging and transport beyond 30
yards paid separately) 2,320.00
Consider trench 15' 0" long 3' 0" wide and 5' 0" depth open planking to both
16 faces. Total area - 2/ 15' 0" x 5' 0"
.
= 150 sq.ft 1,200.00
17 Consider trench 15' 0" long 3' 0" wide and 5' 0" height of planking to both
faces. Total area of planking 2/ 15' 0" x 5' 0" ie 150
sq.ft
Earth work support (close planking) in deep excavation in trenches up to 15' 2,400.00
18 0" depth. - Consider trench of length of 15' 0" width 5' 6" at top 3' 6" at
bottom Then area supported is 2/ 15' x 15' ie 450 sq.ft. 2,844.44

Concrete
19 Mixing concrete 1: 3: 6 (1 1/2") 16,233.00
20 Mixing concrete 1: 2: 5 (1") 16,763.00
21 Mixing concrete 1: 2: 4 (3/4") 18,915.00
22 Mixing concrete 1: 1: 3 (3/4") 21,373.00
23 Mixing concrete 1: 1: 2 (3/4") 25,961.00
24 2" thick cement concrete screed in foundation at depths not exceeding 5' 0" 275.00
25
3" thick cement concrete screed in foundation at depths not exceeding 5' 0" 375.00
26 6" thick cement concrete floor (mass concrete). 1,300.00
27 Consider 24 No. columns each 4 1/2" x 6" x 10' 0" ie 0.45 cubes. 10,000.00
28 Cement concrete in 6" x 6" colomns in ground floor. -
Consider 18 No. columns 6" x 6" each 10' 0" high ie 0.45 cubes. 10,000.00
Curing 880.00
29 Cement concrete in 9" x 9" colomns in ground floor. - Consider 8 No. 9" x 9"
columns each 10' 0" high ie 0.45 cubes. 10,000.00
Curing 400.00
30 Cement concrete in 12" x 12" colomns in ground floor. -
Consider 5 No. 12"
Cement concrete inx13
12" columns
1/2" each
x 13 1/2" 10' 0" high.
colomns in ground floor. - 9,400.00
31 Consider 4 No. colomns 13 1/2" x 13 1/2" each 10' 0" high .
I.e 0.51 cubes. 8,823.53
Curing 800.00
32 Cement concrete in 6" x 6" beam up to 1st floor level. -
Consider 180 L.ft of beam 6" x 6"
I.e 0.45 cubes. 10,888.89
Curing 960.00
33 Cement concrete in 9" x 6" beam up to 1st floor level. -
Consider 120 L.ft of beam 9" x 6" beam
I.e 0.45 cubes. 10,888.89
Curing 900.00
34 Cement concrete in 9" x 9" beam up to 1st floor level. -
Consider 80' 0" length 9" x 9" beam
I.e 0.45 cubes. 10,888.89
Curing
5" thick R.CC floor slab in 1st floor. - 840.00
35 Consider 5" thick slab 10' 0" x 12' 0" volume of concrete 50.00 cu.ft
9,800.00
Curing 780.00
36 6" thick R.CC floor slab in 1st floor. -
Consider 10' 0" x 10' 0" panel = 50 cu.ft 9,800.00
Curing 780.00
37 Cement concrete in 4 1/2" x 6" lintels in ground floor. -
Consider 240 l.ft I.e 45 cu.ft 10,888.89
Curing
Cement concrete in 9" x 9" lintels in ground floor. - 780.00
38 Consider 80 L.ft of lintel I.e 45 cu.ft concrete.
10,888.89
Curing
Cement concrete in 9" x 12" lintels in ground floor. - 780.00
39 Consider length 60' 0" of lintel
= 45 cu.ft 10,888.89
Curing
Cement concrete in 12" x 15" lintels in ground floor. - 780.00
40 Consider length 36' 0"
i.e 45 cu.ft 10,888.89
Curing 880.00

Formwork & RF
41
Sawn timber form work to 9" x 9" cement concrete column in ground floor. 22,769.27
42 Sawn timber form work for concrete beams in ground floor. - 21,672.91
43 Sawn timber form work for underside of first floor slab. - 24,692.60
44 Mild steel / for steel reinforcement to lintels slab beams for columns bent to
shape laid in position and tied with G.I. Wire as directed. - 1,130.04

Masonry & Floor


45 Brick work in cement sand 1:5: in foundation up to D.P.C 14,612.50
46 Brick work cement and sand 1:8 in foundation up to D.P.C 14,244.00
47 Brick work in cement and sand 1:5 in 4 1/2" thick walls in ground floor 6,147.50
48 9" thick brick wall cement sand 1:5 in ground floor 10,800.00
49
Brick work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor 17,078.50
50 9" Brick walls in cement sand 1:8in superstructure in ground floor 17,241.50
51 4 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor
( Facing to brickwork measured separately) 8,598.00
52 9" thick in cement and sand 1:5 with wire cut bricks (Facing to brick work
measured separately) 16,222.50
53 13 1/2" thick brick wall (wire cut) in cement and sand 1:5 in ground floor
(Facing to brick work measured separately) 26,380.00
54 Extra over for facing including raised pointing 1/8" thick in cement and sand
1:1 mixture in ground floor 9,145.00
55 3" thick floor paved in lime mortar 2:5 in ground floor 4,734.00
56 Steps 1' - 1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement
and
Bricksand 1:2inredering
drains cement including
and sandnecessary excavation.
1:5, 9" wide end 6" - 9" average depth 162.50
57 including cement rendering 1/2" thick 1:2 to exposed faces with 1'6" ramp
including necessary excavation. 265.00
58 Brick drains in cement and sand 1:5, 9" wide end 6" - 9" average depth
including cement rendering 1/2" thick 1:2 to exposed faces without ramp
including necessary excavation. 224.10
59 8" thick Hollow block work in cement and sand mortar 1:5 in ground floor
(cavities unfilled) 4,397.50
60 4" thick Hollow block mesonry in cement and sand mortar 1:5 with cavities
unfilled 3,586.00
61 Random Rubble masonry in cement morter 1:5 in foundation 11,280.00
62 Random Rubble masonry in cement morter 1:5 in superstructure 12,145.00
63 Pressed floor tiles bedded in 1/2" cement morter 1:2 and pointing in neat
cement in ground floor 17,270.50
64 Glazed tiles fixed to walles including bedding in cement morter 1:2 and raking
in ground floor. (specials measured separately) 32,409.00
65 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor 10,845.50

Capentary
66 Timber framework for calicut pattern tile hip roof in single storey building
consisting o f wall plate, beam, ridge plate, rafters etc. (Preservutive treatment
to be measured separately) 5,140.00
67 Roof covering with calicut pattern clay tiles in single storeyod building (Timber
frame work & ridge covering measured separately) 3,125.00
68
Timber framework for corrugated asbestos sheet roof in angle storied building 2,774.31
69 Roof covering with corrugated asbestos sheets (timber frame work & ridge
covering measured separately) 6,422.22
70 One layer half round clay tiles over corrugated asbestos roof covering. 1,125.00
71 Asbestos close fittings ridging fixed complete with roofing screws or bolts
(hook) 40.96
72 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar
1:1:4 117.71
73 3/4" x 9" high valance board fixed with brass screws to ends of rafters ( for tile
roofing) 96.16
74 3/4" x 9" high barge board fixed with brass screws at 2' 0" centres to sides of
rafters. 94.56
75 ROOF PLUMBING -
18 B.W.G (1.2 mm) galvanised from sheet valley
gutter 3' 0" girth overall once bent with end laps not less then 9" width
including 3/4" tongued and grooved planks laid to slope and grooved planks
laid to slope and profile on timber members. 486.83
18 B.W.G (1.2 mm) galvanised iron flashing 1' 6" girth overall 3 times bent
76 with end laps not less than 6", lead soldered, turned and tucked up to not less
than 6" in to cement mortar 1:2 lower end dressed over roof covering not less
than 1' 0" wide. 185.88
77 Timber Framework for 4' 0" x 4' 0" flat asbestos ceiling (Sheet measured
separately) comprising of 4" x 2" joists and 2" x 2" bearers in class I timber 2,528.00
78 Horisontal ceiling lining using 4' 0" x 4' 0"flat asbestos cement sheets fixed
with and including beading and cove mouldings on timber framework. (timber
framework & painting measured separated) 5,337.18
79 3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on
4" x 2" class I timber joists at 2' 0" centers with 1 1/2" brass nails. 7,046.67
80 3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to
underside of roof rafters, (existing) with 1 1/2" brass nails including leveling
with timber strips where necessary. 7,914.44
81 Door single hung 3' 3" x 7' 0" high overall with frame having 1 1/4" thick sash
and 3 1/4" x 2 1/4" timber frames. (glazing, ironmongery & painting measured
separately) 222.86
82 Door glazed and panolled double hung 4' 0" x 7' 0" high overall with frame
including 1 1/4" thick sash and 3 3/4" x 2 3/4" frame. (glazing, ironmongery
and painting measured separately). 216.74
83 Plywood door single hung 3' 1 1/2" x 6' 1 1/2" overall with frame having 1 1/4"
thick sash and 3 3/4" x 2 3/4" frame. ( iron - mongery and painting measured
separately) 99.03
84 Door ledged, braced and battened single hung 2' 6" x 6' 6" overall, with frame
having 7/8" thick tongued & grooved planks and 3 3/4" x 2 3/4" frame.
Window, glazed ( Ironmongery and overall
7' 0" x 4' 0" high paintingwith
measured separately)3 No openable
frame comprising 225.97
sashes and 3 3/4" x 2 3/4" frame and mullions
85 1/4" clear sheet glass panes exceeding 1' 0" but not exceeding 4 square feet
cut and fixed with(Clasing, ironmongery
timber beadings and painting
to doors measured separately)
and windows. 223.36
86 Consider sash 3' 0" x 4' 0" high with 3" x 1 1/4"
style and 4 Nos.glass panes. 196.11
87 IRONMONGERY
Butt hinges 5" x 2 1/2" 433.33
88 Tee hinges 6" x 12" 525.00
89 Rim lock 700.00
90 Mortice lock 700.00
91 Casement stays. 197.50
92 Door closer ( Hydraulic) 1,130.00
93 Tower / Skeleton brass bolts 1,050.00
94 Barrel bolt 4" 690.00
95 Casement fasteners. 303.33
96 Spring louded fanlight catches 227.33
97 Draw rings 85.83
Rate per square

Rate per cube

Rate per cube

Rate per cube

Rate per cube

Rate per cube

Rate per cube

Rate per cube


Rate per Square

Rate per Square


Rate per cube
Rate per cube

Rate per cube

Rate per cube

Rate per square

Rate per square

Rate per square

Rate per square

Rate per cube


Rate per cube
Rate per cube
Rate per cube
Rate per cube
Rate per square

Rate per square


Rate per square
Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube

Rate per cube


Rate per cube
Rate per square
Rate per square
Rate per square

Rate per cwt

Rate per square


Rate per square
Rate per square
Rate per square

Rate per square


Rate per square

Rate per square

Rate per square

Rate per square

Rate per square


Rate per square

Rate per L.ft

Rate per L.ft

Rate per L.ft

Rate per square

Rate per square


Rate per cube
Rate per cube

Rate per square

Rate per square


Rate per square

Rate per square

Rate per square


Rate per square

Rate per square


Rate per square

Rate per L.ft

Rate per L.ft

Rate per L.ft

Rate per L.ft

Rate per L.ft

Rate per L.ft

Rate per square

Rate per square

Rate per square

Rate per square

Rate per sqft

Rate per sqft

Rate per sqft

Rate per sqft

Rate per sqft

Rate per sqft

Rate per No
Rate per pair
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Rate per No.
Ref No Description Rate
Earth Warks
1 Removing top soil to a depth not exceeding 6" & depositing as directed within
site 4,000.00 Rate per square
2 Excavation over site to reduce level, in any material except rock requiring
blasting including depositing and leveling as directed up to distance not
exceeding 30' 0" per cube 650.00 Rate per cube
3 Excavation in trenches for walls/ column pits in soft/ loose soil from 0' 0" to 5'
0" deep and depositing excavated materiel to a distance not exceeding 30' 0"
(Earth work support to be paid separately where necessary) per cube. 400.00 Rate per cube
4 Excavation in trenches for walls/ column pits in ordinary soil from 0' 0" to 5' 0"
deep and depositing excavated material not exceeding 30' 0" per cube. 900.00 Rate per cube
5 Excavation in trenches for walls/ column pits in Hard/ dense soil up to a depth
of 5' 0" and depositing excavated material up to a distance not exceeding 30'
0". 1,400.00 Rate per cube
11 Backfilling to trenches with selected earth available at site. 400.00 Rate per cube
12 Back filling to trenches with imported material. 902.50 Rate per cube
13 Filling under floors including leveling, watering & compacting in 3" layers with
available and selected earth at site. 800.00 Rate per cube
14 Filling under floors including leveling, watering & compacting in 3" layers with
imported selected earth. 1,202.50 Rate per cube

Concrete
19 Mixing concrete 1: 3: 6 (1 1/2") 16,233.00 Rate per cube
20 Mixing concrete 1: 2: 5 (1") 16,763.00 Rate per cube
21 Mixing concrete 1: 2: 4 (3/4") 18,915.00 Rate per cube
22 Mixing concrete 1: 1: 3 (3/4") 21,373.00 Rate per cube
23 Mixing concrete 1: 1: 2 (3/4") 25,961.00 Rate per cube
24 2" thick cement concrete screed in foundation at depths not exceeding 5' 0" 275.00 Rate per square
25 3" thick cement concrete screed in foundation at depths not exceeding 5' 0" 375.00 Rate per square
26 6" thick cement concrete floor (mass concrete). 1,300.00 Rate per square
27 Consider 24 No. columns each 4 1/2" x 6" x 10' 0" ie 0.45 cubes. 10,000.00 Rate per cube
28 Cement concrete in 6" x 6" colomns in ground floor. -
Consider 18 No. columns 6" x 6" each 10' 0" high ie 0.45 cubes. 10,000.00 Rate per cube
Curing 880.00 Rate per cube
29 Cement concrete in 9" x 9" colomns in ground floor. - Consider 8 No. 9" x 9"
columns each 10' 0" high ie 0.45 cubes. 10,000.00 Rate per cube
Curing 400.00 Rate per cube
30 Cement concrete in 12" x 12" colomns in ground floor. -
Consider 5 No. 12"
Cement concrete inx13
12" columns
1/2" each
x 13 1/2" 10' 0" high.
colomns in ground floor. - 9,400.00 Rate per cube
31 Consider 4 No. colomns 13 1/2" x 13 1/2" each 10' 0" high .
I.e 0.51 cubes. 8,823.53 Rate per cube
Curing 800.00 Rate per cube
32 Cement concrete in 6" x 6" beam up to 1st floor level. -
Consider 180 L.ft of beam 6" x 6"
I.e 0.45 cubes. 10,888.89 Rate per cube
Curing 960.00 Rate per cube
33 Cement concrete in 9" x 6" beam up to 1st floor level. -
Consider 120 L.ft of beam 9" x 6" beam
I.e 0.45 cubes. 10,888.89 Rate per cube
Curing 900.00 Rate per cube
34 Cement concrete in 9" x 9" beam up to 1st floor level. -
Consider 80' 0" length 9" x 9" beam
I.e 0.45 cubes. 10,888.89 Rate per cube
Curing
5" thick R.CC floor slab in 1st floor. - 840.00 Rate per cube
35 Consider 5" thick slab 10' 0" x 12' 0" volume of concrete 50.00 cu.ft
9,800.00 Rate per cube
Curing 780.00 Rate per cube
36 6" thick R.CC floor slab in 1st floor. -
Consider 10' 0" x 10' 0" panel = 50 cu.ft 9,800.00 Rate per cube
Curing 780.00 Rate per cube
37 Cement concrete in 4 1/2" x 6" lintels in ground floor. -
Consider 240 l.ft I.e 45 cu.ft 10,888.89 Rate per cube
Curing
Cement concrete in 9" x 9" lintels in ground floor. - 780.00 Rate per cube
38 Consider 80 L.ft of lintel I.e 45 cu.ft concrete.
10,888.89 Rate per cube
Curing
Cement concrete in 9" x 12" lintels in ground floor. - 780.00 Rate per cube
39 Consider length 60' 0" of lintel
= 45 cu.ft 10,888.89 Rate per cube
Curing
Cement concrete in 12" x 15" lintels in ground floor. - 780.00 Rate per cube
40 Consider length 36' 0"
i.e 45 cu.ft 10,888.89 Rate per cube
Curing 880.00 Rate per cube

Formwork & RF
41 Sawn timber form work to 9" x 9" cement concrete column in ground floor. 22,769.27 Rate per square
42 Sawn timber form work for concrete beams in ground floor. - 21,672.91 Rate per square
43 Sawn timber form work for underside of first floor slab. - 24,692.60 Rate per square
44 Mild steel / for steel reinforcement to lintels slab beams for columns bent to
shape laid in position and tied with G.I. Wire as directed. - 1,130.04 Rate per cwt

Masonry & Floor


47 Brick work in cement and sand 1:5 in 4 1/2" thick walls in ground floor 6,147.50 Rate per square
48 9" thick brick wall cement sand 1:5 in ground floor 10,800.00 Rate per square
61 Random Rubble masonry in cement morter 1:5 in foundation 11,280.00 Rate per cube