Sie sind auf Seite 1von 16

3P MISCELLANEOUS

3P-1 Fabricating and fixing of wall


cupboards and dressing tables
as per drawing.

150mm thick brick paved under


wall cupboard in 1:5 cement
sand mortar including 12mm
thick, 1:3 cement rendering
finished smooth with neat
cement.

3-1.1 Ground Floor


m2 2.5 3,390.00

3P-1.2 First Floor


m2 6.5 3,490.00

3P-1.3 Second Floor


m2 6.3 3,560.00

75 mm thick 1:2:4 (20mm)


cement concrete slab

3P-1.4 Ground Floor


m2 1 1,170.00

3P-1.5 First Floor


m2 1.3 1,200.00

3P-1.6 Second Floor


m2 2.5 1,230.00

Form work for slab

3P-1.7 Ground Floor


m2 1.5 1,000.00
3P-1.8 First Floor
m2 1.8 1,010.00

3P-1.9 Second Floor


m2 3.6 1,020.00

Tor steel reinforcement for slab

3P-1.10 Ground Floor


kg 8 230.00

3P-1.11 First Floor


kg 10 240.00

3P-1.12 Second Floor


kg 20 250.00

112.5mm thick Brick Work in


1:5 Cement sand mortar.

3P-1.13 Ground Floor


m2 1.6 1,410.00

3P-1.14 First Floor


m2 1.6 1,450.00

3P-1.15 Second Floor


m2 4 1,480.00
15mm thick, cement sand 1:5
plaster finished smooth with
skim coat or equivalent on
walls and concrete surfaces
concrete faces flush with walls
on internal faces.(W1)

3P-1.16 Ground Floor


m2
13 740.00

3P-1.17 First Floor


m2
8.5 780.00

3P-1.18 Second Floor


m2
32 815.00

20mm thick 1:3 cement sand


rendering for wall finishing with
normal cement floating coat.
3P-1.19 Ground Floor
m2
2.6 790.00

3P-1.20 First Floor


m2
4 820.00

3P-1.21 Second Floor


m2
6.6 845.00

Supplying and fixing using


mahogany timber for structure
of wall cupboard and dressing
table. Rate included for
applying of two coats of of
wood preservative, two coats of
wood stain of approved colour
and two coats of water base
paint matt finish for all timber.

3P-1.22 Ground Floor


m3 0.5 119,170.00

3P-1.23 First Floor


m3 1.8 122,740.00
3P-1.24 Second Floor
m3 1.2 125,130.00

Suppying and fixing Glass


mirror in approved fixing type
as instructed by the Engineer.

3P-1.25 Ground Floor


m2 1.5 6,160.00

3P-1.26 First Floor


m2 2.3 6,340.00

3P-1.27 Second Floor


m2 3.8 6,470.00
Supplying all materials,
fabricating and fixing of wall
cupboard and dressing table
Door 100mm x 25mm door
frame using approved quality of
timber "Jak" and 25 mm thick
timber paneled and louvered
door using approved quality of
timber "Mahogany". Rate shall
include for braze handle
approved type door lock with
duplicate keys and other
necessary accessories, as per
the detail drawing.

3P-1.28 First Floor


m2 13 13,100.00
Supplying all materials,
fabricating and fixing of wall
cupboard Door 100mm x 25mm
door frame using approved
quality of timber "Jak" and 25
mm thick timber louvered door
using approved quality of
timber "Mahogany". Rate shall
include for braze handle
approved type door lock with
duplicate keys and other
necessary accessories, as per
the detail drawing.

3P-1.29 Ground Floor


m2 4.3 13,000.00

3P-1.30 First Floor


m2 4.3 13,000.00

3P-1.31 Second Floor


m2 10.7 13,000.00

Painting wall cupboard and


dressing table with two coats of
wood preservative, two coats of
wood stain of approved colour
and two coats of water base
paint matt finish for all timber
doors.
3P-1.32 Ground Floor
m2 35 350.00

3P-1.33 First Floor


m2 148 360.00

3P-1.34 Second Floor


m2 88 370.00
8,475.00

22,685.00

22,428.00

1,170.00

1,560.00

3,075.00

1,500.00
1,818.00

3,672.00

1,840.00

2,400.00

5,000.00

2,256.00

2,320.00

5,920.00
9,620.00

6,630.00

26,080.00
2,054.00

3,280.00

5,577.00

59,585.00

220,932.00
150,156.00

9,240.00

14,582.00

24,586.00
170,300.00
55,900.00

55,900.00

139,100.00
12,250.00

53,280.00

32,560.00

Das könnte Ihnen auch gefallen