Project Appointment Request - 20170209232711-3019 Page 1 of 3

Project Appointment Request


Save Save and Close

PAR Reference: 201702092327113019 Originator: andrew.walnycki@hyderconsulting.com

OpCo Project Details

Project Number: UA0092170602

Project Name:
Leicester City Council Mansfield Street

OpCo Details
Region: United Kingdom
Country: United Kingdom
Legal Entity: Arcadis Consulting Ltd Currency: GBP

Global Business Line: Infrastructure


Project Manager: Andrew Walnycki

OpCo Approver Kevin Tapp

GEC Details
Location: India
Legal Entity: Arcadis Consulting India Pvt Limited

Design Manager: Harshavardhan A

GEC Approver Harshavardhan A

Scope of Services (please describe below)

https://arcadiso365.sharepoint.com/sites/GEC/PA/_layouts/15/FormServer.aspx?XmlLocation=/sites/GEC/PA/PAR/20170209232711-3019.xml 16-Feb-17
Project Appointment Request - 20170209232711-3019 Page 2 of 3

We have been asked to provide design details for a retaining wall positioned at the back of the footway in Leicester. The information I have is:

Retaining wall will be up to 900mm retained height (maximum)

All vehicle restraint systems and boundary fences / screens will be separate to the retaining wall and will not impose any loads.

Retaining wall is to be designed in reinforced concrete.

Drawings showing site location of the wall(s) are being prepared in Bangalore

Deliverables and assumptions:

Design calculations are required for a reinforced concrete wall, 900mm high.
Wall to be designed for 900mm height only and adapted for each site location
Both vertical faces of the wall will be clad in brickwork.
The wall foundations are spread footings. All services can be moved (if necessary) to accommodate the footings.
The wall will be designed for HA surcharge loads.
Design for vehicle impact loads is not required.
Vehicle restraint systems, boundary fences / screens will be separate from the wall and will not impose any loads on the wall.
Drawings Combined GA and RC drawing. Rebar schedules to be incorporated on drawing.
Design check will be undertaken in UK.
Specification to be prepared in UK.
Design calculations & drawings required by 24th February 2017.

Programme Dates: Start Date: 20/02/2017 End Date: 03/03/2017

Deliverables Schedule
Item Id Item Description Delivery Date
1 Design calculations & drawings 03/03/2017
Insert item

Estimated Direct Service Fee Schedule Currency GBP

Item Id Estimated Direct Service Item Description Fee Amount


1 Information review, preliminary and detail design 397.97

2 Document Controller 15.36

3 QAQC Checks 18.07

Insert item
Total Estimated Fees: GBP 431.4
PO Number:
SAP Number:

Agreements
GEC Authorised Personnel use only

https://arcadiso365.sharepoint.com/sites/GEC/PA/_layouts/15/FormServer.aspx?XmlLocation=/sites/GEC/PA/PAR/20170209232711-3019.xml 16-Feb-17
Project Appointment Request - 20170209232711-3019 Page 3 of 3

GEC Agreed: By: harshavardhan.a@hyderconsulting.com 13/02/2017


GEC Process Stage Completed

OpCo Authorised Personnel use only

OpCo Agreed: By: kevin.tapp@hyderconsulting.com 15/02/2017


OpCo Process Stage Completed

BV Authorised Personnel use only

BV Agreed: By: kay.hawkins@hyderconsulting.com 15/02/2017