Beruflich Dokumente
Kultur Dokumente
Step 1
Install the metal stud along the dry
wall. Confirm required dimension of
the door.
Step 2
Place the Door frame into the door
opening and fix with metal screws.
Fix the frame adjacent to the stud by
metal screws.
Step 3
Install the metal studs on
the other side of the Door frame then
fix with metal screws.
Step 4
Attach the butt hinges on the fixed
frame side and install the door leaf.
Attach the hardware and accessory.