STANDARD SPECIFICATION STANDARD SPECIFICATION

laitairiENONEERS
5fgaitameni, INDIA umiTED FOR SURFACE PREPARATION NO. 6-79-0020
MR" eleanSFM (A Gm 0/ India Undertiongi AND PROTECTIVE COATING Rev. 0
PAGE 35 OF 59

TABLE 17.0 COATING SYSTEM (INTERNAL PROTECTION) FOR GALVANIZED OR


NON FERROUS OR STAINLESS STEEL/ DUPLEX STAINLESS STEEL
COMPONENTS OF COOLERS/ CONDENSERS FOR FRESH WATER
SERVICE

Coating System Total Final


Surface Preparation
SI. Design (Post-erection / Field) DFT Remarks
& Pre-erection/Shop in Microns
No. Temp. in C
Primer Primer Finish paint
(min.)
1 coat of F-15 @ 1 coat of F-15 @
17.1 Up to 80 Sweep Blasting 160 -
80g DFT/coat; 80g DFT/coat;
I coat of Glass
Fibre Reinforced
17.2 80 to 140 Sweep Blasting --- 1500 -
Novolac epoxy of
1.5 mm DFT

18.0 STORAGE

18.1 All paints and painting materials shall be stored only in rooms to be arranged by contractor
and approved by Engineer-in-charge for the purpose. All necessary precautions shall be
taken to prevent fire. The storage building shall preferably be separate from adjacent
building. A signboard bearing the word "PAINT STORAGE - NO NAKED LIGHT -
HIGHLY INFLAMABLE" shall be clearly displayed outside. Manufacturer's
recommendation shall be followed for storage of paint materials.

19.0 COLOUR CODE

The following colour coding system shall be followed. However alternate colour coding may
also be followed as per Owner's colour coding practice/scheme.

19.1 IDENTIFICATION

The system of colour coding consists of a ground colour and secondary colour bands
superimposed over the ground colour. The ground colour identifies the basic nature of the
service and secondary colour band over the ground colour distinguishes the particular service.
The ground colour shall be applied over the entire length of the un-insulated pipes. For
insulated lines ground colour shall be provided as per specified length and interval to identify
the basic nature of service and secondary colour bands to be painted on these specified length
to identify the particular service. Above colour code is applicable for both unit and offsite
pipelines.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL All rights reserved

Page 1738 of 3034