Beruflich Dokumente
Kultur Dokumente
email : singhvishen52@gmail.com
phone no: 9739000498
Faculty Mentor: Mr Kishore
Sriram
Industry Mentor: Mr Mathew
Jacob
(CSM Group Manager)
Top 5 Metro Cities Service Level Strategy implementation for ARS orders.
Objective:
Objective:
Step4 Identification of
Conclusion:
Objective 1 To identify top
micro and macro activities Detailed analysis and
selling apparel category fashion product
department wise with time
period categorization to group
Objective 2 To understand
them under top selling
existing supply chain for product.
y
apparel category Minimization of activities
Ste 5 Suggest re- from supply chain of top
Objective 3 To map the engineered supply chain selling apparel category to
processes from sales review to with short lead time and shorten supply chain lead
season launch its implementation time.
Supply chain lead time
Objective 4 To suggest & y reduction from sales review
implement the design of quick to payment to vendor.
responsive supply chain for the Keywords: Develop and implement
top selling apparel category Supply chain management, Quick quick responsive supply
response supply chain, Supply chain re- chain to meet supply and
engineering, Rate of revenue, Top demand in real time.
selling product
Sridhar.C.S
9742228507
Sridarsridar04@gmail.com
Faculty Mentor: Mr. Thippeswamy , Assistant Professor
Industry Mentor: Mr. Hanumanth Rao, General manager, Arvind
Limited (Life style Apparels) , Mysore road, Bengaluru
TITLE: Competitor Brand Analysis and Merchandise Development for mens wear apparel brand for e-
commerce portals
Objective: Conclusion:
To develop merchandise Data Analysis Merchandise Planning process
plan of mens wear for allows the retail buyer to forecast
AW15 season. with some degree of accuracy
To study the brand & its what to purchase and when to
have it delivered. This will
competitors on E
Findings greatly assist the company in
commerce portals in attaining its sales and gross
terms of product margin goals. A successful retail
offerings, price, size and strategy is to be better in terms of
color. following three key areas:
Price
Suggestions
Service
Product
At the same time, the retail buyer
Keywords: must also remain competitive in
Competitor Analysis, SWOT Analysis, the other two.
Sale Through Analysis, Merchandise
Plan
Student SHUBHANGI
Email:shubhangi09verma@gmail.com
phone no: 8904662714
Faculty Mentor: Ms. ANUPAMA
GUPTA
Industry Mentor: Mr. GAUTAM
KOTAMRAJU, CCO, MYNTRA
Objective:
To identify the trend of best- Step 6
selling category.
Fast Fashion Supply Chain
To do extensive product sales
Model
forecast based on their
attributes.
To accelerate the availability of
trend inspired fast fashion
products by reducing lead time. Keywords: (preferably 5)
To optimize range presentation supply chain management, fast fashion
procedure for denim segment. supply chain, Top Sellers, Best Sellers
Student Name1: Mohammad
Shareef
Student email :
mdshareefymft@gmail.com
Students phone no: 9036324367
Faculty Mentor: : Dr. S. Angammal
Santhi Asso. Prof.
Mr. chandramouli N Asso. Prof.
Industry Mentor: Koushal Narayan
GM, Raymond SSAL-II
PROJECT TITLE
IMPROVE PRODUCTIVITY IN CUTTING SECTION BY METHODS IMPROVEMENT AT
SUIT MANUFACTURING UNIT
Operation standardisation
Background: Research Methodology: Analysis:
Operation standardisation is The new production system is
analysis carried to having a major difference in
standardise the work Step 1: Analysis of PBS. handling of material. In PBS
method of each materials are transferred in bundle
where as in UHS single unit is having
workstation. The present
independent movement. This is
research is focused in the
main area to research the new
assembly operation of shirt changes and development needed
Step 2: Analysis of UHS in
where unit hanging system to material handling. Since it has
assembly
is followed. The new activity there is difference in
manufacturing unit has method adopted by the employee.
produces formal shirt. Thus the operation standardization
Assembly section has nine Step 3: Formulation of is more focused on these materials
operations and in each new method to eliminate handling activity. The root cause
production line there will be the variation in working analysis is made to analyse the
three assembly lines. The method. difference in working method of
new activity by Cycle time analysis
analysis is made to
and Video analysis of each
determine different activity Step 4: Cycle time analysis operation.
adopted in the particular
operation. Since operator Conclusion:
shows affinity to different The quantified result indicates the
ways of completing activity Unit hanging system reduced the
it is necessary to standardise Step 5: Preparing new Operating time as compared with
the working method. Overall Training video for library the Progressive bundle system. This
the cycle time of each and SOP project directly ensures the impact
operation become smaller of UHS in increasing the productivity
and the SMV will reduce of the operator by eliminating the
execs time involved in handling
Step 6: Quantifying and activity. Even though the UHS
Objective: documenting the work
contributed directly in reducing
To standardize hanger
SAM, it is necessary to streamline
usage in the UHS system. other factor like rework, Inventory
To standardise the material management and Line balancing to
handling method. achieve the sustainability in
To reduce the work Keywords: production.
content by eliminating poor UHS, PBS, SMV, Operating time, Cycle
work method. time, Allowances, Machine time.
To establish standard
operation procedure for
UHS system.
Student Name:- S. PRAGATI ANAND
Student email : spragatianand096@gmail.com
Students phone no: 9886195817
Streamlining Of Finishing department through Value Stream Mapping & Facility Layout Design.
Industry Mentor:
Mr. Mohit Bafna
(Consultant C.E.O Gemba Concepts)
Mr. Srinivas
(Factory Manager ,Laguna Clothing)
PROJECT TITLE- IMPLIMENTATION OF PULL SYSTEM IN PARTS SECTION OF SEWING DEPARTMENT OF SHIRT MANUFACTURING USING
UNIT HANDLING SYSTEM
Background: Research Methodology: Analysis:
Garment industries in developing countries are The project is carried out in parts section of a company
more focused on sourcing of raw material and where the parts section was following PBS system
minimizing delivery cost than labor productivity Literature study and Problem because of that the company was holding average WIP
because of the availability of cheap labor. Due to of 5300 approx. pieces for sections like Ready for
this, labor productivity is lower in developing
Identification phase
Loading, Matching and Parts Sewing Section, for which
countries than in the developed ones. Similarly, the company was investing apt 26 lakhs and had a lead
the cost of fabric is a major part of the garment so time of 2 days for that WIP. The total WIP of the
there seems to be great need for improvement in company was approximately 10635 pcs where as my
this sector. Even in developing countries the CAD area of concerns are three areas matching parts WIP and
and CAM system for fabric cutting has been ready for loading. Therefore these areas had the WIP
implemented to save fabric. Now the worry is Design and Development of 800, 3000, 1500 pcs as per the past data.
about labor productivity and making production UHS system To achieve lower WIP which may lead to lower lead
flexible; because the fashion industry is highly time, higher flexibility, reduced cost increasing
volatile and if the orders are not fulfilled on time, productivity, and by reducing rework the UHS has been
the fear for losing business is real. implemented in sewing line of Parts Section. The
Even today, industries are getting the same or more company has invested 10.8 lakhs to implement UHS.
volumes (orders), but the number of styles they The lead time of parts section was 1 day to finish 1500
have to handle has increased drastically. Earlier pieces but due to excess WIP it was taking 2 days to
industries were getting bulk order so there is no
Installation and finish 3000 pieces with WIP. As per the historical data
need to worry; if the production line was set for the Implementation of UHS when the line was following PBS, it was holding average
first time it would run for a month or at least a WIP of 2999.5 for which it was taking nearly 2 days of
week or two. But nowadays due to small order lead time.
quantities and complex designs, the garment After implementation training given to operators and
industry has to produce multiple style. even done time study. The Kanban which is one of the lean
within a day; this needs higher flexibility in tool was used to design Kanban for parts section for
volume and style change over. Industries have Trouble Shooting And loading from cutting to sewing of various parts of shirts
been running in a traditional way for years and are Problem Solving in order to maintain pull type.
rigid to change. Now the time has come to struggle The cycle time of each operation in front, back and
with global market demand and niche market in sleeve section have been taken for traditional system as
garment industries if they want to run it further. well as UHS. In UHS the cycle time of some operations
The best way to cope with all these challenges is has been reduced as compared to PBS. Where as in PBS
the implementation of lean manufacturing. This due to material handling the non-value added activity
will serve our purpose of flexibility and save a was higher so, in UHS the non-value added activities has
lot of money by reducing production lead time, Result Analysis And been reduced therefore the cycle time of some operations
reducing the inventory, increasing productivity, Standerdization reduced such as in back section cycle time of all the
and by reducing rework. operations been reduced
Objective: As well as this implementation lead to reduction many
Primary objective: trolleys and racks as its a overhead material handling
Implementation of pull system in parts section of system which lead to high profit to company.
sewing department using unit handling system. Conclusion: After the implementation of UHS. where
Secondary objective: overall WIP for Matching is same , 70% Reduction In
(i) To minimize the work in process Parts , 64% In Ready For Loading .The Investment for
inventory WIP was also reduced by 74.9 % and 30% of lead time
(ii) To implement and standardize process also reduced from 6.9 days to 4.9 days. The 22 trolleys
for Hanger system in parts from and 8 racks are eliminated due to UHS and saved the
Keywords:
cutting to sewing Dept. cost. The cycle time of operations been reduced by 15
(iii) To set SOP and Train operators for UHS- Unit hanger system, Lean 25%. The value stream mapping depicts that the value
the new system Manufacturing, Kanban , added time has been increased from 49% to 63% , non-
(iv) To meet customer demand on time by Progressive Bundle System , Unit value added time has been reduced from 9% to 3% and
eliminating non value added work Production System , WIP , Lead required value added time been 42% to 35% for small
from the process Time . parts.
Student Name:- MESERET ARGAW
Student email : emilove2008@gmail.com
Students phone no: 8553452076
Process Re-Engineering Of Warehouse, Cutting And CAD Department To Optimize Fabric Utilization By
Identifying And Implementing Cad Software
Keywords:
SMED: Style changeover time: Lean
tools: internal and external elements:
Student Name: Divya Bansal
Student email:
divyabansal15@gmail.com
Students phone no: 9980340630
Keywords: (preferably 5)
Fit, Vest, Product development,
analysis, survey
Student :DEEPTI PASSI.
e-mail : deeptipassi90@gmail.com
Students phone no: 9036433736
Faculty Mentor: Mr. Kishore Chandra
Industry Mentor: Mr. Sudheer (category Head)
Developing Online Vendor Evaluation Portal with New Criteria For Buying House.
Objective:
1. Developing Vendor
Evaluation online portal with
new criteria.
6
The intelligence of 4
the tracking system 2
enhances the 0
situation handling Schedule/
on-floor. Questionnaire
A Gap-Analysis of to the Management,
the tracking
Technical experts and
systems helps in Parameters
understanding the Industrial engineers
The major variation in the expectation and satisfaction is
gaps, a technology more in the Comprehensive Dashboards, followed by
bridge is an Business Intelligent Reports. The up gradation of the
absolute necessity reporting paves way to the intelligence of the tracking
to make an systems.
intelligent tracking Gap- analysis of the
system. tracking systems % variation
40%
importance vs satisfaction
30% 32%
27%
Understand the Gaps in 20% 22%
19%
Variation%
Mr. Arivoli N.
(Assistant Professor)
Objective:
Keywords: (preferably 5)
Keywords: QA system, Customer
Returns, Distribution,Defects
Student Name: Zenawi Haile
Studentemail
:hailezenawi.13@gmail.com
Students phone no:
+251913564425/9880307541
Faculty Mentor:
Ms. Subhalakshmi Kropi Bhuyan
Industry Mentor: Mr. Sium
Tekleab, Garment technology
directorate director.
Identifying the major constraints for low Productivity and Capacity utilization in
medium and large scale apparel industry of Ethiopia (Export)
Analysis:
Background: Research Methodology: Data has been analyzed by using SPSS
Garment industry is one of the and hence Labour productivity level
industries that have a potential of medium scale, large scale and
in developing an economy such Design Questionnaire and national level was 10, 8 and
as Ethiopia. History depicts that Selection of companies 8pcs/shift/operator respectively. The
this industry sector has been a efficiency level of the sector is
base for many successful 41.34%. Scarcity of manpower has
industrial developments and been the most critical cause for lower
Ethiopian government is productivity of the sector. Inadequate
Site survey and Collection of data
apparently placing special level of multi-skill operator, Line
emphasis on the garment balancing and method improvement
industry and striving to realize problem are the second and third
the growth and transformation serious causes for low productivity of
plan to enhance the the sector respectively.
contribution to the growth of Analyzing data (SPSS) and
the manufacturing sector. It is founded that the Ethiopian export
comparing with Global standard apparel sector is running at a capacity
Though the sector has a huge
potential for developing an of 49.66%.
economy, the performance and Shortage of manpower, product mix,
global competition level of the raw material shortage and lack of
sector is unsatisfactory due to Identifying and categorizing of market were the major factors for low
low productivity and capacity major factors (Internal Vs External capacity utilization of Ethiopian
utilization in the sector export apparel sector.
IMPLEMENTATION OF QUICK CHANGE OVER AND REDUCTION OF CHANGE OVER TIME USING SMED
TECHNIQUE
Objective: Conclusion:
Reduce Change over time by
To implement the quick change SMED Technique & Compare
over Process with the Supplier change over time of styles Quick change over concept is been
implemented with the supplier and
To reduce the style change the time taken for each change over
over time using SMED is been highly reduced and the peak
Technology is achieved within a period of 5 days
Keywords:
earlier being 10 days and the
To format a standardised SMED, Internal activities, External activities efficiency is being improved to 54 %
action plan for style change
from an average of 40 45 %.
over
Student Name :- Tina Dhingra
Tinadhingra22@gmail.com
9176933091/9739599917
Faculty Mentor: Mr. T
MuruganAssistant Professor, DFT
Industry Mentor: Mr.Ashok,
Global I.E.D Head, Aquarelle
India Pvt. Ltd Bangalore-560105
This paper addresses the Step 1 Indentify the family The current process flow
application of Value Stream of the product that need takes more time for
Mapping as one of the Lean tool to be mapped delivering the product.
to eliminate waste, and improved
operational procedures and Decrease in Productivity
productivity.The study reveals due to increase in process
that there is an improvement in Step 2 Define the scope of
lead time.
Implementation
the lead time by implementing the
proposed changes if incorporated Problems are identified in
in the future state map. industry in terms of non
value adding activities.
Value Stream Mapping (VSM) is Step 3 Draw the current
Value Stream Mapping
a World Class Manufacturing tool Excessive movements
that can be used to minimise (CVSM)
and handlings allow
waste inmanufacturing. damage and lead to
Companies are experiencing reduction in quality.
intense competitive pressure due Step 4 Analysis
to globalisation hence they &suggested opportunities Different types of
cannotafford to operate with of improvement
wastage increasing the
waste in their processes inventory between the
process
Objective: Step 5 Draw the future
Value Stream Mapping
To investigate how VSM (FVSM)
can be used in the factory Conclusion:-
to see the flow of working
values and relate it with
Step 6Comparison CVSM Lean Time reduction in cutting
room of improvement.
& FVSM and Conclusion section by implementation of
suggested kaizen & new layout
To investigate the
effectiveness of proposed for finishing
implementing value department for reducing the
stream map as a tool for Keywords: CVSM, FVSM, different types of lean wastage.
lean manufacturing. TIMWOOD, Lean and World
class manufacturing
To Indentify
TIMWOOD& proposed
Kaizen
Student Name: Srishti Rathore
Student email : srishtirathore@yahoo.co.in
Students phone no:+91-8056046661
Faculty Mentor: Mr. T. Murugan
Assistant Professor,
DFT, NIFT Chennai
Industry Mentor: Dr. Ravinder Tuteja,
AGM, TRADC
Srishti Rathore,
M.F.Tech,NIFT,Chennai, 16.4.2015
StudentName:SonikaDevi
Studentemail:sphogat47@gmail.com,
Student's phone no: 09176373018
Faculty Mentor: Dr. Divya Satyan,
Associate Professor &CC -MFT
Industry Mentor: Mr. Aniket Keshi,
Sr. Category Manager, Myntra.com
PROJECT TITLE : To increase the business contribution of Mens Casual wear category at
Myntra.com
Keywords:
1. Increase in sales
2. Customer Satisfaction
3. Product Visibility
4. Brand Marketing
5. Virtual shopping
Student Name:Neenu.C
Student emai :
neenuchithra@gmail.com
Students phone no:9176933882
To provide competitive
edge in domestic
market by creating a
finish different from
other brands. Keywords: Competitor Analysis,
Exhaust Method, Dip Method,
Wrinkle Recovery and Abrasion
resistance
Student Rahul Badiger
Student email: badigerrahul9@gmail.com
Students phone no: 08754549137
Faculty Mentor:Mrs.M.Padmapriya,
Assistant Professor - DFT
Industry Mentor:Mr.C.Sivakumar
Executive (R&D)
Intimate Fashions Pvt ltd -Chennai
BOBBIN THREAD DEPLETION DETECTION SYSTEM
Conclusion:
The defects has been
reduced which occurs due to
bobbin thread depletion and the
operator has a knowledge about
Keywords: the amount of thread in the
Bobbin,sensor,controller,detection,program bobbin so that he has clear idea
how much he/she can stitch in
order to avoid the defects.
Student Dhruv Kumar Brahmbhatt
Email :dhruv.v.24@gmail.com
Phone no:09601727894
Faculty Mentor:
Amit Kumar Anjanee,
(Assistant Professor, DFT)
Industry Mentor:
Shalu Sharma
(Retail Planner)
Arvind Lifestyle Brand Ltd.
Faculty Mentor:
Ms. Riju Jakhar
Industry Mentor:
Mr.ManishVerma, Category
Manager, Shoppers-stop
EFFECT OF STORE IMAGE ON CONSUMERS: AN INDIAN CONTEXT
Faculty Mentor:
Prof.Dr. NoopurAnand
Industry Mentor
Faculty Mentor:
Prof. (Dr.) Suhail Anwar
Industry Mentor:
Mr. Neeraj Rana
(Principal Consultant, Threadsol)
A study on Tracking System available in garment industry
Background: Research Methodology: Analysis:
Rising competitiveness in Garment manufacturers are using
Garment Industry has resulted in Literature Review of production mainly Barcode, RFID and Smart
tracking and different
manufacturers adopting new technologies being used. Button technologies for production
techniques to increase tracking. RFID has advantages over
productivity of factories thus aforesaid technologies and has high
helping them to stay ahead in acceptance in garment industry.
business. Garment tracking helps SWOT Analysis of commonly used However the most common concern
in increasing efficiency by giving tracking technologies while implementing a production
real-time data of the production tracking system is its huge Initial
floor thereby reducing problems investment. In addition to the cost,
of shrinkage, high rate of garment manufacturers are not
defects, operator under completely satisfied with the
Visit garment manufacturers to
performance, which are often current tracking solutions available
study different tracking systems being
encountered. A monitoring and are looking for a completely
used.
system helps in solving these wireless solution. The main reason
problems by tracking the inflow for choosing a wireless network over
and outflow of the production wired, for data transmission from
process. By bridging the gap Conduct survey to study the trend entry points, is that wireless
between production floor and of tracking technology in industry network saves huge time and effort
management, a tracking solution while implementing a solution in
that is based on Barcode, Radio factory. Moreover making a system
Frequency Identification or wireless helps in reducing
Smart Buttons helps in smooth complexity on production floor. It is
Identify problem of garment
flow of information in the found that Zigbee is a cost-effective
tracking products used in industry.
organization. However the wireless technology that can be
tracking products available have used with RFID for tracking purposes
their fair share of pros and cons. in garment industry.
Formulation of Technology Index
Objective: for Garment Tracking Conclusion:
To identify problem of 1- The existing tracking solutions
tracking system used in are not completely error-proof
and they need modifications on
garment industry various parameters.
To formulate Suggest a feasible tracking
technology that can be used for
Technology Index for production tracking 2- Zigbee working in conjunction
with RFID in the form of Zigbee
garment tracking
enabled RFID readers can prove
To identify feasible Keywords: to be effective on various points
tracking technology for Tracking, Real-time monitoring, RFID, including initial investment
garment industry. Cost, Zigbee incurred and making the system
completely wireless.
Sumit Kumar
Student email:
sumit.suresh@live.com
Students phone no: +919971058028
Mr. Sunil Motwani- Assistant
Professor
Mr. Digvijay Pandey
ABC Pvt. Ltd.
Infocity, Gurgaon
To develop merchandise plan (Womens wear) for AW15 of ABC Ltd. brand for an e-commerce
portal.
Over the last two decades, Past sales data analysis is done in
rising internet and mobile Step 1 detail for better clarity of AW15
phone penetration has Competitor Analysis Merchandise plan. The consumer
survey reveals about what consumer
changed the way we
want. Merchandise planning for e-
communicate and do commerce portal should be done in
business.Sale on E-commerce detail incorporating key components
sites is growing every year as Step 2 of various product categories.
internet and smart phone are
Sales Data Analysis The findings of this research can be
growing.
The merchandise planning used as key inputs in deciding the
plays a critical role in e-retail as merchandise plan.
the competitor brands are only
a click away. The aim of the Step 3
project is to develop a Consumer Survey&
merchandise plan for womens Analysis
wear which is based on
consumer preference and sale
history.
Conclusion:
Step 4
Findings & Suggestions
The consumer preferences largely
Objective:
1. To develop merchandise affect the sales. By carefully
plan of women wear for planning the merchandise
autumn winter15 season. assortment according to consumer
Step 5 needs, sales can be significantly
2. To offer customer centric Merchandise Plan increased.Merchandise plan for e-
products to the market. commerce portal has been
developed on the basis of detailed
3. To develop a merchandise analysis of merchandise at various
plan for womenwear for e an Keywords: points thereby increasing sales
e-commerce portal. Keywords: Sale Through, Merchandise through and also profitability.
Plan
AMAN THARWAN
amantharwan@gmail.com
09555512757
Faculty Mentor:
Dr.SuruchiMittar
Industry Mentor:
Mr. Koshal Bajaj
Vendor evaluation for a Buying house for XYZ Brand Using Analytical Hierarchy Process
The existing Vendor Qualitative /Observational The data collected through was
Evaluation Methods are based research through In-Depth analyzed using Analytical
Interviews has been undertaken Hierarchical Process (AHP). Using
on a simplistic approach Indian
this tool evaluation matrix was
apparel Industry. created to provide ranking on the
basis of reality.AHP Method
For interviews a combination of provided inter-dependency of
It is widely accepted that many
open and close ended questions parameters and analyzed during
of the parameters considered vendor evaluation. An initial
were used
in the evaluation methods have comparison with the conventional
evaluation method and analysis of
a high level of inter-
the above results throws up some
dependency. But this inter- interesting observations.
Ready to use documents
dependency is never available with theorganization
For instance, vendor J still retains
quantified, represented and were used.
the top positionin the evaluation
analyzed during vendor ranking but the second position
evaluation.The AHP method here is of vendor M. This vendor
For external research Internet has been consistently accorded a
addresses this particular issue.
website & published books were much lower ranking (4 instead of 2)
referred to in the conventional evaluation
Objective: method. Similarly, vendor N who
has consistently secured second
To evaluate various position in the conventional
Dataanalysis was done by evaluation method, now is in the
vendors for better forth position.On further
using AHP
sourcing. investigation of these results, the
To provide a well reasons for this divergence become
evident. The hierarchical
defined framework for comparative model has revealed
vendor evaluation using Suggestions and certain dependencies that were
implementations
AHP process. being ignored earlier.
Conclusion:
Keywords:
The results show considerable
AHP (Analytical Hierarchy Process), divergence from the conventional
Vendor Evaluation metrics. The current metrics
seem to be more in line with the
ground realities and hence more
relevant to the vendor evaluation
exercise.
Amrita Som
amrita.som@nift.ac.in
Faculty Mentor: Ms. GirijaJha
Industry Mentor: Mr. Rahul Trivedi, Merchandiser, Triburg
Faculty Mentor:
Dr. Archana Gandhi
Industry Mentor:
Ms. Mahak Sehgal,
Merchandiser, Inditex.
PROJECT TITLE- Vendor Selection, Evaluation and Development for Home Furnishing Department of a Spanish Retailers
Sourcing Office.
Background: Research Methodology: Analysis:
Indian apparel producers are To identifylevel of CSR maturity of The maturity level of XYZ firm is Compliance
the firm and its peers seeking
crucial part of global supply chain
(Through secondary analysis where
claiming to be Industry stalwarts, available else in depth interview of the CSR activities in the XYZ firm are at differential
however not much of information CSR implementers in depth interview) maturity level
on their CSR activities is known by
general public.Consumer Employees are often not aware about their
perception of CSR is different from companies CSR policies and activities
To understand stakeholders CSR
suppliers or manufacturersbecause expectation from the firm Employee perception on Benefits of CSR are
later have to deal with the day to (Data collection from multiple
limited to better employee turnover,
day activities of production. stakeholders, convenience sampling
companies reputation, reduced absenteeism
to be used for data collection)
and enhanced companies presence
Further the incentives and motives
of manufacturers in pursuing CSR Perceived obstacles towards investing in CSR
and complyingwithbuyers dictated activities include hectic production schedule,
Objective 3
codes of conduct are different from To identify CSR activities, which risky market conditions, lack of awareness
are in alignment with CSR maturity and management priorities
those of apparel brands. This is level of the firm,
further complicated by the control stakeholdersexpectation
Conclusion:
and audit mechanism adopted by
brands to enforce these standards. There exist substantial gap between
envisioned and implemented CSR.Initially
Intentions of manufacturers in activities on which companies are at low
implementing those are different maturity level should be addressed
from which are prerequisite for Formulation of specific CSR
strategy (using Carroll model) for XYZ firm has CSR potential and hence is at a
existing CSR strategies to have any
apparel manufacturing firm stage where it can move forward to reap
desirable impact creating need for
benefits. Communication of CSR policies to
different and custom CSR employees is a prerequisite for a firm to reach
strategies for apparel Keywords: a stage conducive for CSR activities
manufacturers which would have
alignment with their business goals. Custom CSR strategy, incentives for Creating awareness about benefits of CSR
apparel manufacturers, stakeholders amongststakeholders and orienting
Oobjective: expectations, CSR expectations, management towards significance of CSR and
CSR maturity level of apparel firms CSR strategy is critical.
To develop CSR strategy for XYZ
apparel manufacturing firm. The project helps in clearly outlining the
steps, which can be taken by any apparel
manufacturing firm for devising its CSR
strategy, which would be in alignment with
its business goals and stakeholders
expectations.
Gajendra Kumar
:gajendra.kumar@nift.ac.in
Students phone no:
0958225570
Faculty Mentor:
Ms Bhawna kapoor verma
Industry Mentor:
Ms Devyani Bains
Senior quality manager, orient
craft
Productivity & Efficiency Improvement through the implementation of Real time data monitoring
system (RFID) in Trouser sewing lines at Classical Mens Wear, Madura Clothing.
Analysis:
Find out the low performing operators and
bottleneck operations in each line for system and
production both.
Student Name: Arpit Shahji
Student email : arpit.shahji@yahoo.in
Students phone no: +91760024360
Faculty Mentor: Ms.Aarti Solanki,
Associate Professor.
Faculty Mentor:
Dr. Amar Tewari,
Associate Professor.
Industry Mentor:
Mr. Chandra Kant Sharma,
Direcot, Vaishali Fashion
To develop B2C framework for Ecommerce
Objective:
To develop an online shopping Conclusion:
framework of Vaishali Fashions.
Understanding the e commerce A research was done to find which e
business model of other factor is best for our e commerce
organization
and how to use it to make a
successful e commerce B2C model.
Primary research/Development
/Implementation.
Key Words :
E Commerce, Online Shopping,
A framework for B2C model,
AHP analysis.
Student Name : Khushboo
Parashar
Student email :
Parasharkhushboo24@gmail.com
Students phone no:9414785173
Faculty Mentor:
Ms. Amisha Mehta,
Associate Professor.
Industry Mentor:
Mr. Riyaz uddin,
Category manager,
Black Berry.
Measure follow for Improvement in OTIF(on time in full) in each department
Keywords:
Self-inspection, Right first time,
Rework, Rejection & Cost of
Quality.
Student: Nabin Biswakarma
Email ID:
nabin.biswakarma@gmail.com
Phone no:9624258498
Faculty Mentor: Mrs. Ettishri Rajput,
Assistant Professor.
Industry Mentor:
Mr. Ujjwal Khamaru ,
Future Retail, Mumbai
PRODUCTIVITY IMPROVEMENT IN MENS DENIM BY VENDOR EVALUATION AND STREAMLINING THE
PRODUCTION.
prevent non value added Keywords : Lean management, Kanban production were controlled.
activities and standardize inventory, Just-in-Time philosophy, Work In The Percentage of pieces
to stock out.
Implementation of these
Step 5
plan as SOP in the
Implementation of Merchandise
company. and Replenishment Plan
Keywords:
Merchandise Plan, Replenishment Plan,
Forecasting, Re-Order Point, Safety
Stock, Stock Out
Student Name: SONAM PIRANI
Sonam_pirani@yahoo.in
9033513305
Industry Mentor :
Mr. Keshav Murthy
Arvind Ltd.,Life style apparel,
Knits Divison,
Industry Mentor:
Ms.Shweta Agarwal,
Senior Manager,
Zovi.com
guideline available for According to AATCC Fabric Ply 2 Ply 3 Ply 4 Ply 2 Ply 3 Ply 4 Ply
polyester 3 3.5 5 4 4.5 4.875
different fabric and seam
puckering scale, decide viscose chiffon 4.5 4.5 4.5 4.5 4.5 4.625
Develop business strategy for apparel software product across different geographical region
Background: Research Methodology: Analysis:
Forces that shape and influence the Develop the ranking of countries From 125 countries across the
industry or market the organisation (on net exports) world 10 countries were
operates in. selected.
Strength of Barriers to Entry - how The 10 countries (based on net exports
easy is it for new rivals to enter the and other parameters) are finally
industry, Supplier power the evaluated.
greater the power, the less control Identifying the garment industry .
Scope of entering into the market And then out of seven strategies
the organisation has on the supply
BCG matrix is chosen to draw
of its inputs, Buyer powerhow
out 4 strategies for business
much power do customers in the
industry possess, Threat from expansion
substituteswhat alternative Analyzing the parameters related
The strategy is applied in 4 corners as
products and services are there. to zones by research.
Internal Records and Marketing
Intelligence-Profound shifts in
centres of economic activity,
increases in public-sector activity, Complete analysis of the market &
change in consumer landscape, ways of capture
technological connectivity. Business
expansion that is self-generated.
This is mainly done through
increases in marketing & sales of Conclusion:
current product, evaluating net Comparative evaluation of 7
strategies Driving strategies for business
exports, exporting goods to foreign
by applying BCG matrix.
countries, and franchising. This is a
relatively low risk method of 5% of the profit sharing = 6480
business expansion. USD
Objective: Listing strategies based on BCG 194,400 is the revenue
matrix. generated from 10 countries
Deducing various strategies
for geographical regions (with almost negligible
necessary for business investment)
expansion. Giving a clear vision as to how
Improvement in profit & sales. Developing four strategies out for to enter into a market.
Listing out Countries to start the expansion Identification of various regions
expansion. (10 countries) for selling of
More security available in product.
diversifying into development Keywords: Providing simple yet necessary
of other products Self actualisation, BCS matrix, Net changes for better running in
Better ability to spread the risk exports, Business expansion, particular regions.
across the different products. Strategic Alliance, Cash cows Creating need for the strategies
Marketing Intelligence
and measures to sustain so.