Sie sind auf Seite 1von 3

Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
WYO SAUDI ARABIAN OIL COMPANY
DIVISION 3 - CONCRETE
NAD

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 03100 - CONCRETE FORMWORK
ENGG CERT
KA
ALL

PART 1 - GENERAL

1.01 DESCRIPTION:
ISSUED FOR CONSTRUCTION

Description of Work: Work includes formwork for concrete work and


DESCRIPTION

installation of items in formwork, such as anchor bolts, setting plates, bearing


plates, anchorages, inserts, frames, sleeves, nosings and other items to be
embedded in concrete.

1.02 DESIGN:
Design of formwork is the responsibility of the Contractor. Conform to ACI
347R. When designing forms for long spans where intermediate supports are
not possible, figure anticipated form deflection due to weight of fresh concrete.
JO/EWO

1.03 REFERENCES:
34070

A. SAES-Q-001 Criteria for Design and Construction of Concrete Structures.


DATE

07-02

B. ACI-347R Guide to Formwork for Concrete


NO.
REV

00

DISCIPLINE C. ACI-301 Specifications for Structural Concrete for Building.


ENGINEER
ALL
07-02
DATE:
PROJECT
ENGINEER
PART 2 - PRODUCTS
KHURSHID, A.
07-02
DATE:
CERTIFIED 2.01 MATERIALS:
KHURSHID, A.

DATE:
07-02 A. Plywood Forms: APA grade-trademarked, USPS PS 1, B-B Plyform,
CONSTRUCTION Exterior Type, Class I, sealed edges, mill oiled and not less than 15 mm
AGENCY
N.A. AL-DAWOOD
thick.
07-02
DATE:
OPERATIONS
B. Lumber Forms: Sound lumber of uniform thickness, dressed, tongue
and grooved, free from loose knots and of such moisture content as to
W.Y. OSAILAN
prevent free absorption of moisture.
07-02
DATE:

C. Chamfer Strips: Shall be placed at all edges and corners of beams and
CONTROL NUMBER
VERIFICATION

pedestals which will be exposed in the finished work even though not
EDSD

indicated on the drawings.


DATE:

D. Metal Forms: Type subject to SAUDI ARAMCO Representative's


BY:

approval.
APPROVAL/CERTIFICATION REQUIREMENTS,

750300-JO-2001-34070-001
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

E. Form Oil: Non-staining type which will allow field applied paints to
(DCC) NO. _____________________

adhere to concrete surfaces without failing.

CONSTRUCTION SPECIFICATIONS (SEC.03100) DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
DOC 1
FIRE TRAINING CENTER
M57 A A RE-3407SP 00
OF
JUAYMAH SAUDI ARABIA JO / EWO: 34070 3
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
WYO SAUDI ARABIAN OIL COMPANY
F. Form Sealer: Type subject to SAUDI ARAMCO Representative's approval.
NAD

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
G. Form Accessories: Form ties, anchors and hangers of sufficient
ENGG CERT
KA

strength to completely resist displacement of forms due to construction


loads and depositing of concrete. Provide tie and spreader type form
ALL

ties designed so that no metal will be within 25 mm of any surface when


forms are removed. Where concrete surfaces are exposed to view, do
not use form ties which, when removed, will leave a depression larger
than 25 mm in diameter. Use water seal ties in concrete exposed to
hydrostatic pressure.
ISSUED FOR CONSTRUCTION

H. Screed Chairs: Metal; wood not permitted.


DESCRIPTION

PART 3 - EXECUTION

3.01 PREPARATORY WORK:

Just before any concrete is poured, forms shall be thoroughly cleaned of all
sticks, boards, loose rocks, sand or other debris, and wetted down with clean
water to the satisfaction of the Saudi Aramco Representative. In tall narrow
JO/EWO
34070

forms "window" shall be provided on the bottom for cleaning out the forms.
DATE

3.02 ERECTION:
07-02

A. General: Except as otherwise specified or indicated on the Drawings,


NO.
REV

00

DISCIPLINE
place all concrete in temporary forms.
ENGINEER

07-02
ALL
B. Location
DATE:
PROJECT
ENGINEER 1. Plywood Forms: Erect plywood forms at surfaces exposed to
KHURSHID, A. view and elsewhere unless directed by SAUDI ARAMCO
DATE:
07-02
Representative at Contractor's option.
CERTIFIED
KHURSHID, A.
2. Lumber Forms: Use only at surfaces not exposed to view.
07-02
DATE:
CONSTRUCTION
AGENCY 3. Metal Forms: Location subject to SAUDI ARAMCO Representative's
N.A. AL-DAWOOD approval.
07-02
DATE:
OPERATIONS
W.Y. OSAILAN C. Construction
07-02
DATE:
1. Forms shall conform to the shape, lines and dimensions of the
CONTROL NUMBER
VERIFICATION

members as shown on the drawings, and shall be substantial and


sufficiently tight to prevent leakage of mortar. Material for exposed
EDSD

surfaces shall be surfaced boards, plywood or material previously


DATE:

approved by the Engineer. Forms shall be properly braced or tied


BY:

together by standard accessories, so as to maintain position and


APPROVAL/CERTIFICATION REQUIREMENTS,

shape during placing and curing of concrete. Chamfer strips shall be


750300-JO-2001-34070-001
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

placed at all edges and corners of beams and columns which will be
(DCC) NO. _____________________

exposed in the finished work, even though not indicated on


drawings. Wall forms shall be built in lifts of sufficient height to
CONSTRUCTION SPECIFICATIONS (SEC.03100) DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
DOC 2
FIRE TRAINING CENTER
M57 A A RE-3407SP 00
OF
JUAYMAH SAUDI ARABIA JO / EWO: 34070 3
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
WYO SAUDI ARABIAN OIL COMPANY
accommodate only one continuous pour. Falsework to support
forms shall have sufficient strength to carry the load without
NAD

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
deformation or settlement.
ENGG CERT
KA

2. Inserts, Anchors and Sleeves: Install all inserts, anchors and sleeves
including those required and furnished by other trades. All inserts,
ALL

anchors, sleeves to be coated as per SAES-Q-001, para. 6.

3. Screeds: Set screeds to proper elevations to facilitate placement of


concrete.
ISSUED FOR CONSTRUCTION

3.03 REMOVAL:
DESCRIPTION

Removal of forms is subject to SAUDI ARAMCO Representative's approval.

3.04 TOLERANCES:

Unless otherwise indicated on the Drawings, erect formwork to the tolerances


specified in ACI 347 and ACI-301, Chapter 2.

End of Section
JO/EWO
34070
DATE

07-02
NO.
REV

00

DISCIPLINE
ENGINEER
ALL
07-02
DATE:
PROJECT
ENGINEER
KHURSHID, A.
07-02
DATE:
CERTIFIED
KHURSHID, A.

07-02
DATE:
CONSTRUCTION
AGENCY
N.A. AL-DAWOOD

07-02
DATE:
OPERATIONS
W.Y. OSAILAN

07-02
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

750300-JO-2001-34070-001
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

(DCC) NO. _____________________

CONSTRUCTION SPECIFICATIONS (SEC.03100) DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
DOC 3
FIRE TRAINING CENTER
M57 A A RE-3407SP 00
OF
JUAYMAH SAUDI ARABIA JO / EWO: 34070 3
EDSD/2616-0399.doc

Das könnte Ihnen auch gefallen