Sie sind auf Seite 1von 42

Date

S/N Location

1 LOYANG WAY

2 MAIN BUILDING
3 NEW ROAD

4 MAIN BUILDING
Prepared by RTO Representative:
Remark: Photo attached (1 page )

Photos taken on:

RD259 PROPOSED BUS DEPOT AT LO

ON-GOING PCN KERB CASTING BES


RD259 PROPOSED BUS DEPOT AT LO

ON-GOING FORMWORKS PRIOR TO C


DRIVE 3
RD276 Appoin

20 JUNE 2015 SATURDAY

Chainage
RTO Representative:
RD276 Appoin

to attached (1 page )

20 JUNE 2015 SATURDAY

OSED BUS DEPOT AT LOYANG

CN KERB CASTING BESIDES GUARDHOUSE 2


OSED BUS DEPOT AT LOYANG

ORMWORKS PRIOR TO CASTING OF RIGID PAVEMENT AT


C & V ENGINEER
Project Consultant Engineers G
Maxwell House, # 09-04/05. 20, Ma
Tel: 62260828 Fa
Email : cveng0904@gmail.com

RD276 Appointment of Qualified Person ( Sup


DAILY SITE

Nature of works

ON-GOING PCN KERB CASTING BESIDES


GUARDHOUSE 2

ON-GOING CCTV PIPE INSTALLATION BESIDES


GUARDHOUSE 2
ON-GOING FORMWORKS PRIOR TO CASTING
OF RIGID PAVEMENT AT PASIR RIS DRIVE 3

ON-GOING INSTALLATION OF SECURITY


FENCING BESIDES MAIN BUIDING AREA
ALFREDO JR. ARIOS CLARO
(Name & signature)
C & V ENGINEER
Project Consultant Engineers G
Maxwell House, # 09-04/05. 20, Ma
Tel: 62260828 Fa
Email : cveng0904@gmail.com

RD276 Appointment of Qualified Person ( Sup

DHOUSE 2
RIGID PAVEMENT AT PASIR RIS
NEERING PTE LTD
ngineers GST. Reg. No. 198202518K
/05. 20, Maxwell Road, Singapore 069113
2260828 Fax: 62225645
gmail.com Website : www.cvconslt.com

on ( Supervision) For Proposed Bus Depot at Loy


AILY SITE REPORT

Time (Hrs) Weather 8-12AM

0800-1800 Condition 1-6PM

RE

0800-1800 RTO

Total
0800-1900

VISITOR AT SITE:

0800-1800

SITE MEETING (IF ANY)

HTC MANPOWER
Project Manager 1

Project Coordinator -

Const. Manager 1

Project Engineer 1

Planning Engineer 1

Architect

Consultant

QECP

Site Supervisor 5

Rigger Signalman 3
Checked by RE
NEERING PTE LTD
ngineers GST. Reg. No. 198202518K
/05. 20, Maxwell Road, Singapore 069113
2260828 Fax: 62225645
gmail.com Website : www.cvconslt.com

on ( Supervision) For Proposed Bus Depot at Loy

RD259 PROP

ON-GOING C
RD259 PROP

ON-GOING IN
AREA
SS ISO 9001:2008
500171

at Loyang

Fine Drizzle Rain

Fine FINE Rain


WSHO 2

ECO 1

Safety Supervisor 2

Quantity Surveyor 1

SPRO 1

Surveyor 0

Tipper Truck Operator 0

Excavator Operator 5

General Worker 174


TOTAL 198

by RE Representative: TAN SHYH MI


(Name & sign
SS ISO 9001:2008
500171

at Loyang

PROPOSED BUS DEPOT AT LOYANG

OING CCTV PIPE INSTALLATION BESIDES GUARDHOUSE


PROPOSED BUS DEPOT AT LOYANG

OING INSTALLATION OF SECURITY FENCING BESIDES MA


ISO 9001:2008 Certificate No: FS
500171

Remarks

3
HTC MACHINERIES
EXCAVATOR 5

GENERATOR 5

ROLLER (1&10
1
TONS)

CRAWLER CRANE 1

SCISSOR LIFT 5

MOBILE CRANE
1
OPERATOR

FORKLIFT 7

BOBCAT 1

TOTAL 26
TAN SHYH MIN
(Name & signature)
ISO 9001:2008 Certificate No: FS
500171

ES GUARDHOUSE 2
CING BESIDES MAIN BUIDING