Beruflich Dokumente
Kultur Dokumente
TPI
Mill/Constr.
defects
22.50
23.00
23.50
24.00
24.50
25.00
25.50
26.00
26.50
T
i
m 27.00
e
( 27.50
s
) 28.00
Landslid
28.50
29.00
29.50
30.00
30.50
31.00
31.50
e
32.00
32.50
Corrosion
Corrosion damage
Photo
Measurement of corrosion
using light/laser scanning
Digital reproduction
(3D point cloud)
Calculation of stress
distribution in surface
using FEM
Pipeline Operation and Maintenance | 10.4.2014
Direct (Defect) Assessment Methods 78
Bending
Corrosion feature
assessment
Buckling
Crack assessment
Pipeline Operation and Maintenance | 10.4.2014
Direct (Defect) Assessment Methods 79
Micrograph at
surface
Pipeline Operation and Maintenance | 10.4.2014
Direct (Defect) Assessment Methods 80
Vibrations
Strain
Temperature-induced stress
winter
Vergleichsdehnung (m/m)
summer
100
200
300
400
500
600
700
800
900
1000
0
03.02.1999
24.02.1999
17.03.1999
07.04.1999
28.04.1999
19.05.1999
09.06.1999
30.06.1999
21.07.1999
11.08.1999
01.09.1999
Temp.(C)
22.09.1999
Evg ME 6.2
Evg ME 6.1
13.10.1999
03.11.1999
24.11.1999
15.12.1999
mining subsidence
Stress relief following 05.01.2000
26.01.2000
16.02.2000
08.03.2000
29.03.2000
19.04.2000
Datum
10.05.2000
31.05.2000
Evg 756 m/m S=1,5
21.06.2000
12.07.2000
02.08.2000
23.08.2000
13.09.2000
04.10.2000
25.10.2000
15.11.2000
06.12.2000
27.12.2000
17.01.2001
Pipeline Operation and Maintenance |
Trend in strain following stress relief
07.02.2001
28.02.2001
21.03.2001
max.958
11.04.2001
02.05.2001
23.05.2001
81
10.4.2014
0
5
10
15
20
25
30
35
40
45
50
Direct (Defect) Assessment Methods
Temperatur (C)
82
+
800
SigV_3 SigVd_2 SigGg3_3 SigGg3_3
700
600 Spannungsnachweis
N/mm
500 Istwerte=Betriebsbedingungen
400
300
200
100
0
0 500 1000
Leitungsmeter
Fibers
Microstructure
Analysis with
SEM and EDX
Failure analysis Pipeline Operation and Maintenance | 10.4.2014
84
Conduction of
intensive measurement at
feature position +/- 50 m
Excavation
Corrosion study
(considering soil type, soil chemistry, type of coating, coating
condition, corrosion products, pH at coating defect and
underneath coating, scale formation, CP operational
parameters etc.)
Contents
OGE at a Glance, OGE Pipelines in Germany
Integrated Management System
Pipeline Design & Safety Philosophy
Pipeline Integrity Management System
Corrosion Control
Hydrostatic and Tightness Testing
Inline Inspection Techniques
Defect and Failure Investigation
Troubleshooting & Repair-Techniques
Conclusions
X 80 Pipe
T-Joint
Data transmission
For online monitoring
Installation of
hot sleeve
Repair Techniques
Inliner in Pipeline
Contents
OGE at a Glance, OGE Pipelines in Germany
Integrated Management System
Pipeline Design & Safety Philosophy
Pipeline Integrity Management System
Corrosion Control
Hydrostatic and Tightness Testing
Inline Inspection Techniques
Defect and Failure Investigation
Troubleshooting & Repair-Techniques
Conclusions
Conclusions
Different Pipeline Standards Existing at OGE
Intelligent strategies for operation of old and new pipelines are available at OGE
The DVGW technical rules (and the referenced standards) provide the
framework for construction, operation and maintenance of approx. 12,000 km of
Transmission pipelines