EHS RISK ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control Additional Control Prob
Cons. Prob. Risk Cons. Risk
.

Supervisor to ensure
approved PTW is available
prior to commencement of
the task and proper
coordination.
Unautho Activity shall be
rized supervised by receiving
workers at authority
working Only competent and
6.1 area. authorized personnel to be 3 1 3
Preparations.
Lack of deployed, supervisor to
coordination control.
with SLII
representati Supervisor to give tool
ve box talk prior to start the
task and must be
documented, this shall
cover the method
statement and risk
assessment

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 1 of 6


EHS RISK ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

Only competent electricians


to be deployed for the
electrical works and for the
Incompe operating of 110V
generator.
tent
Ensure all workers received
workers.
the Big 5 training from SLII
Electrocution training centre. 3 1 3
* Job execution. . Supervisor to ensure that
Lake of the power source to be
safety connected with ELCB and
coverage only 110V industrial socket
to be used at site.
Ensure safety coverage
throughout the activity
Use of bad Inspect all hand tools to be
condition used for the task, do not 2 1 2
hand tools. use homemade hand tools.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 2 of 6


EHS RISK ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

Bad
Supervisor to ensure
condition of
that the generator is in
portable
good condition and
generator. inspected prior to use at
Bad site.
condition of Ensure that the multi-
4 1 4
multi-meter meter tester is calibrated
tester for with valid certificate.
continuity Supervisor to ensure
that temporary cable is in
test.
good management to avoid
Cable creating hazards.
trailing.
During crew meeting,
Manual Supervisor to discuss and
handling explain the hazards & 2 1 2
hazard precaution of manual
handling.
Observe good
housekeeping around the
Workers may working area.
Slip, Trip & Walkway and gangway
Fall same
to be kept free of
ground due 3 1 3
to poor obstruction, hand tools and
housekeepin toolbox to be kept in safe
g. position.
Barricade the working area
as required.

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 3 of 6


EHS RISK ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

All personnel involve in the


Working
activities must wear P.P.E.'s
without
(e.g. hard hat, appropriate
personal 2 1 2
safety glass, safety shoes,
protective
appropriate hand gloves,
equipment.
long sleeve shirt etc.).

NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)

Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 4 of 6


EHS RISK ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

Risk assessment compiled by :

Risk Assessor:
JOSELITO SANGCO SUPERVISOR 30-01-2014

Name Designation Signature Date

Risk assessment approved by :

EHS Department:
SACHIN BABU SR.EHS ADVISOR 30-01-2014

Name Designation Signature Date

Construction:
SULFEEK PROJECT ENGINEER 30-01-2014

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 5 of 6


EHS RISK ASSESSMENT

ACTIVITY: Inspection and testing of bus bar cooling fan


PACKAGE NUMBER: CG-4750-Phase 1 upgrade

Management:
ANWAR SADATH SR.PROJECT MANAGER 30-01-2014

Name Designation Signature Date

503406-AD0000-68AF-12303_R01 (2012-01-30) Page 6 of 6