SECTION: ACTIVITY:
PACKAGE NO. CG 4706 EXISTING SUMPUMP CONTROL CABLE REMOVAL
Ref. No. DAN-RA-AD413-001
503406-AD0000-68AF-12303_R00 (2011-07-19)
EHS RISK ASSESSMENT TEMPLATE
503406-AD0000-68AF-12303_R00 (2011-07-19)
EHS RISK ASSESSMENT TEMPLATE
503406-AD0000-68AF-12303_R00 (2011-07-19)
EHS RISK ASSESSMENT TEMPLATE
503406-AD0000-68AF-12303_R00 (2011-07-19)
EHS RISK ASSESSMENT TEMPLATE
NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control
Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
Financial No Frequency A B C D E
No Safety Health Environ.
Equip. Product. Practically impossible or Once in 10 R=CxP 1 2 3 4 5
A (1)
1 First Aid Immediate Minor <AED 1k <1 hr years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5
ATTENDED BY:
503406-AD0000-68AF-12303_R00 (2011-07-19)
EHS RISK ASSESSMENT TEMPLATE
Name(s):
Risk Assessor:
FOLLOW UP:
NO. FOLLOW-UP ACTION ACTION BY TARGET DATE
APPROVAL:
DESIGNATION NAME SIGNATURE DATE
COMPILED BY:
ACKNOWLEDGED BY: