192000000 Nmm
fy = 400 Mpa
fc' = 20 mpa
b = 200 mm
h = 600 mm
d' = 40 mm
d = 560 mm
m =
= 23.529
Rn =
= 3.827
= 0.01098631655
As
As = 1230.467453
4 22
As Terpasang
= 1520.530844
a = 178.8859817
Mn = 228958862.9 > 192000000
OK
q 2000
L 8
h= 600 mm
b= 200
Cc = 0.85 fc'. a.b
z= d- a/2
Mn= Ts. z
Ts = As. Fy
Mu = 21.77 kgm
21770000 Nmm
fy = 240 Mpa
fc' = 15 mpa
b = 1000 mm
h = 200 mm
d' = 30 mm
d = 170 mm
m=
= 18.824
Rn=
= 0.942
r =
= 0.004080046381
As =
As 693.6078848
As Terpasang
= 1255
20 250
a = 23.62352941
.Mu
200
10-175
L= 1800 mm
900
12 -
Mu = 180 KNm
= 180,000,000 Nmm
fy = 400 Mpa
fc' = 25 mpa
b = 200 mm
h = 600 mm
d' = 40 mm
d = 560 mm
As1 = 600
a = 56.47058824
.Mn1 =
.Mn1 = 102,098,824
Mn2 perlu =
As2 = As' =
As total =
As total = 1380.260181 jadi pakai
600 = h d-a/2
Astotal = 1380.260181mm2
= 3 D 19
= 5 D 19
=0.85 fc' a.b Cs=As'.fy
Ts2 = As2. fy
mm2 =As2 780.260181
Mu = 300 KNm
= 300,000,000 Nmm
fy = 400 Mpa
fc' = 15 mpa
bw = 200 mm
h = 600 mm
hf = 200 mm
d' = 30 mm
d = 570 mm
As1 = 1700 mm2
m =
= 31.373
Rn =
= 0.769
= 0.0020
As
As = 1697.609259
= 1700
1/4 L = 1500 mm
bw+16.hf = 3400 mm bef =
jb = 1800 mm
a = 35.55555556
.Mn1 =
.Mn1 = 300,408,889
300,408,889 > 300,000,000
OK
jadi digunkan = 4 D 25
beff = 1500
hf = 200
1500 mm
bw = 200
=Cc-awal 3825000
=Cc-baru 680000
Ts = 680000
Mu = 500000000 KNm
L = 6000 m
fy = 400 Mpa
fc' = 15 mpa
bw = 300 mm
h = 500 mm
hf = 120 mm
d' = 40 mm
d = 460 mm
As1 = 5000 mm2
1/4 L = 1500 mm
Bw+16hf = 2220 mm bef
jb = 760 mm
a T murni =
f Mn =
224451775840000
f Mn = 658146583 Nmm >
OK
maka digunakan tulangan 7 D
beff = 760
hf = 120
760
bw = 300
mm
mm
ah pelat, jadi termasuk balok T-murni
500000000 Nmm
32
=Cc1
1,162,800 N
837200
Cc2 = 837,200 N
Ts = 2,000,000 N
qult = 3500 kg/m
L = 8 m
Vu = 14000 kg/m
= 140000 N
fy = 240 Mpa
fc' = 15 MPa
b = 200 mm
h = 500 mm
d' = 40 mm
d = 460 mm
.Vc =
.Vc = 59385.74464 N
V s perlu =
V s perlu = 124021.9313 N
. tul = 10 mm
Av = 157.0796327 mm2
= 139.8268134 mm
pakai tulangan
10 - 150
L = 8
10-150 10-300
10-150
DESAIN GELAGAR JEMBATAN
L = 25
Mu = 203113420 kgm
fy = 400 Mpa
fc' = 25 MPa
bw = 400 mm
h = 1500 mm
hf = 200 mm
d' = 40 mm
d = 1460 mm
As1 = 4000 mm2
As2 = 1500 mm2
1/4 L = 6250 mm
bw+16.hf = 3600 mm bef =
b = 1800 mm
a =
a = 41.83
Ts<Cc,maka a<hf, sehingga balok tidak tertekan keseluruhan, jadi termasuk balok persegi
hf 200 mm
1800 400
203113420 Nmm
=Cc-awal
mm 7650000 N
=Cc-awal
6050000 N
Ts2 600000 N
Ts1 1600000 N
mm
DESAIN SENGKANG GELAGAR
.Vc =
.Vc = 39698.0793 N
V s perlu =
V s perlu = 1237220.893 N
. tul = 10 mm
Av = 157.0796327 mm2
= 12.49302848 mm
pakai tulangan
10 - 12
L = 8
10-12 10-24
10-12
DESAIN TIANG SANDARAN
Mu = 814.735 kgm
= 8,147,350 Nmm
fy = 400 Mpa
fc' = 25 mpa
b = 200 mm
h = 600 mm
d' = 40 mm
d = 560 mm
As1 = 600
a = 56.47058824
.Mn1 =
.Mn1 = 102,098,824
Mn2 perlu =
As2 = As' =
As total =
As total = -341.0203679 jadi pakai =
(4) D 19
(2) D 19
Cs=As'.fy
'd-d Mn2
Ts2 = As2. fy
=As2 -941.0203679
DESAIN PIPA SANDARAN
Pu = 7232.765 kg
= 72327.65 N
Fy = 240 Mpa
k = 0.7071067812
L = 25000 mm
Profil = f 76.2 76.2
Letak titik berat = 38.1 mm
=
Propertis Profil =
A = 733.9 mm2
Ix = 492000 mm4
r = 25.9 mm
c =
= 23.6507239
c < 0.25
Kondisi 1
= 1
0.25 < c < 1.2
=
= -0.1003791594
c > 1.2
kondisi 3
= 1.25 . c2
yang dipakai kondisi 3
= 699.195926
f Nn = 251.904 N <
76.2
3.2
3.2
76.2
Kondisi 2
72327.65
PERHITUNGAN KOLOM
Mu = 70 tm 700000000
Pu = 50 t 500000
e = 1400 mm
fy = 400 Mpa
fc' = 30 Mpa
b = 800 mm
h = 800 mm
d' = 40 mm
d = 760 mm
As = 3000 mm2
As' = 1500 mm2
m = 15.68627451
= 0.004934210526
1 = 0.85
cb = 456 mm
ab = 387.6 mm
s = 0.002736842105
fs = 547.3684211 =fs'=fy
Cc = 7907040 N
Cs = 600000 N Pnb =
Ts = 1200000 N fPnb
=
Pn =
=
Pn = 846439.7017
fPnb = 550185.8061 N >
>
Jadi pakai penulangan 5 D
GAN KOLOM
Nmm
N
Pnb
Cs = As . fs' cu = 0.003
s' Cb
Cc=0.85.fc'.ab.b
Ts=As. s
s
fy
400 Mpa
7,307,040.00 N
4,749,576.00 N > 500000 N
HANCUR TARIK
5 D 29
500000 N
29
5 D 29