This document contains proprietary and confidential information which belongs to National Oilwell Varco; it is loaned for
limited purposes only and remains the property of National Oilwell Varco. Reproduction, in whole or in part; or use of this National Oilwell Varco
design or distribution of this information to others is not permitted without the express written consent of National Oilwell 10011 Meadowglen Lane
Varco. This document is to be returned to National Oilwell Varco upon request and in any event upon completion of the use
for which it was loaned. Houston, Texas 77042
Copyright National Oilwell Varco - 2014 USA
72647890 03
Document number 72647890
Revision 03
Page 2
REVISION HISTORY
CHANGE DESCRIPTION
Revision Change description
00 Initial Release
01 Addition of Wire Rope & Hoisting Sheaves
Additional Definitions, Cylinder Testing, NDT Extent and Reporting
02 Addition of Temporary Marking of Parts
Addition of Electrical Component requirements
Addition of Elastomer/Rubber Goods Marking, Storage & Preservation
INDEX
1 GENERAL .................................................................................................................................... 6
1.1 Purpose of this Specification .............................................................................................. 6
1.2 Scope of this Specification ................................................................................................. 6
1.3 Application of Standard Quality Requirements ................................................................... 6
1.4 Exceptions ......................................................................................................................... 6
1.5 Clarifications ...................................................................................................................... 6
2 SUPPLIERS .................................................................................................................................. 6
2.1 Supplier Performance & Management ............................................................................... 6
2.2 Purchase Order (Contract Language) ................................................................................ 6
2.3 Qualified Suppliers ............................................................................................................. 6
2.4 Purchasing and Subcontracts. ........................................................................................... 7
3 REFERENCES.............................................................................................................................. 7
3.1 Standard Quality Program.................................................................................................. 7
4 MATERIALS ................................................................................................................................. 7
4.1 Material Quality General .................................................................................................... 7
4.2 Material Splices ................................................................................................................. 8
4.3 Material Substitutions......................................................................................................... 8
5 MATERIAL IDENTIFICATION AND TRACEABILITY ................................................................... 9
5.1 Material Identification and Traceability Procedures ........................................................... 9
5.2 Material Traceability Exclusions ....................................................................................... 10
5.3 Identification and traceability maintenance and replacement ........................................... 10
5.4 Temporary Marking Parts Restrictions .......................................................................... 10
6 MARKING ................................................................................................................................... 10
6.1 Marking Finished Parts .................................................................................................... 10
7 MILL TEST CERTIFICATION ..................................................................................................... 10
7.1 Mill Test Certificate .......................................................................................................... 10
7.2 Mill Test Certificate Information ........................................................................................ 11
8 LABORATORY TESTING........................................................................................................... 11
8.1 Laboratory Testing Services ............................................................................................ 11
9 STRUCTURAL ASSEMBLY ....................................................................................................... 11
9.1 Structural Assembly General ........................................................................................... 11
10 WELDING ................................................................................................................................... 13
10.1 Structural Welding Process .............................................................................................. 13
10.2 Welding Equipment .......................................................................................................... 14
11 WELDERS AND WELDING OPERATORS ................................................................................ 14
11.1 Welder Qualification ......................................................................................................... 14
12 WELD PROCEDURES QUALIFICATION ................................................................................... 14
12.1 Weld Procedures Qualification General ........................................................................... 14
12.2 Weld Procedures Qualification Review and Approval....................................................... 15
12.3 Weld Procedures Qualification CVNs .............................................................................. 15
1 GENERAL
Exclusions to either document may be considered where any requirement(s) cannot be applied due to
the nature of a Supplier and its Product.
For the Purpose of this document the boxed text is considered equivalent or acceptable Standard.
1.4 Exceptions
Exceptions and/or Deviations to this Specification shall be documented contractually and the
Exceptions must be approved in writing by NOV. Exceptions shall be approved by the same Function
specifying the requirements.
1.5 Clarifications
Should the requirements of the PO or other applicable documents necessitate clarification, Supplier
shall obtain all relevant clarifications from NOV in writing.
2 SUPPLIERS
Sub-Suppliers for Machining, Fabrication, Heat Treating, Coating and NDE shall be reviewed, assessed
and approved by NOV prior to work commencement.
3 REFERENCES
4 MATERIALS
Some formation of rust during fabrication may be accepted, but the rust grade shall be within the limits
of ISO 8501-1 grade B.
Standard Specifications
Structural shapes shall conform to ASTM A6/A6M, Standard Specification for General Requirements for
Rolled Structural Steel Bars, Plates, Shapes and Sheet Piling, materials shall be new, free from
defects, initial condition of steel per ISO-01 Grade B or Better, unless otherwise specified.
Grade A steel covered completely with adherent scale and with, if any little rust acceptable.
Grade B steel surface which has begun to rust and from which the mil scale has begun to
flake acceptable.
Grade C steel surface on which the mil scale has rusted away or from which it can be
scrapped, but with little pitting not acceptable.
Grade D steel surface on which the mil scale has rusted away and on which considerable
pitting is visible to the naked eye not acceptable.
Material Qualification
Tests are performed in accordance with the requirements of ASTM A370 or equivalent standards, using
material in the final heat-treated condition.
Test coupons from the same heat as the components from which they qualify (given the same working
operations) shall be heat-treated with the components.
Material Manufacture
Temperature and time requirements for heat-treatment cycles are determined and are in accordance
with the manufacturer's or processor's written specification.
Actual heat-treatment temperature and times are recorded, heat-treatment records are traceable to
relevant components.
Material Testing
Where testing has not been carried out by the mill, NOV will have samples taken from the
representative heat and size and have independent laboratory tests conducted to confirm the
outstanding properties.
When required, Charpy tested material requirements will be noted on fabrication drawings.
Note: Charpy requirements are to be an average of 3 longitudinal specimens; one value may be under,
provided it is not less than 80% of the specified minimum average per ASTM A370.
Material Allowances
Material dimensions and sizes on the material lists in NOV drawings are net, postproduction sizes.
Accordingly, all dimensions are given without deductions for beveling or allowances for machining
unless noted otherwise. Contractor must, therefore, take the above into consideration when ordering
materials.
Substitute Materials
Supplier may propose substitute materials in writing to NOV for approval. Material substitutions shall
meet the following provisions:
Recognized steels with good weldability and a carbon equivalent not exceeding 0.45 units
(show formula) for materials which require welding.
All mechanical properties shall, as a minimum, match the original requirements.
Mechanical properties shall be fully documented.
Chemical and mechanical properties shall be within the essential variables of contractor's
welding procedures, unless new procedures are qualified.
NOTE: In some industry sectors, configuration management is a means by which identification and
traceability are maintained.
Hoisting equipment
Lifting appliances & loose gear
Pressure containing components
Pressure containing materials
Structural materials
Testing records
Bolts
Bolts shall be exempt from Traceability requirements, provided they are Manufactured and Identified in
accordance with recognized Industry Standards.
Other bolts may require the chemical, mechanical and physical properties, conforming to the limits
guaranteed by the bolt manufacturer.
A summary sheet for traceability records shall include the description and unique identification (size,
grade, heat numbers, serial numbers etc).
6 MARKING
Finished Parts are to be permanently identified by part number and sales order number, unless
specified otherwise.
Steel impression stamp (low-stress) on any unfinished or 500 finish surface.
Engraving may be used on any 250 finish or greater surface.
Mark with black indelible ink for surfaces greater than 250 finish.
If the above methods are impractical, tags may be used and secured by plastic ties, provided they do
not interfere with the stages of production, delivery and installation.
Note: In the case of castings, the part number and serial number shall be cast as identification. If it is
agreed with NOV, the serial number may be stamped at an agreed location.
NOV Proprietary Design products shall not be marked with the Suppliers logo.
MTRs of all steel material received, having a specified yield strength greater than the following:
structural shapes or plate 248 MPa (36 ksi)
tubing 317 MPa (46 ksi)
solid round bars 414 MPa (60 ksi)
All materials in category "essential" and "primary" shall be supplied with certificates according to
EN-10204 type 3.1.
Type 2.2 certificates may be accepted for materials of "secondary" steel purposes, i.e. steels for non
load carrying purposes like ladders, walkways, wire guides, brackets for junction boxes, light fixtures,
brackets for hydraulic lines, components, signs, etc.
Certificates for secondary steels shall be collected and kept in the suppliers manufacturing record files,
for a period min. 2 years, for purchasers historical traceability and shall not be a part of the MRB
8 LABORATORY TESTING
9 STRUCTURAL ASSEMBLY
Fabrication Plans should include the use of a transit or construction level with attention to connections
and faying surfaces. (Tolerances are for assemblies as welded.)
Weld bevels and root gaps shall be within the permitted range of the welding procedures.
Note: Bolt sizes specified on the assembly drawings will be used for verification of the design. All holes
require the correct diameter bolt be inserted during the test of the assembly.
Inspection of Fit Up
The welding supervisor shall visually inspect the fit up and check:
the weld preparations for any surface defects
the root gap and bevel geometry for compliance with WPS
alignment tolerances
Buttering
Excessive root gap shall be rectified by buttering according to a WPS which shall be derived from one
of the qualified main weld procedures. The thickness of the buttering zone shall not exceed 75% of the
plate thickness or 3/8 (10 mm), whichever is less. This means maximum buttering for a groove can be
16 mm (8 mm (5/16) from each side).
All buttered groove welded geometries shall be considered as an essential weld, i.e. extent of NDT
shall be 100%.
Build up welding on raw or machined materials may not be considered buttering welding. Separate
evaluation or requirements will apply.
Cold Forming
Cold forming at ambient temperature may be permitted provided the bending radius is greater than 20
times the plate thickness. Cold forming may be carried out by means of jacking, pressing or rolling
tools. The use of hammering techniques is not acceptable.
Thermal Straightening
Out of tolerance members can be straightened by locally applied heat. Heating shall be carried out
under strict controlled conditions to prevent degradation of the steel properties.
The temperature of heated areas shall be checked by the operator using temp sticks, contact
Pyrometer, Resistance Coil or other suitable means during the heating process.
For structural steel, the temperature shall normally not exceed 1100o F, (590C) except when being
qualified by a separate procedure.
The parts to be heated for straightening shall be free of stress and external forces, except stresses
resulting from mechanical means used in conjunction with the application of heat.
The straightened areas shall be subject to 100% MPI after complete cooling in still air.
Contractor shall carry out dimensional control in accordance with ISO 2768-m for machined products
and EN ISO 13920 Class A and E for welded products to ensure dimension tolerances are met.
Tolerances
Tolerances for overall dimensions, special components, and interface points to equipment, or to other
structures, will be specified on the drawings. All these dimensions shall be verified and recorded and be
a part of the final fabrication documentation.
All dimensional control shall be recorded and documented according to NS 5820. The reporting shall be
in the contractors own format, but the purchaser reserves the right to comment and accept / reject the
submitted dimensional control reports.
Structural Steel
Structures and products produced shall conform to applicable sections of the AISC 335-89, concerning
fabrication unless specified.
Pre-Blast Preparations
Sharp edges, fillets, corners and welds shall be rounded or smoothed by grinding, radius 1/16
(2 mm)
Hard surface layers, e.g. resulting from flame cutting, shall be removed by grinding prior to blast
cleaning.
Any major surface defects, particularly surface laminations or scabs detrimental to the protective
coating system shall be removed by suitable dressing.
10 WELDING
All welding shall be based on the recommendations given in EN 1011. If not specified otherwise, given
fillet weld dimensions on drawings shall be understood as A dimensions.
All qualifications should be to the latest edition; qualification to prior code editions may be accepted.
Qualification
Welders and welding operators shall be qualified in accordance with relevant part of EN 287 or
equivalent recognized standard subject to purchaser's acceptance.
Welder Identifications
Each welder shall be assigned a reference number or identity code which allows traceability of welders
to their welds. Welder ID shall be stamped on the part and recorded on the NDT records.
Continuity Log
Supplier shall keep a continuously updated record of all welders qualifications, listing their approval
categories and expire dates. (Shall not exceed 6 months). Supplier shall document which welding
process the welder used and state, there is no reason to question the welders ability.
Each manufacturer or supplier shall conduct tests required per the applicable code to qualify the WPS
for material classified as Primary and Secondary covering the essential variables.
Submitted WPSs should cover unlimited thickness and at least flat and horizontal positions.
Documented Pre-qualified WPSs which conform with all the requirements of AWS D1.1, Section 3
shall be exempt from testing for material classified as miscellaneous.
Supplier shall include actually used PQR & WPS (approved & stamped by NOV) per purchase order in
the data book (MRB).
The group numbering system for welds in the miscellaneous category shall be used for identification in
Weld & NDT log.
Contractor shall record actual WPS number in Weld & NDT log.
Procedures
Contractor shall prepare welding procedures in accordance to the relevant part of the EN ISO 15614
series and this specification for all structural welding, including repair welding. Welding procedures to
other recognized standards may be accepted, subject to special agreement, provided that the technical
requirements are met.
The qualification is primarily valid for the workshop performing the welding test, and other workshop
under the same technical and quality management. It may also be transferred to and used by a
subcontractor, provided the principles of EN ISO 3834 are implemented and documented.
New qualification test is required if the carbon equivalent for the steel to be welded increase more than
0.03 carbon equivalent units (IIW formula) over the value of the existing welding procedure approval
record (WPAR).
The mechanical properties of the weld, as determined by the procedure qualification test, shall at least
meet the minimum specified mechanical properties required by the design.
When impact testing is required for the base material, it shall also be a procedure qualification
requirement.
Results of testing in the weld and base material heat-affected-zone (HAZ) shall be consistent with
requirements of the base material.
In the case of attachment welds, the HAZ of materials requiring impact testing must meet the base
material. Weld testing is undertaken with the test weldment in the applicable post-weld heat-treated
condition.
13 WELD REPAIRS
The procedure shall include the method of defect location and removal, preparation of weld area and
NDT before and after re-welding. Defects deeper than 7% or 1/8 in (3 mm), shall be repaired by
welding.
Prior to excavation, the NDT operator shall mark the exact location and depth of the defect on the metal
surface, using, if required, additional NDT techniques. The defective material shall then be removed by
machining, or by air arc gouging followed by grinding to sound metal.
After completed excavation and grinding, the suspected area shall be 100% examined by MPI. No
repair area shall be shorter than 4 (100 mm) in the defects longitudinal plane.
The repair weld shall be given the same weld number with the suffix R1, R2, etc. to permit traceability
of NDT. It shall then be subject to 100% NDT by all applicable methods. The retested area shall be the
full excavated area + 4 (100 mm) in each end.
Repair
Surface defects may be repaired by grinding, provided the thickness is not reduced by more than 7% of
the nominal thickness, or 1/8 (3 mm), whichever is less.
The same area shall not be repaired more than twice, without a written acceptance from purchaser.
14 CONSUMABLES
14.1 Consumables
The Supplier shall ensure welding consumables meet the requirements for mechanical properties as
specified for the welding procedure qualification. Low Hydrogen welding consumables shall not
exceed the allowable atmospheric exposure per AWS D1.1-2010, Table 5.1. Certifying body (e.g. ABS,
DNV, Lloyds) requirements in regards to consumables shall take precedence.
Welding consumables shall be stored and maintained in accordance with AWS D1.1, Section 5.3
Note: Consumables listed in ABS or DNV "Approved Welding Consumables" will be accepted.
The parent material surface shall be dry and achieve a temperature of at least 10C before start of
welding. Preheating above 250F (121C) shall be achieved by electric heating elements to ensure
controlled temperature during welding process. (Norsok, DnV) Preheating 121C, propane or
equivalent gas may be allowed.
heating rate
cooling rate
soak temperature and time
heating facilities
insulation
control devices
recording equipment
configuration of structure to be HT/ PWHT or details if local HT/ PWHT shall be carried out.
number and location of thermocouples to be used during HT/ PWHT
17 MACHINING
Note: A non-conformance report or deviation report shall be used to disposition parts out of tolerances.
Any concessions shall be approved in writing.
All dimensions and tolerances (linear, angular, surface, etc.) are to be in accordance with the NOV
drawings. If nothing else is noted, machining tolerances shall meet the requirements below.
Dimension tolerances:
Angular: = +/- 1
Linear: = .x +/- .030 = .xx +/- .015 = .xxx +/- .005
Fractional = .xx +/- 1/16 (2 mm)
Machining tolerances shall meet requirements stated in ISO 2768-m, if nothing else is indicated on
drawings.
NDT shall be carried out according to rules for the actual classification society (ABS, DNV, etc., as
applicable) (see Purchase Order).
NDT Reports
In addition to requirements given in the rules for actual classification society, the NDT report shall
reference Welder ID, drawing number, revision, part number, NOV work order number (project
number), weld number (if applicable), and NOV procedure, location and project.
All final NDT shall be reported in a manner which ensures traceability and reproducibility.
NDT Traceability:
100% of critical welds NDT shall be traceable to the individual part/serial number on the report and
drawings.
Examined parts of welds where less than 100% extent is required, shall be marked as to where NDT is
carried out.
Visual examination shall be performed according to EN 970 and to this specifications normative
references.
NDE Personnel
All inspection personnel shall be level II or equivalent.
Eye exams
Visual (for welds) and NDT Inspector shall have an eye exam as defined in the NOV approved written
practice every 12 months.
All inspection personnel (VT/PT/MT/UT/RT) shall (as a minimum) be certified according to ISO9712,
EN 473 - level II or equivalent certification scheme, accepted by purchaser.
Critical Welds
The extent of NDT shall include 100% of critical welds which joins critical components & any weld
necessary to maintain stability of a structure and resides within the primary load paths of the structure
when the structure is loaded.
Notes:
Ultrasonic inspection of all full & partial penetration welds shall include modified transverse scanning
per procedure D402001155-PRO-001, Non-Destructive Examination (NDE) Procedure for
Identification of Transverse Indications.
Percentage of NDT shall include all 100% of connections and lugs as applicable.
(*)Full or partial penetration welds loaded in tension to 70% or greater of their allowable stress, as
determined by design shall be volumetrically examined as per AWS D1.1, Section 6.
Extent of Non Destructive Testing shall be in accordance with DNV Rules for Certification of Lifting
Appliances, Table G3. Inspection category will be specified on IFC drawings. If there are discrepancies
between this specification and other contractual documents, the more stringent requirements shall
apply.
Clarification on classification
Engineering shall be contacted for clarification on extent if required.
UT: AWS D.1.1- Latest Edition AWS D.1.1 Sect. 6 statically loaded
VE: AWS D.1.1- Latest Edition AWS D.1.1 Sect. 6 statically loaded
ANSI B31.3 Latest Edition Table 341.3.2
ASTM-A578- Latest Edition Level II
ASTM-A898- Latest Edition Level II
Acceptance criteria shall be according to rules for the actual classification society (see P/O).
For visual examination, the weld quality shall comply with EN 25817 - level C.
Any pad intended to lift a single member such as a girt, brace, handrail, platform, etc.
Pad-eyes intended to be used to connect specific machinery such as casing stabbing boards
Pressure Gauges
Pressure gauges and recorders shall be calibrated using a dead weight tester. The calibration
certificates shall be valid at the time of the test. The gage shall be selected so the pressure range is
within 25% to 75% of the gage.
Equipment selection and classification of areas will be referred to API 500 RP Latest Edition for Area
Classification only.
required. Certificate of compliance and certificates per API Specification 9A, section 6.1.1, shall be
traceable to the rope.
24 COATING/SURFACE TREATMENT
All Coating and Surface Treatment for NOV shall be done to documented procedures
according to an international standard.
Paint
Unless specified, surface preparation, painting, repairs and reports shall be in accordance with
manufacturers recommendations and the specified paint system in 3007, System I, Table 1.
Top Coat
Unless specified by the customer, the top coat should reference specified RAL Colors in procedure
3006.
Lifting lugs
Certified lifting lugs with designated SWL and emergency valves (including handle) should be applied
with Red (RAL 3000) topcoat.
Galvanizing
Hot Dipped Galvanizing shall conform to ASTM A123 and NOV PS- 203. Hot dipped galvanizing shall
be in accordance with ISO 1461 or equivalent recognized standard, giving a coating thickness of
minimum 125 microns.
Restriction
The supplier of galvanizing shall contact the fabrication supplier if additional vent holes are required,
and shall not add any holes.
25 MECHANICAL ASSEMBLY
All mechanical assembly of components shall be carried out in accordance with instructions given in
assembly drawings, parts lists, manufacturing standards, this specification, direct instructions from
purchasers representative and otherwise reflect good workmanship and professionalism.
26 HYDRAULIC ASSEMBLY
All hydraulic work shall take place in a clean area and be separated from steelwork (welding and
grinding activities).
Fittings and hose couplings shall be Chromium6-Free surface plating (CF) and preserved with
Densotape (unless otherwise specified).
Hoses shall not be purchased more than 12 months before installation and each hydraulic hose
should be marked in accordance with a relevant "hose-list" for the equipment.
Hydraulic hoses shall be marked for traceability with manufacturer and batch number when
specified.
Elastomers packaged in opaque containers and labelled with the following information:
NOV Part Number
Expiration date, cure date, shelf life, and date of manufacture
NOV P.O. Number
Country of Origin
Elastomers shall be stored in a manner consistent with industry standards to protect the product from
environmental conditions such as temperature, humidity, and light.
Components which are moisture sensitive shall be stored in a nitrogen cabinet and should be shipped
in a moisture barrier bag (MBB) with fresh desiccant.
All other electronic components and assemblies should be shipped in proper ESD protection
packaging.
Strict industry guidelines shall be used for electrical, maintenance, installation and repair of
instrumentation, enclosures and lighting for NOV. Installation of junction boxes, relays/
switches, switchgear, voice and data communication, and automation and controls shall abide
by NEIS standard.
Electrical distributors shall ensure that products sold are UL Listed and rated by organizations
such as NEMA, IEC, ANSI, or NECA
When the equipment is provided from a source external to the organization, including third
party, proprietary, employee- and customer-owned equipment, the organization shall verify that
the equipment is suitable and provide evidence of conformity to the requirements of this
section.
The procedure shall include requirements for the specific equipment type that addresses:
a) unique identifier;
b) calibration status;
c) equipment traceability to international or national measurement standards; where
no such standards exist, the basis used for calibration or verification shall be
recorded
d) frequency of calibration, at specific intervals or prior to use
e) calibration or verification method, including adjustments and re-adjustments, as
necessary;
f) acceptance criteria;
g) control of equipment identified as out-of-calibration, or not suitable, in order to
prevent unintended use;
h) when the equipment is found to be out of calibration, an assessment of the
validity of previous measurements and actions to be taken on the equipment and
product, including maintaining records and evidence of notification to the
customer if suspect product has been shipped.
*If No National/International Reference standard is available, the supplier shall define methods of
calibration in a documented procedure that is accompanied by a calibration certificate which
references this procedure.
Supplier should have available a listing of each measuring device used during process of NOV
product.
30 INSPECTION/TESTING PROCESSES
All personnel performing other quality control activities directly affecting material and product
quality shall be qualified in accordance with the manufacturers documented procedures.
Validation of processes
The processes requiring validation shall include, as a minimum, non-destructive examination, welding
and heat treating, if applicable to the product.
Acceptance inspection
Personnel other than those who performed or directly supervised the production of the product shall
perform final acceptance inspection at planned stages of the product realization process.
Inspection status
Inspection status shall be evident at all times. QC personnel shall be responsible for the application and
removal of status indicators.
It is the responsibility of the Supplier to submit formal application for inspection to the responsible NOV
representative(s). The application will reference the work activity to be inspected and shall be delivered
to the NOV representative(s) no later than 24 hours prior to inspection.
Definitions:
Review (R)
The Supplier will submit for review all indicated documentation and/or quality records to determine the
suitability, adequacy and effectiveness or documentation associated with the task.
31 PRESERVATION
Passivation & Pickling
All Passivation & Pickling shall be performed with a documented procedure, approved by NOV.
The organization shall preserve the conformity of the product and constituent parts during internal
processing through delivery to the intended destination.
32 SHIPPING PREPARATION
The organization shall preserve the conformity of the product and constituent parts through delivery to
the intended destination.
Authorizing Shipping
When all requirements have been satisfied, an NOV QA Review and Release form shall be issued
accepting the product and authorizing shipping.
The MRB documents to be delivered in an A4 size hardcover binders with a four-hole interlock spine
mechanism and sorted accordingly to table below.
No staples to be used, nor documents with text on both sides of the sheet. This is to prevent problems
when copying and scanning during the building of documentation. A content list shall be included in
front of the binders.
All lists and reports to be marked with Work Order number and NOV purchase order number. All
documents to be copied from originals for better readability & shall be copied in their entirety.
The following is the minimum required documentation. In addition, there may be supplementary
documentation requirements on a contract by contract basis. The MRB shall contain these listed
documents unless otherwise is agreed:
Description As
# applicable
The documentation shall be continuously collected during the fabrication / assembly period and always
be accessible for review by NOV surveyor or other responsible personnel.
Purchaser shall, as a general rule, receive all documentation, MRB, As-Built Drawings and the like, no
later than 14 calendar days after delivery of the goods, unless other specific conditions are stated in the
Purchase Order.
# Description As applicable
Base Drilling The structural members of the drilling structure including crown, water
Structure table, gin pole, as applicable.
Can Requirements are conditional and indicate a possibility open to the user
of the standard.
Critically Stressed All welding of joints of structural load bearing or load transfer members
Components of the crane.
Delivery Point in time and physical location at which the agreed transfer of
ownership takes place according to Incoterms.
Erection Load Load produced in the mast and its supporting structure during its raising
and lowering, or in the substructure during its raising and lowering.
Field nonconformity Product nonconformity as detected after delivery or use has started.
May A course of action which is permissible within the limits of the standard
(permission).
Miscellaneous Inspection / Traceability Category: not critical, non load path and only
visual inspection required.
PO Purchase Order
For those measuring devices used in the final inspection of NOV product, the following table
represents minimum calibration cycles, referenced by NOV and industry standards.
Description Equipment Masters
AC/DC electromagnetic yoke 1 Year
Black Light 1 Year
Brinell Hardness Tester 1 Year
Brinell Microscopes 1 Year 3 Years
CMM Calibration Plate 4 Years
Coating Standards 4 Years
Coating Thickness Gage 1 Year
Coordinate Measuring Machine 1 Year
Densitometers 6 months
Depth Micrometer Master 4 Years
Dial Indicators/Gages 1 Year
Digital Pressure Gages 1 Year
Durometers 1 Year
Gage Angle Blocks 4 Years
Gage Blocks 4 Years
Hardness - Brinell and Rockwell 3 Years
Height Gages - Vernier and Digital 1 Year
ID Micrometer 1 Year
Length Measuring Machine 2 Years
Light Intensity Meter 1 Year
Load Bank 1 Year
OD Micrometer 1 Year
Optical Comparator 2 Years
Optical Flats 4 Years
Plug Gages 2 Year
Plug Thread Gages 1 Year
Profile/Radius Gages 3 Years
Protractors 1 Year
Pyrometer and Millivolt Meter 1 Year
Ring Gages 2 Year 7 Years
Ring Thread Gages 1 Year
Rockwell Hardness Testers 1 Year
Rod Ovens 1 Year
Scales, Tape Measures, PI Tapes 1 Year
Shear Pin Calibration 1 Year
Step Wedge Comparison Films 1 year
Surface Roughness Measuring 1 Year 3 Years
Machine
Tachometers 1 Year
Thread Ring Gages 7 Years
IF ANY GAGE WAS NOT USED DURING CALIBRATION FREQUENCY PERIOD, THEY MAY BE
EXTENDED THROUGH ANOTHER FREQUENCY PERIOD WITHOUT BEING RE-MEASURED.