SL NO DESIGN DELIVERABLES DURATION TARGET DATELINE

1 COLUMN LOAD RUN DOWN , FOUNDATION LOAD 3 DAYS 29/01/2017 to 31/1/20

2 LATERAL STRUCTURAL STABILITY CHECK 1 DAYS 1/1/2017

3 STRUCTURAL ELEMANT SIZING 2 DAYS 2/2/2017 to 3/2/2017

4 PRELIMINARY DESIGN DRAWINGS 4 DAYS 4/2/2017 to 7/2/2017

Note: Preliminary design drawings should include all floor layouts, sectinal elevations, column details , beam details, slab de
RC wall details & Staircase details.
TARGET DATELINE

29/01/2017 to 31/1/2017

1/1/2017

2/2/2017 to 3/2/2017

4/2/2017 to 7/2/2017