Sie sind auf Seite 1von 3

Muhammad Noman

engr.muhammadnoman@gmail.com
+92 346 8482210 PEC Membership: Regd: ELECT/40886
Mailing Address: House # 234 Mohallah Malik Nasarullah Jan, Rawail Gali, Nouthia Qadeem, Saddar Cantt, Peshawar.
Skype ID: engr.muhammadnoman CNIC#: 17301 7442225 7
Date of birth: 22nd March, 1991 Marital Status: Single
Passport #: AG9202251 (Validity: 21 August 2018 )

PERSONAL SUMMARY
A competent electrical engineer with a comprehensive knowledge of detailed Engineering design, testing and
commissioning of electrical power systems & components to required specifications, focusing on safety, reliability,
quality and sustainability. Presently I am working with a consulting firm on their 4 Hydropower projects funded by Asian
Development Bank through Renewable Energy Development Sector Investment Program (REDSIP) with net worth of
$92 Million US Dollar.

ACADEMIC QUALIFICATION
Qualification Institute Passed In Marks
Bachelors in Electrical Power University Of Engineering Sept 2013 81.00 %
Engineering And Technology Peshawar (3.24/4 CGPA)
Pre Engineering / A Level Islamia College University July 2009 81.64 %
Peshawar (898/1100)
Matriculation / O Level Islamia Collegiate School July 2007 87.11 %
Peshawar (784/900)

PROFESSIONAL EXPERIENCE 3 Years & 4 Months

Designation Organization Time Period Experience Project Name

Electrical Engineer Electra Consultants Jan 2017 Present 1 Month Koto HPP (40.8MW)

Punjab Hydropower Oct 2013 Dec 2016 3 Years &


Jr. Electrical Engineer REDSIP, Punjab
Consultants 3 Months

Electrical Engineer Jan 2017 Present


Electra Consultants
Presently, I am working with Electra Consultants in the capacity of Electrical Engineer on Koto HPP. The project is in
its early stage of design finalization wherein Electrical design drawings and documents are under review. I am
responsible for perusal of the detailed engineering design for compliance of quality standard and specifications.

My jobs responsibilities on this project are as follows;


Detail Design review of electrical plan layouts for powerhouse, 132 kV AIS switchyard and intake areas.
Design review of Station Service calculations i.e size selection of Auxilliary Transformers for
powerhouse, Sandtrap & Intake areas as well as selection of stand by Diesel Generator for the same.

Page 1 of 3
DC system calculations in accordance with IEEE-Std 485 -1997.
Detailed Design review of System Protection & Metering.
Design review of other electrical design calculations, such as Short Circuit, Cable selection,
Turbine-Generator Unit Selection, Electrical Load Calculation, Earthing Calculations etc.
Design review of Lightning Protection layout for 132 kV outdoor Switchyard.

Jr. Electrical Engineer Oct 2013 Dec 2016


Punjab Hydropower Consultants
Details of my job responsibilities are given as follows;
Guarantee Test for Horizontal shaft Kaplan Turbine & Generating Unit as per IEC code 60041 & 60043 respectively.
Detailed study and monitoring of Electrical & Mechanical parameters during 72 Hour Full Load run test.
Analyzing transient behavior of power plant during Load Rejection Test.
Review SCADA designs for essential modifications.
Supervised installation and testing of SCADA systems to ensure functionality & simplified user experience.
Preparation of Test Reports for Employer pertaining to the E & M tests carried out at site.
Surveillance of compliance to quality standards & specifications.
Design Review and testing of Spillway and Tailrace Draft tube gates.
Detailed study and monitoring of Electrical & Mechanical parameters during 72 Hour Full Load run test.
Analyzing transient behavior of power plant during Load Rejection Test.
Testing & commissioning of 6.3 kV, Two (2) numbers of hydro generators with rated capacity of 1.41 MW each;
1. Start up and trial operation tests
2. Short Circuit Characteristic test
3. No load Characteristic Test
Grounding test of power plant using earthing test set UNI-T UT 521.
11 kV, 6.3 kV & 0.4 kV cable tests;
1. Megger Test
2. High voltage A.C Test
3. High Voltage D.C Test
Factory acceptance tests of distribution transformers at PEL (Pak Elektron Ltd.) facility.
1. Measurement for Break down voltage of Transformer Mineral Oil using Dielectric Tester (BAUR DTA 100 C)
2. Separate source voltage withstands test / power frequency test.
3. Induced over voltage withstand test.
4. Measurement of short circuit impedance and load losses.
5. Measurement of winding resistance.
6. Measurement of no load losses & current
7. Measurement of voltage ratio and check of phase displacement
Design review and approval of interconnection study report including load flow studies, transient stability analysis
and short circuit levels during single phase, phase to phase and 3 phase faults.
Performed voltage drop, ampicity and technical losses calculations for Transmission lines.
Transmission Lines Route survey and visits to interconnected grid stations for data collection.
Design & construction of single circuit & double circuit 11 kV overhead transmission line as per WAPDA specs.
Design review and approval of Plan & Profile Diagrams for double circuit & triple circuit overhead transmission lines.
Design of 11 kV Incoming interconnected panels at Grid End as per WAPDA specifications devised in P-44.

Page 2 of 3
Design and selection of surge arrestors for protection of transmission lines against lightning stokes.
Detailed design review of setting calculations for Overcurrent protection (IDMT, Definite & Instantaneous) for
Step-Up Main Transformers and Transmission lines Feeder relay PCS 9611.
Design calculations and settings of Earth Fault protection for Transmission lines.
Testing and commissioning of power house bridge crane as per FEM standards
Powerhouse building and Spillway AC lighting design as well design of emergency lighting on DC system.
Performed detailed grounding mesh calculations for powerhouse as per IEEE Std 80- 2000.
Performed short circuit calculations as per IEC 60909.
Detailed study and approval of design drawings, specifications and technical documents.
Performed UPS & battery sizing design & calculations in accordance with IEEE 485-1997.
Detailed design calculations for 230 V & 400 V distribution system as well as cable sizing as per IEC 60364.
Detailed design calculations for generator protection as per IEEE C37.101
Design of structural lightning protection as per BS EN 62305.
Design analysis for liquid immersed and dry type transformers as per IEC-76, IEC-600726.
Design review of 0.4 kV, 6.3 kV and 11 kV switchgear panels.
Performed electrical design calculations for the distribution transformers and standby diesel generators
Performed design review of power transformer installation drawings & lightning protection.
Performed selection and sizing of lightning arresters as per IEC & IEEE standards.
Conducted site visits to determine and validate field dimensions.
Processing of Commercial Invoices of equipment imported from abroad. Check and verify the consignments arrived at
site from abroad.
Detailed design review of internal & external lighting schemes.
Verification of interim payment certificates (IPCs) of the contractors.
Meetings and frequent letter correspondence with Client and Contractor to settle down the issues regarding design
services and installation of equipment at site

COMPUTER PROFICIENCY
MS office, AutoCAD, ORCAD 10.5, PSPICE, C, C++, MATLAB (Simulink),Proteus.

LANGUAGES
English, Urdu, Pashto

REFERENCES
Shall be provided on request.

Page 3 of 3

Das könnte Ihnen auch gefallen