PROJECT TITLE : NEW CONSTRUCTION OF SOCIAL OFFICE BUILDING
AT CAICOLI - DILI, TIMOR LESTE LOCATION : DILI , TIMOR LESTE
LANDSCAPE WORK
Unit Cost Total Cost
No Description Unit Quantity (USD) (USD) I PARK AND OFFICE PLATFORM WORK A PRELIMINARY WORK 3 1 Sand filling, t = 10 cm M 707.40 2 Pavingblock work M2 1,512.23 3 3 Kansteen concrete work- K125 M 265.47 4 Concrete rebate, t = 10 cm - K125 M2 151.22 5 Concrete park bench - K125 Unit 50.00 6 Concrete flowerpot - K125 Unit 50.00 7 Garbage fiber box Unit 25.00 8 Supply and installation ornamental plant Ls 1.00 3 9 Humus soil M 756.12 10 Supply and installation flagpole such as drawing appeared Unit 1.00 complete with all accessories
Total for Preliminary Work
II PARK ELECTRICAL WORK 1 Spotlight 1000 watts, complet Unit 10.00 2 Glass ball lamp 40 watts, complete Unit 25.00 3 Decorative lamp of park 120 watts, complete Unit 25.00
Total for Park Electrical Work
III FENCE WORK A EARTH AND SAND WORK 1 Excavation for ordinary foundation M3 370.00 2 Foundation excavation backfilling M3 92.50 3 Sand filling under foundation M3 37.00
Total for Earth And Sand Work
B WALL MASONRY AND PLASTER WORK 1 Aanstamping M3 74.00 2 Stone masonry work (1 Cement : 4 Sand) M3 183.15 3 Ordinary block wall masonry (1 Cement : 5 Sand) M3 71.70 4 Ordinary wall plaster (1 Cement : 5 Sand) M2 1,434.00 5 Ordinary foundation plaster (1 Cementr : 4 Sand) M2 518.00 6 Foundation cement render M2 518.00 7 Wall cement render M2 518.00
Total for Wall Masonry And Plaster Work
Unit Cost Total Cost No Description Unit Quantity (USD) (USD) C CONCRETE WORK 3 1 Concrete sloof 150/200 mm - K175 M 11.10 3 2 Concrete ring balk 150/150 mm - K175 M 7.17 3 3 Concrete Column 250/250 mm + ornamen - K175 M 8.19 3 4 Concrete Column 400/400 mm + ornamen - K175 M 20.96
Total for Concrete Work
D PAINT WORK 2 1 Wall and column paint, merk dulux M 1,445.70
Total for Paint Work
E SUPPLY AND INSTALLATION WORK 1 Supply and installation pipe fence type A Each 44.00 2 Supply and installation pipe fence type B Each 44.00 3 Supply and installation main gate Each 2.00
Total for Supply And Installation Work
Total for Fence Work (A+B+C+D+E) IV SECURITY POST, TWO UNITS A EARTH AND SAND WORK 1 Excavation for ordinary foundation M3 7.20 2 Foundation excavation backfilling M3 1.80 3 Sand filling under foundation M3 0.90 3 4 Sand filling under floor M 1.10 5 Selected material filling for floor leveling M3 1.10
Total for Earth And Sand Work
B WALL MASONRY AND PLASTER WORK 1 Aanstamping M3 1.80 2 Stone masonry work (1 Cement : 4 Sand) M3 3.50 3 Ordinary block wall masonry (1 Cement : 5 Sand) M3 1.78 4 Ordinary wall plaster (1 Cement : 5 Sand) M2 35.50 5 Ordinary foundation plaster (1 Cementr : 4 Sand) M2 3.50 6 Foundation cement render M2 3.50 2 7 Wall cement render M 35.50
Total for Wall Masonry And Plaster Work
C CONCRETE WORK 1 Concrete rebate, t = 10 cm - K125 M3 0.55 2 Concrete sloof 150/200 mm - K175 M3 0.30 3 Concrete ring balk 150/200 mm - K175 M3 0.30 4 Concrete column 150/150 mm - K175 M3 0.25 5 Concrete table, t = 80 mm - K175 M3 0.08
Total for Concrete Work
D FLOOR WORK 1 Floor ceramic : 60x60 cm M2 5.52 2 2 Concrete table ceramic : 20x20 cm M 1.01
Total for Floor Work
Unit Cost Total Cost No Description Unit Quantity (USD) (USD) E DOORS, WINDOWS, AND VENTILATIONS WORK 1 Door Type PS, including all accessories Unit 1.00 2 Ventilation Type BV1, including all accessories for Unit 1.00
Total for Doors, Windows, And Ventilations Work
F ROOF AND PLAFOND WORK 1 Metal tile roof cover (textur sand) + frame zincalume M2 18.73 including screw and all accessories 1 2 Metal tile rooftop M 12.09 2 3 Metal zincalume plafond + frame M 19.52 1 4 Gypsum Listplafond M 19.40
Total for Roof And Plafond Work
G PAINT WORK 1 Wall and column paint, merk dulux M2 35.50
Total for Earth And Sand Work
H ELECTRICAL INSTALATION WORK 1 Electrical instalation work Titik 2.00 2 Socket Each 1.00 3 Double switches Each 1.00 4 Pas. lampu XL Down light 18 watt lengkap tabung/accessories Each 1.00 5 Pas. lampu XL 18 watt lengkap accessories di tempel pd plafond Each 2.00
Total for Electrical Instalation Work
Total for Security Post, One Unit (A+B+C+D+E+F+G+H) Total for Security Post, Two Units V BUILDING PERIMETER DRAINAGE WORK 1 Excavation M3 1.44 2 Trasraam block wall masonry (1 Cement : 2 Sand) M3 32.57 2 3 Trasraam wall plaster (1 Cement : 2 Sand) M 162.83 4 Cement render M2 162.83 5 Iron grille Each 15.00
Total for Building Perimeter Drainage Work
Total for Landscape Work ( I + II + III + IV + V )